SlideShare a Scribd company logo
1 of 4
Download to read offline
Gaurav Sharma
A-1/72 Sector-18 Rohini Delhi-110089 | +91 85 27494760 | gaurav14907@gmail.com
OBJECTIVE
Commit myself for dedicated hard work to develop skills and acquire knowledge to make a meaningful contribution to the
industry with strong emphasis on collaboration and team work.
EDUCATION
Indian School of Mines (ISM), Dhanbad 2008 - 2012
Bachelor of Technology, Petroleum Engineering | OGPA Overall Grade Point Average (Max-10.00): 7.75/10
Internships and project work:
1. “OPTIMIZATION AND DEVELOPMENT OF BROWN FIELD WITH ASP PILOT IMPLEMENTATION” at “Institute For
Reservoir Studies” and Ahmedabad Asset (Sub-Surface Team): This was a project on a satellite field name “VIRAJ” where ASP
pilot was implemented. In this project various constraints of the field and current ASP pilot design was evaluated and optimization
of production and ASP was done.
2. “SINGLE STEP MATRIX ACIDIZATION” at Well stimulation services (ONGC Ahmedabad): In this project technique for
eliminating preflush stage in Mud acid stimulation was studied for “KALOL” field in Ahmedabad asset.
PROFESSIONAL EXPERIENCE
HINDUSTAN OIL EXPLORATION COMPANY, Chennai, INDIA | Petroleum Engineer From June 2015- Present
Responsible for the designing, planning and operations execution from petroleum engineering side for the development of a
Gas field with envisaged sanding problems, which includes following activities:
 PREPARATION OF FIELD DEVEOPMENT PLAN : IT INCLUDES GIVEN BELOW ACTIVITIES:
 Well test interpretation of last well tests of existing exploratory and appraisal wells.
 Preparation of PVT model with the CME, CVD and CCE experiment results for the estimating the retrograde
condensation behavior of the fluid, establishing fluid parameters and condensate gas ratio .
 Finalization of development strategy focusing on maximum recovery from each sand within optimum recovery
period.
 Development of dynamic model with numerical simulator (ECLIPSE 100) with the history matching of existing
production data and incorporating the developed static model data .
 Establishing gas water contacts with the MDT data and petro physical logs.
 Incorporation of static model while upscaling the existing static model to incorporate it in the simulation model.
 History matching of the existing well testing data and finalization of permeability and skin factors for different
sands.
 Perform sensitivities on the model with hydraulic fracturing of highly damaged zones (as per test data)
 Preparation of the budget and cost estimate for the project.
 Designing of artificial lift strategy for liquid unloading: This includes evaluating and establishing artificial lift for
unloading wells with the simulated reservoir pressures and liquid loading criteria’s.
 Evaluation of the sand control strategy : This includes the selection of the appropriate sand control strategy
considering the geo mechanics model, completion strategy, production commitments and PSD data (from offset well).
 Designing of the completion strategy which involve:
 Modeling of the completion string post development of nodal analysis last well tests and as per the proposed
production rates.
 Completion string design considering the proposed operation, expected production rates and expected load
cases.
 Sand screen design considering the offset PSD data.
 Candidate selection for well stimulation opportunity.
.
 DESIGN AND EXECUTION OF THE OPERATIONS: IT INCLUDES GIVEN BELOW ACTIVITIES:
 Preparation of the Scope and tender evaluation for Hydraulic Fracturing, Completion, Wireline, Coil tubing and Surface
well testing services.
 Well stimulation well selection and designing of stimulation jobs for wells with highly damaged zones (during drilling and
testing).
 Modeling of Post hydraulic fracturing well wise and field production rates.
 Preparation of operation plan for the completion and workover operations.
 Preparation of operation plan for Well activation and well testing operations.
ENQUEST PRIVATE LTD. | Petroleum Engineer From April 2015- May 2015
Petroleum Drilling Engineer:
Responsible for design, tendering and execution of the well testing activities from project management side for 6
on shore exploration well campaign of IOCL in CAMBAY basin.
 Preparation of well design document.
 Prepared work programs for drilling and testing of exploration wells in cambay basin.
 Preparation of the scope of work for testing services and evaluation of the tender .
CAIRN INDIA LTD, Gurgaon, INDIA | Petroleum Engineer From April 2012 – February 2015
Petroleum engineer:
Offshore completion engineer:
 Designed work programs of standalone screen completions with SSDs and gas lift valves as completion jewellery for
shallow water wells of Lakshmi field in CAMBAY basin.
 Design and execution of Frac pack completion in Lakshmi field – a successful case history of reduction in sand
production using Frac Pack completion for Cairn India which includes:
 Preparation of workover and frac pack program.
 Designing of service tool for the operation.
 Supervision of workover, Frac pack and well activation with N2-lift operation.
 Played instrumental role in the operational and design for well testing for HPHT well project( Max BHP: 13000
psi, Max BHT: 437 Deg F) which includes:
 Design of surface system layout for flow back, well testing and flaring.
 Design of metallurgy of tubular and completion jewellery like (Packer circulation valve, string tester valves and tubing
tester valve) for DST string.
 Preparation of the design and operational program for the well testing.
 Worked as a night company man at rig site to supervise/execute completion activities.
 Co-ordinated slick-line and e-line jobs in offshore wells in standalone platforms.
Onshore completion engineer:
 Managed successful campaign for open hole completions and multistage fracturing ( First time in India) in
Barmer hill horizontal wells which includes:
 Designing and procurement of completions equipments Frac sleeve’s with ball drop system, high differential swell
packers, liner hangers and Frac tree’s.
 Preparation of completion and fracturing program and managing of completion operations for open hole completions in
horizontal wells for multistage fracturing.
 Managing of packer replacement workovers of multistage fractured horizontal wells.
 Managed campaign of the workover’s of appraisal wells of satellite fields which includes:
 Designing and procurement of completion equipments for Satellite field wells.
 Planning and execution of workover operations in the appraisal wells.
 Planned and executed gas shut off job in NI field – a successful case history of gas channelling shut off using
resin (First time in Asia) which includes:
 Identification of gas channeling medium which includes evaluation of chan plots, production data and formation logs.
 Design and procurement of Well lock chemical (gas shut off chemical).
 Designing, planning and execution of the workover job.
 Experience of designing, formulation of programs and execution of different types of completions for Rajasthan
onshore fields:
 Open hole completion with stand alone screens, ICD screens, Screen with SSD and slotted liner in Mangala Field.
 Cased hole PCP completion with TCP shoot and pull perforation and flow back operations in Bhagyam Field.
 Cased hole liner hanger completions for high pressure Deep gas wells.
 Open hole completions with frac sleeve’s and swell packers for multistage fracturing in Barmer Hill.
 ESP completion with multi-string (chemical injection line, ESP MLE cable and heater string for hot water circulation)
and fluid loss control valve in Mangala Horizontal wells (prone to high losses).
 ESP completion with Y-block and provision to facilitate jet pumping.
 Managed campaign for ESP installation in Aishwarya field which includes:
 Designing of multi bore production packer.
 Preparation of installation programs.
 Managing contract and inventory for completion and ESP equipments.
 FIT test of multi bore packers, packer penetrators, wellhead penetrators and function test of ESP pumps( in service
provider facility).
 Onsite supervision of completion and workover operations for ESP installations.
 Designed and executed well revival’s of Raageshwari deep gas field which includes:
 Designing of the tubular’s and completion jewellery as per the load cases for current workover’s and future well
revival activities.
 Formulation of well killing and fishing programs and repair of the malfunctioned sub-surface safety valves.
 Formulation of well activation programs.
 Single point accountability for 2 workover rigs from May 2013 – Feb 2014 while keeping a record of rig contract,
downtime, operational time, rig move time and zero rate time.
 Commissioned on land workover rig and prepared rig commissioning report.
 Worked as a night company man and completed over 10 ESP workovers in Mangala and Aishwarya field in Rajasthan.
 Performed completion string design, tubing stress analysis and string movement analysis for workovers in deep gas
wells, PCP completions and ESP completions.
Area in-charge for Raageshwari Oil and Tukaram Field:
 Played the role of area in-charge for Raageshwari Oil (Satellite field ( Production 1000 BOPD, Average GOR 1500
scf/bbl) where responsibility was for the following activities:
 Daily Production optimization.
 Intervention Job (Well stimulation, Well activation) opportunity identification.
 Updation of Chan plots, production plot, History matching plots etc.
 Upgradation of surface facilities for gas handling.
 Co-ordination for the preparation of FDP with sub-surface, drilling and production.
PROFESSIONAL COURSES:
 PVT Analysis Course by Dr. Bahman Tohidi :
 Classroom training program on PVT Analysis and Phase behaviour of reservoir fluids.
 IWCF Well control(Surface and Subsea).
 Well control certificate valid till Mar 2016.
 Completion design with Well CAT, Halliburton.
 Completion design on real well data.
 Advanced Gas Lift Modeling.
 Fundamentals of Gas lift, Gas lift modeling using Prosper, Hands on Gas lift design and optimization with real well
data of Cairn India offshore Ravva field.
 ESP Experts, Schlumberger, Singapore
 Classroom training on basics of ESPs, design, monitoring, troubleshooting and optimization. Hands on training on
ESP design and installation in a dummy well.
 Sand Control course, Schlumberger.
 Fundamentals of Screen selection, sieve analysis and design of Gravel pack and Frac pack.
SOFTWARE COMPETANCY:
 PETREL
 ECLIPSE 100,300
 IPM (Prosper).
 KAPPA(SPPHIRE, TOPA, EMERAUDE).
 Well CAT.
 Landmark (Well Plan).
 Cerebrus.
 Design Rite.
REFERENCES:
MR.DEBABRATA PANDA
HEAD DRILLING AND COMPLETIONS
HINDUSTAN OIL EXPLORATION COMPANY
EMAIL ID: DPANDA@HOEC.COM
Mr. SHOBHIT TIWARI
GENERAL MANAGER
PETROLEUM ENGINEERING DEPARTMENT
CAIRN INDIA PVT. LTD.
EMAIL ID: SHOBHITTIWARI@HOTMAIL.COM

More Related Content

What's hot

What's hot (19)

CV Mani
CV ManiCV Mani
CV Mani
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
Ahmed Khalil Engineering role
Ahmed Khalil Engineering roleAhmed Khalil Engineering role
Ahmed Khalil Engineering role
 
Najam Cv
Najam CvNajam Cv
Najam Cv
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
CONNEXUS_WoF_2
CONNEXUS_WoF_2CONNEXUS_WoF_2
CONNEXUS_WoF_2
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
CV for ahmed(1)
CV for ahmed(1)CV for ahmed(1)
CV for ahmed(1)
 
Managing Performance of High Recycle Asphalt Mixtures
Managing Performance of High Recycle Asphalt MixturesManaging Performance of High Recycle Asphalt Mixtures
Managing Performance of High Recycle Asphalt Mixtures
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
Breaking Paradigms in old Fields. Finding “the reservoir key” for Mature Fiel...
 
CV_RuchiraDas
CV_RuchiraDasCV_RuchiraDas
CV_RuchiraDas
 
CV C Pieroni Sept 2016 (3)
CV C Pieroni  Sept 2016 (3)CV C Pieroni  Sept 2016 (3)
CV C Pieroni Sept 2016 (3)
 
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - CopyCV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
CV-NOEL KURTZIOUS-SENIOR PROJECT MANAGER-ENGINEER - Copy
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
Eugene Jose
Eugene JoseEugene Jose
Eugene Jose
 

Viewers also liked

Information-Governance-Saves-Millions-for-national-defense-contractor
Information-Governance-Saves-Millions-for-national-defense-contractorInformation-Governance-Saves-Millions-for-national-defense-contractor
Information-Governance-Saves-Millions-for-national-defense-contractorMark Tango
 
Why every man should wear a silver bracelet
Why every man should wear a silver braceletWhy every man should wear a silver bracelet
Why every man should wear a silver braceletExperion Institute, Inc.
 
薬歴未記入問題の原因とその解決方法
薬歴未記入問題の原因とその解決方法薬歴未記入問題の原因とその解決方法
薬歴未記入問題の原因とその解決方法Tomoro Endo
 
Hearing protection for airport workers
Hearing protection for airport workers Hearing protection for airport workers
Hearing protection for airport workers Lourdes Valdés
 
Active and-passive-voice
Active and-passive-voiceActive and-passive-voice
Active and-passive-voicemrzutp
 
Tango_ArticleMay15
Tango_ArticleMay15Tango_ArticleMay15
Tango_ArticleMay15Mark Tango
 
Present Perfect / Past Simple
Present Perfect / Past SimplePresent Perfect / Past Simple
Present Perfect / Past Simplemrzutp
 

Viewers also liked (9)

Information-Governance-Saves-Millions-for-national-defense-contractor
Information-Governance-Saves-Millions-for-national-defense-contractorInformation-Governance-Saves-Millions-for-national-defense-contractor
Information-Governance-Saves-Millions-for-national-defense-contractor
 
Why every man should wear a silver bracelet
Why every man should wear a silver braceletWhy every man should wear a silver bracelet
Why every man should wear a silver bracelet
 
薬歴未記入問題の原因とその解決方法
薬歴未記入問題の原因とその解決方法薬歴未記入問題の原因とその解決方法
薬歴未記入問題の原因とその解決方法
 
Antiques by experion institute
Antiques by experion instituteAntiques by experion institute
Antiques by experion institute
 
Hearing protection for airport workers
Hearing protection for airport workers Hearing protection for airport workers
Hearing protection for airport workers
 
Active and-passive-voice
Active and-passive-voiceActive and-passive-voice
Active and-passive-voice
 
Tango_ArticleMay15
Tango_ArticleMay15Tango_ArticleMay15
Tango_ArticleMay15
 
Present Perfect / Past Simple
Present Perfect / Past SimplePresent Perfect / Past Simple
Present Perfect / Past Simple
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 

Similar to Gaurav Sharma - Petroleum Engineer LATEST 2017

Similar to Gaurav Sharma - Petroleum Engineer LATEST 2017 (20)

Cv career history
Cv   career historyCv   career history
Cv career history
 
Cv elkhan muradaliyev
Cv elkhan muradaliyevCv elkhan muradaliyev
Cv elkhan muradaliyev
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
Mohamed Fahim 2015
Mohamed Fahim 2015Mohamed Fahim 2015
Mohamed Fahim 2015
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
My Resume
My ResumeMy Resume
My Resume
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
KallalArunCV_TCS
KallalArunCV_TCSKallalArunCV_TCS
KallalArunCV_TCS
 
Ajay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Kumar Sharma_Resume
Ajay Kumar Sharma_Resume
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) Updated
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
anish vikram CV exp 6 months
anish vikram CV exp 6 monthsanish vikram CV exp 6 months
anish vikram CV exp 6 months
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
0.1 Muaz Hassan Resume
0.1 Muaz Hassan  Resume0.1 Muaz Hassan  Resume
0.1 Muaz Hassan Resume
 
Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)Petroleum Engr.R.Murali_CV(1)
Petroleum Engr.R.Murali_CV(1)
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 

Gaurav Sharma - Petroleum Engineer LATEST 2017

  • 1. Gaurav Sharma A-1/72 Sector-18 Rohini Delhi-110089 | +91 85 27494760 | gaurav14907@gmail.com OBJECTIVE Commit myself for dedicated hard work to develop skills and acquire knowledge to make a meaningful contribution to the industry with strong emphasis on collaboration and team work. EDUCATION Indian School of Mines (ISM), Dhanbad 2008 - 2012 Bachelor of Technology, Petroleum Engineering | OGPA Overall Grade Point Average (Max-10.00): 7.75/10 Internships and project work: 1. “OPTIMIZATION AND DEVELOPMENT OF BROWN FIELD WITH ASP PILOT IMPLEMENTATION” at “Institute For Reservoir Studies” and Ahmedabad Asset (Sub-Surface Team): This was a project on a satellite field name “VIRAJ” where ASP pilot was implemented. In this project various constraints of the field and current ASP pilot design was evaluated and optimization of production and ASP was done. 2. “SINGLE STEP MATRIX ACIDIZATION” at Well stimulation services (ONGC Ahmedabad): In this project technique for eliminating preflush stage in Mud acid stimulation was studied for “KALOL” field in Ahmedabad asset. PROFESSIONAL EXPERIENCE HINDUSTAN OIL EXPLORATION COMPANY, Chennai, INDIA | Petroleum Engineer From June 2015- Present Responsible for the designing, planning and operations execution from petroleum engineering side for the development of a Gas field with envisaged sanding problems, which includes following activities:  PREPARATION OF FIELD DEVEOPMENT PLAN : IT INCLUDES GIVEN BELOW ACTIVITIES:  Well test interpretation of last well tests of existing exploratory and appraisal wells.  Preparation of PVT model with the CME, CVD and CCE experiment results for the estimating the retrograde condensation behavior of the fluid, establishing fluid parameters and condensate gas ratio .  Finalization of development strategy focusing on maximum recovery from each sand within optimum recovery period.  Development of dynamic model with numerical simulator (ECLIPSE 100) with the history matching of existing production data and incorporating the developed static model data .  Establishing gas water contacts with the MDT data and petro physical logs.  Incorporation of static model while upscaling the existing static model to incorporate it in the simulation model.  History matching of the existing well testing data and finalization of permeability and skin factors for different sands.  Perform sensitivities on the model with hydraulic fracturing of highly damaged zones (as per test data)  Preparation of the budget and cost estimate for the project.  Designing of artificial lift strategy for liquid unloading: This includes evaluating and establishing artificial lift for unloading wells with the simulated reservoir pressures and liquid loading criteria’s.  Evaluation of the sand control strategy : This includes the selection of the appropriate sand control strategy considering the geo mechanics model, completion strategy, production commitments and PSD data (from offset well).  Designing of the completion strategy which involve:  Modeling of the completion string post development of nodal analysis last well tests and as per the proposed production rates.  Completion string design considering the proposed operation, expected production rates and expected load cases.  Sand screen design considering the offset PSD data.  Candidate selection for well stimulation opportunity. .
  • 2.  DESIGN AND EXECUTION OF THE OPERATIONS: IT INCLUDES GIVEN BELOW ACTIVITIES:  Preparation of the Scope and tender evaluation for Hydraulic Fracturing, Completion, Wireline, Coil tubing and Surface well testing services.  Well stimulation well selection and designing of stimulation jobs for wells with highly damaged zones (during drilling and testing).  Modeling of Post hydraulic fracturing well wise and field production rates.  Preparation of operation plan for the completion and workover operations.  Preparation of operation plan for Well activation and well testing operations. ENQUEST PRIVATE LTD. | Petroleum Engineer From April 2015- May 2015 Petroleum Drilling Engineer: Responsible for design, tendering and execution of the well testing activities from project management side for 6 on shore exploration well campaign of IOCL in CAMBAY basin.  Preparation of well design document.  Prepared work programs for drilling and testing of exploration wells in cambay basin.  Preparation of the scope of work for testing services and evaluation of the tender . CAIRN INDIA LTD, Gurgaon, INDIA | Petroleum Engineer From April 2012 – February 2015 Petroleum engineer: Offshore completion engineer:  Designed work programs of standalone screen completions with SSDs and gas lift valves as completion jewellery for shallow water wells of Lakshmi field in CAMBAY basin.  Design and execution of Frac pack completion in Lakshmi field – a successful case history of reduction in sand production using Frac Pack completion for Cairn India which includes:  Preparation of workover and frac pack program.  Designing of service tool for the operation.  Supervision of workover, Frac pack and well activation with N2-lift operation.  Played instrumental role in the operational and design for well testing for HPHT well project( Max BHP: 13000 psi, Max BHT: 437 Deg F) which includes:  Design of surface system layout for flow back, well testing and flaring.  Design of metallurgy of tubular and completion jewellery like (Packer circulation valve, string tester valves and tubing tester valve) for DST string.  Preparation of the design and operational program for the well testing.  Worked as a night company man at rig site to supervise/execute completion activities.  Co-ordinated slick-line and e-line jobs in offshore wells in standalone platforms. Onshore completion engineer:  Managed successful campaign for open hole completions and multistage fracturing ( First time in India) in Barmer hill horizontal wells which includes:  Designing and procurement of completions equipments Frac sleeve’s with ball drop system, high differential swell packers, liner hangers and Frac tree’s.  Preparation of completion and fracturing program and managing of completion operations for open hole completions in horizontal wells for multistage fracturing.  Managing of packer replacement workovers of multistage fractured horizontal wells.  Managed campaign of the workover’s of appraisal wells of satellite fields which includes:  Designing and procurement of completion equipments for Satellite field wells.  Planning and execution of workover operations in the appraisal wells.  Planned and executed gas shut off job in NI field – a successful case history of gas channelling shut off using resin (First time in Asia) which includes:  Identification of gas channeling medium which includes evaluation of chan plots, production data and formation logs.  Design and procurement of Well lock chemical (gas shut off chemical).
  • 3.  Designing, planning and execution of the workover job.  Experience of designing, formulation of programs and execution of different types of completions for Rajasthan onshore fields:  Open hole completion with stand alone screens, ICD screens, Screen with SSD and slotted liner in Mangala Field.  Cased hole PCP completion with TCP shoot and pull perforation and flow back operations in Bhagyam Field.  Cased hole liner hanger completions for high pressure Deep gas wells.  Open hole completions with frac sleeve’s and swell packers for multistage fracturing in Barmer Hill.  ESP completion with multi-string (chemical injection line, ESP MLE cable and heater string for hot water circulation) and fluid loss control valve in Mangala Horizontal wells (prone to high losses).  ESP completion with Y-block and provision to facilitate jet pumping.  Managed campaign for ESP installation in Aishwarya field which includes:  Designing of multi bore production packer.  Preparation of installation programs.  Managing contract and inventory for completion and ESP equipments.  FIT test of multi bore packers, packer penetrators, wellhead penetrators and function test of ESP pumps( in service provider facility).  Onsite supervision of completion and workover operations for ESP installations.  Designed and executed well revival’s of Raageshwari deep gas field which includes:  Designing of the tubular’s and completion jewellery as per the load cases for current workover’s and future well revival activities.  Formulation of well killing and fishing programs and repair of the malfunctioned sub-surface safety valves.  Formulation of well activation programs.  Single point accountability for 2 workover rigs from May 2013 – Feb 2014 while keeping a record of rig contract, downtime, operational time, rig move time and zero rate time.  Commissioned on land workover rig and prepared rig commissioning report.  Worked as a night company man and completed over 10 ESP workovers in Mangala and Aishwarya field in Rajasthan.  Performed completion string design, tubing stress analysis and string movement analysis for workovers in deep gas wells, PCP completions and ESP completions. Area in-charge for Raageshwari Oil and Tukaram Field:  Played the role of area in-charge for Raageshwari Oil (Satellite field ( Production 1000 BOPD, Average GOR 1500 scf/bbl) where responsibility was for the following activities:  Daily Production optimization.  Intervention Job (Well stimulation, Well activation) opportunity identification.  Updation of Chan plots, production plot, History matching plots etc.  Upgradation of surface facilities for gas handling.  Co-ordination for the preparation of FDP with sub-surface, drilling and production. PROFESSIONAL COURSES:  PVT Analysis Course by Dr. Bahman Tohidi :  Classroom training program on PVT Analysis and Phase behaviour of reservoir fluids.  IWCF Well control(Surface and Subsea).  Well control certificate valid till Mar 2016.  Completion design with Well CAT, Halliburton.  Completion design on real well data.  Advanced Gas Lift Modeling.  Fundamentals of Gas lift, Gas lift modeling using Prosper, Hands on Gas lift design and optimization with real well data of Cairn India offshore Ravva field.  ESP Experts, Schlumberger, Singapore  Classroom training on basics of ESPs, design, monitoring, troubleshooting and optimization. Hands on training on ESP design and installation in a dummy well.  Sand Control course, Schlumberger.  Fundamentals of Screen selection, sieve analysis and design of Gravel pack and Frac pack.
  • 4. SOFTWARE COMPETANCY:  PETREL  ECLIPSE 100,300  IPM (Prosper).  KAPPA(SPPHIRE, TOPA, EMERAUDE).  Well CAT.  Landmark (Well Plan).  Cerebrus.  Design Rite. REFERENCES: MR.DEBABRATA PANDA HEAD DRILLING AND COMPLETIONS HINDUSTAN OIL EXPLORATION COMPANY EMAIL ID: DPANDA@HOEC.COM Mr. SHOBHIT TIWARI GENERAL MANAGER PETROLEUM ENGINEERING DEPARTMENT CAIRN INDIA PVT. LTD. EMAIL ID: SHOBHITTIWARI@HOTMAIL.COM