Single-Pole Phase Comparators
Phase comparators for medium voltage are used to check phase coincidence in
three-phase networks. Single-pole phase comparators of type SPPC have the same
construction as PFISTERER voltage detectors. This ensures a high level of both safety
and reliability.
With the single-pole phase comparator SPPC, phase comparison is achieved by making
contact with both conductors one after the other.
Technical description:
Available for nominal voltages and nominal voltage ranges from 3 to 36 kV
Can be used with a rated frequency of 50 Hz
For reliable phase comparison, a rated frequency between 49.9 and 50.1 Hz is
required, with a maximum frequency drift of 10 mHz/s
Self-test feature
Automatic switch-off
Green, red and yellow LED display
Removable contact electrode top piece, as forked electrode
The single-pole phase comparator Type SPPC is designed to meet international
Standard IEC 61481.
Single-Pole Phase Comparator SPPC
The single-pole phase comparator SPPC is available for various nominal voltages and
voltage ranges. Depending on type, the phase comparator can also be used in rain or
snow.
No. Nominal voltage Total length Insertion depth Diameter of
insulating element
Suitable for use in
rain and snow
Un
(kV) LG
(mm) Ai
(mm) d (mm)
364 788 001 6 - 12 1440 575 24 -
364 825 001 6 - 12 1440 575 24
364 825 002 6 - 12 1640 775 24
364 788 004 10 1040 349 24 -
364 788 002 12 - 24 1640 775 24 -
364 825 003 12 - 24 1640 775 24
364 788 003 24 - 36 1640 775 24 -
364 825 004 24 - 36 1640 775 24
II
Single-polePhaseComparators
Phase Comparators
30 www.pfisterer.com
Single-Pole Phase Comparator SPPC, Switchable
The single-pole phase comparator SPPC is available for various nominal voltages
and voltage ranges. Depending on type, the phase comparator can also be used in rain
or snow. This phase comparator can also be switched between three nominal voltage
ranges using the voltage range switching ring. This allows a larger system range to be
co ere w t o t cre s ter ere ce fie s scept t .
No. Nominal voltage
level I
Nominal voltage
level II
Nominal voltage
level III
Total length Insertion depth Diameter of
insulating element
Suitable for use
in rain and snow
Un
(kV) Un
(kV) Un
(kV) LG
(mm) Ai
(mm) d (mm)
364 750 001 6 - 12 12 - 24 24 - 36 1640 775 24
364 830 001 6 - 12 12 - 24 24 - 36 1640 775 24 -
II
Single-polePhaseComparators
Phase Comparators

More Related Content

What's hot

Thyristors and its series and parallel combinations
Thyristors and its series and parallel combinationsThyristors and its series and parallel combinations
Thyristors and its series and parallel combinations
.Ilyas Ghumman
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
Binit Das
 

What's hot (20)

Loss tangent delta test
Loss tangent delta testLoss tangent delta test
Loss tangent delta test
 
Why neutral grounding resisitor need continuous monitoring
Why neutral grounding resisitor need continuous monitoringWhy neutral grounding resisitor need continuous monitoring
Why neutral grounding resisitor need continuous monitoring
 
Testing of cb
Testing of cbTesting of cb
Testing of cb
 
Voltage Escalation in Shunt Reactor Switching in Circuit Breakers
Voltage Escalation in Shunt Reactor Switching in Circuit BreakersVoltage Escalation in Shunt Reactor Switching in Circuit Breakers
Voltage Escalation in Shunt Reactor Switching in Circuit Breakers
 
SCR protections
SCR protectionsSCR protections
SCR protections
 
Thyristors and its series and parallel combinations
Thyristors and its series and parallel combinationsThyristors and its series and parallel combinations
Thyristors and its series and parallel combinations
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
Measurement of the resistance of switchgear main circuit
Measurement of the resistance of switchgear main circuitMeasurement of the resistance of switchgear main circuit
Measurement of the resistance of switchgear main circuit
 
Inductive shielded superconducting fault current limiter: test results for sc...
Inductive shielded superconducting fault current limiter: test results for sc...Inductive shielded superconducting fault current limiter: test results for sc...
Inductive shielded superconducting fault current limiter: test results for sc...
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
Technotoy stage 4
Technotoy stage 4Technotoy stage 4
Technotoy stage 4
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
 
Dynamic characteristics of thyristor
Dynamic characteristics of thyristorDynamic characteristics of thyristor
Dynamic characteristics of thyristor
 
Gss report
Gss reportGss report
Gss report
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in brief
 
CATU Voltage Tester For MV Separable Connectors (10-36kV)
CATU Voltage Tester For MV Separable Connectors (10-36kV)CATU Voltage Tester For MV Separable Connectors (10-36kV)
CATU Voltage Tester For MV Separable Connectors (10-36kV)
 
2.components in a substation breaker
2.components in a substation   breaker2.components in a substation   breaker
2.components in a substation breaker
 
Tan delta test for power transformers
Tan delta test for power transformersTan delta test for power transformers
Tan delta test for power transformers
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 

Similar to Pfisterer Single-Pole Phase Comparators SPPC - Pfisterer Electrical Safety Equipment

Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
RAJKIRANR3
 

Similar to Pfisterer Single-Pole Phase Comparators SPPC - Pfisterer Electrical Safety Equipment (20)

Kikusui safety testers
Kikusui safety testersKikusui safety testers
Kikusui safety testers
 
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
Kikusui ac power_supply_pcr-le_le2
Kikusui ac power_supply_pcr-le_le2Kikusui ac power_supply_pcr-le_le2
Kikusui ac power_supply_pcr-le_le2
 
Training slides
Training slidesTraining slides
Training slides
 
Mirus genlink dissimiliar_pitch_neutral_limiter_datasheet
Mirus genlink dissimiliar_pitch_neutral_limiter_datasheetMirus genlink dissimiliar_pitch_neutral_limiter_datasheet
Mirus genlink dissimiliar_pitch_neutral_limiter_datasheet
 
Pfisterer KP-Test 5 Voltage Detectors
Pfisterer KP-Test 5 Voltage DetectorsPfisterer KP-Test 5 Voltage Detectors
Pfisterer KP-Test 5 Voltage Detectors
 
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
10 - Ac Power Regulators & Control Power Transformers - Fuji Electric
 
Differential Protential Relay.ppt
Differential Protential Relay.pptDifferential Protential Relay.ppt
Differential Protential Relay.ppt
 
Test Switch Operation and Accessories
Test Switch Operation and AccessoriesTest Switch Operation and Accessories
Test Switch Operation and Accessories
 
RPI_Research_Overview
RPI_Research_OverviewRPI_Research_Overview
RPI_Research_Overview
 
Supreme Technology & Energy Solutions - Hioki 3169-20 Clamp-On Power HiTester...
Supreme Technology & Energy Solutions - Hioki 3169-20 Clamp-On Power HiTester...Supreme Technology & Energy Solutions - Hioki 3169-20 Clamp-On Power HiTester...
Supreme Technology & Energy Solutions - Hioki 3169-20 Clamp-On Power HiTester...
 
Data Teknis Gossen Metrawatt MAVOWATT 4
Data Teknis Gossen Metrawatt MAVOWATT 4 Data Teknis Gossen Metrawatt MAVOWATT 4
Data Teknis Gossen Metrawatt MAVOWATT 4
 
TESCO New Product Updates
TESCO New Product UpdatesTESCO New Product Updates
TESCO New Product Updates
 
Catalog Contactor Fuji Electric - Beeteco.com
Catalog Contactor Fuji Electric - Beeteco.comCatalog Contactor Fuji Electric - Beeteco.com
Catalog Contactor Fuji Electric - Beeteco.com
 
Catalog contactor fuji-electric Mới Nhất - Hạo Phương
Catalog contactor fuji-electric Mới Nhất - Hạo PhươngCatalog contactor fuji-electric Mới Nhất - Hạo Phương
Catalog contactor fuji-electric Mới Nhất - Hạo Phương
 
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
POWER QUALITY IMPROVEMENT USING 5-LEVEL FLYING CAPACITOR MULTILEVEL CONVERTER...
 
Catalog cs switch disconnectors_dienhathe.vn
Catalog cs switch disconnectors_dienhathe.vnCatalog cs switch disconnectors_dienhathe.vn
Catalog cs switch disconnectors_dienhathe.vn
 
VR-8 step voltage regulator
VR-8 step voltage regulatorVR-8 step voltage regulator
VR-8 step voltage regulator
 
New TESCO Product Update
New TESCO Product UpdateNew TESCO Product Update
New TESCO Product Update
 

More from Thorne & Derrick International

More from Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 

Recently uploaded

“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
Muhammad Subhan
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
FIDO Alliance
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc
 

Recently uploaded (20)

JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfFrisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
 
Vector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptxVector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptx
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptxCyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch Tuesday
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
الأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهلهالأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهله
 
Generative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdfGenerative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdf
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 

Pfisterer Single-Pole Phase Comparators SPPC - Pfisterer Electrical Safety Equipment

  • 1. 29www.pfisterer.com Single-Pole Phase Comparators Phase comparators for medium voltage are used to check phase coincidence in three-phase networks. Single-pole phase comparators of type SPPC have the same construction as PFISTERER voltage detectors. This ensures a high level of both safety and reliability. With the single-pole phase comparator SPPC, phase comparison is achieved by making contact with both conductors one after the other. Technical description: Available for nominal voltages and nominal voltage ranges from 3 to 36 kV Can be used with a rated frequency of 50 Hz For reliable phase comparison, a rated frequency between 49.9 and 50.1 Hz is required, with a maximum frequency drift of 10 mHz/s Self-test feature Automatic switch-off Green, red and yellow LED display Removable contact electrode top piece, as forked electrode The single-pole phase comparator Type SPPC is designed to meet international Standard IEC 61481. Single-Pole Phase Comparator SPPC The single-pole phase comparator SPPC is available for various nominal voltages and voltage ranges. Depending on type, the phase comparator can also be used in rain or snow. No. Nominal voltage Total length Insertion depth Diameter of insulating element Suitable for use in rain and snow Un (kV) LG (mm) Ai (mm) d (mm) 364 788 001 6 - 12 1440 575 24 - 364 825 001 6 - 12 1440 575 24 364 825 002 6 - 12 1640 775 24 364 788 004 10 1040 349 24 - 364 788 002 12 - 24 1640 775 24 - 364 825 003 12 - 24 1640 775 24 364 788 003 24 - 36 1640 775 24 - 364 825 004 24 - 36 1640 775 24 II Single-polePhaseComparators Phase Comparators
  • 2. 30 www.pfisterer.com Single-Pole Phase Comparator SPPC, Switchable The single-pole phase comparator SPPC is available for various nominal voltages and voltage ranges. Depending on type, the phase comparator can also be used in rain or snow. This phase comparator can also be switched between three nominal voltage ranges using the voltage range switching ring. This allows a larger system range to be co ere w t o t cre s ter ere ce fie s scept t . No. Nominal voltage level I Nominal voltage level II Nominal voltage level III Total length Insertion depth Diameter of insulating element Suitable for use in rain and snow Un (kV) Un (kV) Un (kV) LG (mm) Ai (mm) d (mm) 364 750 001 6 - 12 12 - 24 24 - 36 1640 775 24 364 830 001 6 - 12 12 - 24 24 - 36 1640 775 24 - II Single-polePhaseComparators Phase Comparators