Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

1

Share

Download to read offline

rakesh resume_10.03.2016

Download to read offline

Related Audiobooks

Free with a 30 day trial from Scribd

See all

rakesh resume_10.03.2016

  1. 1. RESUME RRRAAAKKKEEESSSHHH SSSIIINNNGGGHHH BBBHHHAAADDDOOORRRIIIYYYAAA 11.2 Years Experience in Power Plant Operation, Commissioning, Erection & Maintenance. B.E. Mechanical, BOE, Best Bengal rakeshsinghbhadoriya@gmail.com Mobile – 9204750901 Address Flat No.105 (Tata Power), Garden City, Luby Circular Road, Besides City Centre, Bartand, Dhanbad (Jharkhand)-826001 Personal Data Father Name: Shri S.P.S.Bhadoriya Date of Birth: 05/07/1980 Sex: Male Marital Status Married Nationality: Indian Languages Known: English and Hindi Synopsis B.E. Mechanical having extensive experience in Operation, Commissioning, and Erection & Maintenance of coal based Thermal Power Plant. Self-starter, who applies individual initiative to get the job done, Enjoy working in a demanding condition. Skills Technical: Operation, commissioning, erection activities of Pulverized fuel and CFBC Boiler &Turbine and their auxiliaries. Plant Performance, energy losses, efficiency calculations, water treatment analysis and Plant troubleshooting. Management: Handling site activities and preparing report day-to-day progress Follow up the material availability as shipping list and mobilization of agencies involving in project. Estimation of materials, planning & arranging for resources like equipment’s, manpower etc. for the thermal power plant. Coordinate and follow-up fuel management. Preparing shut- down planning and implementation. Preparation of daily& monthly reports. Coordination with the engineers and planning for implementation. Power Plant O&M: With the Pulverized fuel and CFBC Cold, warm & hot start-up of boiler& turbine through DCS, Synchronizing alternator, load distribution & dispatch. Shut-down maintenance of boiler, turbine & BOPs. Educational Qualification  B.E (Mechanical) from S.A.T.I, Vidisha (M.P.) Affiliated with R.G.P.V. Bhopal (M.P.) in 2003 with 62.73%.  Certificate of Proficiency as BOILER OPERATION ENGINEER (Govt. Of West Bengal, Kolkata)
  2. 2. Nov’10 To Till date Lead Engineer (Mechanical Maintenance), Maithon Power Limited- The Tata Power Company Limited. Maithon Dhanbad (Jharkhand) 2X1700 TPH PF Boilers, M/S BHEL 2X525 MW TG, M/S BHEL Maintenance Responsibilities:-  Handling the manpower, training to associates/operators, co–ordination and reducing losses to achieve maximum production target.  Achieve the departmental goals / objectives in terms of production targets, quality, cost, safety & environment.  Ensure men, machine, material, environment safety with benchmark operating practices fromthe industry.  As a Lead Engineer take the responsibility of site for smooth running the plant and avoid the breakdown.  Maintained the protocols and records of schedule maintenance and shifts.  Carrying out Preventive, periodic & shutdown maintenance of rotary equipment, cone crusher, rotary crusher, jaw crusher, coal impactor, vibro screen, magnetic separator, lobe compressor, screw compressor, wet scraper, gear box , pumps & fans.  Schedule, Material & Manpower availability, Tools & Plant Cash flow & Liability, Site Constraints  Preparing Monthly project report and conducting Deviation Analysis with concerned persons.  Budget Cost estimation, Control & Review for achievement of Target  Conducting meetings with Clients for monthly planning to achieve target.  Responsible for Spare Planning, Manpower Engagement, Reports and Future Planning activity involved in AOH.  Implementation of Safety Standards at site.  Condition monitoring of equipment like Valve, Fan, Mill, Lube oil system, Soot Blower.  SAP – PM module – Material Stock inspection, Defects acknowledgement & closing, creating Material Requisition & Purchase requisition Commissioning and Operation:  Cold, warm and Hot light up of boiler, rolling of turbine and Synchronization loading unit maintaining parameters with in limit. Normal shutdown of unit boiler, turbine and other auxiliary.  Avoiding tripping during house isolation of unit. Load shedding as per generation schedule in case of emergency.  Handling emergencies like plant blackout, tripping of boiler turbine and generator and its auxiliary.  Issue and cancellation PTW (Permit to Work) system, safe isolation, personnel safety and equipment safety.  Prepare the plant performance report for the shift/day during the shift operation logging of all the critical parameters is being done at all location by respective operators and engineers.  Ensuring proper utilization of resources such as water (raw water & DM water), air (instrument air & service air), auxiliary power, coal and oil (HFO, LDO & Plant Lubricants) etc & reducing their wastage.  Air tightening test, drainable and non-drainable hydro test of boiler (1950 TPH) of unit #1 and unit#2.Air tightening test, rain test and kerosene test of ESP of unit #1 and unit #2.  Successfully commissioning of boiler auxiliary like F.D. fan, I.D. fan, P.A. fan there oil skid, scanner air fan and seal air fan.  STG lube oil flushing of lube oil, lifting oil and control oil line. Acid pickling and flushing of BFP lube oil line .Hydro test of condensate and feed lines.  Boiler light up for chemical cleaning through EDTA process, detergent flushing of boiler tubes, feed line and condensate line. .
  3. 3. FABRICATION & ERECTIONS OF PRESSURE PARTS:  Erection and Commissioning of Boilers and auxiliaries Tri Sector Air Pre Heater, Radial ID Fan, Axial PA & FD Fan, Coal Milling System, Coal Piping and Ducting system as per approved drawing and FQAP.  Erection & Commissioning of Pulverized fuel Boilers and auxiliaries from client side & coordinating with M/s BHEL , ThyssenKrupp, Chinese specialists and erection vendors for timely and proper erection of boilers as per FQPs.  Erection of pressure parts attachments like backstay, skin casing, seal box, leveler guide etc  Erection & Fabrication of Pressure & Non pressure parts.  Erection & Fabrication of IBR & Non IBR parts.  Involved in Commissioning activities like Refractory dry Out, Alkali Boil Out, Hydro Test, and steam blowing. PERFORMANCE MONITIORING & MIS  Daily review of progress& status, reporting for the day generation  Involve in the Performance monitoring of 2*525 MW units. Its include daily monitoring of unit Heat Rate, aux power consumption, Sp oil consumption & other performance parameter. Reduction of variable cost through performance improvement.  Preparing the Daily / Monthly MIS report for Senior Management.  Preparing monthly performance report of the station.  Preparation of Annual Business operating plan for the station.  Preparation of Capex/Opex plan for the station as per CERC Guideline.  Preparation of details of ORT/PRT meeting. Reviewing the status of crit ical projects of the station.  Preparing the Board presentation on station performance.  To Plan, control & supervise operational & maintenance tasks for a safe, reliable and smooth plant operation, start up, shutdown and emergency conditions.  Liaison with other departments for related activities in the Plant.  Carrying out preventive maintenance jobs, attending breakdowns, carrying out planned jobs during Plant Shutdowns.  Co-Ordination between field and control room to optimize plant Performance.  To analyze repeated breakdowns, take corrective actions & preventive action to avoid repetition of breakdowns. FUEL MNAGEMENT:  Liasioning with BCCL/CCL for procurement of coal for Maithon Power Plant  Transportation Management – Managing the transportation work to lift the 3.5 Million MT coal from Rail and Road from various Mines of BCCL, CCL & TATA Steel.  Co-ordination with BCCL & CCL officials to timely issue the Release orders as per FSA and to ensure the good quality coal dispatch from mines.  Co-ordination with Transporter to ensure the vehicles availability for lifting of coal from different mines of BCCL and CCL  Co-ordination with Railway officials for timely Rake Placement for dispatch as per indent  Timely Rake Unloading to avoid penalties & Evacuation and shifting from Railway Siding to plant.  Presenting various MIS to management for clear view and communication and follow up to avoid any deviation in plan as per ACQ  Billing & documentation for Rake supply, penalty calculation of Overload / under load, late supply, demurrages charges if any.  Transportation billing and Payment  Vendor Management as per requirement of Job, Timely placement of PR and follow up for release of PO to execute the work and vendor billing.  Formulating coal procurement rolling plan on monthly basis in coordination with O&M. Review of
  4. 4. Career History May’08 To Oct’10 e Engineer-Mechanical (Thermal Power Plant) in Aditya Cement Works. (A Unit of Ultratech Cement Ltd., Aditya Birla Group (Chittorgarh (Raj.) 2X25 MW TG, M/S HTC, China. 2X115 TPH CFBC Boilers, M/S ThyssenKrupp Ind. Pvt. Ltd. 1X23 MW TG, M/S BHEL. 1X105 TPH AFBC Boilers, M/s BHEL. Jan’04 To May’08 e Engineer-Mechanical (Thermal Power Plant) in Aditya Cement Works. (A Unit of Ultratech Cement Ltd., Aditya Birla Group (Chittorgarh (Raj.) 2X25 MW TG, M/S HTC, China. 2X115 TPH CFBC Boilers, M/S ThyssenKrupp Ind. Pvt. Ltd. 1X23 MW TG, M/S BHEL. 1X105 TPH AFBC Boilers, M/s BHEL. Computer skills M.S Office (MS-Word. Power point, Excel) Knowledge of SAP Strengths:  Excellent Communication Skills.  Proficient in managing various Project operations as per the set standards and experience of developing standard operating procedures for operational excellence  An effective communicator and team player with strong analytical, logical & problem solving abilities.  Flexibility to work hard for long hours and patient enough until the goal I accomplish.  Knowledge of Working on SAP system. Declaration I hereby declare that all the information mentioned above is true to the best of my knowledge. Place: Yours faithfully Date:10.03.2016 Rakesh Singh Bhadoriya coal stock on daily basis and communicating same to concern department on weekly basis as to maintain adequate coal inventory.  Proficiency in preparation of Costing of Coal as well as Logistics in Power Sector.  To ensure the Proper supply of coal to CHP as per their requirement without any failure (Average consumption is 13500 MT/ Day).  Facilitate the signing of FSA for linkage coal allocation with CCL and BCCL.  Co-ordination with different inter department for smoothly execution of work.  Co-ordinate and plan the movement of coal through rail from various sidings to Maithon  Ensure availability of weighbridges for smooth operations.  Ensure that the contractual obligations with vendor are complied  Handle the manpower to streamline the support services  Initiate the process of GPS installation in all the vehicles  Execution GPS installation in all the vehicles for effective monitoring to avoid any pilferages
  • MohanR67

    Aug. 7, 2018

Views

Total views

375

On Slideshare

0

From embeds

0

Number of embeds

29

Actions

Downloads

10

Shares

0

Comments

0

Likes

1

×