SlideShare a Scribd company logo
1 of 14
Employment History
SUMMARY OF EXPERIENCE
Over 20 years of experience in mechanical engineering field. Past work experience
includes process system design, mechanical design, plant operation, project
management, fabrication, installation and commissioning. Familiar with Projects
concerned with incineration, renewable energy power generation, cogeneration, tri
generation, coal fired power plant and combined cycle power plants, ASME B31.1,
B31.3, Sec. VIII Div. 1, Sec. IX and Boiler Sec. I & II and TEMA Standards.
Qualification for your project is my knowledge of power generation construction
projects including design, contractor management, procurement, fabrication,
installation, commissioning, start up and plant operation. As an owner of a small
power plant myself, I have wide concept of the industry and the permitting process.
EMPLOYMENT HISTORY
SPAN Company Limited (2012 – Present) Project & Engineering manager
1. Saiyok Waste Heat To Power Plant Project (2012 – Present)
Project Description: SPAN is PMC. For the “ORC” Organic rankine Cycle power
plant from waste heat recovery unit from PGT25 Gas turbine which driven gas
compressor at Saiyok gas compressor station which belong to PTT. This project
consist of 3 unit PGT25 which driven gas compressor and installation of 3 unit
thermal oil WHRU for heat up the organic solution till superheat vapor to drive the
OTG as capacity 14.5 MWe ,Which sale electricity via 115kV to PEA grid line.
Responsibility: Assigned as Project & Engineering manager to do the Conceptual
design and Tendering or Bidding document for find out the EPCC Contractor for
“ORC” Power plant from waste heat recovery unit from PGT25 Gas turbine which
drive gas compressor. (This Project is 1st
“ORC” Power Plant in Thailand)
SPAN Company Limited (2010 – Present) Turbo Compressor Engineer
Employment History Page 1
2. Platform Compression Facility Project (2010 – Present)
Project Description: SPAN is retained as a part of FLUOR’s Project Management
team to oversee the design, fabrication, installation, construction and commissioning
of Balance-Of-Plant for 3 turbine-driven compressors on one of PTT’s offshore
platform plant capacity 2,850 MMSCFD @ 140 barg. The Project is to manage EPC
Contractor in detailed engineering & design, fabrication of structural and piping
elements, onshore 3 turbine-compressor erection, offshore installation, commissioning
and start-up.
Responsibility: Assigned as Turbo-Machinery Engineer to supervise EPC
Contractor’s turbo-compressor teams in making detailed design plans, fabrication,
erection, installation, commissioning and start-up.
Also assigned to review operation philosophy of gas compressor station, review P&ID
of process station and gas turbine driven unit RR-RB211 and DR14, review dynamic
simulation at any operation condition /ESD1, ESD2, ESD3 & ESD 4/ anti surge
conditions, participate in HAZOP and HAZIP review, review installation & assembly
procedures of gas turbine and compressor to module unit, review sea fastening
procedure and heavy lift procedure, review commissioning procedure, supervise EPC
during commissioning and start up, witness site performance acceptance test.
3. Ethane Separation Plant Project (2010)
Project Description: Project was to supervise the construction of an ethane
separation unit at an existing PTT Gas Separation Plant. The system consisted of in-
plant power generation system with capacity at 2x28 MWe, gas turbine, compressor
and turbo expanders, hot oil system with heat duty of 2x116 MW thermal, demineral
water system and utilities. The scope included recommendation for EPC contractor,
detailed design management, procurement management, construction management,
commissioning and start-up.
Responsibility: Assigned as Mechanical Engineer to review engineering data of
gas turbine generator 2 x 28 MWe, and hot oil boiler system having heat duty at 2x116
MW thermal.
Power Prospect Rice Husk Project & Engineering Manager
Power Plant 9.9 MWe (2009 – 2010)
Employment History Page 2
1. Construction of a Rice Husk Power Plant 9.9 MWe Project (2009 – 2010)
Project Description: This power plant used the rice husk as primary fuel from
rice mill’s partner which was nearby the power plant area. This power plant
produced electricity and sold to the PEA grid at 8 MWe and satisfied internal
required 1.2 MWe with approximately 0.7 MWe was sold directly to rice mill and
plastic factory. Also the extraction steam 7 barg & 20 T/h was supply to rice mill
for cooking process, which can replace the existing boiler at rice mill because that
boiler was very low in efficiency. This plant was got C.D.M registration by
UNFCC.
Responsibility: Assigned as Project Manager & Engineering Manager and was
responsible for:
. Reviewing and revising final P&ID for all systems
. Reviewing and revising Master Plant Layout
. Providing TOR for local procurement work
. Preparing documents to apply for BOI, master machine list, local construction
permit, DIW permit and plant commercial operation license from ERC.
. Coordinating with Bank for draw out money to be used for execution of the
project during the construction work
. Coordinating with and preparing documents for PEA to apply for parallel
operation with the Grid
. Project execution of construction work
. Project execution of commissioning work
. Providing leadership during commissioning and Site testing before COD
. Plant performance test for 1 month and verifying plant efficiency
Mitsubishi Power Systems Technical Specialist for Power Plant Unit
(Thailand) Co., LTD (2006 – 2008)
Employment History Page 3
1. TMT. Eco Plant Cogeneration 11MW Project (2007 – 2008)
Project Description: 5.75 MWe gas engine x2 unit which supply electricity
to TMT Plant and supply hot water to drive absorption chiller 1,000 RT and
supply steam 7 T/h to painting process to replace gas fired boiler.
Responsibility: Assigned as Project Manager and was responsible for:
. Coordinating and supporting all documentation to Japanese Manager to
apply for all permits before start the construction work.
. Project execution for construction work until commissioning
. Close-out and conclusion performance test report and handover to
customer
2. TNP. Cogeneration Plant Under MHIT Project (2006– 2007)
Project Description: 5.75 MWe gas engine x 4 unit which supply electricity
to industrial estate and supply LP. Steam to customer in the industrial estate.
Responsibility: Assigned as Project Coordinator and was responsible for:
. Coordinating and supporting all documentation to Japanese Manager to
apply for all permits before construction
. Project execution for construction work until commissioning
. Close-out and conclusion performance test report and handover to
customer
Synimage Mechanical Co., Ltd. (2005-2006) Project Manager
1. Chumporn Palm Oil Project (2005 – 2006)
Project Description: Project was to fabricate, install and commissioning a
biomass boiler capacity rated at 40 tons/hour 35 barg, to drive back pressure steam
turbine 3.5 MW.
Responsibility: Assigned as Project Manager and was responsible for supervising
the fabrication, installation and commissioning of the systems.
Kangwal Tri-Generation Power Plant (2003-2005) Project / Plant Manager
Employment History Page 4
1. 18 MWe Kangwal Tri-Generation Power Plant Project (2003 – 2005)
Project Description: Gas engine 8 units to produce electricity at 18 MWe and
hot water plus steam absorption chiller 5,400 RT, and LP. Steam 3-5 T/h for
replace HFO. The Project was a power generation project which produced
electricity more than 10 MWe and was required to apply for EIA.
Responsibility: Assigned as Project Manager and was responsible for:
. All permit as required before the construction starts
. Assisting and supporting any documents to ERM Siam to apply for EIA
. Preparing ITB to find EPC contractor, including evaluation of the proposals
submitted by contractors
. Witnessing FAT at MHI Yokohama with 1 month training course
. Project execution for natural gas pipeline project from the main pipeline and
block valve station command via SCADA to power plant.
. Project execution for all local procurement that excluded from EPC’s scope of
work
. Project execution for construction work
. Project execution for commissioning work and plant acceptance performance
test
. Taking action as power plant Manager for this project after handover to
customer
. Executing for operation and maintenance of this power plant
. Hands on Turbo Expander (MET90SE)
Free Lance Work (2002-2003) Project & Engineering Manager
1. Jaturamit Engineering (2004-2005)
Project Description: Project was to construct the JP-1 pipe line from Makasan
station to Suwanapoom airport as sub-contractor of Ch-karnchange plc.,ltd.
(Owner is BAFS)
Responsibility: Assigned as Project advisor to execute the JP-1 pipe line included
Testing and commissioning
2. Honey Well System Thailand Project (2002 – 2003)
Employment History Page 5
Project Description: Project was to construct Kangwal Tri-Generation Power
Plant which consisting of supply hot water and steam to absorption chiller total
load of 5,400 RT. And gas engine generator with total output 18 MWe.
Responsibility: Assigned as Project & Engineering Manager to perform
engineering conceptual & detailed design and prepare budgetary estimation.
preparation bidding document to find EPC contractor.
Neuman & Esser SEA. Co.Ltd. (2002-2003) Engineering Manager
1. Fuel Gas Compressor for TIG Project (2002 – 2003)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of reciprocating fuel gas compressor.
Responsibility: Assigned as Engineering Manager and was responsible for design
calculations, procurement activities, project management for heat exchanger,
pressure vessels and piping process design for packaging with the compressor.
2. Fuel Gas Compressor for TOC Project (2002 – 2003)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of reciprocating fuel gas compressor.
Responsibility: Assigned as Engineering Manager and was responsible for design
calculations, procurement activities, project management for heat exchanger,
pressure vessels and piping process design for packaging with the compressor.
3. Methane Compressor for Nanya Taiwan Project (2002 – 2003)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of reciprocating CH4 compressor.
Responsibility: Assigned as Engineering Manager and was responsible for design
calculations, procurement activities, project management for heat exchanger,
pressure vessels and piping process design for packaging with the compressor.
4. Nitrogen Compressor for Nanya Taiwan Project (2002 – 2003)
Employment History Page 6
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of reciprocating N2 compressor.
Responsibility: Assigned as Engineering Manager and was responsible for design
calculations, procurement activities, project management for heat exchanger,
pressure vessels and piping process design for packaging with the compressor.
5. CO2 Compressor for Nanya Taiwan Project (2002 – 2003)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of reciprocating CO2 compressor.
Responsibility: Assigned as Engineering Manager and was responsible for design
calculations, procurement activities, project management for heat exchanger,
pressure vessels and piping process design for packaging with the compressor.
CMI-Thai Services Co.Ltd (2000-2002) Project & Engineering Manager
1. COCO High Bridge Power Plant Project (2001 – 2002)
Project Description: Yearly inspection & maintenance of coal fired boiler CFB
for super critical boiler x2 units.
Responsibility: Assigned as Project & Engineering Manager and was responsible
for:
. Design calculations
. Cost estimation
. Yearly maintenance for coal fired boiler block no. 1# and block no. 2#
2. HRSG Maintenance at COCO Phase 1 Project (2001 – 2002)
Project Description: Yearly inspection & maintenance of HRSG x 2 units for
COCO Phase 1
Responsibility: Assigned as Project & Engineering Manager and was responsible
for yearly maintenance of HRSG at COCO Phase 1
3. TPC Waste Heat Boiler Project (2001 – 2002)
Employment History Page 7
Project Description: Revamp of HCL waste heat recovery boiler
(apply R-stamp)
Responsibility: Assigned as Project & Engineering Manager and was responsible
for overseeing the manufacturing and maintenance of waste heat boiler.
4. IP. Cogeneration Plant Project (2001 – 2002)
Project Description: Yearly inspection & maintenance of HRSG x2 units for IP
cogeneration (115 MW)
Responsibility: Assigned as Project & Engineering Manager and was responsible
for yearly inspection and maintenance of HRSG block no. 1# and no. 2#
5. HRSG Fabrication for Tracterbel PTT Project (2001 – 2002)
Project Description: Design and fabrication of HRSG which installation after
RR-RB211 for Tracterbel PTT Project which supply steam to drive a steam turbine
13 MWe.
Responsibility: Assigned as Project & Engineering Manager and was responsible
for overseeing the fabrication of HRSG unit.
6. Turnaround Shut Down for TOC Project (2001 – 2002)
Project Description: Design and fabrication of heat exchanger, pressure vessel,
column for low temperature process which installation by relocating the existing
unit and put in place a new unit during turnaround shut down period.
Responsibility: Assigned as Project & Engineering Manager and was responsible
for overseeing shut down of heat exchanger and pressure vessels.
7. Maintenance of Heat Exchanger for TPCC & TPAC Project (2001 – 2002)
Project Description: Heat exchanger revamp (tube material is Hasteloy C)
Responsibility: Assigned as Project & Engineering Manager and was responsible
for the maintenance of heat exchanger.
8. Bangkok Cogeneration Power Plant Project (2001 – 2002)
Employment History Page 8
Project Description: Yearly inspection & maintenance HRSG x1 unit capacity
50 t/h 45 barg
Responsibility: Assigned as Project & Engineering Manager and was responsible
for yearly inspection and maintenance of HRSG block no. 1#
9. SAHA Cogeneration Power Plant Project (2001 – 2002)
Project Description: Yearly inspection & maintenance HRSG x 2 units, capacity
50 t/h, 45 barg which supply steam to shin Nippon steam turbine (120 MWe)
Responsibility: Assigned as Project & Engineering Manager and was responsible
for yearly inspection and maintenance of HRSG block no. 1# and no. 2#
10. RoJana Cogeneration Power Plant Project (2001 – 2002)
Project Description: Yearly inspection & maintenance HRSG x 2 units, capacity
50 t/h, 45 barg which supply steam to shin Nippon steam turbine (120 MWe)
Responsibility: Assigned as Project & Engineering Manager and was responsible
for yearly inspection and maintenance of HRSG block no. 1# and no. 2#
11.TPC Project (2001 – 2002)
Project Description: Revamp HCL waste heat recovery boiler (apply R-stamp)
Responsibility: Assigned as Project & Engineering Manager and was responsible
for maintenance service of boiler.
12.TIG Project (2001 – 2002)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of CO2 compressor
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design, packaging and fabrication of heat exchanger for CO2 compressor.
13.Kahnom Power Plant Project (2001 – 2002)
Employment History Page 9
Project Description: Re tube heat exchanger for steam turbine lube oil cooler for
thermal power plant 150 MW (barge power plant)
Responsibility: Assigned as Project & Engineering Manager and was responsible
for overhauling of heat exchanger.
14.Kahnom Combine Cycle Plant Project (2001 – 2002)
Project Description: HRSG revamp, replace existing stub tube and U-bend at
secondary super heater zone
Responsibility: Assigned as Project & Engineering Manager and was responsible
for replacing the new stub tube and U-bend of superheat section SA-213 T91.
15.SITT TATT Industrial Gas in Malaysia Project (2000 – 2001)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger for H2 compressor, supply pressure 320 barg.
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design and fabrication of heat exchanger and pressure vessel c/w packaging of
“NEAC” Hydrogen Compressor with Heat Exchanger installation.
16.Carlsberg Brewery Thailand Project (2000 – 2001)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of CO2 compressor.
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design and fabrication of heat exchanger and pressure vessel c/w packaging of
“NEAC” CO2 Compressor with Heat Exchanger installation.
17.Air Liquid Thailand Project (2000 – 2001)
Employment History Page 10
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of H2 compressor
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design and fabrication of heat exchanger and pressure vessel c/w packaging of
“NEAC” Hydrogen Compressor.
18.Advance Agro Paper Mill Project (2000 – 2001)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of O2 compressor
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design and fabrication of heat exchanger and pressure vessel c/w packaging of
“NEAC” Oxygen Compressor.
19.Advance Agro Paper Mill Project (2000 – 2001)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of O2 compressor
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design and fabrication of heat exchanger and pressure vessel c/w packaging of
“NEAC” Oxygen Compressor.
20.Bangkok Cogeneration Power Plant Project (2000 – 2001)
Project Description: Re tube heat exchanger for gas turbine lube oil cooler for
GE F7A
Responsibility: Assigned as Project & Engineering Manager and was responsible
for maintenance service of heat exchanger for GE Gas Turbine.
21.TIG Project (2000 – 2001)
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of H2 reciprocating compressor
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design and fabrication of heat exchanger and pressure vessel for Hydrogen
Compressor.
22.Bayer Project (2000 – 2001)
Employment History Page 11
Project Description: Completed skid and packaging which consist of pressure
vessel, heat exchanger of CO2 reciprocating compressor
Responsibility: Assigned as Project & Engineering Manager and was responsible
for design and fabrication of heat exchanger and pressure vessel c/w packaging of
“NEAC” CO2 Compressor.
Koh Samui Refuse Chief Plant Operator
Incineration Plant (1999-2000)
1. Koh Samui Refuse Incineration Plant Project (1999 – 2000)
Project Description: The incinerator plant capacity of 150 t/day for burning the
refuse which collected within Koh Samui area. This project was built by NKK,
japan.
Responsibility: Assigned as Chief Plant Operator and was responsible for
preventive maintenance and operation of refuse incinerator 150 tons/day having the
following auxiliary list:
. Pump and Rotation machine
. Overhead crane
. Burner and combustion chamber of furnace
. Conveyor system
. Operation refuse incineration plant capacity of 150 tons/day
Conveyor Technology Co. Ltd. (1995-1999) Mechanical Engineer
1. Bangkok Polyester Cogeneration Power Plant Project (1998 – 1999)
Project Description: A cogeneration power plant with Solar Gas Turbine
Taurus 70 and generator 7 MW. Complete with hot oil exchanger which
produced hot oil for melting the pet resin and also having an HRSG 10
tons/hour which supply steam to York Absorption Chiller.
Responsibility: Assigned as Project & Engineering Manager responsible for
design, estimation, project management, installation and commissioning.
2. Thai Taffeta Cogeneration Power Plant Project (1997 – 1998)
Employment History Page 12
Project Description: A cogeneration power plant with Solar Gas Turbine
Mars 100 and generator 10 MW with HRSG 32 Tons/hour (172 PSIG) which
supply steam to LG Absorption Chiller
Responsibility: Assigned as Project & Engineering Manager responsible for
process design, estimation, project management, installation and
commissioning.
3. Hydro Power Plant at Maesord Tak Project (1996 – 1997)
Project Description: Small hydro power plant with 500kW x 1 unit
(Farnsis turbine) with generator
Responsibility: Assigned as Erection Engineer responsible for project
management for construction of mechanical work, piping work, and
maintenance about rotating machines such as pump, overhead crane and
material handling systems.
4. Hydro Power Plant at Trang Project (1995 – 1996)
Project Description: Small hydro power plant with 250 kW x 2 units (Pelton
wheel turbine) with Generator
Responsibility: Assigned as Erection Engineer responsible for project
management for construction of mechanical work, piping work, and
maintenance about rotating machines such as pump, overhead crane and
material handling systems.
5. Patum Rice Mill Co. Ltd. Project (1995 – 1996)
Project Description: Rice husk boiler 30 T/h x 2 unit revamp which supply
steam to steam turbine 9 MWe and new husk ash bag filter system for collect
the ash by bag package for export to Japan
Responsibility: Assigned as Consultant Engineer responsible for project
management for construction of boiler systems, mechanical work, piping work,
and maintenance about rotating machines such as pump, overhead crane and
material handling systems.
QUALIFICATION:
Employment History Page 13
Below are record of achievement by myself
1. I was featured in “ ”ก๊าซไลน์ as a featured Project Manager for Kangwal Textile
that is building a tri generation plant
2. I was also contracted by Honeywell Systems to perform detailed design for this
tri generation plant system
3. As the Managing Director of RungJarean Energy & Consultant Co. Ltd., he
was contracted to review design calculation and apply for IEAT permits.
I hope my qualifications and work experience will be beneficial and fit to your Project.
Employment History Page 14

More Related Content

What's hot

Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CVMuhammad Naeem
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CVAsif pasha
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandra Sekar
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016RUKNUDDIN ALI
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cvsaryhasabadly
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTmuhammad jamil
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV Khalid Wdn
 
Top 8 mep coordinator resume samples
Top 8 mep coordinator resume samplesTop 8 mep coordinator resume samples
Top 8 mep coordinator resume sampleslombardnick09
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVjignesh kadam
 

What's hot (20)

Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
Electrical Supervisor CV
Electrical Supervisor CVElectrical Supervisor CV
Electrical Supervisor CV
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Karthik Resume
Karthik Resume Karthik Resume
Karthik Resume
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Chandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer newChandrasekar G resume - Instrument Engineer new
Chandrasekar G resume - Instrument Engineer new
 
vijayan - resume
vijayan - resumevijayan - resume
vijayan - resume
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Resume
ResumeResume
Resume
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Nizami_CV
Nizami_CVNizami_CV
Nizami_CV
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
MEP engineer CV
MEP engineer CV MEP engineer CV
MEP engineer CV
 
Top 8 mep coordinator resume samples
Top 8 mep coordinator resume samplesTop 8 mep coordinator resume samples
Top 8 mep coordinator resume samples
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 

Viewers also liked

Viewers also liked (15)

Cv Agung Sri Hendarsa
Cv Agung Sri HendarsaCv Agung Sri Hendarsa
Cv Agung Sri Hendarsa
 
Rohit_Resume_Testing_1
Rohit_Resume_Testing_1Rohit_Resume_Testing_1
Rohit_Resume_Testing_1
 
SYED MOHAMED AHAMED ALI CV
SYED MOHAMED AHAMED ALI CVSYED MOHAMED AHAMED ALI CV
SYED MOHAMED AHAMED ALI CV
 
RAJESH ROUSHAN
RAJESH ROUSHANRAJESH ROUSHAN
RAJESH ROUSHAN
 
Resume (Senthil).DOC
Resume (Senthil).DOCResume (Senthil).DOC
Resume (Senthil).DOC
 
CV Nene Acad
CV Nene AcadCV Nene Acad
CV Nene Acad
 
Mohamed English .C.V.2.Water Treatment.
Mohamed English .C.V.2.Water Treatment.Mohamed English .C.V.2.Water Treatment.
Mohamed English .C.V.2.Water Treatment.
 
CV
CVCV
CV
 
Matthew Gore Resume 3 (1)
Matthew Gore Resume 3 (1)Matthew Gore Resume 3 (1)
Matthew Gore Resume 3 (1)
 
SRIDHARAN.R RESUME
SRIDHARAN.R RESUMESRIDHARAN.R RESUME
SRIDHARAN.R RESUME
 
Top 8 water operator resume samples
Top 8 water operator resume samplesTop 8 water operator resume samples
Top 8 water operator resume samples
 
Navneet cv 2012 revised
Navneet cv 2012 revisedNavneet cv 2012 revised
Navneet cv 2012 revised
 
Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )
 
Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
 
Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash Handling
 

Similar to CV-Project Manager (20)

Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Saeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updatedSaeidi-Abbas-Resume April 2015-updated
Saeidi-Abbas-Resume April 2015-updated
 
madhankumar new CV 2016 june...
madhankumar new CV 2016 june...madhankumar new CV 2016 june...
madhankumar new CV 2016 june...
 
RAJEEV-RESUME
RAJEEV-RESUMERAJEEV-RESUME
RAJEEV-RESUME
 
CV Peter Heinzelmann
CV Peter HeinzelmannCV Peter Heinzelmann
CV Peter Heinzelmann
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
jamespickering
jamespickeringjamespickering
jamespickering
 
Ronald saldanha (1)
Ronald saldanha (1)Ronald saldanha (1)
Ronald saldanha (1)
 
++++byanar cv
++++byanar cv++++byanar cv
++++byanar cv
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985Madhankumar new cv 2016 june6985
Madhankumar new cv 2016 june6985
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 

CV-Project Manager

  • 1. Employment History SUMMARY OF EXPERIENCE Over 20 years of experience in mechanical engineering field. Past work experience includes process system design, mechanical design, plant operation, project management, fabrication, installation and commissioning. Familiar with Projects concerned with incineration, renewable energy power generation, cogeneration, tri generation, coal fired power plant and combined cycle power plants, ASME B31.1, B31.3, Sec. VIII Div. 1, Sec. IX and Boiler Sec. I & II and TEMA Standards. Qualification for your project is my knowledge of power generation construction projects including design, contractor management, procurement, fabrication, installation, commissioning, start up and plant operation. As an owner of a small power plant myself, I have wide concept of the industry and the permitting process. EMPLOYMENT HISTORY SPAN Company Limited (2012 – Present) Project & Engineering manager 1. Saiyok Waste Heat To Power Plant Project (2012 – Present) Project Description: SPAN is PMC. For the “ORC” Organic rankine Cycle power plant from waste heat recovery unit from PGT25 Gas turbine which driven gas compressor at Saiyok gas compressor station which belong to PTT. This project consist of 3 unit PGT25 which driven gas compressor and installation of 3 unit thermal oil WHRU for heat up the organic solution till superheat vapor to drive the OTG as capacity 14.5 MWe ,Which sale electricity via 115kV to PEA grid line. Responsibility: Assigned as Project & Engineering manager to do the Conceptual design and Tendering or Bidding document for find out the EPCC Contractor for “ORC” Power plant from waste heat recovery unit from PGT25 Gas turbine which drive gas compressor. (This Project is 1st “ORC” Power Plant in Thailand) SPAN Company Limited (2010 – Present) Turbo Compressor Engineer Employment History Page 1
  • 2. 2. Platform Compression Facility Project (2010 – Present) Project Description: SPAN is retained as a part of FLUOR’s Project Management team to oversee the design, fabrication, installation, construction and commissioning of Balance-Of-Plant for 3 turbine-driven compressors on one of PTT’s offshore platform plant capacity 2,850 MMSCFD @ 140 barg. The Project is to manage EPC Contractor in detailed engineering & design, fabrication of structural and piping elements, onshore 3 turbine-compressor erection, offshore installation, commissioning and start-up. Responsibility: Assigned as Turbo-Machinery Engineer to supervise EPC Contractor’s turbo-compressor teams in making detailed design plans, fabrication, erection, installation, commissioning and start-up. Also assigned to review operation philosophy of gas compressor station, review P&ID of process station and gas turbine driven unit RR-RB211 and DR14, review dynamic simulation at any operation condition /ESD1, ESD2, ESD3 & ESD 4/ anti surge conditions, participate in HAZOP and HAZIP review, review installation & assembly procedures of gas turbine and compressor to module unit, review sea fastening procedure and heavy lift procedure, review commissioning procedure, supervise EPC during commissioning and start up, witness site performance acceptance test. 3. Ethane Separation Plant Project (2010) Project Description: Project was to supervise the construction of an ethane separation unit at an existing PTT Gas Separation Plant. The system consisted of in- plant power generation system with capacity at 2x28 MWe, gas turbine, compressor and turbo expanders, hot oil system with heat duty of 2x116 MW thermal, demineral water system and utilities. The scope included recommendation for EPC contractor, detailed design management, procurement management, construction management, commissioning and start-up. Responsibility: Assigned as Mechanical Engineer to review engineering data of gas turbine generator 2 x 28 MWe, and hot oil boiler system having heat duty at 2x116 MW thermal. Power Prospect Rice Husk Project & Engineering Manager Power Plant 9.9 MWe (2009 – 2010) Employment History Page 2
  • 3. 1. Construction of a Rice Husk Power Plant 9.9 MWe Project (2009 – 2010) Project Description: This power plant used the rice husk as primary fuel from rice mill’s partner which was nearby the power plant area. This power plant produced electricity and sold to the PEA grid at 8 MWe and satisfied internal required 1.2 MWe with approximately 0.7 MWe was sold directly to rice mill and plastic factory. Also the extraction steam 7 barg & 20 T/h was supply to rice mill for cooking process, which can replace the existing boiler at rice mill because that boiler was very low in efficiency. This plant was got C.D.M registration by UNFCC. Responsibility: Assigned as Project Manager & Engineering Manager and was responsible for: . Reviewing and revising final P&ID for all systems . Reviewing and revising Master Plant Layout . Providing TOR for local procurement work . Preparing documents to apply for BOI, master machine list, local construction permit, DIW permit and plant commercial operation license from ERC. . Coordinating with Bank for draw out money to be used for execution of the project during the construction work . Coordinating with and preparing documents for PEA to apply for parallel operation with the Grid . Project execution of construction work . Project execution of commissioning work . Providing leadership during commissioning and Site testing before COD . Plant performance test for 1 month and verifying plant efficiency Mitsubishi Power Systems Technical Specialist for Power Plant Unit (Thailand) Co., LTD (2006 – 2008) Employment History Page 3
  • 4. 1. TMT. Eco Plant Cogeneration 11MW Project (2007 – 2008) Project Description: 5.75 MWe gas engine x2 unit which supply electricity to TMT Plant and supply hot water to drive absorption chiller 1,000 RT and supply steam 7 T/h to painting process to replace gas fired boiler. Responsibility: Assigned as Project Manager and was responsible for: . Coordinating and supporting all documentation to Japanese Manager to apply for all permits before start the construction work. . Project execution for construction work until commissioning . Close-out and conclusion performance test report and handover to customer 2. TNP. Cogeneration Plant Under MHIT Project (2006– 2007) Project Description: 5.75 MWe gas engine x 4 unit which supply electricity to industrial estate and supply LP. Steam to customer in the industrial estate. Responsibility: Assigned as Project Coordinator and was responsible for: . Coordinating and supporting all documentation to Japanese Manager to apply for all permits before construction . Project execution for construction work until commissioning . Close-out and conclusion performance test report and handover to customer Synimage Mechanical Co., Ltd. (2005-2006) Project Manager 1. Chumporn Palm Oil Project (2005 – 2006) Project Description: Project was to fabricate, install and commissioning a biomass boiler capacity rated at 40 tons/hour 35 barg, to drive back pressure steam turbine 3.5 MW. Responsibility: Assigned as Project Manager and was responsible for supervising the fabrication, installation and commissioning of the systems. Kangwal Tri-Generation Power Plant (2003-2005) Project / Plant Manager Employment History Page 4
  • 5. 1. 18 MWe Kangwal Tri-Generation Power Plant Project (2003 – 2005) Project Description: Gas engine 8 units to produce electricity at 18 MWe and hot water plus steam absorption chiller 5,400 RT, and LP. Steam 3-5 T/h for replace HFO. The Project was a power generation project which produced electricity more than 10 MWe and was required to apply for EIA. Responsibility: Assigned as Project Manager and was responsible for: . All permit as required before the construction starts . Assisting and supporting any documents to ERM Siam to apply for EIA . Preparing ITB to find EPC contractor, including evaluation of the proposals submitted by contractors . Witnessing FAT at MHI Yokohama with 1 month training course . Project execution for natural gas pipeline project from the main pipeline and block valve station command via SCADA to power plant. . Project execution for all local procurement that excluded from EPC’s scope of work . Project execution for construction work . Project execution for commissioning work and plant acceptance performance test . Taking action as power plant Manager for this project after handover to customer . Executing for operation and maintenance of this power plant . Hands on Turbo Expander (MET90SE) Free Lance Work (2002-2003) Project & Engineering Manager 1. Jaturamit Engineering (2004-2005) Project Description: Project was to construct the JP-1 pipe line from Makasan station to Suwanapoom airport as sub-contractor of Ch-karnchange plc.,ltd. (Owner is BAFS) Responsibility: Assigned as Project advisor to execute the JP-1 pipe line included Testing and commissioning 2. Honey Well System Thailand Project (2002 – 2003) Employment History Page 5
  • 6. Project Description: Project was to construct Kangwal Tri-Generation Power Plant which consisting of supply hot water and steam to absorption chiller total load of 5,400 RT. And gas engine generator with total output 18 MWe. Responsibility: Assigned as Project & Engineering Manager to perform engineering conceptual & detailed design and prepare budgetary estimation. preparation bidding document to find EPC contractor. Neuman & Esser SEA. Co.Ltd. (2002-2003) Engineering Manager 1. Fuel Gas Compressor for TIG Project (2002 – 2003) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of reciprocating fuel gas compressor. Responsibility: Assigned as Engineering Manager and was responsible for design calculations, procurement activities, project management for heat exchanger, pressure vessels and piping process design for packaging with the compressor. 2. Fuel Gas Compressor for TOC Project (2002 – 2003) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of reciprocating fuel gas compressor. Responsibility: Assigned as Engineering Manager and was responsible for design calculations, procurement activities, project management for heat exchanger, pressure vessels and piping process design for packaging with the compressor. 3. Methane Compressor for Nanya Taiwan Project (2002 – 2003) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of reciprocating CH4 compressor. Responsibility: Assigned as Engineering Manager and was responsible for design calculations, procurement activities, project management for heat exchanger, pressure vessels and piping process design for packaging with the compressor. 4. Nitrogen Compressor for Nanya Taiwan Project (2002 – 2003) Employment History Page 6
  • 7. Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of reciprocating N2 compressor. Responsibility: Assigned as Engineering Manager and was responsible for design calculations, procurement activities, project management for heat exchanger, pressure vessels and piping process design for packaging with the compressor. 5. CO2 Compressor for Nanya Taiwan Project (2002 – 2003) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of reciprocating CO2 compressor. Responsibility: Assigned as Engineering Manager and was responsible for design calculations, procurement activities, project management for heat exchanger, pressure vessels and piping process design for packaging with the compressor. CMI-Thai Services Co.Ltd (2000-2002) Project & Engineering Manager 1. COCO High Bridge Power Plant Project (2001 – 2002) Project Description: Yearly inspection & maintenance of coal fired boiler CFB for super critical boiler x2 units. Responsibility: Assigned as Project & Engineering Manager and was responsible for: . Design calculations . Cost estimation . Yearly maintenance for coal fired boiler block no. 1# and block no. 2# 2. HRSG Maintenance at COCO Phase 1 Project (2001 – 2002) Project Description: Yearly inspection & maintenance of HRSG x 2 units for COCO Phase 1 Responsibility: Assigned as Project & Engineering Manager and was responsible for yearly maintenance of HRSG at COCO Phase 1 3. TPC Waste Heat Boiler Project (2001 – 2002) Employment History Page 7
  • 8. Project Description: Revamp of HCL waste heat recovery boiler (apply R-stamp) Responsibility: Assigned as Project & Engineering Manager and was responsible for overseeing the manufacturing and maintenance of waste heat boiler. 4. IP. Cogeneration Plant Project (2001 – 2002) Project Description: Yearly inspection & maintenance of HRSG x2 units for IP cogeneration (115 MW) Responsibility: Assigned as Project & Engineering Manager and was responsible for yearly inspection and maintenance of HRSG block no. 1# and no. 2# 5. HRSG Fabrication for Tracterbel PTT Project (2001 – 2002) Project Description: Design and fabrication of HRSG which installation after RR-RB211 for Tracterbel PTT Project which supply steam to drive a steam turbine 13 MWe. Responsibility: Assigned as Project & Engineering Manager and was responsible for overseeing the fabrication of HRSG unit. 6. Turnaround Shut Down for TOC Project (2001 – 2002) Project Description: Design and fabrication of heat exchanger, pressure vessel, column for low temperature process which installation by relocating the existing unit and put in place a new unit during turnaround shut down period. Responsibility: Assigned as Project & Engineering Manager and was responsible for overseeing shut down of heat exchanger and pressure vessels. 7. Maintenance of Heat Exchanger for TPCC & TPAC Project (2001 – 2002) Project Description: Heat exchanger revamp (tube material is Hasteloy C) Responsibility: Assigned as Project & Engineering Manager and was responsible for the maintenance of heat exchanger. 8. Bangkok Cogeneration Power Plant Project (2001 – 2002) Employment History Page 8
  • 9. Project Description: Yearly inspection & maintenance HRSG x1 unit capacity 50 t/h 45 barg Responsibility: Assigned as Project & Engineering Manager and was responsible for yearly inspection and maintenance of HRSG block no. 1# 9. SAHA Cogeneration Power Plant Project (2001 – 2002) Project Description: Yearly inspection & maintenance HRSG x 2 units, capacity 50 t/h, 45 barg which supply steam to shin Nippon steam turbine (120 MWe) Responsibility: Assigned as Project & Engineering Manager and was responsible for yearly inspection and maintenance of HRSG block no. 1# and no. 2# 10. RoJana Cogeneration Power Plant Project (2001 – 2002) Project Description: Yearly inspection & maintenance HRSG x 2 units, capacity 50 t/h, 45 barg which supply steam to shin Nippon steam turbine (120 MWe) Responsibility: Assigned as Project & Engineering Manager and was responsible for yearly inspection and maintenance of HRSG block no. 1# and no. 2# 11.TPC Project (2001 – 2002) Project Description: Revamp HCL waste heat recovery boiler (apply R-stamp) Responsibility: Assigned as Project & Engineering Manager and was responsible for maintenance service of boiler. 12.TIG Project (2001 – 2002) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of CO2 compressor Responsibility: Assigned as Project & Engineering Manager and was responsible for design, packaging and fabrication of heat exchanger for CO2 compressor. 13.Kahnom Power Plant Project (2001 – 2002) Employment History Page 9
  • 10. Project Description: Re tube heat exchanger for steam turbine lube oil cooler for thermal power plant 150 MW (barge power plant) Responsibility: Assigned as Project & Engineering Manager and was responsible for overhauling of heat exchanger. 14.Kahnom Combine Cycle Plant Project (2001 – 2002) Project Description: HRSG revamp, replace existing stub tube and U-bend at secondary super heater zone Responsibility: Assigned as Project & Engineering Manager and was responsible for replacing the new stub tube and U-bend of superheat section SA-213 T91. 15.SITT TATT Industrial Gas in Malaysia Project (2000 – 2001) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger for H2 compressor, supply pressure 320 barg. Responsibility: Assigned as Project & Engineering Manager and was responsible for design and fabrication of heat exchanger and pressure vessel c/w packaging of “NEAC” Hydrogen Compressor with Heat Exchanger installation. 16.Carlsberg Brewery Thailand Project (2000 – 2001) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of CO2 compressor. Responsibility: Assigned as Project & Engineering Manager and was responsible for design and fabrication of heat exchanger and pressure vessel c/w packaging of “NEAC” CO2 Compressor with Heat Exchanger installation. 17.Air Liquid Thailand Project (2000 – 2001) Employment History Page 10
  • 11. Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of H2 compressor Responsibility: Assigned as Project & Engineering Manager and was responsible for design and fabrication of heat exchanger and pressure vessel c/w packaging of “NEAC” Hydrogen Compressor. 18.Advance Agro Paper Mill Project (2000 – 2001) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of O2 compressor Responsibility: Assigned as Project & Engineering Manager and was responsible for design and fabrication of heat exchanger and pressure vessel c/w packaging of “NEAC” Oxygen Compressor. 19.Advance Agro Paper Mill Project (2000 – 2001) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of O2 compressor Responsibility: Assigned as Project & Engineering Manager and was responsible for design and fabrication of heat exchanger and pressure vessel c/w packaging of “NEAC” Oxygen Compressor. 20.Bangkok Cogeneration Power Plant Project (2000 – 2001) Project Description: Re tube heat exchanger for gas turbine lube oil cooler for GE F7A Responsibility: Assigned as Project & Engineering Manager and was responsible for maintenance service of heat exchanger for GE Gas Turbine. 21.TIG Project (2000 – 2001) Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of H2 reciprocating compressor Responsibility: Assigned as Project & Engineering Manager and was responsible for design and fabrication of heat exchanger and pressure vessel for Hydrogen Compressor. 22.Bayer Project (2000 – 2001) Employment History Page 11
  • 12. Project Description: Completed skid and packaging which consist of pressure vessel, heat exchanger of CO2 reciprocating compressor Responsibility: Assigned as Project & Engineering Manager and was responsible for design and fabrication of heat exchanger and pressure vessel c/w packaging of “NEAC” CO2 Compressor. Koh Samui Refuse Chief Plant Operator Incineration Plant (1999-2000) 1. Koh Samui Refuse Incineration Plant Project (1999 – 2000) Project Description: The incinerator plant capacity of 150 t/day for burning the refuse which collected within Koh Samui area. This project was built by NKK, japan. Responsibility: Assigned as Chief Plant Operator and was responsible for preventive maintenance and operation of refuse incinerator 150 tons/day having the following auxiliary list: . Pump and Rotation machine . Overhead crane . Burner and combustion chamber of furnace . Conveyor system . Operation refuse incineration plant capacity of 150 tons/day Conveyor Technology Co. Ltd. (1995-1999) Mechanical Engineer 1. Bangkok Polyester Cogeneration Power Plant Project (1998 – 1999) Project Description: A cogeneration power plant with Solar Gas Turbine Taurus 70 and generator 7 MW. Complete with hot oil exchanger which produced hot oil for melting the pet resin and also having an HRSG 10 tons/hour which supply steam to York Absorption Chiller. Responsibility: Assigned as Project & Engineering Manager responsible for design, estimation, project management, installation and commissioning. 2. Thai Taffeta Cogeneration Power Plant Project (1997 – 1998) Employment History Page 12
  • 13. Project Description: A cogeneration power plant with Solar Gas Turbine Mars 100 and generator 10 MW with HRSG 32 Tons/hour (172 PSIG) which supply steam to LG Absorption Chiller Responsibility: Assigned as Project & Engineering Manager responsible for process design, estimation, project management, installation and commissioning. 3. Hydro Power Plant at Maesord Tak Project (1996 – 1997) Project Description: Small hydro power plant with 500kW x 1 unit (Farnsis turbine) with generator Responsibility: Assigned as Erection Engineer responsible for project management for construction of mechanical work, piping work, and maintenance about rotating machines such as pump, overhead crane and material handling systems. 4. Hydro Power Plant at Trang Project (1995 – 1996) Project Description: Small hydro power plant with 250 kW x 2 units (Pelton wheel turbine) with Generator Responsibility: Assigned as Erection Engineer responsible for project management for construction of mechanical work, piping work, and maintenance about rotating machines such as pump, overhead crane and material handling systems. 5. Patum Rice Mill Co. Ltd. Project (1995 – 1996) Project Description: Rice husk boiler 30 T/h x 2 unit revamp which supply steam to steam turbine 9 MWe and new husk ash bag filter system for collect the ash by bag package for export to Japan Responsibility: Assigned as Consultant Engineer responsible for project management for construction of boiler systems, mechanical work, piping work, and maintenance about rotating machines such as pump, overhead crane and material handling systems. QUALIFICATION: Employment History Page 13
  • 14. Below are record of achievement by myself 1. I was featured in “ ”ก๊าซไลน์ as a featured Project Manager for Kangwal Textile that is building a tri generation plant 2. I was also contracted by Honeywell Systems to perform detailed design for this tri generation plant system 3. As the Managing Director of RungJarean Energy & Consultant Co. Ltd., he was contracted to review design calculation and apply for IEAT permits. I hope my qualifications and work experience will be beneficial and fit to your Project. Employment History Page 14