1. JAYANTA PAUL
AGARTALA,TRIPURA
CONTACT: -+91-8093521612,EMAIL: - jayanta_paul34@yahoo.com
PROJECT INSPECTION, EXECUTION & COMMISSIONING ENGINEER
Steel, Energy & Power industry
OBJECTIVE:-
Seeking a position in an organization that provides me ample opportunity to explore & excel with while carving out the niche for
personal, professional as well as organizational goals. in.
SUMMARY OF SKILLS:-
>With an experience of over 9.9 years at Project Execution, Commissioning & Inspection work of Piping & Structures for Hot
Strip Mill, Cold Roll Mill, Steel Melt Shop, and Coal Handling Plant & Nuclear Power Plant.
>Application of preventive, planned & predictive practicesensuringmaximum operational availabilitywith expertise in ensuring
adherence to Safety, Environment and Health standards.
PROFESSIONAL EXPERIENCE:-
Working as a SENIOR INSPECTION ENGINEER PROJECT in SGS INDIA (Pvt.) Ltd. (Industrial Division) from
April’16 to Present.
Project : BHUSHAN POWER & STEEL- STEEL MELT SHOP, SAMBALPUR ODISHA
JOB RESPONSIBILITY:-
Bhushan Steel- Steel Melt Shop new expansion project at Sambalpur Orissa is under construction stage where SGS India is
the Principal Inspection agency & mostly following responsibilities I have to deal with:
Inspection of Structural & Piping work Fabrication and Erection job as per schedule.
Checking& Certification of Contractor Billingwith reference toprogress on regular basis.
Co-ordination between Client, design department and site for anyMajor on-site modifications.
Issuance of fabrication, erection & alignment report on daily basis for contractor billing.
Preparation & Maintaining records of daily progress after consultation with Client PMC Dept.
Working as a SENIOR ENGINEER PROJECT in M.N.DASTUR &COMPANY (Pvt.) Ltd. (Construction Division)
from July’14 to March’ 16.
Project :TATA STEEL KALINGANAGAR HOT STRIP MILL 3.0 MTPA PROJECT,ODISHA
JOB RESPONSIBILITY:-
Tata Steel Hot Strip mill project at Kalinga nagar is under construction stage where Dastur co is the Principal Consultant &I
am assigned with following responsibilities:
Planning, scheduling and Detail supervision of Interconnecting piping at both Floor & Cellar for systems like e.g,
Hydraulics(Servo & Auxiliary), Utilities, Mill Drives Gear Oil & Motor Oil Lubrication System, DM Water for Panel Cooling &
Indirect CoolingWater system for Main Motor Cooling, Grease Lubrication system&On-board/Machine piping for Finishing&
Roughing Mill 1 & 2.
Billing, contractor management,project co-ordination on regular basis.
Co-ordination between design department and site for anyMajor on-site modifications.
Preparation/Maintainingoferection, alignment, Hydro-testing, PicklingFlushing and qualityrelated documents.
2. ACHIEVEMENTS:-
Pressure Testing, Pickling Flushing & Single Function Test for Finishing Mill Servo &Auxiliary Hydraulic system.
Trial Run &Commissioning of Mill Drives, Gear& Motor Oil Lubrication System, Drive Cooling & Grease Lub oil
system, Fume Exhaust System & Transformer Fire Protection Sprinkling system for Finishing & Roughing Mill.
Pressure Testing & Charging of Plant Utilities e.g, CO Gas, Chilled Water, Service Water, Drinking Water, Fire
Water, Compressed Air etc.
Working as a DEPUTYMANAGER inMCNALLYBHARAT ENGINEERINGCOMPANYLIMITED(ProjectDivision)
from Aug’11 to June’14.
Project : STEEL AUTHORITY OF INDIA LTD COLD ROLLING MILL-III, Bokaro, Jharkhand
JOB RESPONSIBILITY:-
Fabrication, Erection, Hydro testing, Pickling Flushing, Trial Run/Integrated Commissioning of Medium &High Pressure
Hydraulic, Gear Oil Lub Piping for systems with Valve stand & On-board piping for Tandem Cold Mill and Pickling Line.
Erection, Hydro testing& Commissioning of process/utility piping e.g, Compressed Air, Instrument Air, Industrial
Cooling Water, DM Water, Portable Water, Waste Water, Make up water etc with Installation of Pipe Rack.
Erection & Charging of Steam/IBR piping including its insulation job for entire PLTCM.
Monthly Billing process for the entire project with certification of Subcontractor’s Invoices.
Preparation, Submission& certification of Extra Claims.
ACHIEVEMENTS:-
Successful Commissioning of HydraulicPower Packs, Valve Stands& High/Medium Pressure Piping for Pickling Line and
Tandem Mill including Mill House at pressure 130 bar & 330 bar.
SPECIAL ACHIEVEMENTS:-
•First Coil production with Reduction in sheet thickness up to 0.7 mm on 31 st July’2013 & Obtaining PAC for Coupled
Pickling Line and Tandem Cold Mill at CRM-III, Bokaro Steel Plant, SAIL.
Working as an ASSISTANT MANAGER in MCNALLY BHARAT ENGINEERING COMPANY LIMITED
(Infrastructure Division) from Nov’10 to Aug’11.
Project :VEDANTA ALLUMINIUM LIMITED (IPP-600X4MW &CPP-135X9 MW),Jharsuguda,Odisha
JOB RESPONSIBILITY:-
Looking after Dry Fog and Plain Water Dust Suppression System for Integrated Coal Handling Plant at IPP and CPP area-
Truck Tippler & Wagon Tippler project with Installation of Pump House and Compressor Station.
Ventilation & plant Fire Fighting system for Truck Tippler house, Conveyor Tunnel and MCC Room of IPP & CPP.
ACHIEVEMENTS:-
Commissioning of DFDS, PWDSS, Fire Fighting and Ventilation system for Truck Tippler of IPP & CPP.
Completion of Final Material Accounting Statement with certification of final billing.
SPECIAL ACHIEVEMENTS:-
•Obtaining PAC for Truck Tippler System for IPP & CPP from VEDANTA ALLUMINIUM LIMITED after Commissioning.
3. Working as an ENGINEER GRADUATE TRAINEE& ASSISTANT MANAGER in NICCO CORPORATION LTD.
(Project Division) up to Nov’10.
.Project :NPCIL, RAPP-5&6(250X2MW), Kota, Rajasthan May 2007 to March 2010
> . Project : TATA STEEL3.0MTPA LD3WATERTREATMENT PLANT, Jamshedpur up to November 2010
JOB RESPONSIBILITY:-
Fabrication, Erection, Hydro/Pneumatic testing, Trial Run & Integrated Commissioning of unit piping job for VRS
(Vapour Recovery System)&CAVS (Contaminated Air Ventilation System),.
Fabrication & Erection Rack/Yard piping for Water Treatment System LD3.
Erection of equipments e,g. Pumps, Heat Exchangers, Pre cooler, Moister Separator, Vessels, Blowers etc.
Preparation, certification of Billing as per predefined target/progress.
ACHIEVEMENTS:-
Successful completion of Erection, Testing, Integrated commissioning, Insulation with Final Material
Accounting statement, Amendment of Order from NPCIL, Mumbai , Settlement of Final Bill , certification of
Extra claim for Vapour Recovery Package & Contaminated Air Ventilation System of NPCIL,RAPP-5 &6 Unit.
SPECIAL ACHIEVEMENTS:-
• Obtaining PAC & FAC for VRS & CAVS System from NPCIL.
• Certification of Supply and Service Final Bill with substantial amount of extra claim settlement.
EDUCATIONAL QUALIFICATION:-
Completed Secondary Standard in the year-1999, from Tripura Board Of Secondary Education with an Aggregate of 71.75%.
Completed Higher Secondary Standard in the year-2001, from Tripura Board Of Secondary Education with an Aggregate of
66.75%.
PROFESSIONAL QUALIFICATION:-
♦ Bachelor of Engineering (B.E) in MECHANICAL from NATIONAL INSTITUTE OF TECHNOLOGY, AGARTALA in the year-2006,
with an Aggregate of 76.05 %.
♦ NDT Level-II Certification course in PT, MPT & RT.
DECELERATION:-
I do here by declare that the particulars of information and facts stated here in above are true, correct and complete to the best
of my knowledge and belief.
Place: Jharsuguda Sambalpur, Odisha.
Date:
JAYANTA PAUL