Mechanical Engineer with Experience in Fabrication / Erection / Operation / Maintenance /
Commissioning / Project Coordination. An effective communicator at all levels who easily
Establishes Stable and Positive Interpersonal Relationships. I believe in the overall understanding of
the Job (Technical, Contractual and Commercial Aspects).
EDUCATIONAL CREDENTIALS
Amalgamation Valeo Clutch Pvt Ltd ,Madhavaram,Chennai
As Apprentice For Logistics Department
Oct 2007 to March 2008(0 year – 6 months )
Greene sol Power System Pvt Ltd, Chennai.(India) as Assistant Project Engineer -trainee
Mar 2008 to Mar 2009 (1 year(s) - 0 month(s))
RESPONSIBILITIES:
Client handled M/S Ind – Bharath power Gencon Ltd, TN (3 X 70 MW),
M/S Sanghi Cement, Gujarat (1 X 63 MW)
Client Handle project Site - 2 x 135 MW DCPP ,JSPL ,Raigarh, Chhattisgarh
1) Involved in Supervising of erection and testing ,Inspection & Commissioning for boiler & ESP
2) As coordinator for the Project site in Design and Erection Activity.
3) Traveling to the project Site for the Client Assistance and query of the project site and reporting to
the project manager.
4) Monitoring the Subcontractor in Project Execution, Bill to the Sub Contractor.
5) Traveling to all the Industrial Sector to inspection for the raise PO states of the project.
6) Coordination with all the vendor regarding the PO Work progress.
7) Asst the Project manager in the liaison Work of the project.
8) Sub contractor billing ,Client Billing and Project planning.
9) Co-ordination of the Site Execution between the Client and the Subcontractor.
Madhankumar
Qualification
specification
Name of College /School
Address
University Percentage
Bachelor of Engineering
(B.E ) Mechanical
Engineering
Raja Rajeswari Engineering
College,
Adayalampattu,Chennai – 96
ANNA UNIVERSITY
Anna University 65
Higher Secondary
School (maths ,Physics,
Chemistry ,Biology)
St Joseph higer Secondary
,Chennai - 118
State board 63
10 std - Matriculation Don Bosco Matriculation
School ,Chennai – 118
Matriculation Board 72
2. 10) Reporting to the project manager about the Site execution.
11) Preparing DPR, MPR,MOM and Ensuring the safety of the work force.
12) Involved in the Commissioning Activity of boiler and turbine of the projects.
Short Service Commissioning From Arvind Manpower Solution ,Cochin.India
In MINISTRY OF ELECTRICITY AND WATER SHUWAIKH POWER GENERATION &
WATER DESALINATION STATION As Maintenance Engineer (Second Man) for 3B General
trading & Cont.(Industrial service Contractor)
Nov 2009 to May 2010 (0 year(s) - 6 month(s))
( PCC for Kuwait ) File No X 013912/09 dt on 26/11/2010
Working in the shuwaikh distillation and power generation as Maintenance Engineer .
This comprises of Distillation having capacity of 6.2 MIPGPD.
3 x 130 Tons/Hour Boiler at 16 bar Pressure of royal schedule make.
DM Plant having capacity of 25 cubic meters
RESPONSIBILITIES:
11 Involved in getting work permit as per the scope of work from the Ministry of Kuwait for the Shuwaikh
Power Generation and water desalination station .(Boiler 12 A,12B,12C) & Distiller(D1,D2,D3)
11 Allocation of manpower as per the scope of work of the ministry of Kuwait for the Shuwaikh Power
Generation and water desalination station . (Boiler 12 A,12B,12C) & Distiller(D1,D2,D3)
11 Leading the team for Annual Maintenance (Target risk assignment)
11 Getting working Permit Ensuring the Safety of the Manpower.
11 Involved in inspection and Maintenance of Rotary equipment and preparing Check list of the
maintenance dismantling and assembling spare parts ,like feed water pump, jetty pump, seawater
circulation pump ,distiller pump & drain pump.
11 Involved in Preparing maintenance daily report.
11 Involved in Planning of Manpower for the schedule unit of the plant .
11 Co- ordination as the second Engineer for the shuwaikh distillation and power generation.
11 Involved in inspection, Maintenance Co-ordination & Documentation of the Project .
111 Testing ,Commissioning and Annual Maintenance of the short term project(Bolier ,distiller ,
re- carbonization plant ,gas scrubber, DM plant ,Fire - fighting area, Pumps & compressor ) of
Distillation having capacity of 6.2 MIPGPD & 3 x 130 Tons/Hour Boiler at 16 bar Pressure of royal
schedule make.
Involved in Co – Ordination of erection of cooling water line with jetty pump area & trench cleaning
111 Involved in the co-ordination of chemical cleaning, hydro blasting, high/ultra pressure jetting, wet/dry
Vacuum service, Pipeline Commissioning & Pre Commissioning ,Pigging, Hydro testing, Pipeline
Drying, Nitrogen Purging, Environmental Cleaning.
111 Complete successfully with the Indian PCC date on 26/11/2009.
111 Ensuring the safety of the work force.
111 Scope of Work of the project are Available as per your request .
111 Successfully commissioned Shuwaikh Power Generation and water desalination station .(Boiler 12
A,12B,12C) ,Distiller(D1,D2,D3), Re – carbonization Plant ,gas scrubber, DM Plant, Sea water
intake area ,jetty area & culvert area of the Power station.
MINISTRY OF KUWAIT EXTENSION, DEVELOPMENT & ENHANCEMENT
Project as Engineer –Al-MUNTASER TRADING & GENERAL CONTRACTING CO W.L.L
Nov 2010 to Mar 2011 (0 year(s) - 4 month(s))
Madhankumar
3. Working in M/S MINISTRY OF KUWAIT EXTENSION, DEVELOPMENT & ENHANCEMENT OF
SHUAIBA SEA COOLING WATER PUMPING STATION (A & B)
Educational Certificated are Certified by government of India – 2010 PCC (Oct/2010)
RESPONSIBILITIES:
1) Worked As second Engineer of Project Leading Team of Technical People.
2) Involved in the Inspection ,testing ,dismantling and assembling of valve of 2000mm dia with
Expansion bellows and counter weight butterfly valve.
3) Getting working Permit Ensuring the Safety of the Manpower.
4) Planning and Execution of project as per the Scope of work.
5) Planning the manpower for execution of the Project.
6) Involved in commissioning of Power plant, cooling water plant (pumping Station).
7) Erection Pumping station ( 2000 Mm diameter ) .Storage and open – case inspection
of the Equipment.
8) Replacement of 2000mm dia of pipe line in cooling water plant, Rubber lining, commissioning
of plant.
9) Rubber line execution for 2000mm dia pipe in cooling plant A & B.
10) Involved in Maintenance work of cooling water plant which under go the following Process like
chemical cleaning, hydro blasting, high/ultra pressure jetting, wet/dry Vacuum service,
Pipeline Commissioning & Pre Commissioning ,Pigging, Hydro testing, Pipeline Drying,
Nitrogen Purging, Environmental Cleaning for the project .
11) Involved in the supervising of the rubber line and curing process of the cooling water plant .
12) Involved in the supervising of the rubberline removal of the header line of the cooling water plant .
13) Involved in the replacing of the Header line of 2000dia using 20 tons crane .
14) Ensuring the safety of the work force.
15) Scope of Work of the project are Available as per your request .
16) Successfully commissioned SHUAIBA SEA COOLING WATER PUMPING STATION A & B
Greene sol Power System Pvt Ltd, Chennai.(India) as Sr Project Engineer (PMT)
Jun 2011 to Jul 2012 (1 year(s) - 1 month(s))
For M/S Utkal alumina International ltd,
3 X 30 Captive Co – generation Power Plant ,
Rayagada ,Orissa ,India.
RESPONSIBILITIES:
Involved in Design, Engineering, testing, Inspection, supervising of erection ,
Commissioning ,Performance Test and finally documentation of boiler proper which are below :
1) Steam Drum and internal ,Down comer and raiser, Membrane wall and heater ,super heater and
header ,Air Pre- heater ,Economizer.
2) Spray type attemperator, Outer casting ,door and peephole of boiler proper, valve and local
indication instruments, steelwork ,Platform and stairs.
3) Piping of boiler , Diesel oil started up burner, Soot blower provision, Refractory and insulation
material of the boiler proper .
Madhankumar
4. 4) Complete structural steel system including roof covering sheets and side cladding , Cyclone
separator and ash cooler for bottom ash, complete with auxiliary ,Critical valve and damper .
5) Fuel feed system of boiler, Commissioning spare.
Involved in Design, Engineering, testing, Inspection, supervising of erection ,
Commissioning , Performance Test and finally documentation of indigenous Parts of boiler proper
which are below :
1) Structural Work for bunker and hopper for APH and ESP ,De- aerator and Accessories mounted
on turbine building civil column.
2) FD,ID ,SA Fan system ,Ducting from fans to APH to ESP ,ESP to ID FAN and to chimney inlet,
Rotary ash discharge valves for hoppers, HP and LP Chemical Dosing system, Fuel feeding
consisting screw/drag chain feeder ,distributors with connecting chutes ,Pneumatic distributors,
rotary air dampers etc .
3) Coal Feeding mechanism with storage Bunker suitable or Combustion ,Insulation and Cladding,
Instrumentation upto field junction boxes, Piping integral/external,Main steam Piping upto 5 mtrs
from the Mssv .
4) Feed water piping from deaerator feed tank to feed pump suction and from feed pump discharge
to economizer through feed control station, Minimum recirculation piping balance leak off piping
shall be individually taken from each pump and connected to de – aerator tank.
5) HP/LP dosing system piping from terminal point near boiler to all equipment within the boiler
island required cooling water supply ,Instrument air piping from terminal point near boiler to
all equipment within the boiler island ,requiring instrument air.Coordination for IBR documentation
and other activities at site with Director of boiler of states .
7) Preparation of Engineering design drawing and documents of the project, P&ID & PO.
8) Preparation of technical specification, Technical offer evaluation, drg /document submission.
9) Job involves right from conversion of Purchase Requisition to order, Follow up of material of
the Engineering inputs are thoroughly analyzed and necessary technical documents will be
collected from the vendors for submitting the same for our customer/consultant approval.
10) Organizing third party inspection for major bought out items of boiler & BOP at vendor premises.
11) Preparation bill of material for Ingenious Item list duct & structural item of the boiler and fans.
12) Preparation of Daily progress report ,Week progress report & monthly progress report
for the project.
13) Involved in vendor meeting for the progress for the Ingenious Item dispatch to the site .
14) Inspection of Construction work of the Construction Plant reporting to the Project manager .
Following design check ,Procurement ,Planning and execution of Engineering works.
15) Representatives to freeze the technical Meeting involving the Engineering, Project manager
Madhankumar
5. and Supplier Conduct price and commercial negotiation to optimize the purchases within the
budgeted amount.
16) Expedite the Consultant for the timely review, approval and return of engineer data submitted
in order to initiate the manufacturing process by the supplier.
17) Involved in the Co – ordination of third party Inspection , Clearing and Forwarding agencies for
the port clearance and site dispatch of the material .
18) Involved in co – ordination of Planning, Commissioning, Erection, hydro testing and inspection
of Power Plant.
19) Co – ordination and inspection of boiler ancillary like Ducting, Rotary equipment,
instrumentation and Electrical as per Conversant to International Materials standards like
ASME, ASTM..
20) Ensuring the safety of the work force.
GPR POWER SYSTEM PVT LTD in Chennai as Assistant Manager Purchase
Oct 2012 to Mar 2013 (0 year(s) - 5 month(s))
RESPONSIBILITIES:
1) Involved in Design, Engineering, testing, Inspection, supervising of erection , Commissioning for
the Projects.
2) Involved in preparing document of Purchase activity for site of the project .
3) Prepares detail Engineering report of the Project site solar and biomass plant .
4) Prepares Requests for Proposal, Requests for Qualifications and Requests for Information, evaluates
submissions, and makes award recommendations, as requested by Supervisor.
5) Prepares reports on procurement activities as needed by the project manager .
6) Preparing Tender bid Documents and Approves purchase orders for solar and Power project for
TNEB of Tamilnadu Government and AP, India.
7) Administers compliance on awards, addendums, and notifications.
8) Assists with and trains employees on procurement, warehouse, and contract policies and procedures.
Oversees Purchasing and Warehouse operations for compliance
9) Supervises staff and attends meetings in the absence of the Purchasing & Contracts Manager.
10) Ensuring the safety of the work force.
Working at Consultant (Contrator works)– Bharathi Solar Technologies , Perambur ,Chennai –
600011,Marketing Executives – jayaam fabrication ,Ponneri ,Chennai
Dec 2013 to feb 2016 (1 year(s) – 11 Months)
RESPONSIBILITIES:
1) Involved in Design, Engineering, testing, Inspection, supervising of erection , Commissioning for
the Projects.
2) Preparing Detail Tender bid document of the proposed project .
3) Preparing Procurement Document of Engineered equipment & material including spare material.
4) Technical discussions with suppliers of the client requirement for the erection of the plant .
Madhankumar
6. 5) Involving Co-ordination of the client for the erection of solar structural module and transmission
line.
6) Co-ordination for the Project Execution of the structural item are per the scope .
7) Marketing of Energy source (solar product).
8) Conduct price and commercial negotiation to optimize the purchases within the budgeted amount.
Expedite the Consultant for the timely review, approval and return of engineer data submitted in
order to initiate the manufacturing process by the supplier.
9) EPC Project documentation ,budget, Costing ,Estimation and execution.
10) Ensuring the safety of the work force
Working at – RKS Engineering Industries ,Madhavaram ,Chennai – 60
Feb 2016 to till date
RESPONSIBILITIES:
1) Involved in Engineering, Inspection, Production , Supervising of erection of aluminum Product
like ladder, trolleys.
2) Involved in the Study of technical drawing for the Quotation.
3) Involved as production engineer in the factory for the fabrication.
4) Preparing document Quotation for fabrication with management of the enquiry.
5) Feasibility of fabrication, learning production process of various orders in fabrication work
6) Preparing the BOM, Technical Document form the drawing of the Enquiry list .
7) Estimation ,Costing of project ,Preparing Marketing Report of the client and fellow up.
8) Co – ordination with the client for the fabrication on the order execution .
9) Preparing daily progress report ,Daily maintenance Report ,Stores Report of the factory .
10) Preparing Procurement Document of Engineered equipment & material including spare material.
11) Technical discussions with suppliers of the client requirement.
12) Conduct price and commercial negotiation to optimize the purchases within the budgeted amount.
13) Expedite the Consultant for the timely review, approval and return of engineer data submitted in
order to initiate the manufacturing process by the supplier.
14) Attending the Maintenance work of machine like Compressor ,5 Ton drilling machines,
5 ton pinching machine ,electrical work & Industrial Maintenance of the factory
15) Ensuring the safety of the work force.
SKILL SET
Operating System : WINDOWS 10, 2000, XP,AUTO – CADD,CADDIAN
Office : MS Office(Word, Excel, Power Point),MS Project.
Liaison Works:
Involved in the Liaison Work (Meeting government officials) for the Approval for Oil take
safety Work ,from Petroleum and Explosives Safety Organisation(PESO)(Chief Controller of
Explosives) Nagpur. India in 2012 for the Construction Site .
Madhankumar
7. Involved in the liaison work for the Approval for Boiler and pressure part , IBR document ,Safety
Valves from Directorate of boiler Government of Tamil nadu, Government of Orissa in 2008 and
2013 for the Construction Site .
Involved in the liaison Works for the port Clearance from the Government of India .
Participated in the Tender of TNEB for Tamilnadu and AP.2013 for solar and bio – mass, Thermal
Project.
Successfully completed two Scope of work in international Project in Kuwait for Kuwait ministry in
2009 and 2011.
SELF-EVALUATION
Areas of Interest : Projects Management, Manufacturing Industries.
Extra Curricular Activitie : Music, Cricket, Hockey, Reading books.
Personal Strength : Quick Learner.
Want to be : A Good Colleague, Technically Competent.
Personal Information
Name : MADHANKUMAR
Father’s Name : THANAGARAJ
Gender : Male
DOB : 01-09-1984
Mother Tongue : Tamil
Nationality : Indian
Languages Known : Tamil, English
Passport No : G9183511 Valid up 2018 july
Marriage Status : Single
Permanent Address : S/o. Thangaraj,
E/12, 184, Parry complex,
M.K.B Nagar,
Chennai – 39
Place: Chennai,
Date : Madhankumar .T
Madhankumar