General:
The tan δ-measurement is intended to detect deviations in an insulation of a machine during its
service-lifetime. To obtain this, periodic tanδ-measurements are advisable.
Introduction
During the service-lifetime of a rotating machine deviations in its insulation system can not be
excluded. Reasons of such deviations are manifold and thus are spread widely, between e.g. a
deterioration of the potential grading and e.g. a delimitation of the insulation. Starting the tan δ-
measurement (= loss tangent test, dissipation factor test) prior to the first operation of a machine,
the tan δ-readings are characteristic for a particular machine and each change in the tan δ will be an
obvious indicator of deviations in the insulation.
The tan δ-measurement
Using the terms described in figure 1, tan δ can be defined as the ratio between the loss component
IR of a current and its capacitive component Ic.
The capacitance of a insulation normally depend to a small extent on the temperature i.e. the
dielectric constant of the insulation slightly increases with the temperature. On the contrary, the loss
component remarkably depends on the applied voltage as well as on the temperature of the
insulation. The dependency on temperature here is given by the fact that the insulation resistance
decreases with the
Page 1
Temperature and thus both IR and tan δ increase with the temperature as both IC and IR change their
value depending on the temperature (but in contrary way), the tan δ rises remarkably with the
temperature. Thus an exact recording of the temperature of the insulation under test is
indispensable for comparing tan δ-measurements.
It is common practice to increase the applied voltage in steps of 20% (or 10%) of the normal line-to-
line voltage and read the respective tanδ-values. In particular the tanδ-values at 20%, 60% and
100% of the nominal line-to-line voltage are important as well as the tip-up, i.e. the maximum
increment per 20% - (or 10%) voltage-step.
It is commonly known that for most of the machine-relevant insulations tanδ is a function of the
voltage, i.e. the tanδ increases with the voltage (see figure 2). As the increase of tanδ is influenced
by partial discharges in voids in the insulation (the discharges increase the loss component IR), the
shape of the plot “tanδ versus applied voltage” gives some information on the up-to-date status of
the insulation. The increase of tanδ also may be caused by deviations in the anti-corona-paint and/or
at the potential grading.
An item to be observed is the fact that a particular increase in tanδ-reading any be caused e.g. either
by many small voids or one extensive insulation damage and thus one single tanδ reading cannot
separate between severe or neglectable insulation failures and thus in doubtful cases additional test
e.g. a PD-measurement, are recommended.
The test technique for the determination of the loss tangent is commonly known, a connection
diagram is shown in figure 3. It is recommended to measure the tanδ.
Page 2
Separately for each phase (the other phases connected to the grounded core) of a winding and
additionally all phases versus ground.
General Requirements
The main requirement for a meaningful tanδ-measurement is that the insulation under test was dried
and roughly cleaned prior to the test.
For the generation of the AC test voltage, an appropriate regulator-transformer (step-up transformer)
is necessary (sine-shaped voltage requested). Measuring test voltage should be done by a precision
voltage-transformer.
As indicated in figure 3, an adequate standard-capacitor (with extremely low internal tanδ) is
required.
For the test set-up and for the operation of the test equipment, one high-voltage engineer is
necessary, assisted by at least one experienced technician. If necessary, additional personnel
and/or barricades are required in order to prevent persons from touching energized components
and/or lines.
As high voltage is used for the test, appropriate safety precautions are necessary; all relevant
(national and/or international) safety instructions and standards have to be observed.
© This QM-Instruction is properly of PNG Power and must neither be copied nor used in any other
way without the written consent of PNG Power. Neither is it to be handed over nor in other way
communicated to a third party. Infringement will lead to prosecution.
Page 3

More Related Content

What's hot

Tan delta test for power transformers
Tan delta test for power transformersTan delta test for power transformers
Tan delta test for power transformersjibinjoy1988
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, IndiaRajuMondal18
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-enSuresh Patil
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in briefMuthar Hussain
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformerKapil Singh
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTCRohit Dave
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relaysRoberto Costa
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenancePremanandDesai
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)J. FR
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSimple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSARAVANAN A
 
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSimple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSARAVANAN A
 
Electrical Current transformer(CT) and Potential transformer(PT) basics for R...
Electrical Current transformer(CT) and Potential transformer(PT) basics for R...Electrical Current transformer(CT) and Potential transformer(PT) basics for R...
Electrical Current transformer(CT) and Potential transformer(PT) basics for R...Malaiyappasamy Sivashanmugam
 
Maintenance of Substation Equipment | Operation And Maintenance Of Substation
Maintenance of Substation Equipment | Operation And Maintenance Of SubstationMaintenance of Substation Equipment | Operation And Maintenance Of Substation
Maintenance of Substation Equipment | Operation And Maintenance Of SubstationSystem Protection
 

What's hot (20)

Tan delta test for power transformers
Tan delta test for power transformersTan delta test for power transformers
Tan delta test for power transformers
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
Best transformer-test-procedures-en
Best transformer-test-procedures-enBest transformer-test-procedures-en
Best transformer-test-procedures-en
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in brief
 
Operation and maintenance of transformer
Operation and maintenance of transformerOperation and maintenance of transformer
Operation and maintenance of transformer
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 
Unit 06 - Substation and maintenance
Unit 06 - Substation and maintenanceUnit 06 - Substation and maintenance
Unit 06 - Substation and maintenance
 
Testing
TestingTesting
Testing
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
testing formats
testing formatstesting formats
testing formats
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
RTCC & AVR
RTCC & AVRRTCC & AVR
RTCC & AVR
 
Transformer
TransformerTransformer
Transformer
 
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard EquipmentSimple Disconnector Switch (DS) Testing for Switchyard Equipment
Simple Disconnector Switch (DS) Testing for Switchyard Equipment
 
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSimple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
 
Electrical Current transformer(CT) and Potential transformer(PT) basics for R...
Electrical Current transformer(CT) and Potential transformer(PT) basics for R...Electrical Current transformer(CT) and Potential transformer(PT) basics for R...
Electrical Current transformer(CT) and Potential transformer(PT) basics for R...
 
Maintenance of Substation Equipment | Operation And Maintenance Of Substation
Maintenance of Substation Equipment | Operation And Maintenance Of SubstationMaintenance of Substation Equipment | Operation And Maintenance Of Substation
Maintenance of Substation Equipment | Operation And Maintenance Of Substation
 

Similar to Loss tangent delta test

Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance testDonald Stephen
 
Transformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.docTransformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.docMdAbdullahAlMamun258178
 
C0212014018
C0212014018C0212014018
C0212014018theijes
 
Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2koperundeviG
 
What is test method of impulse limiting voltage on signal SPD (impulse voltag...
What is test method of impulse limiting voltage on signal SPD (impulse voltag...What is test method of impulse limiting voltage on signal SPD (impulse voltag...
What is test method of impulse limiting voltage on signal SPD (impulse voltag...Fang Sam
 
Three-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitudeThree-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitudeijiert bestjournal
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenanceLucian Lazar
 
Lm 317 to 92 datasheet
Lm 317 to 92 datasheetLm 317 to 92 datasheet
Lm 317 to 92 datasheetAndy Medina
 
Minor_project_b.tech_sem7_dec_2017
Minor_project_b.tech_sem7_dec_2017Minor_project_b.tech_sem7_dec_2017
Minor_project_b.tech_sem7_dec_2017Dipen Kantariya
 
unit-iii- Sphere Gap.ppt
unit-iii- Sphere Gap.pptunit-iii- Sphere Gap.ppt
unit-iii- Sphere Gap.pptVijayHiremath26
 
CHapter 4 -Signal Conditioning.pptxyyhhhj
CHapter 4 -Signal Conditioning.pptxyyhhhjCHapter 4 -Signal Conditioning.pptxyyhhhj
CHapter 4 -Signal Conditioning.pptxyyhhhjteddiyfentaw
 

Similar to Loss tangent delta test (20)

Insulation resistance test
Insulation resistance testInsulation resistance test
Insulation resistance test
 
Transformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.docTransformerprotectionrelaycalculations.doc
Transformerprotectionrelaycalculations.doc
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
C0212014018
C0212014018C0212014018
C0212014018
 
Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2Testing of power_transformers_kt_80_gb_2
Testing of power_transformers_kt_80_gb_2
 
What is test method of impulse limiting voltage on signal SPD (impulse voltag...
What is test method of impulse limiting voltage on signal SPD (impulse voltag...What is test method of impulse limiting voltage on signal SPD (impulse voltag...
What is test method of impulse limiting voltage on signal SPD (impulse voltag...
 
Three-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitudeThree-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitude
 
CT and VT.pptx
CT and VT.pptxCT and VT.pptx
CT and VT.pptx
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenance
 
Power transformer maintenance
Power transformer maintenancePower transformer maintenance
Power transformer maintenance
 
K2917.pptx
K2917.pptxK2917.pptx
K2917.pptx
 
Lm 317 to 92 datasheet
Lm 317 to 92 datasheetLm 317 to 92 datasheet
Lm 317 to 92 datasheet
 
CDG_11.PDF
CDG_11.PDFCDG_11.PDF
CDG_11.PDF
 
Minor_project_b.tech_sem7_dec_2017
Minor_project_b.tech_sem7_dec_2017Minor_project_b.tech_sem7_dec_2017
Minor_project_b.tech_sem7_dec_2017
 
Ke2517881796
Ke2517881796Ke2517881796
Ke2517881796
 
Ke2517881796
Ke2517881796Ke2517881796
Ke2517881796
 
unit-iii- Sphere Gap.ppt
unit-iii- Sphere Gap.pptunit-iii- Sphere Gap.ppt
unit-iii- Sphere Gap.ppt
 
Datasheet ni
Datasheet niDatasheet ni
Datasheet ni
 
CHapter 4 -Signal Conditioning.pptxyyhhhj
CHapter 4 -Signal Conditioning.pptxyyhhhjCHapter 4 -Signal Conditioning.pptxyyhhhj
CHapter 4 -Signal Conditioning.pptxyyhhhj
 
E044043336
E044043336E044043336
E044043336
 

More from Donald Stephen

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report formDonald Stephen
 
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testSustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testDonald Stephen
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit testDonald Stephen
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setupDonald Stephen
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction testDonald Stephen
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr testDonald Stephen
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation testDonald Stephen
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setupDonald Stephen
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistancesDonald Stephen
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsDonald Stephen
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial dischargesDonald Stephen
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit testDonald Stephen
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testingDonald Stephen
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windingsDonald Stephen
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodDonald Stephen
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constantDonald Stephen
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejectionDonald Stephen
 

More from Donald Stephen (20)

Tangent delta test report form
Tangent delta test report formTangent delta test report form
Tangent delta test report form
 
Sustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent testSustained three phase short-circuit test and overcurrent test
Sustained three phase short-circuit test and overcurrent test
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit test
 
Stator insulation test setup
Stator insulation test setupStator insulation test setup
Stator insulation test setup
 
Stator core induction test
Stator core induction testStator core induction test
Stator core induction test
 
Stator core compr test
Stator core compr testStator core compr test
Stator core compr test
 
Open circuit saturation test
Open circuit saturation testOpen circuit saturation test
Open circuit saturation test
 
Rotor insul test setup
Rotor insul test setupRotor insul test setup
Rotor insul test setup
 
Noise measurement
Noise measurementNoise measurement
Noise measurement
 
Measurement of winding resistances
Measurement of winding resistancesMeasurement of winding resistances
Measurement of winding resistances
 
Measurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearingsMeasurement of shaft voltage and shaft current on machines with sleeve bearings
Measurement of shaft voltage and shaft current on machines with sleeve bearings
 
Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
 
Load test
Load testLoad test
Load test
 
Line to-line sustained short-circuit test
Line to-line sustained short-circuit testLine to-line sustained short-circuit test
Line to-line sustained short-circuit test
 
Insulation resistance testing
Insulation resistance testingInsulation resistance testing
Insulation resistance testing
 
Impedance measurement of field windings
Impedance measurement of field windingsImpedance measurement of field windings
Impedance measurement of field windings
 
High potential test
High potential testHigh potential test
High potential test
 
Efficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric methodEfficiency determination on hydrogenerators by calorimetric method
Efficiency determination on hydrogenerators by calorimetric method
 
Determination of the transient open circuit time constant
Determination of the transient open circuit time constantDetermination of the transient open circuit time constant
Determination of the transient open circuit time constant
 
Determination of inertia by load rejection
Determination of inertia by load rejectionDetermination of inertia by load rejection
Determination of inertia by load rejection
 

Recently uploaded

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 

Recently uploaded (20)

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Loss tangent delta test

  • 1. LOSS TANGENT DELTA TEST General: The tan δ-measurement is intended to detect deviations in an insulation of a machine during its service-lifetime. To obtain this, periodic tanδ-measurements are advisable. Introduction During the service-lifetime of a rotating machine deviations in its insulation system can not be excluded. Reasons of such deviations are manifold and thus are spread widely, between e.g. a deterioration of the potential grading and e.g. a delimitation of the insulation. Starting the tan δ- measurement (= loss tangent test, dissipation factor test) prior to the first operation of a machine, the tan δ-readings are characteristic for a particular machine and each change in the tan δ will be an obvious indicator of deviations in the insulation. The tan δ-measurement Using the terms described in figure 1, tan δ can be defined as the ratio between the loss component IR of a current and its capacitive component Ic. The capacitance of a insulation normally depend to a small extent on the temperature i.e. the dielectric constant of the insulation slightly increases with the temperature. On the contrary, the loss component remarkably depends on the applied voltage as well as on the temperature of the insulation. The dependency on temperature here is given by the fact that the insulation resistance decreases with the Page 1
  • 2. Temperature and thus both IR and tan δ increase with the temperature as both IC and IR change their value depending on the temperature (but in contrary way), the tan δ rises remarkably with the temperature. Thus an exact recording of the temperature of the insulation under test is indispensable for comparing tan δ-measurements. It is common practice to increase the applied voltage in steps of 20% (or 10%) of the normal line-to- line voltage and read the respective tanδ-values. In particular the tanδ-values at 20%, 60% and 100% of the nominal line-to-line voltage are important as well as the tip-up, i.e. the maximum increment per 20% - (or 10%) voltage-step. It is commonly known that for most of the machine-relevant insulations tanδ is a function of the voltage, i.e. the tanδ increases with the voltage (see figure 2). As the increase of tanδ is influenced by partial discharges in voids in the insulation (the discharges increase the loss component IR), the shape of the plot “tanδ versus applied voltage” gives some information on the up-to-date status of the insulation. The increase of tanδ also may be caused by deviations in the anti-corona-paint and/or at the potential grading. An item to be observed is the fact that a particular increase in tanδ-reading any be caused e.g. either by many small voids or one extensive insulation damage and thus one single tanδ reading cannot separate between severe or neglectable insulation failures and thus in doubtful cases additional test e.g. a PD-measurement, are recommended. The test technique for the determination of the loss tangent is commonly known, a connection diagram is shown in figure 3. It is recommended to measure the tanδ. Page 2
  • 3. Separately for each phase (the other phases connected to the grounded core) of a winding and additionally all phases versus ground. General Requirements The main requirement for a meaningful tanδ-measurement is that the insulation under test was dried and roughly cleaned prior to the test. For the generation of the AC test voltage, an appropriate regulator-transformer (step-up transformer) is necessary (sine-shaped voltage requested). Measuring test voltage should be done by a precision voltage-transformer. As indicated in figure 3, an adequate standard-capacitor (with extremely low internal tanδ) is required. For the test set-up and for the operation of the test equipment, one high-voltage engineer is necessary, assisted by at least one experienced technician. If necessary, additional personnel and/or barricades are required in order to prevent persons from touching energized components and/or lines. As high voltage is used for the test, appropriate safety precautions are necessary; all relevant (national and/or international) safety instructions and standards have to be observed. © This QM-Instruction is properly of PNG Power and must neither be copied nor used in any other way without the written consent of PNG Power. Neither is it to be handed over nor in other way communicated to a third party. Infringement will lead to prosecution. Page 3