K V V RAMANA RAO
+918197000664 kvvrrao@yahoo.com
A Mechanical Engineering Professional with 25 year experience with
Core Experience of Project Management,Construction Management
Pulp&Paper,water,Mineral,BulkMaterialHandling,Water,Effluent,Chemical
Plants,Power Plants,Oil & gas ,Petro Chemical Complex etc,Maintenance
Management in paper mills,Chemical Plants,Water & Effluent treatment
plants,Operation & Maintenance of Power Plants upto 50 MW Coal based
Power Plants
• Proven abilities in handling in EPC Projects Project Management,Project
Execution,Project Controls In various segments-Pulp & PaperMill,Chemical Plants
with Piping(Clo2,Hypo,Casutic,H2O2,Chlorine,HCl ,H2s04,Brine),Ash Handling
Plant, Power -Coal Handling Plants, Eqipments with Piping for RODM Plants,Water
Treatment Plants,Waste water Treatment Plants,Oil & Gas Refinery Piping,Petro
chemicals Complex Piping Material Handling Systems etc
• Proven Ability in Business Development,Proposals & Estimation, Scheduling the
Project,Material Planning ,Production planning in the manufacturing of Process E
quipments,Pressure Vessels & Heat Exchangers,Piping Skids in Hydro Carbon
Sector, Clarifiers for Water /Effluent Treatment plants.
• Extensive Experience in heavy Erection in pulp & Paper ,Power ,Oil& Gas , Petro
Chemical Complex Equipments & Utilities piping.
• Opreartion & Maintenance of 12.06 /5.6 MW Coal Based Thermal Power Plants.
(FBC/Stoker Fired Boilers, DM Plants, Raw Water/ Waste Water Treatment Plants)
& Maintenance of Liquor Fired Boiler,Evaporator,Causticizing and Lime Kiln for
Sludge Reburning.
• Shut down Planning, Spares Planning,Inventory Control,Vendor Development,
Contract Management.
Proffessional Experience : 25 Years
Name of the Company Position Held Duration Years
Reliance Industries Limited
Jamnagar
World Largest Refinery & Petro
Chemical Complex
Project Cost : Rs 75000 Crores
General Manager
-Projects
Reporting to Sector
Head
Since
Feb 15
Tenova Bateman Engg India
(p) Ltd-Bangalore
(Project Cost : Rs 500 Crs)
Head Projects –
Construction.
Reporting to MD
Mar13-
Nov14
1.8
Elecon EPC Projects Ltd
Gujarat.
(Multiple Projects:Rs 750Cr)
Gen.Manager-Projects
Reporting to CEO
Aug 11 –
Feb13
1.6
Page 1 of 7
Hindustan Dorr Oiliver Ltd,
Ahmedabad ,Gujarat.
(Projects Handled : 150 Crs)
Sr Deputy General
Manager-Projects
Reporting to VP-Oper
Nov 08 –
Aug 11
2.7
Bahia Pulp ,Salvador,Brasil
(4500000TPA RG Grade Pulp)
Manager –Projects
Reporting to GM
June 08 –
Sept 08
0.4
Ballarpur Industries Ltd
Dissolving Grade Pulp
(100000 TPA )Unit:APRayons
Kamalapuram,Warangal,AP,
India (Thapar Group)
(Projects Handled : 200 Crs)
Deputy General
Manager Power Plant
Report to Unit Head
Dec 91 –
May 08
17
CharminarPapers Ltd,
Hyderabad
Maintenance Engineer
Reporting to MD
May91-
Dec91
0.7
Sri Venkateswara Industrial
Consultants ,Rajahmundry
Site Engineer
Reporting to Partner
May-89 –
May 91
2.0
• Reliance Industries Limited ,Jamnagar, Gujarat ,India (2015-Till Date)
Position : General Manager –Projects Piping
 Project Management ,Erected & Commisssioning of Oil & Gas Refinery
Piping and petro chemical complex ,Utilities Piping ,Unit Piping etc pipe
spools fabrication,Laying & Erection of various piping CS /LTCS/Alloy Steel
P-11,P-22 ,P-91, SS 304 / SS 316 ,Under Ground Piping, GRP Piping
,PVC ,HDPE Piping etc for Pet Coke Gassificastion unit,ROGC,MEG LDPE,
PX4 ,BRU ,Scanfiner, Rubber Plant ( Eqpt & Piping) ,Cooling
Tower( Equipemnt & Piping) sizing from ½” to 114” etc.
 Created pipe fabrication shop capacity of 100000 ID/month to cater Petro
chemical Complex Piping spools,
 Executed 2500000 Inch Meter pipe Laying
 Erection of 5 nos of Pipe Rack Structures ( Approx 25000MT) to facilitate
the pipe laying.
• Bateman Engg India (P) Ltd ,Bangalore,India (2013-Till Date)
Position : Head –Project & Construction
Page 2 of 7
 Project Management ,Erected & Commisssioned EPC LSTK Project of
Bauxite Feeding & Crushing Plant ( Capacity : 1500 TPH) at UTKAL Alumina
Refinery Inernational ,Odisha. (1.5 MTPA Capacity) including Utilities
(Equipment & Piping).
 Project Management ,Erection and Commissioning of EPC LSTK Contract of
18.50 KM Belt Conveyor for Transporting Bauxite from Mines - Refinery)
consists 18000 MT Structural Fabrication (Rectangular Gantry type)&
Erection, 30000 M3 RCC ,2000 MT Equipment Erection,300 KM of HT Cable
Laying for a Bauxite Handling system for 1.5 MTPA Alumina Refinery at
UTKAL Alumina International Odisha (Under Erection) including Utilities
( Equipment & Piping).
• ELECON EPC PROJECTS ,VV Nagar Gujarat ,India (2011-2013)
Position : General Manager –Projects
 Project Management,Erection & Commissioning of Coal Handling Plant for 2
x 300 MW Power Plant at GMR Warora.(Wagon Tipler ,Apron Feeder,Belt
Conveyors,Bucket Wheel Reclaimer,Utliities ( E quipment & Piping) and
other accessories).
 Responsible for Project Management for all EPC and Non EPC Projects (Project
Planning ,Project Monitoring ,Review,Project controls and Project cost control)
for supply,Erection & Comissioning of Coal Handling Plants (2500 TPH)
including all Utlilities ( Equipment & Piping) for Major /Mega power plants upto
660 MW, BOP Package and major material Handling projects for
steel,cement,ports and Fertliser plants
o (NTPC,BHEL,SAIL.NMDC,TECPRO,MAHAGENCO,APGENCO,LANCO,GVK
o ,GMR,KSK.MANIKGARH,ULTRATECH,SHREE & SIDDHIVINAYAK,IFFCO.)
 Responsible for Project Management of Coal Handling Plant EPC Project at NTPC Mouda -2000
TPH Coal Conveying System along with all accessories. (Coal Handling Plant for 2 X 660MW Super
Thermal Power at NTPC – Mouda,Maharastra )
• Hindustan Dorr Oliver Ltd,Ahmedabad ,Gujarat,India(2008-2011)
Position : Sr Deputy General Manager –Projects
 Supply & Erection of 130 Mld Raw Water Treatment Plant, 21 Mld RODM Plant
Equipment along with Piping for 165 MW Captive Power Plant for IOCL
Paradeep
 21 Mld RODM Plant Equipment along with Pipingfor 165 MW Captive Power
Plant at Hindustan Mittal EnergyporLimited ,Bhatinda.(Guru Gobind Singh Oil
Refinery Limited) & IOCL Paradeep.
 Supply & Erection of Various Effluent,Raw Water Treatment Plants Capacity of
9-30MLD Equipments and piping for Oil Refineries -Viz Indian Oil
Corporation,,Hindustan Petroleum Corporation,Bharat Petroleum Corporation.
 Supply & Erection of Various Raw Water,Effluent Treatment Plants Equipments
along with piping for Municipal Corporations of CIDCO,CPCL,Nirma,Coromondal
Fertlilisers,and Uranium Corporation Limited.
Page 3 of 7
 Supply of 180 TPD Paper Plant Pulpmill Equipment at KR Pulp&Papers & 300
TPD Pulp Mill Bindal Papers Limited.
 Responsible for Business Development,Proposal & Estimation,Material
Planning, Production Planning,Project Planning,Project Execution ,Project cost
Control for above EPC Projects related to manufacturing of Heavy
Equipment, Static & Rotating Equipments , Pressure Vessels and Heat
Exchangers.Equipments for Piping Skids for water/Gas.
 Coordination with design for modifications to be carried out for cost control
before and after Project Execution.
 Responsible for Estimation of the Process Equipment Group Equipment orders.
• BAHIA PULP –SALVADOR BRASIL,SA (2008)
Position : Manager – Projects.
 Involved in Erection & Commissioning of Utilities for 2x 50 MW Power Plant
related to 1500 TPD Dissolving grade Pulp.
• Ballarpur Industries Limited Unit : AP Rayons ,Warangal AP ,India
( 1991-2008)
Position : Deputy General Manager –Projects / Power Plant
 Erection & Commissioning of 300 TPD Fibre line (Digesters,Washplant &
Bleach Plant, Sheeting Machine) Supplied by M/s Andritz,Ahlstrom,ABB
Sweden,Lamb Switzerland .
 Erection of All Utilities ( Equipment & Piping) related to Paper Machine -II
Project ( Unit : Sewa) HP ,MP LP Hot Water ,Chiiled Water,Air ,drinking
water,white water ,Cooling water , Stock, Wam water Fire Hydrant Piping)
 Erection& Commissioning of 4TPD Integrated Chlorine Dioxide Plant
(R-6Process)Equipments and Piping (CS,LTCS,Titanium,Monel,PVDF LINED,
FRP,CPVC,PVDF,HDPE etc) Supplied by Kaverner Chemetics ,Canada
 Erection & Commissioning of Chemical Complex Equipment along with piping
Consisting of Plants for handling & preparation of
Clo2,Hypo,Casutic,H2O2,Chlroine,HCl ,H2s04,Brine.
 Erection & Commissioning of Carbotech PSA Oxygen Gas & Nitrogen Gas
Generation Plants of 100 NM3 /Hr & 20 Nm3 /hr along with handling system
Equipment including piping.
 Erection & Commisioning of Vapor Absorption Chiller machines along with Air
Conditioning system with piping.
 Erection & Commissioning of All Utility Systems related ( Equipment &
Piping) to 12.04 MW Power Plant for a 300 TPD Rayon Grade Dissolving Pulp
Industry.
Page 4 of 7
 Erection & Commissioning of ESP for Coal fired Boiler FBC Boiler & Dense
Phase Ash Handling system for 32 TPH ,45 Kg/cm2 FBC Boiler
 Erection & Commissioning of Water Evaporation Plant along with piping
supplied by M/s Enmas Ahsltrom .
 Erection & Commissioning of 120 TPD Lime Reburning System ( Lime Kiln
supplied by FL Smidth along with Fuel oil handling system.
 Erection & Commisioning of Recausticizing Plants for 300 TPD & 200 TPD Paper
Mills supplied by M/s HDO.
 Assisting GM-Engineering for Coodrination with all the departments to
maintain the plant in his absence.
 Operation & Maintenance of 12.06 MW and 5.6 MW Captive Power Plants –Coal
based Thermal power Plant ( BTG & BOP)
 Maintenance of Liquor Fired Boiler to fire 617 TPD Dry Solids capacity of
make Ahlstrom-Enmas,Falling Film/ Shell &Tube type Evaporator Ahlstrom,
L&T, Recausticizing Plant of make Hindustan Dorr Oliver,120 TPD Sludge
Reburning system of make FL Smidth.
 Conducting Condition Monitoring techniques for Predictive, preventive &
breakdown maintenance to maintain the Uptime of the Plant.
 Responsible for Inventory Control & Spares Management.
 Responsible for functioning of Design & Drawing Office for all development
jobs and spare parts development.
 Progress Monitiroing of the Capex and Maintenance Budget Review on
monthly basis.
 Responsible for Estimation of all the Projects ,Capex Jobs.
 Create quality consciousness through total Quality management by making
the operators /Technicians as members of the team to improve the
productivity.
 Responsible for implementation of Total Quality Management,EVA
Techniques,Energy Conservation measures.
• Charminar Papers Limited,Hyderabad,India (1991)
Position : Maintenance Engineer
 Maintenance of 10 TPD Kraft Paper Mill including Utilities.
• Sri Venkateswra Industrial Consultants,Rajahmundry, AP India (1989-
91)
Page 5 of 7
Position : Site Engineer
 Erection & Commissioning of 20 TPH Wood Chip Plant along with Chip
conveying system at International Paper ,Rajahmundry ,AP,India
 Erection & Commissioning of 8 TPH Husk Cethar Make FBC boiler along
with Fuel Handling system,Piping at Kanakadurga Agro Oils
,Vijayawada,AP,India.
PROFESSIONAL ACHIEVEMENTS
 Design & Exceution of Utlitiy Piping for for 10 MW Power Plant in
a Paper Mili capacity of 200TPD.
 Implenmentation of Energy Conservation measures in the Plant
to achieve 75 Kwh /ton of Pulp .
 Implenmentation of Water Conservation measures in the Entire
Plant to achieve 100 m3 /ton of Pulp .
 Reduction of Digester Cooking Cycle time by Vapor Phase
 Balancing of the Equipment capacities to achieve Sustainable
production designed capacity of the dissolving grade pulp Mill.
 Reduction of cycle time in manufacturing of process Equipment
 Turnover Increase at HDO Manufacturing Unit & Elecon Engg
Software Proficiency
MS Project ,Primavera.
Auto-Cad R14,
MS Office (Excel, Access, Word, PowerPoint
Implementation of ERP & SAP
Professional Trainings Attended.
Total Quality Management ( ANAAR ,USA)
Energy Conservation & Energy Audit
Finance Management for Non Finance Managers
Traning Programme on Selection & Maintenance of Pumps
Bearings,Compressors,Turbo Feed Pumps
Condition Monitoring Techniques.
Training on Energy Conservation Measures.
PROFESSIONAL & EDUCATIONAL QUALIFICATIONS
Class School /College Year of Pass %Marks
X MTH School ,Rajahmundry 1982 69
XII CGTM Jr College,Rajahmumdry 1984 64.3
B.Tech
(Mech)
SVH College of Engineeering,
Machilipatnam,Nagarjuna University
1989 65
Page 6 of 7
Personal Particulars
Date of Birth : 11.12.1966
Age : 48 Yrs
Languages known : English, Hindi & Telugu
Passport details : J7160322 valid upto 2021
Marital Status : Married.
Date : 01.01.2016
Place: Jamnagar ,Gujarat KVV Ramana Rao
101, Krishnam Apts
ParkColony
Jamnagar-366001
Gujarat
Page 7 of 7

More Related Content

What's hot (20)

cv
cvcv
cv
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
RESUME-Latest
RESUME-LatestRESUME-Latest
RESUME-Latest
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
Resume_vishwesh_April 16
Resume_vishwesh_April 16Resume_vishwesh_April 16
Resume_vishwesh_April 16
 
CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25CV-AnirbanDatta-Stress Analysis-2016-03-25
CV-AnirbanDatta-Stress Analysis-2016-03-25
 
JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
CV of Jayakumar (Lat)
CV of Jayakumar (Lat)CV of Jayakumar (Lat)
CV of Jayakumar (Lat)
 
MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
HareshPattani
HareshPattaniHareshPattani
HareshPattani
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
 
pranay
pranaypranay
pranay
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
Resume
ResumeResume
Resume
 
Resume140515
Resume140515Resume140515
Resume140515
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 

Viewers also liked

SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Kenneth Ifidon
 
Resume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedResume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedVincent Le Cornu
 
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...Arun Chowdhury
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visUlimella Siva Sankar
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalAbhishek Gorai
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentationrajkumar_sm
 
Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)Baskaran Vaithyam
 
Mining objective answers
Mining objective answersMining objective answers
Mining objective answersBhaskar Naidu
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systemsArnab Chakraborty
 
Top 10 mine interview questions with answers
Top 10 mine interview questions with answersTop 10 mine interview questions with answers
Top 10 mine interview questions with answersharrisaimee4
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantRonak Thakare
 

Viewers also liked (20)

SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Parsons Brinckerhoff Corporate Profile
Parsons Brinckerhoff Corporate ProfileParsons Brinckerhoff Corporate Profile
Parsons Brinckerhoff Corporate Profile
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Resume - Mahipal Singh Bisht
Resume - Mahipal Singh BishtResume - Mahipal Singh Bisht
Resume - Mahipal Singh Bisht
 
mukesh Resume (1)
mukesh Resume (1)mukesh Resume (1)
mukesh Resume (1)
 
Resume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - DetailedResume Vincent Le Cornu - Detailed
Resume Vincent Le Cornu - Detailed
 
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
 
Pillar design
Pillar designPillar design
Pillar design
 
Selection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-visSelection of powered roof supports – 2 leg shields vis-à-vis
Selection of powered roof supports – 2 leg shields vis-à-vis
 
Coal india limited
Coal india limitedCoal india limited
Coal india limited
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 
CSR of Coal India ltd.
CSR of Coal India ltd.CSR of Coal India ltd.
CSR of Coal India ltd.
 
Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)Baskaran Vaithyam Devendran SCM PP QM Resume (1)
Baskaran Vaithyam Devendran SCM PP QM Resume (1)
 
Mining objective answers
Mining objective answersMining objective answers
Mining objective answers
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systems
 
Top 10 mine interview questions with answers
Top 10 mine interview questions with answersTop 10 mine interview questions with answers
Top 10 mine interview questions with answers
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plant
 

Similar to Mechanical Engineer with 25 years experience in project management and maintenance of pulp, paper, power and process plants

Similar to Mechanical Engineer with 25 years experience in project management and maintenance of pulp, paper, power and process plants (20)

prk_cv
prk_cvprk_cv
prk_cv
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
CV_Raja
CV_RajaCV_Raja
CV_Raja
 
Cv Rafee
Cv Rafee Cv Rafee
Cv Rafee
 
Experience Profile
Experience ProfileExperience Profile
Experience Profile
 
Experience profile
Experience profileExperience profile
Experience profile
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Hemant Oza_CV - July 16
Hemant Oza_CV - July 16Hemant Oza_CV - July 16
Hemant Oza_CV - July 16
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Prashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs finalPrashant_rai_Mech8 yrs final
Prashant_rai_Mech8 yrs final
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
1AB-CV5
1AB-CV51AB-CV5
1AB-CV5
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015updated Trupti Goswami_Resume 281015
updated Trupti Goswami_Resume 281015
 
ASHWANI ANAND Resume
ASHWANI ANAND ResumeASHWANI ANAND Resume
ASHWANI ANAND Resume
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Alstom india
Alstom indiaAlstom india
Alstom india
 
Exp.Brief
Exp.BriefExp.Brief
Exp.Brief
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 

Mechanical Engineer with 25 years experience in project management and maintenance of pulp, paper, power and process plants

  • 1. K V V RAMANA RAO +918197000664 kvvrrao@yahoo.com A Mechanical Engineering Professional with 25 year experience with Core Experience of Project Management,Construction Management Pulp&Paper,water,Mineral,BulkMaterialHandling,Water,Effluent,Chemical Plants,Power Plants,Oil & gas ,Petro Chemical Complex etc,Maintenance Management in paper mills,Chemical Plants,Water & Effluent treatment plants,Operation & Maintenance of Power Plants upto 50 MW Coal based Power Plants • Proven abilities in handling in EPC Projects Project Management,Project Execution,Project Controls In various segments-Pulp & PaperMill,Chemical Plants with Piping(Clo2,Hypo,Casutic,H2O2,Chlorine,HCl ,H2s04,Brine),Ash Handling Plant, Power -Coal Handling Plants, Eqipments with Piping for RODM Plants,Water Treatment Plants,Waste water Treatment Plants,Oil & Gas Refinery Piping,Petro chemicals Complex Piping Material Handling Systems etc • Proven Ability in Business Development,Proposals & Estimation, Scheduling the Project,Material Planning ,Production planning in the manufacturing of Process E quipments,Pressure Vessels & Heat Exchangers,Piping Skids in Hydro Carbon Sector, Clarifiers for Water /Effluent Treatment plants. • Extensive Experience in heavy Erection in pulp & Paper ,Power ,Oil& Gas , Petro Chemical Complex Equipments & Utilities piping. • Opreartion & Maintenance of 12.06 /5.6 MW Coal Based Thermal Power Plants. (FBC/Stoker Fired Boilers, DM Plants, Raw Water/ Waste Water Treatment Plants) & Maintenance of Liquor Fired Boiler,Evaporator,Causticizing and Lime Kiln for Sludge Reburning. • Shut down Planning, Spares Planning,Inventory Control,Vendor Development, Contract Management. Proffessional Experience : 25 Years Name of the Company Position Held Duration Years Reliance Industries Limited Jamnagar World Largest Refinery & Petro Chemical Complex Project Cost : Rs 75000 Crores General Manager -Projects Reporting to Sector Head Since Feb 15 Tenova Bateman Engg India (p) Ltd-Bangalore (Project Cost : Rs 500 Crs) Head Projects – Construction. Reporting to MD Mar13- Nov14 1.8 Elecon EPC Projects Ltd Gujarat. (Multiple Projects:Rs 750Cr) Gen.Manager-Projects Reporting to CEO Aug 11 – Feb13 1.6 Page 1 of 7
  • 2. Hindustan Dorr Oiliver Ltd, Ahmedabad ,Gujarat. (Projects Handled : 150 Crs) Sr Deputy General Manager-Projects Reporting to VP-Oper Nov 08 – Aug 11 2.7 Bahia Pulp ,Salvador,Brasil (4500000TPA RG Grade Pulp) Manager –Projects Reporting to GM June 08 – Sept 08 0.4 Ballarpur Industries Ltd Dissolving Grade Pulp (100000 TPA )Unit:APRayons Kamalapuram,Warangal,AP, India (Thapar Group) (Projects Handled : 200 Crs) Deputy General Manager Power Plant Report to Unit Head Dec 91 – May 08 17 CharminarPapers Ltd, Hyderabad Maintenance Engineer Reporting to MD May91- Dec91 0.7 Sri Venkateswara Industrial Consultants ,Rajahmundry Site Engineer Reporting to Partner May-89 – May 91 2.0 • Reliance Industries Limited ,Jamnagar, Gujarat ,India (2015-Till Date) Position : General Manager –Projects Piping  Project Management ,Erected & Commisssioning of Oil & Gas Refinery Piping and petro chemical complex ,Utilities Piping ,Unit Piping etc pipe spools fabrication,Laying & Erection of various piping CS /LTCS/Alloy Steel P-11,P-22 ,P-91, SS 304 / SS 316 ,Under Ground Piping, GRP Piping ,PVC ,HDPE Piping etc for Pet Coke Gassificastion unit,ROGC,MEG LDPE, PX4 ,BRU ,Scanfiner, Rubber Plant ( Eqpt & Piping) ,Cooling Tower( Equipemnt & Piping) sizing from ½” to 114” etc.  Created pipe fabrication shop capacity of 100000 ID/month to cater Petro chemical Complex Piping spools,  Executed 2500000 Inch Meter pipe Laying  Erection of 5 nos of Pipe Rack Structures ( Approx 25000MT) to facilitate the pipe laying. • Bateman Engg India (P) Ltd ,Bangalore,India (2013-Till Date) Position : Head –Project & Construction Page 2 of 7
  • 3.  Project Management ,Erected & Commisssioned EPC LSTK Project of Bauxite Feeding & Crushing Plant ( Capacity : 1500 TPH) at UTKAL Alumina Refinery Inernational ,Odisha. (1.5 MTPA Capacity) including Utilities (Equipment & Piping).  Project Management ,Erection and Commissioning of EPC LSTK Contract of 18.50 KM Belt Conveyor for Transporting Bauxite from Mines - Refinery) consists 18000 MT Structural Fabrication (Rectangular Gantry type)& Erection, 30000 M3 RCC ,2000 MT Equipment Erection,300 KM of HT Cable Laying for a Bauxite Handling system for 1.5 MTPA Alumina Refinery at UTKAL Alumina International Odisha (Under Erection) including Utilities ( Equipment & Piping). • ELECON EPC PROJECTS ,VV Nagar Gujarat ,India (2011-2013) Position : General Manager –Projects  Project Management,Erection & Commissioning of Coal Handling Plant for 2 x 300 MW Power Plant at GMR Warora.(Wagon Tipler ,Apron Feeder,Belt Conveyors,Bucket Wheel Reclaimer,Utliities ( E quipment & Piping) and other accessories).  Responsible for Project Management for all EPC and Non EPC Projects (Project Planning ,Project Monitoring ,Review,Project controls and Project cost control) for supply,Erection & Comissioning of Coal Handling Plants (2500 TPH) including all Utlilities ( Equipment & Piping) for Major /Mega power plants upto 660 MW, BOP Package and major material Handling projects for steel,cement,ports and Fertliser plants o (NTPC,BHEL,SAIL.NMDC,TECPRO,MAHAGENCO,APGENCO,LANCO,GVK o ,GMR,KSK.MANIKGARH,ULTRATECH,SHREE & SIDDHIVINAYAK,IFFCO.)  Responsible for Project Management of Coal Handling Plant EPC Project at NTPC Mouda -2000 TPH Coal Conveying System along with all accessories. (Coal Handling Plant for 2 X 660MW Super Thermal Power at NTPC – Mouda,Maharastra ) • Hindustan Dorr Oliver Ltd,Ahmedabad ,Gujarat,India(2008-2011) Position : Sr Deputy General Manager –Projects  Supply & Erection of 130 Mld Raw Water Treatment Plant, 21 Mld RODM Plant Equipment along with Piping for 165 MW Captive Power Plant for IOCL Paradeep  21 Mld RODM Plant Equipment along with Pipingfor 165 MW Captive Power Plant at Hindustan Mittal EnergyporLimited ,Bhatinda.(Guru Gobind Singh Oil Refinery Limited) & IOCL Paradeep.  Supply & Erection of Various Effluent,Raw Water Treatment Plants Capacity of 9-30MLD Equipments and piping for Oil Refineries -Viz Indian Oil Corporation,,Hindustan Petroleum Corporation,Bharat Petroleum Corporation.  Supply & Erection of Various Raw Water,Effluent Treatment Plants Equipments along with piping for Municipal Corporations of CIDCO,CPCL,Nirma,Coromondal Fertlilisers,and Uranium Corporation Limited. Page 3 of 7
  • 4.  Supply of 180 TPD Paper Plant Pulpmill Equipment at KR Pulp&Papers & 300 TPD Pulp Mill Bindal Papers Limited.  Responsible for Business Development,Proposal & Estimation,Material Planning, Production Planning,Project Planning,Project Execution ,Project cost Control for above EPC Projects related to manufacturing of Heavy Equipment, Static & Rotating Equipments , Pressure Vessels and Heat Exchangers.Equipments for Piping Skids for water/Gas.  Coordination with design for modifications to be carried out for cost control before and after Project Execution.  Responsible for Estimation of the Process Equipment Group Equipment orders. • BAHIA PULP –SALVADOR BRASIL,SA (2008) Position : Manager – Projects.  Involved in Erection & Commissioning of Utilities for 2x 50 MW Power Plant related to 1500 TPD Dissolving grade Pulp. • Ballarpur Industries Limited Unit : AP Rayons ,Warangal AP ,India ( 1991-2008) Position : Deputy General Manager –Projects / Power Plant  Erection & Commissioning of 300 TPD Fibre line (Digesters,Washplant & Bleach Plant, Sheeting Machine) Supplied by M/s Andritz,Ahlstrom,ABB Sweden,Lamb Switzerland .  Erection of All Utilities ( Equipment & Piping) related to Paper Machine -II Project ( Unit : Sewa) HP ,MP LP Hot Water ,Chiiled Water,Air ,drinking water,white water ,Cooling water , Stock, Wam water Fire Hydrant Piping)  Erection& Commissioning of 4TPD Integrated Chlorine Dioxide Plant (R-6Process)Equipments and Piping (CS,LTCS,Titanium,Monel,PVDF LINED, FRP,CPVC,PVDF,HDPE etc) Supplied by Kaverner Chemetics ,Canada  Erection & Commissioning of Chemical Complex Equipment along with piping Consisting of Plants for handling & preparation of Clo2,Hypo,Casutic,H2O2,Chlroine,HCl ,H2s04,Brine.  Erection & Commissioning of Carbotech PSA Oxygen Gas & Nitrogen Gas Generation Plants of 100 NM3 /Hr & 20 Nm3 /hr along with handling system Equipment including piping.  Erection & Commisioning of Vapor Absorption Chiller machines along with Air Conditioning system with piping.  Erection & Commissioning of All Utility Systems related ( Equipment & Piping) to 12.04 MW Power Plant for a 300 TPD Rayon Grade Dissolving Pulp Industry. Page 4 of 7
  • 5.  Erection & Commissioning of ESP for Coal fired Boiler FBC Boiler & Dense Phase Ash Handling system for 32 TPH ,45 Kg/cm2 FBC Boiler  Erection & Commissioning of Water Evaporation Plant along with piping supplied by M/s Enmas Ahsltrom .  Erection & Commissioning of 120 TPD Lime Reburning System ( Lime Kiln supplied by FL Smidth along with Fuel oil handling system.  Erection & Commisioning of Recausticizing Plants for 300 TPD & 200 TPD Paper Mills supplied by M/s HDO.  Assisting GM-Engineering for Coodrination with all the departments to maintain the plant in his absence.  Operation & Maintenance of 12.06 MW and 5.6 MW Captive Power Plants –Coal based Thermal power Plant ( BTG & BOP)  Maintenance of Liquor Fired Boiler to fire 617 TPD Dry Solids capacity of make Ahlstrom-Enmas,Falling Film/ Shell &Tube type Evaporator Ahlstrom, L&T, Recausticizing Plant of make Hindustan Dorr Oliver,120 TPD Sludge Reburning system of make FL Smidth.  Conducting Condition Monitoring techniques for Predictive, preventive & breakdown maintenance to maintain the Uptime of the Plant.  Responsible for Inventory Control & Spares Management.  Responsible for functioning of Design & Drawing Office for all development jobs and spare parts development.  Progress Monitiroing of the Capex and Maintenance Budget Review on monthly basis.  Responsible for Estimation of all the Projects ,Capex Jobs.  Create quality consciousness through total Quality management by making the operators /Technicians as members of the team to improve the productivity.  Responsible for implementation of Total Quality Management,EVA Techniques,Energy Conservation measures. • Charminar Papers Limited,Hyderabad,India (1991) Position : Maintenance Engineer  Maintenance of 10 TPD Kraft Paper Mill including Utilities. • Sri Venkateswra Industrial Consultants,Rajahmundry, AP India (1989- 91) Page 5 of 7
  • 6. Position : Site Engineer  Erection & Commissioning of 20 TPH Wood Chip Plant along with Chip conveying system at International Paper ,Rajahmundry ,AP,India  Erection & Commissioning of 8 TPH Husk Cethar Make FBC boiler along with Fuel Handling system,Piping at Kanakadurga Agro Oils ,Vijayawada,AP,India. PROFESSIONAL ACHIEVEMENTS  Design & Exceution of Utlitiy Piping for for 10 MW Power Plant in a Paper Mili capacity of 200TPD.  Implenmentation of Energy Conservation measures in the Plant to achieve 75 Kwh /ton of Pulp .  Implenmentation of Water Conservation measures in the Entire Plant to achieve 100 m3 /ton of Pulp .  Reduction of Digester Cooking Cycle time by Vapor Phase  Balancing of the Equipment capacities to achieve Sustainable production designed capacity of the dissolving grade pulp Mill.  Reduction of cycle time in manufacturing of process Equipment  Turnover Increase at HDO Manufacturing Unit & Elecon Engg Software Proficiency MS Project ,Primavera. Auto-Cad R14, MS Office (Excel, Access, Word, PowerPoint Implementation of ERP & SAP Professional Trainings Attended. Total Quality Management ( ANAAR ,USA) Energy Conservation & Energy Audit Finance Management for Non Finance Managers Traning Programme on Selection & Maintenance of Pumps Bearings,Compressors,Turbo Feed Pumps Condition Monitoring Techniques. Training on Energy Conservation Measures. PROFESSIONAL & EDUCATIONAL QUALIFICATIONS Class School /College Year of Pass %Marks X MTH School ,Rajahmundry 1982 69 XII CGTM Jr College,Rajahmumdry 1984 64.3 B.Tech (Mech) SVH College of Engineeering, Machilipatnam,Nagarjuna University 1989 65 Page 6 of 7
  • 7. Personal Particulars Date of Birth : 11.12.1966 Age : 48 Yrs Languages known : English, Hindi & Telugu Passport details : J7160322 valid upto 2021 Marital Status : Married. Date : 01.01.2016 Place: Jamnagar ,Gujarat KVV Ramana Rao 101, Krishnam Apts ParkColony Jamnagar-366001 Gujarat Page 7 of 7