PRESENTED BY - GUIDED BY -
AHER SANKET D. PROF. SHAIKH SIR
Why "Testing of Circuit Breaker" is Necessary?
A Circuit Breaker should be capable of carrying, making, and
breaking under normal and abnormal conditions. In any power
system circuit breaker has to withstand power frequency over
voltages and transient over voltages due to switching and lightning.
The performance of a circuit breaker under normal and abnormal
conditions can be verified by performing different type of tests on
circuit breakers. The main purpose of testing of circuit breakers is
to confirm if circuit breaker is able to work on particular voltage
and current ratings or not.
NECESSARY OF TESTING OF CIRCUIT
BREAKER:-
There are mainly two tests classified:
1) Type Test
2) Routine Test
TYPES OF TEST ON CIRCUIT BREAKERS:-
The purpose of type tests is to prove design features and the
quality of circuit breaker. Type tests are not conducted on each
circuit breaker. This is done to prove the capabilities and to
confirm the rated characteristics of the circuit breakers.
1) TYPE TESTS
Routine test is performed before circuit breaker dispatch to
ensure the product. This gives result about defects in materials
and construction of circuit breaker. We can check quality of
material of circuit breaker by performing Routine Test.
2) ROUTINE TESTS:
 Thermal tests
 Dielectric tests
 Measurement of resistance of the main circuits
 Short Circuit tests
TYPE TESTS LISTED BELOW:-
This test determines the maximum normal current that the circuit
breaker can carry without exceeding the maximum allowable
temperature rise In this test the rated normal current of normal
frequency is passed through the current carrying parts of circuit
breaker.
Method are recognized by Indian standards for measuring
temperature rise of parts:-
1) Thermometer method
2) Thermocouple method
3) Self resistance method
THERMAL TESTS(TEMPERATURE RISE TEST):-
1) Breaking Capacity Test:-
Sequence Of Performing This Tests Is As Follows:-
First of all,the master circuit breaker (MB)and the breaker
under test (TB)are closed.
The s.c.current is passed by closing the make switch.
The circuit breaker under test(TB) is opened to interrupt the
s.c.current at desired moment.
SHORT CIRCUIT TESTS:-
2) Making Capacity Test:-
Sequence Of Performing This Test :-
First of all,the master circuit breaker (MB)and the make
switch(MS) are closed.
Then,the short circuit current is initiated by closing the test
breaker (TB).
The rated short circuit making current i.e.the peak value of the
first major loop of the short circuit current envelope is measured
from the oscillorgram.
3(Short Time Withstand Current Capacity
In this test,the rated short-time withstand current is
applied to the circuit breaker
under test for the specified duration of the time.
The rated short time withstand current is equal to be
rated short circuit breaking current and standarad value
of rated duration of short circuit
current is 1 second or 3 seconds.
The current is measured by taking an oscillograph of the
short circuit current wave.
After the test,there should be no mechanical or insulation
damage and any contact welding.
1(Mechanical Operational test
2(One-Minute power frequency voltage dry
withstand test
3(Measurement of resistance of main circuits
ROUTINE TEST LISTED BELOW:-
 This test should be made before temperature rise
test.The measurement of resistance is made by
measuring dc voltage drop or resistance across the
terminals of each pole of circuit breaker.
 The current during the test shall have any convenient
value between 100 A and the rated current of the
circuit breaker.
 The d.c. resistance of main contact of each pole of a
circuit breaker is of the order of a few tens of micro-
ohms.
MEASUREMENT OF RESISTANCE OF MAIN
CIRCUITS:-
 Operational tests are made to ensure that the circuit breakers
comply with prescribed operating conditions within the
specified voltage and supply pressure limits of their opening
and closing devices.
 During routine test five opening and five closing operations
should carry out at
a. Minimum supply voltage and pressure
b. Maximum supply voltage and pressure
After the test,all parts should be in good condition and should not
undue wear.
 MECHANICAL OPERATIONAL TESTS:-
The preliminary preparations of circuit breaker testing include the
following:
 Connect the equipment.
 Adjust the correct values of resistance and reactors to set the
required magnitude of short circuit.
 Connect and set the transformer to get desired test voltage.
 The contacts on sequence switch are adjusted to get desired
timings.
 Oscillographs are adjusted and calibrated.
CIRCUIT BREAKER TESTING PROCEDURE:-
1) Short Circuit generator:-
It is a specially designed generator having very low leakage
reactance to provide short power for testing c.b. It is driven by 3-
phse induction motor.A flywheel is provided on shaft of generator
to supply kinetic energy during short circuit and helps in spped
regulation.
2)Short Circuit Transformer:-
 It is connected between TB and power source.It is used to allow
for flexibility to test at different voltage levels and also provide
isolation between the power source and test breaker.
It is designed to have low leakage reactance and to withstand
repeated short circuit.
EQUIPMENTS USED IN THE SHORT
CIRCUIT TESTING STATIONS:-
3) MASTER CIRCUIT BREAKER(MB):-
It is used as a back up c.b. to interrupt the short circuit current
in event of c.b.under test(TB) fails to operate.It has higher
capacity than the circuit breaker under test.After every test,it is
also isolates the test circuit breaker(TB) from the supply
source.It is set to operate at a predetermined time after the
initiation of short circuit.
4) Make Switch(MS):-
It is very high speed switch used for initiation of short circuit
test current at desired moment.Recently,SF6 gas make switch
are used in short circuit testing station.
5) Reactors(L):-
It is connected in series.It is used to limit or control the
magnitude of the short circuit or test current to its required
value.
6) Resistors and Capacitors (R and C):-
RV shaping circuit(R and C) is connected across the circuit
breaker under test(TB).This circuit is used to control transient
recovery voltage(TRV).Capacitors are also used for voltage
measurement.
7) Measuring Equipments:-
 For the measurements of voltage,voltage dividers are used
and for cureent measurements shunts or CTs are used in the
short circuit testing stations.
Photo Of Testing Of Circuit Breaker
Testing of cb

More Related Content

What's hot

Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNadir Baloch
 
Surge arrester ppt
Surge arrester pptSurge arrester ppt
Surge arrester pptIrinElsa
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devicesRahul Aman
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
HV testing of insulator
HV testing of insulatorHV testing of insulator
HV testing of insulatorJawad Ali
 
Circuit Breaker : Types
Circuit Breaker : TypesCircuit Breaker : Types
Circuit Breaker : TypesRidwanul Hoque
 
Power System Protection
Power System ProtectionPower System Protection
Power System ProtectionRahul Mehra
 
Circuit breaker presentation
Circuit breaker presentationCircuit breaker presentation
Circuit breaker presentationravi kant
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work pptDemsew Mitiku
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relaykishore kish
 

What's hot (20)

Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Surge arrester ppt
Surge arrester pptSurge arrester ppt
Surge arrester ppt
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Substation protection devices
Substation protection devicesSubstation protection devices
Substation protection devices
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
HV testing of insulator
HV testing of insulatorHV testing of insulator
HV testing of insulator
 
Circuit Breaker : Types
Circuit Breaker : TypesCircuit Breaker : Types
Circuit Breaker : Types
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
Current Transformer
Current TransformerCurrent Transformer
Current Transformer
 
EE6702 Protection and Switchgear notes R2013
EE6702 Protection and Switchgear notes R2013EE6702 Protection and Switchgear notes R2013
EE6702 Protection and Switchgear notes R2013
 
Circuit breaker presentation
Circuit breaker presentationCircuit breaker presentation
Circuit breaker presentation
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Lighting arrester
Lighting arresterLighting arrester
Lighting arrester
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relay
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 

Viewers also liked

Digital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerDigital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerneeraj prasad
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerRenuka Verma
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technologysiddhartha muduli
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breakerRahul Ruddra
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Rohini Haridas
 
Transformer testing
Transformer testingTransformer testing
Transformer testingajayknows
 
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument TestingCircuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument Testinginfoweb12
 
Insulation testing of power cable
Insulation testing of power cableInsulation testing of power cable
Insulation testing of power cableSyed Atif Naseem
 
Designing and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV lineDesigning and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV lineRohit Khare
 
2.components in a substation breaker
2.components in a substation   breaker2.components in a substation   breaker
2.components in a substation breakerayyadurai SHANMUGAM
 
Low Voltage Circuit Breaker
Low Voltage Circuit BreakerLow Voltage Circuit Breaker
Low Voltage Circuit BreakerAbdul Haseeb
 
Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage labNidhi Maru
 
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...Shivakumar Shivu
 
EE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesEE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesRajesh Ramesh
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Circuit protection devices perfect ppt
Circuit protection devices perfect ppt Circuit protection devices perfect ppt
Circuit protection devices perfect ppt vikram rajpurohit
 

Viewers also liked (20)

Digital testing of high voltage circuit breaker
Digital testing of high voltage circuit breakerDigital testing of high voltage circuit breaker
Digital testing of high voltage circuit breaker
 
HV Circuit Breaker Testing
HV Circuit Breaker TestingHV Circuit Breaker Testing
HV Circuit Breaker Testing
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breaker
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technology
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breaker
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)
 
final yr project-1
final yr project-1final yr project-1
final yr project-1
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Transformer
TransformerTransformer
Transformer
 
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument TestingCircuit Breaker, Recloser and Tap-Changer Instrument Testing
Circuit Breaker, Recloser and Tap-Changer Instrument Testing
 
Insulation testing of power cable
Insulation testing of power cableInsulation testing of power cable
Insulation testing of power cable
 
Designing and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV lineDesigning and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV line
 
2.components in a substation breaker
2.components in a substation   breaker2.components in a substation   breaker
2.components in a substation breaker
 
Low Voltage Circuit Breaker
Low Voltage Circuit BreakerLow Voltage Circuit Breaker
Low Voltage Circuit Breaker
 
Design, planning and layout of high voltage lab
Design, planning and layout of high voltage labDesign, planning and layout of high voltage lab
Design, planning and layout of high voltage lab
 
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR                   ...
TRANSFORMER OIL TESTING FOR CORROSIVE SULFUR BY SHIVAKUMAR ...
 
EE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesEE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of Cables
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Circuit protection devices perfect ppt
Circuit protection devices perfect ppt Circuit protection devices perfect ppt
Circuit protection devices perfect ppt
 

Similar to Testing of cb

Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTafhim Bin Nasir
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERRitesh Kumawat
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...Ali Sepehri
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjarMukesh gurjar
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptChristinaBoyd12
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.pptsantubanga333
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptssuser1f60f6
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedKishan Gabel
 

Similar to Testing of cb (20)

Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptx
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKERDIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
DIGITAL TESTING OF HIGH VOLTAGE CIRCUIT BREAKER
 
ET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptxET 5 LESSON 2 TEST EQUIPMENT.pptx
ET 5 LESSON 2 TEST EQUIPMENT.pptx
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
Test Switch Operation, Specifications & Accesories
Test Switch Operation, Specifications & Accesories Test Switch Operation, Specifications & Accesories
Test Switch Operation, Specifications & Accesories
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
AC High voltage Air Break Disconnector Switch Routine Test According to IEC 6...
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
Test Switch Operation, Specification & Accessories
Test Switch Operation, Specification & AccessoriesTest Switch Operation, Specification & Accessories
Test Switch Operation, Specification & Accessories
 
Chapter 5 mukesh gurjar
Chapter 5 mukesh gurjarChapter 5 mukesh gurjar
Chapter 5 mukesh gurjar
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
93518813-TESTING-MAINTENANCE-PROTECTION-OF-DISTRIBUTION-TRANSFORMERS.ppt
 
TESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.pptTESTING,MAINTENANCE&PROTECTION.ppt
TESTING,MAINTENANCE&PROTECTION.ppt
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
A vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power LimitedA vocational summer training at Jindal Steel and Power Limited
A vocational summer training at Jindal Steel and Power Limited
 

Recently uploaded

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

Testing of cb

  • 1. PRESENTED BY - GUIDED BY - AHER SANKET D. PROF. SHAIKH SIR
  • 2. Why "Testing of Circuit Breaker" is Necessary? A Circuit Breaker should be capable of carrying, making, and breaking under normal and abnormal conditions. In any power system circuit breaker has to withstand power frequency over voltages and transient over voltages due to switching and lightning. The performance of a circuit breaker under normal and abnormal conditions can be verified by performing different type of tests on circuit breakers. The main purpose of testing of circuit breakers is to confirm if circuit breaker is able to work on particular voltage and current ratings or not. NECESSARY OF TESTING OF CIRCUIT BREAKER:-
  • 3. There are mainly two tests classified: 1) Type Test 2) Routine Test TYPES OF TEST ON CIRCUIT BREAKERS:-
  • 4. The purpose of type tests is to prove design features and the quality of circuit breaker. Type tests are not conducted on each circuit breaker. This is done to prove the capabilities and to confirm the rated characteristics of the circuit breakers. 1) TYPE TESTS
  • 5. Routine test is performed before circuit breaker dispatch to ensure the product. This gives result about defects in materials and construction of circuit breaker. We can check quality of material of circuit breaker by performing Routine Test. 2) ROUTINE TESTS:
  • 6.  Thermal tests  Dielectric tests  Measurement of resistance of the main circuits  Short Circuit tests TYPE TESTS LISTED BELOW:-
  • 7. This test determines the maximum normal current that the circuit breaker can carry without exceeding the maximum allowable temperature rise In this test the rated normal current of normal frequency is passed through the current carrying parts of circuit breaker. Method are recognized by Indian standards for measuring temperature rise of parts:- 1) Thermometer method 2) Thermocouple method 3) Self resistance method THERMAL TESTS(TEMPERATURE RISE TEST):-
  • 8. 1) Breaking Capacity Test:- Sequence Of Performing This Tests Is As Follows:- First of all,the master circuit breaker (MB)and the breaker under test (TB)are closed. The s.c.current is passed by closing the make switch. The circuit breaker under test(TB) is opened to interrupt the s.c.current at desired moment. SHORT CIRCUIT TESTS:-
  • 9. 2) Making Capacity Test:- Sequence Of Performing This Test :- First of all,the master circuit breaker (MB)and the make switch(MS) are closed. Then,the short circuit current is initiated by closing the test breaker (TB). The rated short circuit making current i.e.the peak value of the first major loop of the short circuit current envelope is measured from the oscillorgram.
  • 10. 3(Short Time Withstand Current Capacity In this test,the rated short-time withstand current is applied to the circuit breaker under test for the specified duration of the time. The rated short time withstand current is equal to be rated short circuit breaking current and standarad value of rated duration of short circuit current is 1 second or 3 seconds. The current is measured by taking an oscillograph of the short circuit current wave. After the test,there should be no mechanical or insulation damage and any contact welding.
  • 11. 1(Mechanical Operational test 2(One-Minute power frequency voltage dry withstand test 3(Measurement of resistance of main circuits ROUTINE TEST LISTED BELOW:-
  • 12.  This test should be made before temperature rise test.The measurement of resistance is made by measuring dc voltage drop or resistance across the terminals of each pole of circuit breaker.  The current during the test shall have any convenient value between 100 A and the rated current of the circuit breaker.  The d.c. resistance of main contact of each pole of a circuit breaker is of the order of a few tens of micro- ohms. MEASUREMENT OF RESISTANCE OF MAIN CIRCUITS:-
  • 13.  Operational tests are made to ensure that the circuit breakers comply with prescribed operating conditions within the specified voltage and supply pressure limits of their opening and closing devices.  During routine test five opening and five closing operations should carry out at a. Minimum supply voltage and pressure b. Maximum supply voltage and pressure After the test,all parts should be in good condition and should not undue wear.  MECHANICAL OPERATIONAL TESTS:-
  • 14. The preliminary preparations of circuit breaker testing include the following:  Connect the equipment.  Adjust the correct values of resistance and reactors to set the required magnitude of short circuit.  Connect and set the transformer to get desired test voltage.  The contacts on sequence switch are adjusted to get desired timings.  Oscillographs are adjusted and calibrated. CIRCUIT BREAKER TESTING PROCEDURE:-
  • 15. 1) Short Circuit generator:- It is a specially designed generator having very low leakage reactance to provide short power for testing c.b. It is driven by 3- phse induction motor.A flywheel is provided on shaft of generator to supply kinetic energy during short circuit and helps in spped regulation. 2)Short Circuit Transformer:-  It is connected between TB and power source.It is used to allow for flexibility to test at different voltage levels and also provide isolation between the power source and test breaker. It is designed to have low leakage reactance and to withstand repeated short circuit. EQUIPMENTS USED IN THE SHORT CIRCUIT TESTING STATIONS:-
  • 16. 3) MASTER CIRCUIT BREAKER(MB):- It is used as a back up c.b. to interrupt the short circuit current in event of c.b.under test(TB) fails to operate.It has higher capacity than the circuit breaker under test.After every test,it is also isolates the test circuit breaker(TB) from the supply source.It is set to operate at a predetermined time after the initiation of short circuit. 4) Make Switch(MS):- It is very high speed switch used for initiation of short circuit test current at desired moment.Recently,SF6 gas make switch are used in short circuit testing station.
  • 17. 5) Reactors(L):- It is connected in series.It is used to limit or control the magnitude of the short circuit or test current to its required value. 6) Resistors and Capacitors (R and C):- RV shaping circuit(R and C) is connected across the circuit breaker under test(TB).This circuit is used to control transient recovery voltage(TRV).Capacitors are also used for voltage measurement. 7) Measuring Equipments:-  For the measurements of voltage,voltage dividers are used and for cureent measurements shunts or CTs are used in the short circuit testing stations.
  • 18. Photo Of Testing Of Circuit Breaker