SlideShare a Scribd company logo
1 of 3
JAYANTA PAUL
AGARTALA,TRIPURA
CONTACT: -+91-8093521612,EMAIL: - jayanta_paul34@yahoo.com
PROJECT INSPECTION, EXECUTION & COMMISSIONING ENGINEER
Steel, Energy & Power industry
OBJECTIVE:-
Seeking a position in an organization that provides me ample opportunity to explore & excel with while carving out the niche for
personal, professional as well as organizational goals. in.
SUMMARY OF SKILLS:-
>With an experience of over 9.9 years at Project Execution, Commissioning & Inspection work of Piping & Structures for Hot
Strip Mill, Cold Roll Mill, Steel Melt Shop, and Coal Handling Plant & Nuclear Power Plant.
>Application of preventive, planned & predictive practicesensuringmaximum operational availabilitywith expertise in ensuring
adherence to Safety, Environment and Health standards.
PROFESSIONAL EXPERIENCE:-
 Working as a SENIOR INSPECTION ENGINEER PROJECT in SGS INDIA (Pvt.) Ltd. (Industrial Division) from
April’16 to Present.
 Project : BHUSHAN POWER & STEEL- STEEL MELT SHOP, SAMBALPUR ODISHA
JOB RESPONSIBILITY:-
Bhushan Steel- Steel Melt Shop new expansion project at Sambalpur Orissa is under construction stage where SGS India is
the Principal Inspection agency & mostly following responsibilities I have to deal with:
 Inspection of Structural & Piping work Fabrication and Erection job as per schedule.
 Checking& Certification of Contractor Billingwith reference toprogress on regular basis.
 Co-ordination between Client, design department and site for anyMajor on-site modifications.
 Issuance of fabrication, erection & alignment report on daily basis for contractor billing.
 Preparation & Maintaining records of daily progress after consultation with Client PMC Dept.
 Working as a SENIOR ENGINEER PROJECT in M.N.DASTUR &COMPANY (Pvt.) Ltd. (Construction Division)
from July’14 to March’ 16.
 Project :TATA STEEL KALINGANAGAR HOT STRIP MILL 3.0 MTPA PROJECT,ODISHA
JOB RESPONSIBILITY:-
Tata Steel Hot Strip mill project at Kalinga nagar is under construction stage where Dastur co is the Principal Consultant &I
am assigned with following responsibilities:
 Planning, scheduling and Detail supervision of Interconnecting piping at both Floor & Cellar for systems like e.g,
Hydraulics(Servo & Auxiliary), Utilities, Mill Drives Gear Oil & Motor Oil Lubrication System, DM Water for Panel Cooling &
Indirect CoolingWater system for Main Motor Cooling, Grease Lubrication system&On-board/Machine piping for Finishing&
Roughing Mill 1 & 2.
 Billing, contractor management,project co-ordination on regular basis.
 Co-ordination between design department and site for anyMajor on-site modifications.
 Preparation/Maintainingoferection, alignment, Hydro-testing, PicklingFlushing and qualityrelated documents.
ACHIEVEMENTS:-
 Pressure Testing, Pickling Flushing & Single Function Test for Finishing Mill Servo &Auxiliary Hydraulic system.
 Trial Run &Commissioning of Mill Drives, Gear& Motor Oil Lubrication System, Drive Cooling & Grease Lub oil
system, Fume Exhaust System & Transformer Fire Protection Sprinkling system for Finishing & Roughing Mill.
 Pressure Testing & Charging of Plant Utilities e.g, CO Gas, Chilled Water, Service Water, Drinking Water, Fire
Water, Compressed Air etc.
 Working as a DEPUTYMANAGER inMCNALLYBHARAT ENGINEERINGCOMPANYLIMITED(ProjectDivision)
from Aug’11 to June’14.
 Project : STEEL AUTHORITY OF INDIA LTD COLD ROLLING MILL-III, Bokaro, Jharkhand
JOB RESPONSIBILITY:-
 Fabrication, Erection, Hydro testing, Pickling Flushing, Trial Run/Integrated Commissioning of Medium &High Pressure
Hydraulic, Gear Oil Lub Piping for systems with Valve stand & On-board piping for Tandem Cold Mill and Pickling Line.
 Erection, Hydro testing& Commissioning of process/utility piping e.g, Compressed Air, Instrument Air, Industrial
Cooling Water, DM Water, Portable Water, Waste Water, Make up water etc with Installation of Pipe Rack.
 Erection & Charging of Steam/IBR piping including its insulation job for entire PLTCM.
 Monthly Billing process for the entire project with certification of Subcontractor’s Invoices.
 Preparation, Submission& certification of Extra Claims.
ACHIEVEMENTS:-
 Successful Commissioning of HydraulicPower Packs, Valve Stands& High/Medium Pressure Piping for Pickling Line and
Tandem Mill including Mill House at pressure 130 bar & 330 bar.
SPECIAL ACHIEVEMENTS:-
•First Coil production with Reduction in sheet thickness up to 0.7 mm on 31 st July’2013 & Obtaining PAC for Coupled
Pickling Line and Tandem Cold Mill at CRM-III, Bokaro Steel Plant, SAIL.
 Working as an ASSISTANT MANAGER in MCNALLY BHARAT ENGINEERING COMPANY LIMITED
(Infrastructure Division) from Nov’10 to Aug’11.
 Project :VEDANTA ALLUMINIUM LIMITED (IPP-600X4MW &CPP-135X9 MW),Jharsuguda,Odisha
JOB RESPONSIBILITY:-
 Looking after Dry Fog and Plain Water Dust Suppression System for Integrated Coal Handling Plant at IPP and CPP area-
Truck Tippler & Wagon Tippler project with Installation of Pump House and Compressor Station.
 Ventilation & plant Fire Fighting system for Truck Tippler house, Conveyor Tunnel and MCC Room of IPP & CPP.
ACHIEVEMENTS:-
 Commissioning of DFDS, PWDSS, Fire Fighting and Ventilation system for Truck Tippler of IPP & CPP.
 Completion of Final Material Accounting Statement with certification of final billing.
 SPECIAL ACHIEVEMENTS:-
•Obtaining PAC for Truck Tippler System for IPP & CPP from VEDANTA ALLUMINIUM LIMITED after Commissioning.
 Working as an ENGINEER GRADUATE TRAINEE& ASSISTANT MANAGER in NICCO CORPORATION LTD.
(Project Division) up to Nov’10.
 .Project :NPCIL, RAPP-5&6(250X2MW), Kota, Rajasthan May 2007 to March 2010
> . Project : TATA STEEL3.0MTPA LD3WATERTREATMENT PLANT, Jamshedpur up to November 2010
JOB RESPONSIBILITY:-
 Fabrication, Erection, Hydro/Pneumatic testing, Trial Run & Integrated Commissioning of unit piping job for VRS
(Vapour Recovery System)&CAVS (Contaminated Air Ventilation System),.
 Fabrication & Erection Rack/Yard piping for Water Treatment System LD3.
 Erection of equipments e,g. Pumps, Heat Exchangers, Pre cooler, Moister Separator, Vessels, Blowers etc.
 Preparation, certification of Billing as per predefined target/progress.
ACHIEVEMENTS:-
 Successful completion of Erection, Testing, Integrated commissioning, Insulation with Final Material
Accounting statement, Amendment of Order from NPCIL, Mumbai , Settlement of Final Bill , certification of
Extra claim for Vapour Recovery Package & Contaminated Air Ventilation System of NPCIL,RAPP-5 &6 Unit.
 SPECIAL ACHIEVEMENTS:-
• Obtaining PAC & FAC for VRS & CAVS System from NPCIL.
• Certification of Supply and Service Final Bill with substantial amount of extra claim settlement.
EDUCATIONAL QUALIFICATION:-
 Completed Secondary Standard in the year-1999, from Tripura Board Of Secondary Education with an Aggregate of 71.75%.
 Completed Higher Secondary Standard in the year-2001, from Tripura Board Of Secondary Education with an Aggregate of
66.75%.
PROFESSIONAL QUALIFICATION:-
♦ Bachelor of Engineering (B.E) in MECHANICAL from NATIONAL INSTITUTE OF TECHNOLOGY, AGARTALA in the year-2006,
with an Aggregate of 76.05 %.
♦ NDT Level-II Certification course in PT, MPT & RT.
DECELERATION:-
I do here by declare that the particulars of information and facts stated here in above are true, correct and complete to the best
of my knowledge and belief.
Place: Jharsuguda Sambalpur, Odisha.
Date:
JAYANTA PAUL

More Related Content

What's hot (20)

Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New Resume
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
 
rajpanday
rajpandayrajpanday
rajpanday
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
Bansil Resume field operator
Bansil Resume field operatorBansil Resume field operator
Bansil Resume field operator
 
CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!CV.- Sayed Asghar Mosavi VA Version!
CV.- Sayed Asghar Mosavi VA Version!
 
CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 
CV - Nasir Muzaffar (Chemical Eng.)
CV - Nasir Muzaffar (Chemical Eng.)CV - Nasir Muzaffar (Chemical Eng.)
CV - Nasir Muzaffar (Chemical Eng.)
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
sengu cv
sengu cvsengu cv
sengu cv
 
MANIKANDAN KOTHANDAN_original
MANIKANDAN KOTHANDAN_originalMANIKANDAN KOTHANDAN_original
MANIKANDAN KOTHANDAN_original
 
SHASHIKANT (2)
SHASHIKANT (2)SHASHIKANT (2)
SHASHIKANT (2)
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 
My latest cv 1
My latest cv 1My latest cv 1
My latest cv 1
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
MUHAMMAD ASIF CV - JUNE-2016
MUHAMMAD ASIF CV  -  JUNE-2016MUHAMMAD ASIF CV  -  JUNE-2016
MUHAMMAD ASIF CV - JUNE-2016
 

Viewers also liked

Resume of Dr Aunt Khine MBA 3 2013 MM Revised
Resume of Dr Aunt Khine MBA 3 2013 MM RevisedResume of Dr Aunt Khine MBA 3 2013 MM Revised
Resume of Dr Aunt Khine MBA 3 2013 MM RevisedAunt Khine
 
11 07 SIVAM KRISHNASWAMY RESUME
11 07  SIVAM KRISHNASWAMY RESUME11 07  SIVAM KRISHNASWAMY RESUME
11 07 SIVAM KRISHNASWAMY RESUMESivam Krishnasamy
 

Viewers also liked (9)

Anual report 1112
Anual report 1112Anual report 1112
Anual report 1112
 
Mech.pdf
Mech.pdfMech.pdf
Mech.pdf
 
4 YEARS EXP RESUME
4 YEARS EXP RESUME4 YEARS EXP RESUME
4 YEARS EXP RESUME
 
Resume - Mudit (1)
Resume - Mudit (1)Resume - Mudit (1)
Resume - Mudit (1)
 
PATHAN ASIF CV
PATHAN ASIF CVPATHAN ASIF CV
PATHAN ASIF CV
 
Resume of Dr Aunt Khine MBA 3 2013 MM Revised
Resume of Dr Aunt Khine MBA 3 2013 MM RevisedResume of Dr Aunt Khine MBA 3 2013 MM Revised
Resume of Dr Aunt Khine MBA 3 2013 MM Revised
 
new C.v.update_antonio2
new C.v.update_antonio2new C.v.update_antonio2
new C.v.update_antonio2
 
11 07 SIVAM KRISHNASWAMY RESUME
11 07  SIVAM KRISHNASWAMY RESUME11 07  SIVAM KRISHNASWAMY RESUME
11 07 SIVAM KRISHNASWAMY RESUME
 
Resume - Self
Resume - SelfResume - Self
Resume - Self
 

Similar to RESUME-Latest (20)

MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
lal bahadur CVF
lal bahadur CVFlal bahadur CVF
lal bahadur CVF
 
cv
cvcv
cv
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
PM_SSN_Steel.
PM_SSN_Steel.PM_SSN_Steel.
PM_SSN_Steel.
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
Cv tapan kumar prusty updated
Cv tapan kumar prusty updatedCv tapan kumar prusty updated
Cv tapan kumar prusty updated
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Sundar Resume
Sundar ResumeSundar Resume
Sundar Resume
 
Bharat New Resume May16
Bharat New Resume May16Bharat New Resume May16
Bharat New Resume May16
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
tamuthu
tamuthutamuthu
tamuthu
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
 
BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)BINOD UPDATED RESUME (2)
BINOD UPDATED RESUME (2)
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CV
 
amit resume - Copy
amit resume - Copyamit resume - Copy
amit resume - Copy
 
Shiv Shankar @Resume
Shiv Shankar @ResumeShiv Shankar @Resume
Shiv Shankar @Resume
 
Shiv Shankar @Resume
Shiv Shankar @ResumeShiv Shankar @Resume
Shiv Shankar @Resume
 

RESUME-Latest

  • 1. JAYANTA PAUL AGARTALA,TRIPURA CONTACT: -+91-8093521612,EMAIL: - jayanta_paul34@yahoo.com PROJECT INSPECTION, EXECUTION & COMMISSIONING ENGINEER Steel, Energy & Power industry OBJECTIVE:- Seeking a position in an organization that provides me ample opportunity to explore & excel with while carving out the niche for personal, professional as well as organizational goals. in. SUMMARY OF SKILLS:- >With an experience of over 9.9 years at Project Execution, Commissioning & Inspection work of Piping & Structures for Hot Strip Mill, Cold Roll Mill, Steel Melt Shop, and Coal Handling Plant & Nuclear Power Plant. >Application of preventive, planned & predictive practicesensuringmaximum operational availabilitywith expertise in ensuring adherence to Safety, Environment and Health standards. PROFESSIONAL EXPERIENCE:-  Working as a SENIOR INSPECTION ENGINEER PROJECT in SGS INDIA (Pvt.) Ltd. (Industrial Division) from April’16 to Present.  Project : BHUSHAN POWER & STEEL- STEEL MELT SHOP, SAMBALPUR ODISHA JOB RESPONSIBILITY:- Bhushan Steel- Steel Melt Shop new expansion project at Sambalpur Orissa is under construction stage where SGS India is the Principal Inspection agency & mostly following responsibilities I have to deal with:  Inspection of Structural & Piping work Fabrication and Erection job as per schedule.  Checking& Certification of Contractor Billingwith reference toprogress on regular basis.  Co-ordination between Client, design department and site for anyMajor on-site modifications.  Issuance of fabrication, erection & alignment report on daily basis for contractor billing.  Preparation & Maintaining records of daily progress after consultation with Client PMC Dept.  Working as a SENIOR ENGINEER PROJECT in M.N.DASTUR &COMPANY (Pvt.) Ltd. (Construction Division) from July’14 to March’ 16.  Project :TATA STEEL KALINGANAGAR HOT STRIP MILL 3.0 MTPA PROJECT,ODISHA JOB RESPONSIBILITY:- Tata Steel Hot Strip mill project at Kalinga nagar is under construction stage where Dastur co is the Principal Consultant &I am assigned with following responsibilities:  Planning, scheduling and Detail supervision of Interconnecting piping at both Floor & Cellar for systems like e.g, Hydraulics(Servo & Auxiliary), Utilities, Mill Drives Gear Oil & Motor Oil Lubrication System, DM Water for Panel Cooling & Indirect CoolingWater system for Main Motor Cooling, Grease Lubrication system&On-board/Machine piping for Finishing& Roughing Mill 1 & 2.  Billing, contractor management,project co-ordination on regular basis.  Co-ordination between design department and site for anyMajor on-site modifications.  Preparation/Maintainingoferection, alignment, Hydro-testing, PicklingFlushing and qualityrelated documents.
  • 2. ACHIEVEMENTS:-  Pressure Testing, Pickling Flushing & Single Function Test for Finishing Mill Servo &Auxiliary Hydraulic system.  Trial Run &Commissioning of Mill Drives, Gear& Motor Oil Lubrication System, Drive Cooling & Grease Lub oil system, Fume Exhaust System & Transformer Fire Protection Sprinkling system for Finishing & Roughing Mill.  Pressure Testing & Charging of Plant Utilities e.g, CO Gas, Chilled Water, Service Water, Drinking Water, Fire Water, Compressed Air etc.  Working as a DEPUTYMANAGER inMCNALLYBHARAT ENGINEERINGCOMPANYLIMITED(ProjectDivision) from Aug’11 to June’14.  Project : STEEL AUTHORITY OF INDIA LTD COLD ROLLING MILL-III, Bokaro, Jharkhand JOB RESPONSIBILITY:-  Fabrication, Erection, Hydro testing, Pickling Flushing, Trial Run/Integrated Commissioning of Medium &High Pressure Hydraulic, Gear Oil Lub Piping for systems with Valve stand & On-board piping for Tandem Cold Mill and Pickling Line.  Erection, Hydro testing& Commissioning of process/utility piping e.g, Compressed Air, Instrument Air, Industrial Cooling Water, DM Water, Portable Water, Waste Water, Make up water etc with Installation of Pipe Rack.  Erection & Charging of Steam/IBR piping including its insulation job for entire PLTCM.  Monthly Billing process for the entire project with certification of Subcontractor’s Invoices.  Preparation, Submission& certification of Extra Claims. ACHIEVEMENTS:-  Successful Commissioning of HydraulicPower Packs, Valve Stands& High/Medium Pressure Piping for Pickling Line and Tandem Mill including Mill House at pressure 130 bar & 330 bar. SPECIAL ACHIEVEMENTS:- •First Coil production with Reduction in sheet thickness up to 0.7 mm on 31 st July’2013 & Obtaining PAC for Coupled Pickling Line and Tandem Cold Mill at CRM-III, Bokaro Steel Plant, SAIL.  Working as an ASSISTANT MANAGER in MCNALLY BHARAT ENGINEERING COMPANY LIMITED (Infrastructure Division) from Nov’10 to Aug’11.  Project :VEDANTA ALLUMINIUM LIMITED (IPP-600X4MW &CPP-135X9 MW),Jharsuguda,Odisha JOB RESPONSIBILITY:-  Looking after Dry Fog and Plain Water Dust Suppression System for Integrated Coal Handling Plant at IPP and CPP area- Truck Tippler & Wagon Tippler project with Installation of Pump House and Compressor Station.  Ventilation & plant Fire Fighting system for Truck Tippler house, Conveyor Tunnel and MCC Room of IPP & CPP. ACHIEVEMENTS:-  Commissioning of DFDS, PWDSS, Fire Fighting and Ventilation system for Truck Tippler of IPP & CPP.  Completion of Final Material Accounting Statement with certification of final billing.  SPECIAL ACHIEVEMENTS:- •Obtaining PAC for Truck Tippler System for IPP & CPP from VEDANTA ALLUMINIUM LIMITED after Commissioning.
  • 3.  Working as an ENGINEER GRADUATE TRAINEE& ASSISTANT MANAGER in NICCO CORPORATION LTD. (Project Division) up to Nov’10.  .Project :NPCIL, RAPP-5&6(250X2MW), Kota, Rajasthan May 2007 to March 2010 > . Project : TATA STEEL3.0MTPA LD3WATERTREATMENT PLANT, Jamshedpur up to November 2010 JOB RESPONSIBILITY:-  Fabrication, Erection, Hydro/Pneumatic testing, Trial Run & Integrated Commissioning of unit piping job for VRS (Vapour Recovery System)&CAVS (Contaminated Air Ventilation System),.  Fabrication & Erection Rack/Yard piping for Water Treatment System LD3.  Erection of equipments e,g. Pumps, Heat Exchangers, Pre cooler, Moister Separator, Vessels, Blowers etc.  Preparation, certification of Billing as per predefined target/progress. ACHIEVEMENTS:-  Successful completion of Erection, Testing, Integrated commissioning, Insulation with Final Material Accounting statement, Amendment of Order from NPCIL, Mumbai , Settlement of Final Bill , certification of Extra claim for Vapour Recovery Package & Contaminated Air Ventilation System of NPCIL,RAPP-5 &6 Unit.  SPECIAL ACHIEVEMENTS:- • Obtaining PAC & FAC for VRS & CAVS System from NPCIL. • Certification of Supply and Service Final Bill with substantial amount of extra claim settlement. EDUCATIONAL QUALIFICATION:-  Completed Secondary Standard in the year-1999, from Tripura Board Of Secondary Education with an Aggregate of 71.75%.  Completed Higher Secondary Standard in the year-2001, from Tripura Board Of Secondary Education with an Aggregate of 66.75%. PROFESSIONAL QUALIFICATION:- ♦ Bachelor of Engineering (B.E) in MECHANICAL from NATIONAL INSTITUTE OF TECHNOLOGY, AGARTALA in the year-2006, with an Aggregate of 76.05 %. ♦ NDT Level-II Certification course in PT, MPT & RT. DECELERATION:- I do here by declare that the particulars of information and facts stated here in above are true, correct and complete to the best of my knowledge and belief. Place: Jharsuguda Sambalpur, Odisha. Date: JAYANTA PAUL