Generating
solutions
for power
Gas Combustion Turbine Systems
With over 13,000 MW of combustion turbine generation
experience, you can say we get fired up over power.
13,000+ MW
Your gas
turbines drive
your business
We believe your gas turbine projects should serve your business objectives from
the even before they’re activated. We structure our design and delivery services
to ensure our gas turbine systems are designed for the project’s requirements,
and to suit your business needs throughout their development.
With over 13,000 MW of gas turbine experience, we’ve provided EPCM services
for gas turbine projects up to over 1,000 MW in size, supplying industrial plant
station service loads, peaking and base load power applications, utility power
sales, and provided process steam. Our experience ranges from major capital
projects to small equipment installations, providing controls upgrades, gas fired
systems, and steam turbine generators.
Our flexibility means we can tailor the project’s delivery to best suit your needs.
Our experience delivering projects in a variety of execution approaches means
we can help you determine the best delivery method for your project.
Project Development
• 	 Site selection and permitting
• 	 Environmental site assessment
• 	 Environmental and
regulatory approvals
• 	 Air quality management
and modeling
• 	 Greenhouse gas management
• 	 Hazard identification
• 	 Energy audits
•	 Feasibility studies
• 	 Risk assessment
• 	 Modeling
• 	 Risk analysis
• 	 Life cycle analysis
• 	Emissions inventory
• 	 Conceptual feasibility studies
Services to develop
your assets, and
advance your business
From initial planning and feasibility studies through to
final commissioning and turn-over, we develop more
than a project, we develop your business assets.
Detailed Engineering
and Design
•	 Civil/structural
•	 Mechanical
•	 Geotechnical
•	 Piping
•	 Electrical
•	 Instrumentation and controls
•	 Process
•	 Water treatment and waste system 	
design including zero wastewater
system design
•	 Procurement
Project and
Construction
Management
•	 Scheduling
•	 Cost Controls
Start-up, Commissioning,
and Testing
•	 System turnover and
checkout functions
•	 Equipment, system, and plant testing
Asset Management
•	Repowering
•	Retrofitting
•	Decommissioning
El Furrial Power Plant
Monagas, Venezuela
We provided engineering and construction management
services for the 240 MW simple-cycle El Furrial Power Plant.
The facility consists of four Phase III Rolls Royce Trent 60
Combustion Turbine Generators capable of operation on natural
gas, evaporator cooling, a gas compression system, and a water
injection system. Our work on the El Furrial plant required
we provide the engineering and design for the installation of
the turbines as well as balance of plant equipment including
evaporative cooling of the turbine inlet air, balance of plant
equipment, and the engineering and design of a supporting
115kV substation. We were also involved in the project’s
construction, providing construction management services.
Client: Pro Energy
Olinda Landfill Gas to Energy
Olinda, California
We were involved with the 32 MW combined cycle Olinda
Landfill Gas to Energy Project from its design and permitting
through start-up and commissioning.
Once conditioned, the landfill gas is distributed to the four
on-site Solar Taurus combustion gas turbine generators,
heat recovery steam generators, and a single steam turbine
generator. All of the major equipment components were
manufactured in the United States, including the four
combustion turbine generators.
The project received funding by the U.S. Department of
Energy’s Industrial Technologies Program (ITP). Our scope of
work for this project included onsite and offsite civil engineer
design, environmental permitting support, detail engineering
and design services, construction permitting, and start-up and
commissioning of the power plant.
Client: DCO Energy
Eastex Cogeneration Plant
Lonview, Texas
We were actively involved throughout the development of
this 430 MW combined cycle cogeneration facility. We first
acted as the Owner’s Engineer on the project, which utilizes
two GE Frame 7FA combustion turbines, each exhausting
into an off gas duct fired heat recovery steam generator
and supplying steam to a condensing extraction steam
turbine. The facility supplies electrical power to Eastman
Dispatchers, and both high and intermediate pressure
steam to Eastman Chemical Company.
We also provided post construction engineering services,
during start-up and operation, including:
•	 Pipe Stress Analysis
•	 Heat Balances
•	 Piping Modifications
•	 DCS & Controls
•	 HP Pressure Reduction Stations
•	 Water Treatment System Analysis
Client: CSW Energy Inc.
With over 6,500 MW of repowering
experience, we know how to develop
your asset’s potential
6,500+ MW
Riverbay Cogeneration
Bronx, New York
We provided engineering and design, and procurement
support for this 40 MW repowering of the existing Riverbay
thermal facility. Two Siemens combustion turbines coupled
to once through steam generators, a Siemens steam turbine
generator, and HP packaged boiler supply process steam
to the Riverbay facility. We provided our engineering and
design services to Fresh Meadow Mechanical Corporation
of Queens, NY, the EPC Contractor.
Client: Fresh Meadow Mechanical Corp.
L’Energia Energy Center
Lowell, Massachusetts
We provided engineering, design, and project management
and procurement services for the repowering of the L’Energia
Energy Center 80 MW capacity combined cycle power plant.
Repowering of the facility required the installation of a new
Rolls Royce Trent 60 dual fuel WLE generator set to replace
the existing Siemens V64.3 combustion turbine generator, and
modifying the existing Deltak HRSG to improve performance
and add an SCR and CO catalyst to reduce emissions.
Our work also involved the installation of an inlet air absorption
chiller, packaged cooling tower, water pumps, balance of plant
control system upgrade, gas compressor and other necessary
equipment and auxiliaries, including:
• DCS upgrade
• Fuel Gas compressors and FG system design
• Building addition and retrofit
• Cable bus
• Switchgear/MCC evaluation and addition
• Station Service Transformer
• CEMS upgrade
• STG Controls
Client: Montgomery L’Energia Power LLC
Hunlock Power Station
Repowering Project
Hunlock Creek, Pennsylvania
Our services ranged from conceptual design through
commissioning of this conversion of the former 45 MW
coal-fired power plant to a clean-burning, efficient natural
gas combined cycle power plant with 125 MW of capacity. We
provided engineering and design, procurement support, and
construction management services for the project, keeping
the project contained within the plant’s original footprint
Details of the project include:
• 	 Two new dual fuel General Electric LM6000 combustion 	
	 turbine generators
•	 Two heat recovery steam generators
•	 Existing 44 MW steam turbine generator
•	 Existing condenser
•	 Auxiliary boiler
•	 Mechanical chiller system
Client: UGI Development Company
Valleyview Cogeneration
Valleyview, Alberta
We provided engineering, procurement, and construction
management services for the installation of a 1 x 45 MW
LM-6000 PC, sprint gas turbines with provision for future
conversion to combined cycle operation, and synchronous
condenser. These units contained water injection for power
augmentation and NOx control. The scope of work included
conceptual engineering, permit application support,
regulatory approvals, detailed and construction engineering,
and commissioning.
Client: ATCO
Rathdrum Power Project
Rathdrum, Idaho
We provided engineering and design, procurement,
assistance, and startup support for this 270 MW natural
gas fired combined cycle power plant.
The 1x1 configured indoor facility is water cooled using a
multi-cell cooling tower. Our design of this plant included
major power equipment consisting of:
•	 One GE 7FA combustion turbine
•	A three pressure heat recovery steam generator with
a selective catalytic reduction system and carbon
monoxide catalyst
•	 One GE reheat, condensing steam turbine
In addition, the design included a two staged cooling, zero
discharge system for the on-site disposal of all process
wastewater, and a 230 kV switchyard.
Client: Cogentrix /Avista
Pasco Cogeneration
Optimization Study
Dade City, Florida
We executed a performance optimization study to prepare the
Pasco Cogeneration Facility for operation under the plant’s
new Power Purchase Agreement.
This natural gas fired combined cycle cogeneration
plant was designed to deliver process steam and power.
The facility consists of two General Electric LM6000
combustion turbines with water injection, each with a heat
recovery steam generator. Steam is fed to a nominal 26.5
MW condensing steam turbine generator.
The facility was originally designed for base loaded
operation and up to 200,000 lb/hr of export steam.
Currently, the facility operates with daily cycling and will no
longer have an export steam host.
The main goals of this study were to maximize output,
optimize heat rate and ensure that the facility can start up
within the time constraints established in the PPA.
Our services included:
•	 Heat Rate optimization
•	 Long term cycling and increased cold start effects on all 	
	 plant equipment and systems
•	 Steam usage optimization
•	 Identified opportunities to reduce operator interfaces
•	 Operational concerns for the dump condenser
•	 Circulating Water System efficiency and tube
	 failure concerns
•	Zero Water Discharge system efficiency
and solids concerns
Client: Pasco Cogeneration LTD.
Design with community in mind
We’re active members of the communities we serve. That’s why at Stantec, we always
design with community in mind.
The Stantec community unites more than 13,000 employees working in over 200 locations.
We collaborate across disciplines and industries to bring buildings, energy and resource, and
infrastructure projects to life. Our work—professional consulting in planning, engineering,
architecture, interior design, landscape architecture, surveying, environmental sciences,
project management, and project economics—begins at the intersection of community,
creativity, and client relationships.
Since 1954, our local strength, knowledge, and relationships, coupled with our world-class
expertise, have allowed us to go anywhere to meet our clients’ needs in more creative and
personalized ways. With a long-term commitment to the people and places we serve, Stantec
has the unique ability to connect to projects on a personal level and advance the quality of life
in communities across the globe. Stantec trades on the TSX and the NYSE under the symbol STN.
first.last@stantec.com
(999) 999-9999
Location
Position/Title
Name

More Related Content

What's hot

B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyIceland Geothermal
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013Sean Chen, PMP, MBA
 
CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25Anirban Datta, CEng
 
Siemens - Power Generation Power Plants
Siemens - Power Generation Power PlantsSiemens - Power Generation Power Plants
Siemens - Power Generation Power PlantsSiemens
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut
 
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...Kevin Perry
 
IFS General Presentation 120315
IFS General Presentation 120315IFS General Presentation 120315
IFS General Presentation 120315Bill Marsh
 

What's hot (20)

B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013GMCP Site Presentation_August 2013
GMCP Site Presentation_August 2013
 
CV - M. Taj Arain
CV - M. Taj ArainCV - M. Taj Arain
CV - M. Taj Arain
 
Resume
ResumeResume
Resume
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Atef_2015_linkedin
Atef_2015_linkedinAtef_2015_linkedin
Atef_2015_linkedin
 
Siemens - Power Generation Power Plants
Siemens - Power Generation Power PlantsSiemens - Power Generation Power Plants
Siemens - Power Generation Power Plants
 
CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Piotr Blaut Student Placement
Piotr Blaut Student PlacementPiotr Blaut Student Placement
Piotr Blaut Student Placement
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
 
Pumping Unit
Pumping Unit Pumping Unit
Pumping Unit
 
REFERENCE 2015
REFERENCE 2015REFERENCE 2015
REFERENCE 2015
 
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
VanAssche, James, GHD Services, Rice MACT and Boiler MACT Common Compliance C...
 
IFS General Presentation 120315
IFS General Presentation 120315IFS General Presentation 120315
IFS General Presentation 120315
 

Similar to Gas Combustion Turbine System

Lanmark Engineering 2013
Lanmark Engineering 2013Lanmark Engineering 2013
Lanmark Engineering 2013Lauren Pryor
 
Virtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing PerformanceVirtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing PerformanceGSE Systems, Inc.
 
Shawn Witt Portfolio
Shawn Witt PortfolioShawn Witt Portfolio
Shawn Witt PortfolioShawn Witt
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16fidge72
 
Ibm divisions single sheet
Ibm divisions single sheetIbm divisions single sheet
Ibm divisions single sheetDaniel Webb
 
M.Usman Ali Internship Report.
M.Usman Ali Internship Report.M.Usman Ali Internship Report.
M.Usman Ali Internship Report.M.Usman Ali
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael Najarian
 
Tanwir Ahmed Power House Manager
Tanwir Ahmed Power House ManagerTanwir Ahmed Power House Manager
Tanwir Ahmed Power House ManagerTanwir ahmed
 
AFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webAFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webMartin Kerrigan
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementRay Salmons
 
Heating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralHeating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralEMEX
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort StreetShamitha Reddy
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...Carlos Camino
 

Similar to Gas Combustion Turbine System (20)

Rex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resumeRex Scott 2016-11-03 resume
Rex Scott 2016-11-03 resume
 
Heat Pump case studies Aspiration Energy
Heat Pump case studies   Aspiration EnergyHeat Pump case studies   Aspiration Energy
Heat Pump case studies Aspiration Energy
 
Lanmark Engineering 2013
Lanmark Engineering 2013Lanmark Engineering 2013
Lanmark Engineering 2013
 
Virtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing PerformanceVirtual Commissioning and Real-Time Training for Increasing Performance
Virtual Commissioning and Real-Time Training for Increasing Performance
 
Shawn Witt Portfolio
Shawn Witt PortfolioShawn Witt Portfolio
Shawn Witt Portfolio
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16
 
Ibm divisions single sheet
Ibm divisions single sheetIbm divisions single sheet
Ibm divisions single sheet
 
M.Usman Ali Internship Report.
M.Usman Ali Internship Report.M.Usman Ali Internship Report.
M.Usman Ali Internship Report.
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016
 
Tanwir Ahmed Power House Manager
Tanwir Ahmed Power House ManagerTanwir Ahmed Power House Manager
Tanwir Ahmed Power House Manager
 
AFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_webAFP Oil and Gas Capability Statement_2015_web
AFP Oil and Gas Capability Statement_2015_web
 
Nandan CV (1)
Nandan CV (1)Nandan CV (1)
Nandan CV (1)
 
tanajib
tanajibtanajib
tanajib
 
KinetIQ Solutions Capability Statement
KinetIQ Solutions Capability StatementKinetIQ Solutions Capability Statement
KinetIQ Solutions Capability Statement
 
Heating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralHeating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s Cathedral
 
Case study -4 Mort Street
Case study -4 Mort StreetCase study -4 Mort Street
Case study -4 Mort Street
 
Wajid Ali Shah
Wajid Ali ShahWajid Ali Shah
Wajid Ali Shah
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...
 

Gas Combustion Turbine System

  • 2. With over 13,000 MW of combustion turbine generation experience, you can say we get fired up over power. 13,000+ MW
  • 3. Your gas turbines drive your business We believe your gas turbine projects should serve your business objectives from the even before they’re activated. We structure our design and delivery services to ensure our gas turbine systems are designed for the project’s requirements, and to suit your business needs throughout their development. With over 13,000 MW of gas turbine experience, we’ve provided EPCM services for gas turbine projects up to over 1,000 MW in size, supplying industrial plant station service loads, peaking and base load power applications, utility power sales, and provided process steam. Our experience ranges from major capital projects to small equipment installations, providing controls upgrades, gas fired systems, and steam turbine generators. Our flexibility means we can tailor the project’s delivery to best suit your needs. Our experience delivering projects in a variety of execution approaches means we can help you determine the best delivery method for your project.
  • 4. Project Development • Site selection and permitting • Environmental site assessment • Environmental and regulatory approvals • Air quality management and modeling • Greenhouse gas management • Hazard identification • Energy audits • Feasibility studies • Risk assessment • Modeling • Risk analysis • Life cycle analysis • Emissions inventory • Conceptual feasibility studies Services to develop your assets, and advance your business From initial planning and feasibility studies through to final commissioning and turn-over, we develop more than a project, we develop your business assets. Detailed Engineering and Design • Civil/structural • Mechanical • Geotechnical • Piping • Electrical • Instrumentation and controls • Process • Water treatment and waste system design including zero wastewater system design • Procurement Project and Construction Management • Scheduling • Cost Controls Start-up, Commissioning, and Testing • System turnover and checkout functions • Equipment, system, and plant testing Asset Management • Repowering • Retrofitting • Decommissioning
  • 5.
  • 6. El Furrial Power Plant Monagas, Venezuela We provided engineering and construction management services for the 240 MW simple-cycle El Furrial Power Plant. The facility consists of four Phase III Rolls Royce Trent 60 Combustion Turbine Generators capable of operation on natural gas, evaporator cooling, a gas compression system, and a water injection system. Our work on the El Furrial plant required we provide the engineering and design for the installation of the turbines as well as balance of plant equipment including evaporative cooling of the turbine inlet air, balance of plant equipment, and the engineering and design of a supporting 115kV substation. We were also involved in the project’s construction, providing construction management services. Client: Pro Energy Olinda Landfill Gas to Energy Olinda, California We were involved with the 32 MW combined cycle Olinda Landfill Gas to Energy Project from its design and permitting through start-up and commissioning. Once conditioned, the landfill gas is distributed to the four on-site Solar Taurus combustion gas turbine generators, heat recovery steam generators, and a single steam turbine generator. All of the major equipment components were manufactured in the United States, including the four combustion turbine generators. The project received funding by the U.S. Department of Energy’s Industrial Technologies Program (ITP). Our scope of work for this project included onsite and offsite civil engineer design, environmental permitting support, detail engineering and design services, construction permitting, and start-up and commissioning of the power plant. Client: DCO Energy Eastex Cogeneration Plant Lonview, Texas We were actively involved throughout the development of this 430 MW combined cycle cogeneration facility. We first acted as the Owner’s Engineer on the project, which utilizes two GE Frame 7FA combustion turbines, each exhausting into an off gas duct fired heat recovery steam generator and supplying steam to a condensing extraction steam turbine. The facility supplies electrical power to Eastman Dispatchers, and both high and intermediate pressure steam to Eastman Chemical Company. We also provided post construction engineering services, during start-up and operation, including: • Pipe Stress Analysis • Heat Balances • Piping Modifications • DCS & Controls • HP Pressure Reduction Stations • Water Treatment System Analysis Client: CSW Energy Inc. With over 6,500 MW of repowering experience, we know how to develop your asset’s potential 6,500+ MW
  • 7.
  • 8.
  • 9. Riverbay Cogeneration Bronx, New York We provided engineering and design, and procurement support for this 40 MW repowering of the existing Riverbay thermal facility. Two Siemens combustion turbines coupled to once through steam generators, a Siemens steam turbine generator, and HP packaged boiler supply process steam to the Riverbay facility. We provided our engineering and design services to Fresh Meadow Mechanical Corporation of Queens, NY, the EPC Contractor. Client: Fresh Meadow Mechanical Corp. L’Energia Energy Center Lowell, Massachusetts We provided engineering, design, and project management and procurement services for the repowering of the L’Energia Energy Center 80 MW capacity combined cycle power plant. Repowering of the facility required the installation of a new Rolls Royce Trent 60 dual fuel WLE generator set to replace the existing Siemens V64.3 combustion turbine generator, and modifying the existing Deltak HRSG to improve performance and add an SCR and CO catalyst to reduce emissions. Our work also involved the installation of an inlet air absorption chiller, packaged cooling tower, water pumps, balance of plant control system upgrade, gas compressor and other necessary equipment and auxiliaries, including: • DCS upgrade • Fuel Gas compressors and FG system design • Building addition and retrofit • Cable bus • Switchgear/MCC evaluation and addition • Station Service Transformer • CEMS upgrade • STG Controls Client: Montgomery L’Energia Power LLC Hunlock Power Station Repowering Project Hunlock Creek, Pennsylvania Our services ranged from conceptual design through commissioning of this conversion of the former 45 MW coal-fired power plant to a clean-burning, efficient natural gas combined cycle power plant with 125 MW of capacity. We provided engineering and design, procurement support, and construction management services for the project, keeping the project contained within the plant’s original footprint Details of the project include: • Two new dual fuel General Electric LM6000 combustion turbine generators • Two heat recovery steam generators • Existing 44 MW steam turbine generator • Existing condenser • Auxiliary boiler • Mechanical chiller system Client: UGI Development Company
  • 10. Valleyview Cogeneration Valleyview, Alberta We provided engineering, procurement, and construction management services for the installation of a 1 x 45 MW LM-6000 PC, sprint gas turbines with provision for future conversion to combined cycle operation, and synchronous condenser. These units contained water injection for power augmentation and NOx control. The scope of work included conceptual engineering, permit application support, regulatory approvals, detailed and construction engineering, and commissioning. Client: ATCO Rathdrum Power Project Rathdrum, Idaho We provided engineering and design, procurement, assistance, and startup support for this 270 MW natural gas fired combined cycle power plant. The 1x1 configured indoor facility is water cooled using a multi-cell cooling tower. Our design of this plant included major power equipment consisting of: • One GE 7FA combustion turbine • A three pressure heat recovery steam generator with a selective catalytic reduction system and carbon monoxide catalyst • One GE reheat, condensing steam turbine In addition, the design included a two staged cooling, zero discharge system for the on-site disposal of all process wastewater, and a 230 kV switchyard. Client: Cogentrix /Avista Pasco Cogeneration Optimization Study Dade City, Florida We executed a performance optimization study to prepare the Pasco Cogeneration Facility for operation under the plant’s new Power Purchase Agreement. This natural gas fired combined cycle cogeneration plant was designed to deliver process steam and power. The facility consists of two General Electric LM6000 combustion turbines with water injection, each with a heat recovery steam generator. Steam is fed to a nominal 26.5 MW condensing steam turbine generator. The facility was originally designed for base loaded operation and up to 200,000 lb/hr of export steam. Currently, the facility operates with daily cycling and will no longer have an export steam host. The main goals of this study were to maximize output, optimize heat rate and ensure that the facility can start up within the time constraints established in the PPA. Our services included: • Heat Rate optimization • Long term cycling and increased cold start effects on all plant equipment and systems • Steam usage optimization • Identified opportunities to reduce operator interfaces • Operational concerns for the dump condenser • Circulating Water System efficiency and tube failure concerns • Zero Water Discharge system efficiency and solids concerns Client: Pasco Cogeneration LTD.
  • 11.
  • 12. Design with community in mind We’re active members of the communities we serve. That’s why at Stantec, we always design with community in mind. The Stantec community unites more than 13,000 employees working in over 200 locations. We collaborate across disciplines and industries to bring buildings, energy and resource, and infrastructure projects to life. Our work—professional consulting in planning, engineering, architecture, interior design, landscape architecture, surveying, environmental sciences, project management, and project economics—begins at the intersection of community, creativity, and client relationships. Since 1954, our local strength, knowledge, and relationships, coupled with our world-class expertise, have allowed us to go anywhere to meet our clients’ needs in more creative and personalized ways. With a long-term commitment to the people and places we serve, Stantec has the unique ability to connect to projects on a personal level and advance the quality of life in communities across the globe. Stantec trades on the TSX and the NYSE under the symbol STN. first.last@stantec.com (999) 999-9999 Location Position/Title Name