Ravi Kumar is a mechanical engineer with nearly 20 years of experience in erection, commissioning, and team management in the oil, gas, and power industries. He is currently a manager overseeing refurbishment and construction projects in Abu Dhabi. Previously, he led teams and managed projects in Saudi Arabia, Oman, Qatar, Yemen, and India. Ravi Kumar has a proven track record of successfully executing large projects on schedule and within budget while ensuring safety and quality standards. He is seeking new managerial opportunities to utilize his skills in project management, team leadership, and process optimization.
1. KAMATHAM.RAVI KUMAR
Mobile: +971563560039, +971561182879, +919959977448~ E-Mail: ravi9459@gmail.com/@yahoo.co.in
Seeking Managerial assignments in the areas of Erection & Commissioning, Team Management and Process
Enhancement with a growth oriented organization in Construction in Oil & Gas/ Power sector
SYNOPSIS
A competent professional with nearly 20 years of experience in Erection & Commissioning and Team Management
of various plants.
Currently associated with (NBTC) NASER M.AL BADDAH & PARTNER GENERAL CONTRACTING L.L.C DAS-ISLAND
ABUDHABI, as Manager and working in Plant 19 Refurbishment works & LG7 Power Generation Unit Electrical
Cable Trenches, Man Holes, Duct Bank Activities, New Road Crossings and Associated Accessories.
Exhibited Excellence in working on succession planning of the workforce, shift management activities, appraising
the member’s performance & providing feedback.
Track record of managing erection & commissioning activities involving resource planning, team building
and co-ordination.
Adept in maintaining high morale of workforce for minimum machinery breakdown to achieve required
production target.
Positive attitude, Self-confidence and belief in hard work, Goal-oriented and ability to work independently.
Excellent verbal and written communication skills, quickly adoptable to new environments.
An effective communicator with excellent relationship management skills and strong analytical, problem solving
& organizational abilities.
Major Clients worked with :
– ADGAS ABUDHABI GAS LIQUEFACTION COMPANY, DAS ISLAND, ABUDHABI, UAE.
– ADCO ABUDHABI COMPANY FOR ONSHORE OPERATION, ABUDHABI, UAE.
– OXY OCCIDENTAL AT MUKHAIZANA FIELD SOUTH CENTRAL OMAN.
– QATAR PETROLEUM RASLAFFAN AT QATAR.
– YEMGAS LNG PROJECT(TOTAL,HINT,SKS,KOGAS,HYUNDAI & YEMEN PUBLIC SECTORS (JV of
TECHNIP, KBR AND JGC for YEMEN LNG COMPANY YEMEN.
– TECHNMONT-TASNEE HDPE, LDPE POLYTHYLENE PROJECT AT JUBAIL SAUDI ARABIA.
– SNAMPROGETTI-GAS TREATMENT AND COMPRESSION FACILITIES PROJECT AT SAUDI ARAMCO’S NGL
RECOVERY PLANT, HAWIYAH SAUDI ARABIA.
– BHEL, MPPGCL SARNI, AMARKANTAK MADYA PRADESH INDIA.
– BHEL, TNEB, ENNORE TAMILNADU INDIA.
– BHEL, KPCL, RAICHUR KARNATAKA INDIA.
– BHEL, APSEB.KOTHGUDEM ANDHRA PRADESH INDIA
AREAS OF EXPERTISE
Erection & Commissioning
Responsible for Execution including Fabrication, Erection, Testing and Commissioning of process piping, and
Flow Line Piping B31.3, B31.4 & B 31.8.
Co-ordinate with planning Dept for construction schedule and updating of construction schedule for the project
focusing on catch up plan for delayed area and close monitoring on daily work progress.
Follow-Up of Test Packs to Clear (A,S & B) Punch Points, Conduct Test Packs daily Meeting with Engineers &
Supervisors, Punch list closing, Ready for start-up(RFSU) & system integration checks.
Holds the distinction of organizing & fully conversant with GAD, P&ID and ISO’s.
Liaise with Client/Consultant for project handling over process and external auditors for ISO certification.
2. Played a stellar role of supervision of Installation of pipe supports, Different types of station piping activities, Hot
Bolting, Spading, Hot Tapping, GRE F/W Piping including Heating Lamination, Hardness Test, NDT jobs, Reinstatement
works, Torqueing & Tensioning.
Efficiently ensured PTW (Permit to Work) system functioning as per procedure, First Aid, Risk Assessments, Safety
Tool Box Talks, JSA and Stop card system.
Good acquaintance with work Process and Construction Sequences interfaces between different Disciplines and
Commissioning.
Ensure previous lessons learned are reviewed and that new lessons learned are identified and documented.
Adhere to the best practices, standards and procedure of the company.
Ensured 100% EHS Norms follower at site and 100% Quality works during erection.
To maintain all quality records & documents for final submission to the client
Man Management
Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater
operational effectiveness/ efficiency.
Working on succession planning of the workforce, shift management activities, appraising the member’s performance
& providing feedback.
Process Enhancement
Implementing various techniques for cycle time reduction, entailing identification of opportunities, energy audits,
analysis of data and post audits.
Executing cost saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures
and work within the budget.
Conducting other tests like specific power consumption for the system/package to ensure that the results are within
the pre-committed performance guarantee parameters.
ORGANISATIONAL DETAILS
Since Jun’14 - Present with (NBTC) NASER M.AL BADDAH & PARTNER GENERAL CONTRACTING L.L.C as Manager
Piping in DAS-ISLAND ABUDHABI UAE
Highlights:
Work for Plant 19 Refurbishment works (Lead the Dismantling Erection & Testing of Plant 19 Replacement of Vapour
Flare Winch Block Frame and Winch Structure, Vapour LP(Tankage )Flare, Sweet & H2S Flares and Liquid Flares,
Burners, Vapour Flares Tower Structure(up to 52 mtr ) and Liquid Flares Structural Towers , Blow down pipe rack,
Vapour & Liquid Flares Piping (on blow down pipe rack), Liquid Flares concrete platform Refurbishment works,
Anodes Replacement works, Fire Proofing works and Replacement of 24’’ pipe line cold insulation on-line with high
density supports (Jun’2014 to Present).
Work for LG7 POWER GENERATION UNIT ( Lead the Construction of concrete 222 mtr Electrical Cable Trenches,
Man Holes & Duct Bank Activities, 115 mtr New Road Crossings and Associated Accessories (Jan’2015 to Present).
Since Dec’08 – May’14 with PUNJLLOYD MIDDLE EAST LIMITED as Senior Eng. up to Dy.Manager Mechanical in
Abu Dhabi, Oman, Qatar and Yemen.
Highlights:
Work for EPC for TIE-IN OF OIL PRODUCERS, WATER DISPOSAL, WATER INJECTION, PWRI, GAS LIFT WELLS &
FLOW LINES AT ASAB ADCO, UAE (Lead the Team of Constructionand Handling of Various Activities Like Execution
of Well Head and Associated Piping Works, Flow Line Activities Like ROW Construction, Stringing, Main Line Welding,
Road Crossing, HDD, Trenching and Hydro Testing Activities (Jan’2013 to May 2014).
3. Installation of New 120,130 and KBPD Water Treatment Plant, Central Processing Facility Upgrade Projects
For OCCIDENTAL (OXY) at Mukhaizna Field South Central OMAN (Lead the Execution of Soft Water Tanks, Walnut
Shell Filter Units, Filter Press Units, Free Knock out drums, Induced Gas Flotation Units and Connective Piping with
TIE-INS of Sales Oil Tank, Dehydration Tank, Skim Tanks with Connective Piping and Supports)(Aug’2011 to
Dec’2012).
EPIC of Strategic Gas Transmission Project for Qatar Petroleum, Worth 800 Million, The Project incl Laying of
211 Km of Pipeline with Associated Stations and Infrastructure, It will Transport 2000 MMSCFD OF Sweet Lean Gas
from Ras-Laffan (Lead the Execution of Launcher’s, Receiver’s, Flow Metering Station’s & Skid’s, Manifold’s and
Connective Piping and Supports With TIE-IN’S (Dec’2009 to JUL’2011).
YEMGAS LNG Project ( TOTAL,HINT,SKS,KOGAS,HYUNDAI & YEMEN PUBLIC SECTORS JV of Technip/KBR/JGC) For
Yemen LNG Company Offshore, Onshore Mechanical Electrical(Lead the Execution of Boiler and its Pipe rack,
Desalination and its Connective Pipe Rack, Boil Off Gas Compressor and its Related Piping, Jetty Piping For Offshore
work(Dec’2008 to Dec’2009).
Since Nov’06 - Nov’08 with Gama Al-Moushegah Arabia Limited as Senior Piping Engineer in Kingdom of Saudi Arabia
Highlights
SNAMPROGETTI-Gas Treatment and Compression Facilities Project at SAUDI ARAMCO’S NGL Recovery Plant,
Hawiyah, K.S.A (Lead the Execution of Sales Gas Compressor Connective Piping ,Inlet Gas B63 Area Connective
Piping, Main North South Pipe Rack all 3 levels Connective Piping and Supports)(Nov’2006 to Feb’2008).
TECHNMONT-TASNEE, HDPE/LDPE Polyethylene Expansion Project at Jubail, K.S.A (Lead the Execution of LDPE
Polymerization Connective Piping, PO Dosing and its Related Piping and H.P Recycle Gas Treatment Connective
Piping and Supports) (Mar’2008 to Nov’2008).
Since Mar’05-Oct’06 with Power Mech Projects Limited as Senior Manager in INDIA.
Highlights:
Lead the Erection Testing & Commissioning of Boiler Package Pressure parts, Air Pre-Heater, Ducting & Steam
Generating Piping at Unit II 1x210MW & Maintenance of Boiler Pressure Parts, Air Pre-Heater, Turbines,H.P,L.P & H.P
Unit # III &VI,2 x110MW Boiler at Amarkantak Thermal Power Station, Chachai BHEL MPEB (Mar’2005 to Oct’2006).
Feb’1995 -Feb ’05 with Indwell Constructions Ltd. As Junior Engineer up to Resident Manager in INDIA.
Highlights:
Essayed a key role in:
– Erection & Commissioning of Boiler Pressure parts, Air Pre-Heater and Ducting at Kothagudem Thermal
Power Station, Stage-V, Unit 1X, 2x250MW, BHEL,APSEB ( Feb’95 to Sep’97 )
– Erection & Commissioning of Boiler Pressure parts, Air Pre-heater and Ducting at Raichur Thermal
Power Station, Unit V, 2x210MW, BHEL,KPCL ( Oct’97 to Oct’99 )
– Boiler Pressure Parts, Ducting, Air Pre- Heater, Dismantling & Same Erection Welding, NDE & Heat
Treatment at Unit # IV 1 x110MW Boiler BHEL, at Tamil Nadu Electricity Board, ( Nov’99 to
Feb’2001)
– Boiler Pressure Parts ,Ducting, Air Pre-Heater, Dismantling & Erection(Renovation & Up-Gradation)at
Kothagudem Thermal Power Station, unit 5&6,(2x110 to 120MW)BHEL,APGENCO (Mar’2001 to Oct’
2001).
– Led the Maintenance of Boiler Pressure Parts, Ducting & Air Pre-Heater at Unit I to VIII (5X62.5 &
4X210MW) Sarni Thermal Power Station MPEB (Nov’2001 to Aug’2003).
4. – Boiler Pressure Parts ,Ducting, Air Pre-Heater, Dismantling & Erection(Renovation & Up-gradation)at
Kothagudem Thermal Power Station, unit 7&8,(2x110 to 120MW)BHEL,APGENCO (Sep’2003 to Feb’
2005).
QUALIFICATION
Diploma in Mechanical Engineering IN GURUNANAK ENGG COLLGE BIDAR, BANGLORE UNIVERSITY 1994.
COMPUTER SKILLS
Operating Systems : WINDOWS-98, XP,MS-Office
PERSONAL DETAILS
Present Address : Kamatham Ravi Kumar
Flat No: 302, ARCHIES METRO APARTMENT,
Shiva Ganga Colony, L.B NAGAR-500074
HYDERABAD, TELANGANA (State) INDIA
Mobil No. : +971563560039, +971561182879, +919959977448
Languages Known : English, Hindi, Telugu and Tamil
Date of Birth : 10 August 1972
Sex : Male
Marital Status : Married
Passport No : M 5258924
Nationality : Indian
Preferred Industry : Oil & Gas, Petrochemicals and Power Plants
References : Available on request
(Kamatham Ravi Kumar)