PRASHANT RAI 
C97, Petrochemicals Township, RIL-NMD 
Nagothane, Dist: Raigad, Maharashtra 
India-402125 
Cell no: +91 8600029573 
Email id: raiprashant18092006@gmail.com 
Summary 
Mechanical Engineer with 8 years of experience in India’s top oil & gas sector organization in the field of Petrochemicals and Refinery 
division with specialization in Rotating equipment, Mechanical maintenance, project management, inventory modeling, static equipment 
, shutdown & turnaround planning & execution, annual budgeting & planning, MIS reports, Contract management, troubleshooting ,etc. 
Committed to have long term career with a world class organization. 
Key responsibilities/position during career 
Sr.no. Position Duration Company Field 
1 Maintenance Engineer 
Sept 2006 - Oct 
2007 
Reliance Industries 
Limited Petrochemicals 
2 
Project Engineer (Pining and 
Rotary) Oct 2007- Jan 2009 
Reliance Industries 
Limited Refinery 
3 Maintenance planner 
Jan 2009 - Dec 
2009 
Reliance Industries 
Limited Petrochemicals 
4 
Lead Engineer- mechanical 
maintenance 
Jan 2010 - Mar 
2014 
Reliance Industries 
Limited Petrochemicals 
5 
Project and commissioning 
engineer 
April 2014 - Aug 
2014 
Reliance Industries 
Limited Chemical 
6 
Lead Engineer- mechanical 
maintenance Aug 2014 - till now 
Reliance Industries 
Limited Petrochemicals 
Key skills/Highlights 
 Rotating equipments 
 Static equipments 
 SAP PM module 
 Annual budgeting and planning 
 Plant maintenance 
 Reliability centered maintenance 
 Codification and procurement 
 Inventory modeling 
 Minor Projects commissioning 
 Contract Management 
 Turnaround/shutdown planning and execution 
 DuPont safety resources 
 Standard maintenance procedure preparation 
 Risk assessment 
 IMS and OSHA 
 MS Project
Position 
 Company Reliance Industries Ltd -India 
 Sector Petrochemical and Refinery 
 Designation Sr. Manager (s ince Sep’06) 
 Work profile Lead Engineer (Mechanical maintenance) 
Key responsibilities 
 Rotating equipments maintenance and troubleshooting of Dresser Rand make reciprocating compressors, Howden-Burton 
make Diaphragm compressors, Nikkiso make reciprocating pumps, Khimline make centrifugal pumps, David brown make axial 
flow reactor pumps, Pompe gabbionata make axial flow pumps, Awamura make liquid ring comp ressors, Coperian (Werner 
&Pfederer ) make extruders, JSW make extruders, MAAG pumps, Funken make metering systems, Buhler Miag make rotary 
valves, screw conveyors, Nuopignone make BOG compressors, Comer make agitators, Samic make agitators, Binder bagging 
machines, Gala make dryers, Sundyne make pumps , etc. 
 Static equipment integrity maintenance like BHEL make safety valves, Nuopignone make safety valves, GRI SAPAg make 
safety valves, Reactors, Heat exchangers, KOBE make heat exchangers, Chart make heat exchangers, columns, vessels, 
bullets, isolation valves & NRVs, Pipeline, IBR piping, etc. 
 Preparation and implementation of safety procedures of Dupont safety resources like Process hazard analysis (PHA), PT 
(Process technology), ERCP (Emergency response and control planning), MIQA (Mechanical integrity and quality assurance), 
MOCT (Management of change-technology) , etc. 
 Inventory modeling expert including categorization of s pares as ins urance & critical s pares and it’s level s ettings bas ed on 
consumption and lead time. 
 SAP PM module expert including permit system, spares management, MIS reporting, equipment BOM updation, PM order 
generation and completion, etc. 
 Preparation and review of maintenance procedures, best maintenance practices, and PM/PDM frequency for equipments. 
 Root cause analysis of failures. 
Key Responsibilities 
Manager (Mechanical Maintenance), Reliance Industries Ltd.Nagothane. (From 18.09.2006 to 20.09.2007 & 
from 21.10.2008 till now) 
 Ensuring the availability of critical equipment and the desired plant availability factor. 
 Leading the team in maintenance of mechanical equipment (extruders, compressor, pumps, metering units, gala dryer, heat 
exchangers, pumps, rotating machines,Gas turbines, pressure parts etc.) for routine, preventive and predictive maintenance 
and annual overhauls 
 Reviewing the preventive and predictive maintenance plan for the plant, condition monitoring of the equipment and tracking of 
equipment efficiency 
 Spares planning (to maintain minimum inventory of spares), inventory management and vendor development 
 Preparation of Plant O&M budget 
 Preparation of contract documents for work in the scope of plant mechanical maintenance 
 Coordinating with plant operations department for plant-related jobs 
 Benchmarking industry best practices, implementation of TPM etc 
 Dealing with labour force and handle IR and HR issues 
 Implementing Dupont Safety resources, OHSAS,IMS,Security & Fire fighting systems & procedures at sites 
 Negotiating with vendors, authorizing payments 
 Prepare and attend monthly SAP preventive maintenance schedule of the rotary and static equipments 
 Planning of yearly maintenance schedule for equipments like extruder and diaphragm compressors (including extruder 
gearbox overhauling). 
 To work in co-ordination with Production Dept. to see that the breakdowns are promptly attended and planned shutdowns 
does not affect productivity 
 Review of annual maintenance contracts for rotary and static Equipments like extruders and compressors 
 Prepare the history cards of the machines.
Manager (Erection and commissioning), Reliance Industries Ltd.JERP (Jamnagar export refinery project) 
Jamnagar. (From 21.09.2007 to 21.10.2008) 
 EIC for Fabrication of IBR piping (42”, 36”, 24”, 12”) by s etting up a new fabrication yard to s peed up the ere ction process at 
JERP Jamnagar. 
 Fabrication of flare lines (102”, 96”, 72”, and 84”) in JERP. 
 Fabrication of spools for process and utility lines in JERP. 
 Responsible for quality checking of IBR and non IBR lines including fit up checking and NDT in JERP. 
 Conduction first pneumatic testing of flare lines in JERP Jamnagar to examine the behavior of lines during valve pop. 
 Erection in charge for 35000 IM erection of OSBL IBR piping in JERP. 
 Responsible for loop clearances of OSBL IBR piping including hydro test in JERP. 
 New fabrication yard set up in coordination with L&T and B&R and achieved record fabrication in a single month in JERP. 
 Rated excellent rating for record IBR fabrication in a single month in OSBL JERP. 
 Involved in material management for sight in coordination with planning department in JERP. 
Major projects 
 Enhancements of COPERION make extruder capacity from 14TPH to 22TPH. Enhance included following sub 
activities 
 Increasing of speed of gear box from 189/226 RPM to 226/252RPM. It also includes replacement of 
spur gears with helical gears. 
 Increasing the size of barrels so that more polymers can be passed between screw and barrel. 
 Replacing the older screen pack changer with new one having modified hydraulic circuit and 2 
accumulators in parallel. 
 Replacement of old start up valve with new increased capacity start up valve and hydraulic 
arrangement. 
 Erection and commissioning of new separate hot oil unit having 2 magna drive SPECK make pumps 
separately for start up valve and SPC. 
 Setting up a new fabrication yard in OSBl plant of JERP Jamnagr in coordination with L&T and Bridge & Roof 
to speed up the fabrication and erection process of IBR/Non IBR piping. Project included following activities 
 Fabrication,erection and commissioning of IBR lines and other process lines in OSBL plant of 
JERP (Jamnagar export refinery Projects). 
 Fabrication of IBR piping (42”, 36”, 24”, 12”) by setting up a new fabrication yard to speed up the 
erection process at JERP Jamnagar. 
 Fabrication of flare lines (102”, 96”, 72”, and 84”) in JERP. 
 Fabrication of spools for process and utility lines in JERP. 
 quality checking of IBR and non IBR lines including fit up checking and NDT in JERP. 
 Conduction first pneumatic testing of flare lines in JERP Jamnagar to examine the behavior of 
lines during valve pop. 
 Erection in charge for 35000 IM erection of OSBL IBR piping in JERP. 
 Responsible for loop clearances of OSBL IBR piping including hydro test in JERP. 
 Involved in material management for sight in coordination with planning department in JERP 
 Root cause identification for moisture contents in polymer from extruder in gandhar complex and overhauling 
of same extruder. Overhauling included 
 Removal of barrels and screws from location. Locating the puncture in barrels and replacing that part 
with new one. 
 Overhauling of MAAG Gear pump. 
 Overhauling of JSW supplied screen pack changer. 
 Overhauling of JSW extruder in LLDPE plant IN RIL-NMD including gear box overhauling. 
 Overhauling of 3 stage Neupignon Boil off gas compressor in Gas cracker plant in RIL-NMD. 
 Overhauling of oxygen compressor (Labyrinth type) compressor in EOEG plant in RIL-NMD.
 Responsible for 31 nos exchangers cleaning&Hydrotest and 7 nos of vessels hydrotest in Gandhar complex 
shutdown. 
Projects – Yearly 
 08.2010 ->: Working on “Reduction in High frequency of free wheel breakage in PP extruder”. 
 06.2010 ->: Working on “Reduction in high frequency of maintenance of Recycle gas reciprocating compress ors of PP Plant”. 
 03.2010.>: Implimentation of 5S and identification & Codification of project stage equipment spares. 
Projects – Root Cause Analysis 
 07.2010 - 08.2010: Found Root cause for tube/tube sheet failure of Barrel cooling water exchanger of Extruder Unit in PP 
Plant. 
 07.2010: Found root cause of Liquid ring compressors frequent seal failure. 
 09.2009: Found root cause for frequent bearing failure of hot oil pump. 
 07.2009 - 09.2009: Found Root Cause of Repetitive Belt burning incident of Root blower and Reciprocating compressor by 
calculating and verifying the number of belts installed for power transmission as well as identifying less than adequate 
operating/maintenance practices. 
 09.2008 - 12.2008: Found Root Cause of a Root Blower developing low differential pressure in comparison to its stand by 
Blower by drilling down maintenance history of Blower and studying Pressure Performance Curve of Blower. 
Project – Turnaround RIL-NMD, Apr’2010 
 04.2010 - 06.2010: Worked exclusively for Fixed and Floating head exchangers in shutdown of PP Plant in Apr’2010.This job 
included cleaning, inspection (Hydro jetting, chemical cleaning) and Hydro test of all exchangers of PP Plant. Job was 
successfully and safely executed in coordination with C&I department and crane section. 
 01.2010 - 03.2010: Worked as dedicated Turnaround engineer for the PP mechanical department, prepared job pack for static 
jobs, identified material for MOC/ Miscellaneous job execution in TA and raised PR for the same. 
Did Job planning for Turnaround, and prepared bar charts for all the jobs after identifying the quantum of man power required. 
Also, prepared service PR after quantifying the job, resources and material. 
 03.2009 - 03.2010: Worked as Turnaround Coordinator for all the departments in Apr' 2010 Turnaround of the Polypropylene 
plant, taking care of various interfaces between the departments. This job included preparation of common job list, various 
estimations like workforce, accommodation, Crane availability, transportation etc. 
 01.2009: Enhancement of Coperion made extruder from 14TPH to 22TPH. It included complete replacement of extruder gear 
box (RENK make) for higher speed and complete replacement of barrel,SPC&SUV for increasing size from 220 to 240mm. 
 01.2009 - 02.2009: Executed 7 nos. of MOCT along with PSSR in Plant area of PP Plant during 1 month Extruder Shutdown. 
Achievements 
 Got excellent rating for record fabrication and erection in single month in JERP Jamnagar. 
 Undergone “Em erging leaders hip program” in Indian Ins titute of Kozikode. 
 Undergone Reliability centered maintenance workshop organized by Shell global solutions. 
 Rated excellent for PP extruder gear box overhauling and record time finish of LLDPE shutdown. 
 Award with well done award for rectifying frequent failures of Roto seal of PP extruder due to high vibration. 
 Won award for paper presentation in college on Shape Memory Alloys. 
Training & Skills 
 Trained on RCA, RCFA, FMEA, Six Sigma Green Belt, alignment techniques of rotating machines . 
 Undergone “Em erging leaders hip program” in Indian Ins titute of Kozikode. 
 Undergone Reliability centered maintenance workshop organized by Shell global solutions. 
 In plant trainer for Service to process Interconnections, Scaffolding Safety.
 Trained on 32 different Du Pont safety procedures including Incident Investigation. 
 Working knowledge of MS office, SAP PM and MM module and SAP permit module. 
 Certification course in MS project. 
 Working experience in MMCS. 
 Working knowledge of AutoCAD- 2004 to 2006. 
 Adequate knowledge in reading GA drawings / P&ID/Layouts, piping, valves, material of construction specification as per 
international codes and standards, troubleshooting. 
 Successfully completed 45 days training in Deisel locomotive works Varanasi. India 
 Successfully completed 45 days training in Hindalco industries ltd, sonbhadra. India. 
 
Academic Qualification 
Name of Exam Board/University Year of Passing 
Bachelor of Mechanical Eng. UP Technical university, Lucknow 2006 
Higher Secondary CBSE 2000 
High School CBSE 1998 
Personal Details 
 Name Prashant Rai 
 Mobile +918600029573 
 Landline (Office) 02194668851 
 Date of Birth 27th Mar, 1983 
 Gender Male 
 Marital Status Married 
 Nationality Indian 
 Languages known English & Hindi 
 Email Address raiprashant18092006@gmail.com 
 Current Address C-97 , P T, Nagothane, Raigad, Maharashtra – 402125 
References 
L.K.Sharma 
K.Mayilvahanan 
Scientist In charge-Indian Ceramic Institute. Contact info: +919412858762, lksharma6@redif f .com 
Senior construction manager,L&TECC. Contact info: +919001291433, kmv@lntecc.com 
Additional Informations 
1.Prsesent Location: Nagothane,Maharashtra 
2.Prsesnt CTC: INR 16.5 LPA 
3. Expected CTC: INR 22 LPA 
4.Notice period required for joining: 1 months (Can be reduced) 
5.Designation: Sr.Manager (Lead Engineer)

More Related Content

What's hot

What's hot (20)

DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
RESUME-Latest
RESUME-LatestRESUME-Latest
RESUME-Latest
 
HARI RESUME 2016
HARI RESUME 2016HARI RESUME 2016
HARI RESUME 2016
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisor
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
cv-imtiaz ahmed
cv-imtiaz ahmedcv-imtiaz ahmed
cv-imtiaz ahmed
 
SURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATORSURESH CCR & FIELD OPERATOR
SURESH CCR & FIELD OPERATOR
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
lal bahadur CVF
lal bahadur CVFlal bahadur CVF
lal bahadur CVF
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
abhinav rawat
abhinav rawatabhinav rawat
abhinav rawat
 
Raiyani cv
Raiyani cvRaiyani cv
Raiyani cv
 
Abdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application EngineerAbdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application Engineer
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
MUHAMMAD ASIF CV - JUNE-2016
MUHAMMAD ASIF CV  -  JUNE-2016MUHAMMAD ASIF CV  -  JUNE-2016
MUHAMMAD ASIF CV - JUNE-2016
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
 

Viewers also liked

Laser Preventive Maintenace Training
Laser Preventive Maintenace TrainingLaser Preventive Maintenace Training
Laser Preventive Maintenace Trainingloamejan
 
Vietnam Laser Alignment
Vietnam Laser Alignment Vietnam Laser Alignment
Vietnam Laser Alignment Tai Nguyen
 
Mechanical Maintenance & Operation Engineer
Mechanical Maintenance & Operation EngineerMechanical Maintenance & Operation Engineer
Mechanical Maintenance & Operation EngineerMazahar Nawaz Shaliban
 
Mechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerMechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerNemish Kanwar
 
Energy saving and pollution control in urea plant though prilling tower and o...
Energy saving and pollution control in urea plant though prilling tower and o...Energy saving and pollution control in urea plant though prilling tower and o...
Energy saving and pollution control in urea plant though prilling tower and o...Prem Baboo
 
Material technology
Material technologyMaterial technology
Material technologyPrem Baboo
 
Indian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineeringIndian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineeringRajeev Mandal
 
sealing system for rotating shafts ( mechanical seals and packing )
sealing system for rotating shafts ( mechanical seals and packing )sealing system for rotating shafts ( mechanical seals and packing )
sealing system for rotating shafts ( mechanical seals and packing )elkeik
 
Iocl barauni presentation ppt.
Iocl barauni presentation ppt.Iocl barauni presentation ppt.
Iocl barauni presentation ppt.M4UBIHARI
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 

Viewers also liked (14)

Sealcare Brochure
Sealcare BrochureSealcare Brochure
Sealcare Brochure
 
Laser Preventive Maintenace Training
Laser Preventive Maintenace TrainingLaser Preventive Maintenace Training
Laser Preventive Maintenace Training
 
Vietnam Laser Alignment
Vietnam Laser Alignment Vietnam Laser Alignment
Vietnam Laser Alignment
 
Mechanical Maintenance & Operation Engineer
Mechanical Maintenance & Operation EngineerMechanical Maintenance & Operation Engineer
Mechanical Maintenance & Operation Engineer
 
Mechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerMechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani Power
 
Lapping Machine Process and Application
Lapping Machine Process and ApplicationLapping Machine Process and Application
Lapping Machine Process and Application
 
Bearing 2016
Bearing 2016 Bearing 2016
Bearing 2016
 
Energy saving and pollution control in urea plant though prilling tower and o...
Energy saving and pollution control in urea plant though prilling tower and o...Energy saving and pollution control in urea plant though prilling tower and o...
Energy saving and pollution control in urea plant though prilling tower and o...
 
Material technology
Material technologyMaterial technology
Material technology
 
Indian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineeringIndian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineering
 
sealing system for rotating shafts ( mechanical seals and packing )
sealing system for rotating shafts ( mechanical seals and packing )sealing system for rotating shafts ( mechanical seals and packing )
sealing system for rotating shafts ( mechanical seals and packing )
 
Iocl barauni presentation ppt.
Iocl barauni presentation ppt.Iocl barauni presentation ppt.
Iocl barauni presentation ppt.
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
CV@RAHUL
CV@RAHULCV@RAHUL
CV@RAHUL
 

Similar to Prashant_rai_Mech8 yrs final

Similar to Prashant_rai_Mech8 yrs final (20)

abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
Project engineer C.V.
Project engineer C.V.Project engineer C.V.
Project engineer C.V.
 
RESUME.pdf
RESUME.pdfRESUME.pdf
RESUME.pdf
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
Mahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerMahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineer
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
 
Rsume CB
Rsume CBRsume CB
Rsume CB
 
PROJECT SUNIL KUMAR SINGH.pdf
PROJECT SUNIL KUMAR SINGH.pdfPROJECT SUNIL KUMAR SINGH.pdf
PROJECT SUNIL KUMAR SINGH.pdf
 
Abhishek
AbhishekAbhishek
Abhishek
 
Resume-Subhakar
Resume-SubhakarResume-Subhakar
Resume-Subhakar
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
 
SYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CVSYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CV
 

Prashant_rai_Mech8 yrs final

  • 1. PRASHANT RAI C97, Petrochemicals Township, RIL-NMD Nagothane, Dist: Raigad, Maharashtra India-402125 Cell no: +91 8600029573 Email id: raiprashant18092006@gmail.com Summary Mechanical Engineer with 8 years of experience in India’s top oil & gas sector organization in the field of Petrochemicals and Refinery division with specialization in Rotating equipment, Mechanical maintenance, project management, inventory modeling, static equipment , shutdown & turnaround planning & execution, annual budgeting & planning, MIS reports, Contract management, troubleshooting ,etc. Committed to have long term career with a world class organization. Key responsibilities/position during career Sr.no. Position Duration Company Field 1 Maintenance Engineer Sept 2006 - Oct 2007 Reliance Industries Limited Petrochemicals 2 Project Engineer (Pining and Rotary) Oct 2007- Jan 2009 Reliance Industries Limited Refinery 3 Maintenance planner Jan 2009 - Dec 2009 Reliance Industries Limited Petrochemicals 4 Lead Engineer- mechanical maintenance Jan 2010 - Mar 2014 Reliance Industries Limited Petrochemicals 5 Project and commissioning engineer April 2014 - Aug 2014 Reliance Industries Limited Chemical 6 Lead Engineer- mechanical maintenance Aug 2014 - till now Reliance Industries Limited Petrochemicals Key skills/Highlights  Rotating equipments  Static equipments  SAP PM module  Annual budgeting and planning  Plant maintenance  Reliability centered maintenance  Codification and procurement  Inventory modeling  Minor Projects commissioning  Contract Management  Turnaround/shutdown planning and execution  DuPont safety resources  Standard maintenance procedure preparation  Risk assessment  IMS and OSHA  MS Project
  • 2. Position  Company Reliance Industries Ltd -India  Sector Petrochemical and Refinery  Designation Sr. Manager (s ince Sep’06)  Work profile Lead Engineer (Mechanical maintenance) Key responsibilities  Rotating equipments maintenance and troubleshooting of Dresser Rand make reciprocating compressors, Howden-Burton make Diaphragm compressors, Nikkiso make reciprocating pumps, Khimline make centrifugal pumps, David brown make axial flow reactor pumps, Pompe gabbionata make axial flow pumps, Awamura make liquid ring comp ressors, Coperian (Werner &Pfederer ) make extruders, JSW make extruders, MAAG pumps, Funken make metering systems, Buhler Miag make rotary valves, screw conveyors, Nuopignone make BOG compressors, Comer make agitators, Samic make agitators, Binder bagging machines, Gala make dryers, Sundyne make pumps , etc.  Static equipment integrity maintenance like BHEL make safety valves, Nuopignone make safety valves, GRI SAPAg make safety valves, Reactors, Heat exchangers, KOBE make heat exchangers, Chart make heat exchangers, columns, vessels, bullets, isolation valves & NRVs, Pipeline, IBR piping, etc.  Preparation and implementation of safety procedures of Dupont safety resources like Process hazard analysis (PHA), PT (Process technology), ERCP (Emergency response and control planning), MIQA (Mechanical integrity and quality assurance), MOCT (Management of change-technology) , etc.  Inventory modeling expert including categorization of s pares as ins urance & critical s pares and it’s level s ettings bas ed on consumption and lead time.  SAP PM module expert including permit system, spares management, MIS reporting, equipment BOM updation, PM order generation and completion, etc.  Preparation and review of maintenance procedures, best maintenance practices, and PM/PDM frequency for equipments.  Root cause analysis of failures. Key Responsibilities Manager (Mechanical Maintenance), Reliance Industries Ltd.Nagothane. (From 18.09.2006 to 20.09.2007 & from 21.10.2008 till now)  Ensuring the availability of critical equipment and the desired plant availability factor.  Leading the team in maintenance of mechanical equipment (extruders, compressor, pumps, metering units, gala dryer, heat exchangers, pumps, rotating machines,Gas turbines, pressure parts etc.) for routine, preventive and predictive maintenance and annual overhauls  Reviewing the preventive and predictive maintenance plan for the plant, condition monitoring of the equipment and tracking of equipment efficiency  Spares planning (to maintain minimum inventory of spares), inventory management and vendor development  Preparation of Plant O&M budget  Preparation of contract documents for work in the scope of plant mechanical maintenance  Coordinating with plant operations department for plant-related jobs  Benchmarking industry best practices, implementation of TPM etc  Dealing with labour force and handle IR and HR issues  Implementing Dupont Safety resources, OHSAS,IMS,Security & Fire fighting systems & procedures at sites  Negotiating with vendors, authorizing payments  Prepare and attend monthly SAP preventive maintenance schedule of the rotary and static equipments  Planning of yearly maintenance schedule for equipments like extruder and diaphragm compressors (including extruder gearbox overhauling).  To work in co-ordination with Production Dept. to see that the breakdowns are promptly attended and planned shutdowns does not affect productivity  Review of annual maintenance contracts for rotary and static Equipments like extruders and compressors  Prepare the history cards of the machines.
  • 3. Manager (Erection and commissioning), Reliance Industries Ltd.JERP (Jamnagar export refinery project) Jamnagar. (From 21.09.2007 to 21.10.2008)  EIC for Fabrication of IBR piping (42”, 36”, 24”, 12”) by s etting up a new fabrication yard to s peed up the ere ction process at JERP Jamnagar.  Fabrication of flare lines (102”, 96”, 72”, and 84”) in JERP.  Fabrication of spools for process and utility lines in JERP.  Responsible for quality checking of IBR and non IBR lines including fit up checking and NDT in JERP.  Conduction first pneumatic testing of flare lines in JERP Jamnagar to examine the behavior of lines during valve pop.  Erection in charge for 35000 IM erection of OSBL IBR piping in JERP.  Responsible for loop clearances of OSBL IBR piping including hydro test in JERP.  New fabrication yard set up in coordination with L&T and B&R and achieved record fabrication in a single month in JERP.  Rated excellent rating for record IBR fabrication in a single month in OSBL JERP.  Involved in material management for sight in coordination with planning department in JERP. Major projects  Enhancements of COPERION make extruder capacity from 14TPH to 22TPH. Enhance included following sub activities  Increasing of speed of gear box from 189/226 RPM to 226/252RPM. It also includes replacement of spur gears with helical gears.  Increasing the size of barrels so that more polymers can be passed between screw and barrel.  Replacing the older screen pack changer with new one having modified hydraulic circuit and 2 accumulators in parallel.  Replacement of old start up valve with new increased capacity start up valve and hydraulic arrangement.  Erection and commissioning of new separate hot oil unit having 2 magna drive SPECK make pumps separately for start up valve and SPC.  Setting up a new fabrication yard in OSBl plant of JERP Jamnagr in coordination with L&T and Bridge & Roof to speed up the fabrication and erection process of IBR/Non IBR piping. Project included following activities  Fabrication,erection and commissioning of IBR lines and other process lines in OSBL plant of JERP (Jamnagar export refinery Projects).  Fabrication of IBR piping (42”, 36”, 24”, 12”) by setting up a new fabrication yard to speed up the erection process at JERP Jamnagar.  Fabrication of flare lines (102”, 96”, 72”, and 84”) in JERP.  Fabrication of spools for process and utility lines in JERP.  quality checking of IBR and non IBR lines including fit up checking and NDT in JERP.  Conduction first pneumatic testing of flare lines in JERP Jamnagar to examine the behavior of lines during valve pop.  Erection in charge for 35000 IM erection of OSBL IBR piping in JERP.  Responsible for loop clearances of OSBL IBR piping including hydro test in JERP.  Involved in material management for sight in coordination with planning department in JERP  Root cause identification for moisture contents in polymer from extruder in gandhar complex and overhauling of same extruder. Overhauling included  Removal of barrels and screws from location. Locating the puncture in barrels and replacing that part with new one.  Overhauling of MAAG Gear pump.  Overhauling of JSW supplied screen pack changer.  Overhauling of JSW extruder in LLDPE plant IN RIL-NMD including gear box overhauling.  Overhauling of 3 stage Neupignon Boil off gas compressor in Gas cracker plant in RIL-NMD.  Overhauling of oxygen compressor (Labyrinth type) compressor in EOEG plant in RIL-NMD.
  • 4.  Responsible for 31 nos exchangers cleaning&Hydrotest and 7 nos of vessels hydrotest in Gandhar complex shutdown. Projects – Yearly  08.2010 ->: Working on “Reduction in High frequency of free wheel breakage in PP extruder”.  06.2010 ->: Working on “Reduction in high frequency of maintenance of Recycle gas reciprocating compress ors of PP Plant”.  03.2010.>: Implimentation of 5S and identification & Codification of project stage equipment spares. Projects – Root Cause Analysis  07.2010 - 08.2010: Found Root cause for tube/tube sheet failure of Barrel cooling water exchanger of Extruder Unit in PP Plant.  07.2010: Found root cause of Liquid ring compressors frequent seal failure.  09.2009: Found root cause for frequent bearing failure of hot oil pump.  07.2009 - 09.2009: Found Root Cause of Repetitive Belt burning incident of Root blower and Reciprocating compressor by calculating and verifying the number of belts installed for power transmission as well as identifying less than adequate operating/maintenance practices.  09.2008 - 12.2008: Found Root Cause of a Root Blower developing low differential pressure in comparison to its stand by Blower by drilling down maintenance history of Blower and studying Pressure Performance Curve of Blower. Project – Turnaround RIL-NMD, Apr’2010  04.2010 - 06.2010: Worked exclusively for Fixed and Floating head exchangers in shutdown of PP Plant in Apr’2010.This job included cleaning, inspection (Hydro jetting, chemical cleaning) and Hydro test of all exchangers of PP Plant. Job was successfully and safely executed in coordination with C&I department and crane section.  01.2010 - 03.2010: Worked as dedicated Turnaround engineer for the PP mechanical department, prepared job pack for static jobs, identified material for MOC/ Miscellaneous job execution in TA and raised PR for the same. Did Job planning for Turnaround, and prepared bar charts for all the jobs after identifying the quantum of man power required. Also, prepared service PR after quantifying the job, resources and material.  03.2009 - 03.2010: Worked as Turnaround Coordinator for all the departments in Apr' 2010 Turnaround of the Polypropylene plant, taking care of various interfaces between the departments. This job included preparation of common job list, various estimations like workforce, accommodation, Crane availability, transportation etc.  01.2009: Enhancement of Coperion made extruder from 14TPH to 22TPH. It included complete replacement of extruder gear box (RENK make) for higher speed and complete replacement of barrel,SPC&SUV for increasing size from 220 to 240mm.  01.2009 - 02.2009: Executed 7 nos. of MOCT along with PSSR in Plant area of PP Plant during 1 month Extruder Shutdown. Achievements  Got excellent rating for record fabrication and erection in single month in JERP Jamnagar.  Undergone “Em erging leaders hip program” in Indian Ins titute of Kozikode.  Undergone Reliability centered maintenance workshop organized by Shell global solutions.  Rated excellent for PP extruder gear box overhauling and record time finish of LLDPE shutdown.  Award with well done award for rectifying frequent failures of Roto seal of PP extruder due to high vibration.  Won award for paper presentation in college on Shape Memory Alloys. Training & Skills  Trained on RCA, RCFA, FMEA, Six Sigma Green Belt, alignment techniques of rotating machines .  Undergone “Em erging leaders hip program” in Indian Ins titute of Kozikode.  Undergone Reliability centered maintenance workshop organized by Shell global solutions.  In plant trainer for Service to process Interconnections, Scaffolding Safety.
  • 5.  Trained on 32 different Du Pont safety procedures including Incident Investigation.  Working knowledge of MS office, SAP PM and MM module and SAP permit module.  Certification course in MS project.  Working experience in MMCS.  Working knowledge of AutoCAD- 2004 to 2006.  Adequate knowledge in reading GA drawings / P&ID/Layouts, piping, valves, material of construction specification as per international codes and standards, troubleshooting.  Successfully completed 45 days training in Deisel locomotive works Varanasi. India  Successfully completed 45 days training in Hindalco industries ltd, sonbhadra. India.  Academic Qualification Name of Exam Board/University Year of Passing Bachelor of Mechanical Eng. UP Technical university, Lucknow 2006 Higher Secondary CBSE 2000 High School CBSE 1998 Personal Details  Name Prashant Rai  Mobile +918600029573  Landline (Office) 02194668851  Date of Birth 27th Mar, 1983  Gender Male  Marital Status Married  Nationality Indian  Languages known English & Hindi  Email Address raiprashant18092006@gmail.com  Current Address C-97 , P T, Nagothane, Raigad, Maharashtra – 402125 References L.K.Sharma K.Mayilvahanan Scientist In charge-Indian Ceramic Institute. Contact info: +919412858762, lksharma6@redif f .com Senior construction manager,L&TECC. Contact info: +919001291433, kmv@lntecc.com Additional Informations 1.Prsesent Location: Nagothane,Maharashtra 2.Prsesnt CTC: INR 16.5 LPA 3. Expected CTC: INR 22 LPA 4.Notice period required for joining: 1 months (Can be reduced) 5.Designation: Sr.Manager (Lead Engineer)