SlideShare a Scribd company logo
1 of 32
General Information
Skill Matrix,
Multi Skill
Development
& Training Plan
General Information
Goal
Mampu membuat Skill
Matrix & Rencana Training
General Information
Coach’s Background
AJI WIJAYA KUSUMA, ST
Enthusiast & professional on Lean,
Improvement, people development
and motivation.
16 years experience in Apparel
Industry focus on practical lean
implementation, costing & capacity
management
471.wijayakusuma@gmail.com
+62 815 7898 6913
Aji Wijaya Kusuma
Lean Manufacturing
Industrial Engineering
Production Planning
Apparel CMT Costing & CPM
90%
90%
80%
85%
85%
Supplier Capacity Management
https://www.youtube.com/user/471WijayaKusuma/featured
https://www.facebook.com/Lets-LEAN-788239307962079
General Information
Masalah Pabrik
Garment
General Information
Layout
lama ± 1-2
hari Mesin
belum siap
pakai
Skill
operator
belum OK
Kalo sore
sisaan
permakan
masih ada
General Information
Training Within Industry
Perang Dunia Ke-2
General Information
Q1 Q2 Q3 Q4
1 2
2 5
3 6
4
1 1 2 2 2 2 1
GREENTEX LEAN DEPT-- SKILL MATRIX & TRAINING PLAN
SKILL NAME /PROCESS
1. Motion &
Time Study
4.
Presentation
3. 5S & Visual
Performance
7. Problem
Solving PDCA
2. Data
Analyze &
Visualization
5. Coaching 6. Inter Dept
Relation
REMARKS
ACTUAL CAPABILITIES
(75% PERFORMANCE)
Manpower Needs
Performance Needs
(Work Manner)
No.
Reni
5 6 7
Riski Chairani
NO SKILL
KNOW THE THEORY
CAN APPLY SOME OF THE THEORY
HAVE APPLIED IN MOST OF ACTUAL PROBLEM
CAN COACH OTHER WITH PROVEN RESULT
Winarsih
Putut Setiawan
Remarks
Job Needs
(Poduction Change)
RESULT OF
TRAINING
Beginning of Year
Middle of Year
End of Year
SKILL LEVEL
TARGET
LEAN TEAM NAME
General Information
Remarks
Job Needs
(Poduction Change)
End of Year
Middle of Year
RESULT OF
TRAINING
Beginning of Year
4
3 WATI
2 IKA
15
1 TINA
ACTUAL 10 3 2
6 52
6 2 5 3 5 3
TARGET TOTAL OPERATOR 10 5 5 2
No.
CAPABILITIES Manpower Needs
Q1 Q2 Q3 Q3
Performance Needs
(Work Manner)
JOIN
WB
CROSS
BOX
JOIN
HOOD
SNAP/BARTACK
PASANG
PLACKET
PASANG
ZIPPER
OVERDECK
MAKE
UP
OVERLOCK
SKILL MATRIX SEWING
Name:
Section/Group:
Date:
Process or
Operation
Name
PENGUASAAN MESIN PENGUASAAN PROSES SPESIAL
REMARKS
SINGLE
NEEDLE
DOIBLE
NEEDLE
TARGET SKILL
NAME
General Information
Creating a Planning Time-table
MULTI-FUNCTION WORKER TRAINING TIMETABLE
Name: REMARKS
Section/Group:
CAPABILITIES
Date:
NUMBER NAME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
= 100% Performance
= 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 5/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Forming
Grinding
Punching
Seam
Weld
Edge
Prep
Tacking
Spot
Weld
Flange
Weld
Paint
KEY
Increase orders 10% for the year
Primer
Step 1
Step 2
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 5/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Forming
Grinding
Punching
Seam
Weld
Edge
Prep
Tacking
Spot
Weld
Flange
Weld
Paint
KEY
Increase orders 10% for the year
Primer
Step 3
List Job
Names
General Information
1. Select Critical/Special Process/Machine
Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Namaoperator NIK
Cross box Jarum 1 V V Saenur GIU0494
Obras pasangtangan Obras benang4 V Witri GIU2351
Obras variasi samping Obras benang4 V -
Tutup kerah Jarum 1 V V Khomsiyatun GIU2088
Stick armhole Kamput V V Drsini GIU0971
Cross box Jarum 1 V V Mila GIU3636
Hemmingtangan Kamput V -
Tutup kerah Jarum 1 V V Heni GIU0273
Cross box Jarum 1 V V Masriah GIU0277
Pasangkerah Jarum 1 V V Siti GIU1956
Stick slit Jarum 1 V V Biut GIU3783
Hemmingtangan Kamput V V Suhartiningsih GIU0758
Stick armhole /printing Kamput V Rohani GIU0290
Make up Make up V V Risna GIU0354
Obras kerah Obras benang4 V V Nuraini GIU0337
Stick zipper Jarum 1 V V iis GIU0210
Tutup kerah Jarum 1 V V Elis GIU4130
Pasangzipper Jarum 1 V V Mimin GIU0217
Pasangzipper Jarum 1 V V Uli GIU3204
Stick zipper Jarum 1 V V -
Corongtape kerah Jarum 1 V V -
Stick tape Jarum 1 V V -
Stick zipper Jarum 1 V V Kiswati GIU2461
8 385FA
395FA
2
395FA
12
7
5
P31142
MSTR08390
DATA CRITICAL PROSES SEWING
POLO
6
15
16
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 5/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Forming
Grinding
Punching
Seam
Weld
Edge
Prep
Tacking
Spot
Weld
Flange
Weld
Paint
KEY
Increase orders 10% for the year
Primer
Step 4
Assess Skill
Levels
General Information
SKILL
LEVEL
PERSENTASE
C 1%-25% Hanya dapat melakukan langkah-langkah dasar, dan masih belum lepas dari pengawasan
B 26%-50%
Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan tapi
belum mencapai target waktu yang ditetapkan. Masih membutuhkan banyak pengawasan
S 76%-100%
Tidak membutuhkan pengawasan dan dapat melatih karyawan lain untuk melakukan proses
sewing yang ditargetkan
A 51%-75%
Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan dan
mencapai target waktu yang ditetapkan. Hanya butuh sedikit pengawasan
SIMBOL KETERANGAN
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Step 5
Ideal number: the ideal number
of people capable of doing the job
at 75% performance or better
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Step 6
Step 6
Add Total
Capabilities
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Performance needs:
• Individual adherence to quality, rate and safety standards
• Individual use of equipment and machines
• Waste, rework, damage to equipment and injuries
Step 8
Step 7
Manpower needs:
• New employees
• Promotions / transfers
• Vacations
• Temporary employees
• Job rotations
• Temporary assignments
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Production needs:
• Work that piles up
• Seasonal work
• Bottlenecks
• New Work
• Production changes
Step 9
General Information
MULTI-FUNCTION WORKER TRAINING SHEET
Name: Ron Coleman REMARKS
Section/Group:
CAPABILITIES
Date: 8/15/02 Jan Jun Dec
NUMBER NAME 4 6 6 6 6 6 6 6 4 4
1. Ron Coleman (Supervisor) 10 10
2. Eddie Day (Team Leader) 3 4
3. Jeffe Goedde (Team Leader) 3 5
4. Bradley Alvey 2 4
5. Tina Brooks 6 7
6. Clark Campbell 3 4
7. Willie Coleman 1 4
8. Dennis Daniel 1 2
9.
10.
3 3 3 1 3 3 2 3 5 3 = 100% Performance
5 4 4 2 4 4 3 4 6 4 = 75% Performance
= 50% Performance
= In Training
Process or
Operation
Name
IDEAL NUMBER
Manpower Needs
Performance Needs
(Work Manner)
RESULT
OF
TRAINING
Beginning of Year
Middle of Year
End of Year
Job Needs
(Production Change)
Remarks
Frame Department
Chop
Saw
(2)
HPP
Glue
and
Dowel
Frame
Clamp
(2)
Prep/Inspect
Special
Busellato
Giben
Panel
Saw
Edgebander
KEY
Increase orders 10% for the year
Parts
Compare :
• IDEAL CAPACITY to
• RESULT OF TRAINING
Examine :
• Manpower Needs
• Capabilities and
• Job Needs to determine
training needs.
Step 10
Step 10
• Plan for and record anticipated
training completion dates.
• Write dates next to individual circles.
Step 11
General Information
Copyright 2001 - 2008 Lean Associates,
Inc.
General Information
Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Nama operator NIK
Cross box Jarum 1 V V Saenur GIU 0494
Obras pasang tangan Obras benang 4 V Witri GIU 2351
Obras variasi samping Obras benang 4 V -
Tutup kerah Jarum 1 V V Khomsiyatun GIU 2088
Stick armhole Kamput V V Drsini GIU 0971
Cross box Jarum 1 V V Mila GIU 3636
Hemming tangan Kamput V -
Tutup kerah Jarum 1 V V Heni GIU 0273
Cross box Jarum 1 V V Masriah GIU 0277
Pasang kerah Jarum 1 V V Siti GIU 1956
Stick slit Jarum 1 V V Biut GIU 3783
Hemming tangan Kamput V V Suhartiningsih GIU 0758
Stick armhole /printing Kamput V Rohani GIU 0290
Make up Make up V V Risna GIU 0354
Obras kerah Obras benang 4 V V Nuraini GIU 0337
Stick zipper Jarum 1 V V iis GIU 0210
Tutup kerah Jarum 1 V V Elis GIU 4130
Pasang zipper Jarum 1 V V Mimin GIU 0217
Pasang zipper Jarum 1 V V Uli GIU 3204
Stick zipper Jarum 1 V V -
Corong tape kerah Jarum 1 V V -
Stick tape Jarum 1 V V -
Stick zipper Jarum 1 V V Kiswati GIU 2461
8 385 FA
395 FA
2
395 FA
12
7
5
P31142
MSTR08390
DATA CRITICAL PROSES SEWING
POLO
6
15
16
2. Select Best Operator To Do TOT (Training Of Trainer)
General Information
3. Train the best operator with
Lean Method (JI)
www.themegallery.com Company Logo
General Information
General Information
Perbaikan Terus-Menerus
❖ Update Weekly/Monthly untuk Skill Level %
❖ Merencanakan lebih awal jika ada resign dan rotasi
❖ Memperbaiki ISQ/RFT
Factory
Category Level - HR Data
S A B C
5% 25% 40% 30%
IY 01 12.4% 29.7% 34.5% 18.4%
IY 02 6.6% 17.0% 36.1% 26.1%
IY 03 7.9% 26.1% 35.7% 26.3%
IY 04 9.1% 27.5% 38.2% 21.4%
IY 05 9.1% 29.8% 28.5% 24.0%
IY 07 7.5% 31.4% 29.7% 19.8%
IY 08 7.3% 21.4% 36.8% 22.0%
IY 09 4.8% 15.1% 37.4% 29.2%
IY 10 6.0% 21.8% 40.3% 23.1%
IY 12 4.3% 21.1% 35.5% 25.6%
IY 13 6.9% 20.9% 33.9% 20.0%
IY 14 11.1% 36.1% 21.7% 23.4%
OUTSOLE 0.0% 34.8% 35.9% 4.0%
TOTAL 6.5% 25.9% 34.4% 20.3%
Train for mechanic
development
Test Skill
Visual Control Mechanic
Development Skill
No NAME Machine
Problem
Focus
Analyze Std
Total
Time
Setting
+ repair
(Minute
)
Education Skill
Update:
19 Feb
Update:
26 Mar
Update:
16 Apr
Update:
11 Mei
Update:
3 Jun
Update:
15 Jun
Update:
07 Jul
Update:
10
August
Update:
19 Feb
Update:
26 Mar
Update:
16 Apr
Update:
11 Mei
Update:
3 Jun
Update:
15 Jun
Update:
07 Jul
Update:
10
August
1 Dendi
Overdeck
( 3
Neddle,
Cutt )
Jumping
Stitch
3,7 3,8 3,9 3,6 3,7 3,9
20
2 Tatang 3,7 3,7 3,8 3,8 3,4 3,6 3,6 3,7
3 Aji 2,0 2,6 3,6 3,0 2,9 3,3
4 Jenal 3,3 3,7 3,7 3,3 3,4 3,7
5 Andre 3,1 3,3 3,7 3,3 3,3 3,4
6 Hari 4,0 4,0 3,9 3,9
7 Willy 2,8 3,1 3,2 2,7 2,7 3,0
NOTE
SCORE REMARKS
0 Can not repairing machine
1 Can carry out basic repairing machine
2 Can carry out basic repairing machine + requires intermediate supervision
3 Can carry out basic repairing machine + requires advance supervision
4 Can carry out basic repairing machine , propose improvement ideas, be able to work with
other Dept. & can train other mechanics to make repairs
Score Mechanic skill before & after
project
2.8
2.0
3.1
3.3
3.7 3.7
4.0
3.2
3.6 3.7 3.7 3.8 3.9 4.0
WILLY AJI ANDRE JENAL TATANG DENDI HARI
SKILL MATRIX MECHANIC
BEFORE AFTER
3.
Result on machine breakdown
ADD A FOOTER 31
Neal Creative ©
FINISH
IMPROVEMENTS!
THANK YOU

More Related Content

Similar to 11_Skill Matrix_Multiskill Development & Training plan.pdf

Human Resources Management Process Powerpoint Presentation Slides
Human Resources Management Process Powerpoint Presentation SlidesHuman Resources Management Process Powerpoint Presentation Slides
Human Resources Management Process Powerpoint Presentation SlidesSlideTeam
 
Human Resources Management Process PowerPoint Presentation Slides
Human Resources Management Process PowerPoint Presentation Slides Human Resources Management Process PowerPoint Presentation Slides
Human Resources Management Process PowerPoint Presentation Slides SlideTeam
 
Presentation Production Compliance control BE
Presentation Production Compliance control BEPresentation Production Compliance control BE
Presentation Production Compliance control BECATHERINE NGUYEN
 
Agile DC Lead Time
Agile DC Lead TimeAgile DC Lead Time
Agile DC Lead Timeazheglov
 
Ad september 2014 exam final
Ad september 2014 exam   finalAd september 2014 exam   final
Ad september 2014 exam finalLo Wai
 
Keep 'em or kick 'em out: Evaluating student workforce performance
Keep 'em or kick 'em out: Evaluating student workforce performanceKeep 'em or kick 'em out: Evaluating student workforce performance
Keep 'em or kick 'em out: Evaluating student workforce performanceAndrew Lyons
 
mani resume
mani resumemani resume
mani resumeMK mani
 
Maniiiii (3)
Maniiiii (3)Maniiiii (3)
Maniiiii (3)MK mani
 
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...The Pathway Group
 
Colt & Grow Training Modules by S K Kalraiya
Colt & Grow Training Modules by S K KalraiyaColt & Grow Training Modules by S K Kalraiya
Colt & Grow Training Modules by S K KalraiyaSanjay Kumar Kalraiya
 
Presentasi tugas akhir
Presentasi tugas akhirPresentasi tugas akhir
Presentasi tugas akhirDedi Dedi
 
Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.Mikalai Alimenkou
 
Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentTimothy Wooi
 

Similar to 11_Skill Matrix_Multiskill Development & Training plan.pdf (20)

Human Resources Management Process Powerpoint Presentation Slides
Human Resources Management Process Powerpoint Presentation SlidesHuman Resources Management Process Powerpoint Presentation Slides
Human Resources Management Process Powerpoint Presentation Slides
 
Human Resources Management Process PowerPoint Presentation Slides
Human Resources Management Process PowerPoint Presentation Slides Human Resources Management Process PowerPoint Presentation Slides
Human Resources Management Process PowerPoint Presentation Slides
 
Presentation Production Compliance control BE
Presentation Production Compliance control BEPresentation Production Compliance control BE
Presentation Production Compliance control BE
 
Mbs burial village oracle fusion implementation
Mbs burial village oracle fusion implementationMbs burial village oracle fusion implementation
Mbs burial village oracle fusion implementation
 
Itb Chap 09
Itb Chap 09Itb Chap 09
Itb Chap 09
 
Report
ReportReport
Report
 
What is kaizen
What is kaizenWhat is kaizen
What is kaizen
 
Agile DC Lead Time
Agile DC Lead TimeAgile DC Lead Time
Agile DC Lead Time
 
Ad september 2014 exam final
Ad september 2014 exam   finalAd september 2014 exam   final
Ad september 2014 exam final
 
Executive briefing business case- saudi electricity
Executive briefing   business case- saudi electricityExecutive briefing   business case- saudi electricity
Executive briefing business case- saudi electricity
 
Keep 'em or kick 'em out: Evaluating student workforce performance
Keep 'em or kick 'em out: Evaluating student workforce performanceKeep 'em or kick 'em out: Evaluating student workforce performance
Keep 'em or kick 'em out: Evaluating student workforce performance
 
Lean - Tight Oil Design & Construction
Lean - Tight Oil Design & ConstructionLean - Tight Oil Design & Construction
Lean - Tight Oil Design & Construction
 
mani resume
mani resumemani resume
mani resume
 
Maniiiii (3)
Maniiiii (3)Maniiiii (3)
Maniiiii (3)
 
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
How Apprenticeships Work & Why They Work - Apprenticeship Training Material -...
 
Colt & Grow Training Modules by S K Kalraiya
Colt & Grow Training Modules by S K KalraiyaColt & Grow Training Modules by S K Kalraiya
Colt & Grow Training Modules by S K Kalraiya
 
Presentasi tugas akhir
Presentasi tugas akhirPresentasi tugas akhir
Presentasi tugas akhir
 
Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.
 
Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course Content
 
8_TPM.pdf
8_TPM.pdf8_TPM.pdf
8_TPM.pdf
 

More from Aji Wijaya Kusuma

Kaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxKaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxAji Wijaya Kusuma
 
4_5S & Visual Management.pdf
4_5S & Visual Management.pdf4_5S & Visual Management.pdf
4_5S & Visual Management.pdfAji Wijaya Kusuma
 
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdfAji Wijaya Kusuma
 
2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdfAji Wijaya Kusuma
 
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdfAji Wijaya Kusuma
 
3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdf3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdfAji Wijaya Kusuma
 
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdfAji Wijaya Kusuma
 
7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdfAji Wijaya Kusuma
 
Rft real implementation korean fty
Rft real implementation korean ftyRft real implementation korean fty
Rft real implementation korean ftyAji Wijaya Kusuma
 
Rft project real implementation
Rft project real implementationRft project real implementation
Rft project real implementationAji Wijaya Kusuma
 
Greentex indonesia utama lean implementation
Greentex indonesia utama lean implementationGreentex indonesia utama lean implementation
Greentex indonesia utama lean implementationAji Wijaya Kusuma
 
BEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGBEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGAji Wijaya Kusuma
 
Reducing cleanliness defect_GRB
Reducing cleanliness defect_GRBReducing cleanliness defect_GRB
Reducing cleanliness defect_GRBAji Wijaya Kusuma
 

More from Aji Wijaya Kusuma (20)

Kaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptxKaizen in healtcare industry_hospital.pptx
Kaizen in healtcare industry_hospital.pptx
 
16_QCO.pdf
16_QCO.pdf16_QCO.pdf
16_QCO.pdf
 
4_5S & Visual Management.pdf
4_5S & Visual Management.pdf4_5S & Visual Management.pdf
4_5S & Visual Management.pdf
 
14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf14_PULL SYSTEM.pdf
14_PULL SYSTEM.pdf
 
12_Standar Kerja.pdf
12_Standar Kerja.pdf12_Standar Kerja.pdf
12_Standar Kerja.pdf
 
15_One Piece Flow.pdf
15_One Piece Flow.pdf15_One Piece Flow.pdf
15_One Piece Flow.pdf
 
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
6_Learning to see with VSM (Value Stream Mapping)_Belajar Melihat dengan VSM.pdf
 
2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf2_Hoshin Kanri~Policy Deployment.pdf
2_Hoshin Kanri~Policy Deployment.pdf
 
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
5_Value,Waste & 8 Waste in production_ 8 Pemborosan.pdf
 
3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdf3_Kaizen & Culture of Empowerment.pdf
3_Kaizen & Culture of Empowerment.pdf
 
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
9_RFT(Right First Time_Benar Saat Pertama Proses).pdf
 
7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf7_Problem solving using PDCA thinking (A3 Report).pdf
7_Problem solving using PDCA thinking (A3 Report).pdf
 
Rft real implementation korean fty
Rft real implementation korean ftyRft real implementation korean fty
Rft real implementation korean fty
 
Rft project real implementation
Rft project real implementationRft project real implementation
Rft project real implementation
 
RFT Workshop
RFT WorkshopRFT Workshop
RFT Workshop
 
Creating speed with 5 s
Creating speed with 5 sCreating speed with 5 s
Creating speed with 5 s
 
New qco project greentex
New qco project greentexNew qco project greentex
New qco project greentex
 
Greentex indonesia utama lean implementation
Greentex indonesia utama lean implementationGreentex indonesia utama lean implementation
Greentex indonesia utama lean implementation
 
BEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADINGBEFORE AFTER SHORT PRESENTATION SPREADING
BEFORE AFTER SHORT PRESENTATION SPREADING
 
Reducing cleanliness defect_GRB
Reducing cleanliness defect_GRBReducing cleanliness defect_GRB
Reducing cleanliness defect_GRB
 

Recently uploaded

Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxOs Hillman
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledCaitlinCummins3
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesHaseebBashir5
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsSlidesAI
 
Global Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdfGlobal Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdfAmer Morgan
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...srcw2322l101
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdfzukhrafshabbir
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Associationseri bangash
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Alejandro Cremades
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxSaksham Gupta
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionAlejandro Cremades
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfmstarkes24
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowMiriam Robeson
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future worldChris Skinner
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementsirhcs
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performanceirhcs
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptxrdishurana
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFCaitlinCummins3
 

Recently uploaded (20)

Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptx
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Global Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdfGlobal Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdf
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
 

11_Skill Matrix_Multiskill Development & Training plan.pdf

  • 1. General Information Skill Matrix, Multi Skill Development & Training Plan
  • 2. General Information Goal Mampu membuat Skill Matrix & Rencana Training
  • 3. General Information Coach’s Background AJI WIJAYA KUSUMA, ST Enthusiast & professional on Lean, Improvement, people development and motivation. 16 years experience in Apparel Industry focus on practical lean implementation, costing & capacity management 471.wijayakusuma@gmail.com +62 815 7898 6913 Aji Wijaya Kusuma Lean Manufacturing Industrial Engineering Production Planning Apparel CMT Costing & CPM 90% 90% 80% 85% 85% Supplier Capacity Management https://www.youtube.com/user/471WijayaKusuma/featured https://www.facebook.com/Lets-LEAN-788239307962079
  • 5. General Information Layout lama ± 1-2 hari Mesin belum siap pakai Skill operator belum OK Kalo sore sisaan permakan masih ada
  • 6. General Information Training Within Industry Perang Dunia Ke-2
  • 7. General Information Q1 Q2 Q3 Q4 1 2 2 5 3 6 4 1 1 2 2 2 2 1 GREENTEX LEAN DEPT-- SKILL MATRIX & TRAINING PLAN SKILL NAME /PROCESS 1. Motion & Time Study 4. Presentation 3. 5S & Visual Performance 7. Problem Solving PDCA 2. Data Analyze & Visualization 5. Coaching 6. Inter Dept Relation REMARKS ACTUAL CAPABILITIES (75% PERFORMANCE) Manpower Needs Performance Needs (Work Manner) No. Reni 5 6 7 Riski Chairani NO SKILL KNOW THE THEORY CAN APPLY SOME OF THE THEORY HAVE APPLIED IN MOST OF ACTUAL PROBLEM CAN COACH OTHER WITH PROVEN RESULT Winarsih Putut Setiawan Remarks Job Needs (Poduction Change) RESULT OF TRAINING Beginning of Year Middle of Year End of Year SKILL LEVEL TARGET LEAN TEAM NAME
  • 8. General Information Remarks Job Needs (Poduction Change) End of Year Middle of Year RESULT OF TRAINING Beginning of Year 4 3 WATI 2 IKA 15 1 TINA ACTUAL 10 3 2 6 52 6 2 5 3 5 3 TARGET TOTAL OPERATOR 10 5 5 2 No. CAPABILITIES Manpower Needs Q1 Q2 Q3 Q3 Performance Needs (Work Manner) JOIN WB CROSS BOX JOIN HOOD SNAP/BARTACK PASANG PLACKET PASANG ZIPPER OVERDECK MAKE UP OVERLOCK SKILL MATRIX SEWING Name: Section/Group: Date: Process or Operation Name PENGUASAAN MESIN PENGUASAAN PROSES SPESIAL REMARKS SINGLE NEEDLE DOIBLE NEEDLE TARGET SKILL NAME
  • 9. General Information Creating a Planning Time-table MULTI-FUNCTION WORKER TRAINING TIMETABLE Name: REMARKS Section/Group: CAPABILITIES Date: NUMBER NAME 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. = 100% Performance = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks
  • 10. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 5/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Forming Grinding Punching Seam Weld Edge Prep Tacking Spot Weld Flange Weld Paint KEY Increase orders 10% for the year Primer Step 1 Step 2
  • 11. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 5/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Forming Grinding Punching Seam Weld Edge Prep Tacking Spot Weld Flange Weld Paint KEY Increase orders 10% for the year Primer Step 3 List Job Names
  • 12. General Information 1. Select Critical/Special Process/Machine Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Namaoperator NIK Cross box Jarum 1 V V Saenur GIU0494 Obras pasangtangan Obras benang4 V Witri GIU2351 Obras variasi samping Obras benang4 V - Tutup kerah Jarum 1 V V Khomsiyatun GIU2088 Stick armhole Kamput V V Drsini GIU0971 Cross box Jarum 1 V V Mila GIU3636 Hemmingtangan Kamput V - Tutup kerah Jarum 1 V V Heni GIU0273 Cross box Jarum 1 V V Masriah GIU0277 Pasangkerah Jarum 1 V V Siti GIU1956 Stick slit Jarum 1 V V Biut GIU3783 Hemmingtangan Kamput V V Suhartiningsih GIU0758 Stick armhole /printing Kamput V Rohani GIU0290 Make up Make up V V Risna GIU0354 Obras kerah Obras benang4 V V Nuraini GIU0337 Stick zipper Jarum 1 V V iis GIU0210 Tutup kerah Jarum 1 V V Elis GIU4130 Pasangzipper Jarum 1 V V Mimin GIU0217 Pasangzipper Jarum 1 V V Uli GIU3204 Stick zipper Jarum 1 V V - Corongtape kerah Jarum 1 V V - Stick tape Jarum 1 V V - Stick zipper Jarum 1 V V Kiswati GIU2461 8 385FA 395FA 2 395FA 12 7 5 P31142 MSTR08390 DATA CRITICAL PROSES SEWING POLO 6 15 16
  • 13. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 5/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Forming Grinding Punching Seam Weld Edge Prep Tacking Spot Weld Flange Weld Paint KEY Increase orders 10% for the year Primer Step 4 Assess Skill Levels
  • 14. General Information SKILL LEVEL PERSENTASE C 1%-25% Hanya dapat melakukan langkah-langkah dasar, dan masih belum lepas dari pengawasan B 26%-50% Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan tapi belum mencapai target waktu yang ditetapkan. Masih membutuhkan banyak pengawasan S 76%-100% Tidak membutuhkan pengawasan dan dapat melatih karyawan lain untuk melakukan proses sewing yang ditargetkan A 51%-75% Dapat melakukan pekerjaan dengan aman, sesuai dengan kualitas yang diinginkan dan mencapai target waktu yang ditetapkan. Hanya butuh sedikit pengawasan SIMBOL KETERANGAN
  • 15. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Step 5 Ideal number: the ideal number of people capable of doing the job at 75% performance or better
  • 16. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Step 6 Step 6 Add Total Capabilities
  • 17. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Performance needs: • Individual adherence to quality, rate and safety standards • Individual use of equipment and machines • Waste, rework, damage to equipment and injuries Step 8 Step 7 Manpower needs: • New employees • Promotions / transfers • Vacations • Temporary employees • Job rotations • Temporary assignments
  • 18. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Production needs: • Work that piles up • Seasonal work • Bottlenecks • New Work • Production changes Step 9
  • 19. General Information MULTI-FUNCTION WORKER TRAINING SHEET Name: Ron Coleman REMARKS Section/Group: CAPABILITIES Date: 8/15/02 Jan Jun Dec NUMBER NAME 4 6 6 6 6 6 6 6 4 4 1. Ron Coleman (Supervisor) 10 10 2. Eddie Day (Team Leader) 3 4 3. Jeffe Goedde (Team Leader) 3 5 4. Bradley Alvey 2 4 5. Tina Brooks 6 7 6. Clark Campbell 3 4 7. Willie Coleman 1 4 8. Dennis Daniel 1 2 9. 10. 3 3 3 1 3 3 2 3 5 3 = 100% Performance 5 4 4 2 4 4 3 4 6 4 = 75% Performance = 50% Performance = In Training Process or Operation Name IDEAL NUMBER Manpower Needs Performance Needs (Work Manner) RESULT OF TRAINING Beginning of Year Middle of Year End of Year Job Needs (Production Change) Remarks Frame Department Chop Saw (2) HPP Glue and Dowel Frame Clamp (2) Prep/Inspect Special Busellato Giben Panel Saw Edgebander KEY Increase orders 10% for the year Parts Compare : • IDEAL CAPACITY to • RESULT OF TRAINING Examine : • Manpower Needs • Capabilities and • Job Needs to determine training needs. Step 10 Step 10 • Plan for and record anticipated training completion dates. • Write dates next to individual circles. Step 11
  • 20. General Information Copyright 2001 - 2008 Lean Associates, Inc.
  • 21. General Information Line Style SKETCH Proses critical Jenis mesin OUTPUT QUALITAS Nama operator NIK Cross box Jarum 1 V V Saenur GIU 0494 Obras pasang tangan Obras benang 4 V Witri GIU 2351 Obras variasi samping Obras benang 4 V - Tutup kerah Jarum 1 V V Khomsiyatun GIU 2088 Stick armhole Kamput V V Drsini GIU 0971 Cross box Jarum 1 V V Mila GIU 3636 Hemming tangan Kamput V - Tutup kerah Jarum 1 V V Heni GIU 0273 Cross box Jarum 1 V V Masriah GIU 0277 Pasang kerah Jarum 1 V V Siti GIU 1956 Stick slit Jarum 1 V V Biut GIU 3783 Hemming tangan Kamput V V Suhartiningsih GIU 0758 Stick armhole /printing Kamput V Rohani GIU 0290 Make up Make up V V Risna GIU 0354 Obras kerah Obras benang 4 V V Nuraini GIU 0337 Stick zipper Jarum 1 V V iis GIU 0210 Tutup kerah Jarum 1 V V Elis GIU 4130 Pasang zipper Jarum 1 V V Mimin GIU 0217 Pasang zipper Jarum 1 V V Uli GIU 3204 Stick zipper Jarum 1 V V - Corong tape kerah Jarum 1 V V - Stick tape Jarum 1 V V - Stick zipper Jarum 1 V V Kiswati GIU 2461 8 385 FA 395 FA 2 395 FA 12 7 5 P31142 MSTR08390 DATA CRITICAL PROSES SEWING POLO 6 15 16 2. Select Best Operator To Do TOT (Training Of Trainer)
  • 22. General Information 3. Train the best operator with Lean Method (JI) www.themegallery.com Company Logo
  • 25. Perbaikan Terus-Menerus ❖ Update Weekly/Monthly untuk Skill Level % ❖ Merencanakan lebih awal jika ada resign dan rotasi ❖ Memperbaiki ISQ/RFT Factory Category Level - HR Data S A B C 5% 25% 40% 30% IY 01 12.4% 29.7% 34.5% 18.4% IY 02 6.6% 17.0% 36.1% 26.1% IY 03 7.9% 26.1% 35.7% 26.3% IY 04 9.1% 27.5% 38.2% 21.4% IY 05 9.1% 29.8% 28.5% 24.0% IY 07 7.5% 31.4% 29.7% 19.8% IY 08 7.3% 21.4% 36.8% 22.0% IY 09 4.8% 15.1% 37.4% 29.2% IY 10 6.0% 21.8% 40.3% 23.1% IY 12 4.3% 21.1% 35.5% 25.6% IY 13 6.9% 20.9% 33.9% 20.0% IY 14 11.1% 36.1% 21.7% 23.4% OUTSOLE 0.0% 34.8% 35.9% 4.0% TOTAL 6.5% 25.9% 34.4% 20.3%
  • 26.
  • 28. Visual Control Mechanic Development Skill No NAME Machine Problem Focus Analyze Std Total Time Setting + repair (Minute ) Education Skill Update: 19 Feb Update: 26 Mar Update: 16 Apr Update: 11 Mei Update: 3 Jun Update: 15 Jun Update: 07 Jul Update: 10 August Update: 19 Feb Update: 26 Mar Update: 16 Apr Update: 11 Mei Update: 3 Jun Update: 15 Jun Update: 07 Jul Update: 10 August 1 Dendi Overdeck ( 3 Neddle, Cutt ) Jumping Stitch 3,7 3,8 3,9 3,6 3,7 3,9 20 2 Tatang 3,7 3,7 3,8 3,8 3,4 3,6 3,6 3,7 3 Aji 2,0 2,6 3,6 3,0 2,9 3,3 4 Jenal 3,3 3,7 3,7 3,3 3,4 3,7 5 Andre 3,1 3,3 3,7 3,3 3,3 3,4 6 Hari 4,0 4,0 3,9 3,9 7 Willy 2,8 3,1 3,2 2,7 2,7 3,0 NOTE SCORE REMARKS 0 Can not repairing machine 1 Can carry out basic repairing machine 2 Can carry out basic repairing machine + requires intermediate supervision 3 Can carry out basic repairing machine + requires advance supervision 4 Can carry out basic repairing machine , propose improvement ideas, be able to work with other Dept. & can train other mechanics to make repairs
  • 29. Score Mechanic skill before & after project 2.8 2.0 3.1 3.3 3.7 3.7 4.0 3.2 3.6 3.7 3.7 3.8 3.9 4.0 WILLY AJI ANDRE JENAL TATANG DENDI HARI SKILL MATRIX MECHANIC BEFORE AFTER 3.
  • 30. Result on machine breakdown