1. Sengottaiyan Vivek
kumarappapuram
Thamaraippalayam(po),Erode(Dt),India
Mail id:mailtovivekbe@gmail.com
Mobile:+919566997552
Skype id: kingmakervivek
Seeking a challenging career and encourages continuous learning and provides
exposure to new ideas, personal and professional growth.
I am bringing dynamic professional 7 years 1 month of experience in commissioning
activities
Expertise in managing maintenance operations for reducing breakdown / downtime &
enhancing operational effectiveness of equipment.
Proficient in handling site operations and accountable for quality service & timely
completion of the projects.
Hands on experience in handling the modification of equipment for better working
condition and maintenance of stock preparation
Expertise in Planning Manpower resources with required tools, consumables.
Working as a Control room Desk Engineer Supercritical Boiler 2*800MW Reheat
Condensate Turbine (MHI,L&T MANUFACTURE)
Working as a operation supervisor 2*623MW Reheat Condensate Turbine
(GE&DOOSAN MANUFACTURE)
Experience in commissioning of 4*2374 TPH Oil fired Boiler DOOSAN MADE,
4*700MW Reheat Condensate Turbine (GE MADE)
Experience in commissioning of 3*500 MW TURBINE(BHEL MADE) as
Commissioning Engineer.
Page 1 of 2
Vivek_Resume
Career Objective
Career Summary
AREA OF INTEREST
TECHNICAL EXPOSURE &EXPERIENCE
2. Experience in Operation of 125 TPH ,125 TPH Fluidised Bed Combustion
Boiler,45 MW CONDENSATE TURBINE as Junior Engineer
1.COMPANY NAME : OMS LIMITED, INDIA.
CUSTOMER : AES-VCM,Mong Duong power corporation Ltd.Viatnam
DESIGNATION : Operation Supervisor.
WORKING PERIOD : From MAR 2015 to still
WORKING PLANT : The unit comprises of the following plants,
PLANT CONFIGURATIONS:
Working in the MARK VI DCS system.
2*2137 TPH Boiler at 5650
C Temp,172 Kg/Cm², M/s.Doosan Heavy
Industries and construction Limited BOILER MAKE
M/s. GE Limited Turbine make (2*623MW)
2. COMPANY NAME : ANI INSTRUMENTS PVT LTD,MUMBAI
CLIENT : L&T POWER, NELLURE.
CUSTMER : APGENCO,NELLURE.
DESIGNATION : CONTROL ROOM DESK ENGINEER
WORKING PERIOD : From March 2014 to jan 2015
WORKING PLANT : The unit comprises of the following plants,
PLANT CONFIGURATIONS:
Working in the EMERSON DCS system.
2*2454 TPH Supercritical Boiler at Main Steam parameter 5650
C Temp,
242 Kg/Cm², Reheater 5950
C Temp,55 Kg/Cm² ,Boiler Make ALSTOM.
Reheat & Condensate Turbine, Turbine make MHI L&T MANUFACTURE
TURBINE 2*800 MW
2. COMPANY NAME : DOOSAN HEAVY INDUSTRIES & CONSTRUCTION,KSA
CLIENT : SAUDI ELECTRICITY COMPANY.RABIGH
DESIGNATION : DESK ENGINEER
WORKING PERIOD : From APRIL 2013 to Feb 2014
WORKING PLANT : The unit comprises of the following plants,
PLANT CONFIGURATIONS:
Working in the SIEMENS DCS system.
Page 2 of 2
Vivek_Resume
Career Scan
3. 4*2374 TPH Boiler at 5400
C Temp,172 Kg/Cm², Boiler Make DOOSAN HEAVY
INDUSTRIES&CONSTRUCTION.
Turbine make GE TURBINE 4*700 MW
Water treatment plant capacity :4*80 m3
TPH (DM PLANT)
3.COMPANY NAME : EDAC ENGINEERING LTD.CHENNAI
CLIENT : TAMILNADU GENERATION & DISTRIBUTION CORPORATION
LIMITED,CHENNAI.
DESIGNATION : DESK ENGINEER
WORKING PERIOD : From may 2010 to march 2013
WORKING PLANT : The unit comprises of the following plants,
PLANT CONFIGURATIONS:
Working in the ABB DCS system.
3*1590 TPH Boiler at 5410
C Temp,209 Kg/Cm², M/s.Bharat Heavy Electrical
Limited BOILER MAKE
M/s.Bharat Heavy Electrical Limited Turbine make 1500MW (3*500MW)
4.COMPANY NAME : CVL ENERGY LTD.
CLIENT : TNPL ,KAGITHAPURAM,KARUR
DESIGNATION : JUNIOR ENGINEER
WORKING PERIOD : From may 2008 to April 2010
WORKING PLANT : The unit comprises of the following plants,
PLANT CONFIGURATIONS:
Working in the ABB DCS system.
125 TPH Boiler at 5100
C Temp,85 Kg/Cm², M/s ENMAS GB BOILER MAKE
125 TPH Boiler at 5100
C Temp,85 Kg/Cm², M/s CVL BOILER MAKE
45 MW CONDESATE TURBINE SIMENS MAKE
Monitoring and recording the parameters in DCS as well as local of Turbine . Triple
Pressure and Steam Turbine & Auxiliary systems.
Pays Particular attention to safety by ensuring safe working practice and
environment for man and machinery.
Planning, controlling & supervising safe, reliable and smooth plant operation, start
up, shutdown and emergency conditions.
Page 3 of 2
Vivek_Resume
JOB PROFILE
4. Having experience on load dispatch in accordance with Regional Load Dispatch
Centre instruction.
Conducting the scheduled and emergency changeovers for reliable and smooth plant
operation.
Handling mechanical & electrical isolation of various equipments & drives as per
lockout & tag-out procedure.
Coordinating with maintenance department for various kinds of maintenance
(scheduled, corrective &shut-down) of equipments for bringing back to normal
operation with least time.
Preparing reports (Generation report, Start-up report, Monthly report etc.,)
Reporting to higher officials regarding plant activities.
Operation and monitoring of Balance of plants equipments through DCS.
Unit startup and shut down activities through DCS from Control room.
Operation and Control of sea water based RODM plant
Involves isolation & normalization of system as per approved Permit to Work System.
Preparation of Checklists and log sheets.
Preparation and implementation of various standard operating procedures.
Looking after mechanical isolations & ensuring safety measures during activities.
Manpower Handling and ensuring the safe operating procedures.
Working with safely with following the plan.
Inspection of Turbine as per P&I Drawing ,
Carry out Steam boil out of turbine as per standard
Pre-commissioning checking of ,Pump, Piping and its supports ,duct
supports,
Checking of starting permissive and trip logic.
Carry out Steam,air Blowing of turbine, Lube Oil flushing and EH Oil line
flushing as per standard.
Page 4 of 2
Vivek_Resume
5. Co- ordination with Technical drawings / Design department for necessary changes
in routing of piping.
Having good experience Hydro test in high presure boiler.
Carry out commissioning of SCCW SYSTEM and SEAL OIL system
Carry out HP-LP BYPASS steam blowing
Responsible for all All vaccum pump commissioning activity including
maintenance.
Following monthly and weekly commissioning schedule.
Responsible for Overhauling, break down, Regular and preventive maintenance of
Boiler feed pumps, Condensate Extraction Pumps,Oil Centrifuge Pumps, CW Pumps,
CT Fans, turbine auxiliaries
Taking Boiler feed pump, CEP trial run.
Turbine steam line parallelity with stop valve flange.
Performing Turbine rolling and checking of protecting system
Gland sealing line blowing and condensate line air blowing
Heater shell side cleaning
Performing Vacuum fill test and vacuum pulling in condenser.
Commissioning of Generator H2 system.
Performing H2 line air blowing and co2 purging activities
Involved in Commercial operation declaration for handing over turbine and its
auxiliaries to client.
Commissioning Experience of Turbine, Cooling Tower, BFPs. Turbine manually
tripped due to drain valve not working so onther drain valve putted
Page 5 of 2
Vivek_Resume
6. Very Efficient Start up works, Safe shutdown work of the plant
Boiler Feed Pump Start up,safe shutdown and Trial works handling
CEP Pumps trial handling work
TDBFP trail run taken
TDBFP steam line blowing .BFP lube oil line flushing..
1.Turbine Rear Journal Bearing demage
Cause:Lube Oil had dust from VEF Discharge valve opened
Remedy:For changed Oil and bearing polished by using of petrol
4.Turbine gasket demage at blowout time
Remedy:For changed onther gasket
Boiler feed water pump
Seal oil pumps
CEP
AOP of turbine
Bearing gear motor
JOP
SCCW pump
Generator cooling system for H2 line.
CPU system.
TDBFP
B.E in Mechanical Engineering from M. Kumarasamy (Anna University)
Engineering College, Karur with 68%.
HSC from Govt. Hr. Sec. School, Kandampalayam,Namakkal with 67%.
SSLC from S.R.H.chool,Vasanthapauram,Namakkal with 88%.
Page 6 of 2
Vivek_Resume
EDUCATIONAL QUALIFICATION
COMMISSIONING TIME FACEING PROBLEMS
COMMISSIONING EQUIPMENTS
COMMISSIONING TIME FACEING PROBLEMS:
7. Presented a paper on topic “Recent Trends in Automobile Engineering” in a
National Level Technical Symposium held at
JJ College of Engineering, Trichy
Mahendra Engineering College, Tiruchengode.
Done project on “DC Power Lawn Mover” in M.K.C.E College.
Done project on “Automatic Control of Pneumatic Breaking System” in final
year project.
I am bringing 7 years 1 month of experience in commissioning engineer,operation
and maintenance.
Working as a Engineer (E3), responsible for the boiler and Turbine commissioning,
operation and maintenance.
Have a good understanding of background process conditions and operations.
Have adaptability to work in routine shift as well.
Have flexibility to relocate & travel if required.
Well versed and equiped in all the operational process related activities.
Having a good experience in starup and safe shutdown of plant
Had great experience in power plant commissioning operational and maintenance
utilities.
Good hard worker
Place: CHENNAI
Date: [S.VIVEK]
Page 7 of 2
Vivek_Resume
PAPER PRESENTATION
PROJECT DETAILS
HOW DO I MATCH