SlideShare a Scribd company logo
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
1
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB 60103 – SITE SURVEYING
SEMESTER 2
FIELDWORK 1 REPORT
TRAVERSING
Name Student ID Marks
Hor Weng Lim 0319441
Felix Vong Zhi Wei 0318462
Kevin Lee Hee Xian 0315192
Jackson Ting Shii Hang 0324326
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
2
Content Page
Cover Page 1
Table of Content 2
1.0 Introduction to Traversing 3
1.1 Open Traverse 3
1.2 Closed Traverse 4 - 5
1.3 Northing 6
1.4 Azimuths 7
1.5 Bearing 8
2.0 Objective 9
3.0 Outline of Apparatus 10
3.1 Theodolites 10
3.2 Tripod Stand 11
3.3 Optical Plummet 12
3.4 Ranging Rod 13
3.5 Spirit Bubble 14
3.6 Plumb Bob 15
4.0 Field Data 16
4.1 Compute the Angular Error and Adjust the Angles 17
4.2 Stadia Method 18 - 19
4.3 Compute Course Bearing and Azimuth 20
4.4 Compute Course Latitude and Departure 21
4.5 Determine the Error of Closure 22
4.6 Adjust Course Latitude and Departure 23
5.0 Discussion 24
6.0 Conclusion 25
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
3
1.0 INTRODUCTION TO TRAVERSING
Traversing is a form of a control survey that requires the establishment of a series of stations that
are linked together by angles and distance. It can be open traverse and close traverse. The angles
are measured by theodolites and the distance can be measured by calculating the stadia’s reading
or using electronic distance measuring equipment. The use of theodolites in traversing survey is
one of the most common methods in engineering work to get the provision of control surveys,
angle measurement and detail mapping.
1.1 OPEN TRAVERSE
Figure 1.0: Open Traverse
Sources: http://mygeosurvey.blogspot.my/
Open traverse is a series of measured straight lunes and angles that do not geometrically close or
a surveying traverse that fails to terminate at the starting point and does not completely enclose a
polygon. It ends at a station whose relative position is not previously known. It is the least
desirable type of traverse because it provides no check on fieldwork or starting data.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
4
1.2 CLOSED TRAVERSE
Closed traverse is a series of connected line which end at the starting point. It is basically a
traverse proceed from one coordinate point to another. A closed traverse may be close back to its
starting point or whose relative position is known.
Closed traverse can be in two types:
 Closed Loop Traverse
Figure 1.1: Closed loop Traverse
Sources: http://mygeosurvey.blogspot.my/
A closed loop traverse starts and ends on the starting point with assumed coordinates and azimuth
without affecting the area, computations or relative position of the stations. It usually need at least
4 point to conduct this survey. The coordinates must be tied to an existing grid system and the
traverse must start from a known station which is azimuth on that system. Closed loop traverse
provides some check upon fieldwork and computations, it does not provide for check of data that
may cause systematic error during the survey.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
5
 Closed Connecting Traverse
Figure 1.2: Closed Connecting Traverse
Sources: http://www.globalsecurity.org/military/library/policy/army/fm/6-2/fig5-6.gif
A closed connecting traverse is almost looks like an open traverse, the only different between
closed loop traverse and closed connecting traverse is it begins and ends at points or lines of
known position and the direction at each of the particular traverse.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
6
1.3 NORTHING
There are 3 reference direction or datum meridian that are used as traverse reference. Which is
Magnetic North, Grid North and True North (Geodetic North).
 Magnetic North
Angle are measured from magnetic north. Since magnetic fields fluctuate over time, this
meridian is time-dependent. The magnetic fields will orientate a free swinging magnetic
needle in a north or south direction.
 Grid North
A grid of lines parallel to the true meridian of one point on the grid, usually the origin of
the grid. The angle is dependent on the map projection. Since the central meridian point
to true north, when we move east or west away from the meridian, the difference between
grid north and true north will increases.
 True North
True North is the direction along the earth’s surface towards to the geographic North Pole
which all the lines of longitude converge. Historically south has occasionally been used.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
7
1.4 AZIMUTHS
Figure 1.3: Azimuths
Sources: http://www.engr.mun.ca/~sitotaw/Site/Fall2007_files/TP_Lecture9_CloseTravers-
ENGI3703.pdf
Azimuths defined as horizontal angles turned clockwise from the reference line. Which is
between the ranges from 0°to 360°. For example: 128°, 239°and 351°. Generally, the angles
should be measured only from the north.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
8
1.5 BEARINGS
Figure 1.4: Bearings
Sources: http://www.engr.mun.ca/~sitotaw/Site/Fall2007_files/TP_Lecture9_CloseTravers-
ENGI3703.pdf
Bearings is defined as an acute angle which is less than 90°. It is a horizontal angles measured
from the meridian either east or west. Usually required two letter with an acute angle which is
North (N), South (S), East (E) & West (W). The different between azimuths and bearing is
bearing can be measured both either clockwise or counter clockwise. It can be measured from
North or South axis of the meridian.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
9
2.0 OBJECTIVE
 To learn the principles of running a closed field traverse.
 To enhance students’ knowledge in traversing procedure.
 To establish ground control for photographic mapping.
 To enable students to get hands-on experience in setting up and working with the
theodolites, leveling rod, tripod stand as well as other instruments and collect the data of
the relevant fieldwork.
 To allow students to learn the correct method in doing traversing,
 To allow students to apply the theories that had been taught in classes to a hands-on
situation.
 To enable students to identify the error and make adjustment to the data by using the
correct formula.
 Learn how to compute a traverse and properly adjust the measured values of a closed
traverse to achieve mathematical closure.
 Determine the error of closure and compute the accuracy of work.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
10
3.0 OUTLINE OF APPARATUS
3.1 THEODOLITE
Figure 1.5: Theodolite
Sources: http://www.visurveyinstruments.co.za/image/cache/data/DT-209-500x500.jpg
Theodolite is a precision instrument for measuring angles in both horizontal and vertical planes. It
is used to identify the ground level and the ways to construct super structure or sub structure. A
theodolites consists of a small sized movable telescope mounted within two perpendicular axis
which are horizontal and vertical axis. It also able to rotate 360 degree on a tripod stand that’s
where we get angles from it. When the telescope is pointed at a target object, the angle of each
axis can be measured with great precision. It is commonly used to measure horizontal and vertical
angles, ranging and leveling as well as controlling verticality.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
11
3.2 TRIPOD STAND
Figure 1.6: Tripod Stand
Sources: http://www.toolup.com/product-images/2161_1.jpg
A tripod stand is a three-legged support platform for the level. The main function of the tripod
stand is to ensure a stable instrument setup for reliable measurements. The legs of the tripod can
be adjust to get the vertical height that required. Once the instrument is moved, then it must be set
up again which is to loosen the screw and adjust again and lock it back tight. It usually has a flat
tip and a mounting screw for instrument attachment. It is also to make sure that the leveling tripod
placed horizontally.
.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
12
3.3 OPTICAL PLUMMET
Figure 1.7: Optical Plummet
Sources: https://www.hayesinstrument.com/accs_TopconTribrachOP.jpg
Optical Plummets is a device that used to center the instrument over a ground station. It is used in
place of a plumb bob to center transits and theodolites over a given point, preferred for its
steadiness in strong winds. The procedure speeds up the setting up process as well as protect the
instrument from accident, because it has a lock below the optical plummet to lock the devices that
used in fieldwork. Sometimes, the optical plummet can be used to perform angular or distance
measurements from the survey point.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
13
3.4 RANGING ROD
Figure 1.8: Ranging Rod
Sources: http://3.imimg.com/data3/JA/BD/MY-2853543/steel-ranging-rods-500x500.jpg
Ranging rod is used to mark areas and to set out straight lines on the field. It is also used to mark
points that must be seen from a distance. The length of the ranging rod is either 2m or 3m. It is
made up of wood or metal. Ranging rod usually painted with alternate red-white or black-white
bands.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
14
3.5 SPIRIT BUBBLE
Figure 1.8: Spirit Bubble
Sources: http://g02.a.alicdn.com/kf/HTB1nZ8OJXXXXXaZXpXXq6xXFXXXw/34-20-12mm-
Metal-Bullseye-Level-Circular-vials-Bubble-Spirit-Level-with-Mounting-holes-Accuracy-8.jpg
The spirit bubble is used for maintaining both level rods and sighting poles in a vertical position.
An out of adjustment of spirit bubble level will cause accumulative error in level lines. It can used
in traversing and leveling measurements in fieldworks. In order to get an accurate measurement
for both, the spirit bubble level must be inside the middle of the black circle. It is located on the
optical plummet and leveling rod.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
15
3.6 PLUMB BOB
Figure 1.9: Plumb Bob
Sources: https://www.pinterest.com/pin/537687642987491772/
Plumb bob is used to check if the object are vertical. A plumb bob consist of a piece of metal
pointing downwards, which is attached to cord. It is normally tie on the optical plummet by using
the string. When the plumb bob is hanging free and not moving, the cord is vertical. It is used to
mark a point directly under theodolite as well.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
16
4.0 Field Data
Station Field Angles
A 86°44’ 20’’
B 92°39’ 40’’
C 86°46’ 20’’
D 93°46’ 40’’
Total 357° 175’ 120’’
359°57’ 00’
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
17
4.1 COMPUTE THE ANGULAR ERROR AND ADJUST THE ANGLES
The sum of the interior angles in any loop traverse must equal to 360°.
Total angular error = 360°- 359°57’ 00’’
= 00°03’ 00’’
Error per angle = 00°03’ 00’’ / 4
= 00° 00’ 45’’ / 45’’ per angle
Station Field Angle Correction Adjusted Angles
A 86°44’ 20’’ + 00° 00’ 45’’ 86°45’ 05’’
B 92°39’ 40’’ + 00° 00’ 45’’ 92°40’ 25’’
C 86°46’ 20’’ + 00° 00’ 45’’ 86° 47’ 05’’
D 93°46’ 40’’ + 00° 00’ 45’’ 93°47’ 25’’
Total 357° 175’ 120’’ 357°179’ 60’’
359°57’ 00’ 360° 00’ 00’’
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
18
4.2 STADIA METHOD
We can use stadia method to calculate the distances between the points. The horizontal and
vertical distances between the survey points and the theodolites can be calculated using the
equation.
The differences between the top stadia readings and the bottom stadia readings must be the same
while conducting the survey.
Equation
D = K x S x Cos2
(θ) + C x Cos
D = Horizontal distance between survey point and instrument
S = Difference between top stadia and bottom stadia
θ = Vertical angle of telescope from the horizontal line when capturing the stadia readings.
K = Multiplying constant given by the manufacturer of the theodolite, normally 100
C = Addictive factor given by the manufacturer of the theodolite, normally 0
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
19
We can calculate the distance by using stadia method which is use top stadia and bottom stadia
readings.
The calculation of the stadia method is below follow by the distance:
Dab = 100 x (0.4887) x Cos2
(0) + 0 x Cos (0) = 48.8626m
Dbc = 100 x (0.29355) x Cos2
(0) + 0 x Cos (0) = 29.3505m
Dcd = 100 x (0.4795) x Cos2
(0) + 0 x Cos (0) = 47.9427m
Dda = 100 x (0.2989) x Cos2
(0) + 0 x Cos (0) = 29.8854m
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
20
4.3 COMPUTE COURSE BEARING AND AZIMUTH
A – B
Azimuths Bearings
00° 00’ 00’’ N 00° 00’ 00’’
B – C
Azimuths Bearings
180° 00’ 00’’ – 92°40’ 25’’ N 87° 19’ 35’’ W
= 87° 19’ 35’’
C – D
Azimuths Bearings
92°40’ 25’’ + 86°47’ 05’’ S 00°32’ 30’’ W
= 179°27’ 30’’
180° 00’ 00’’ – 179°27’ 30’’
= 00°32’ 30’’
D – A
Azimuths Bearings
93°47’ 25’’ + 00°32’ 30’’ S 85°40’ 05’’E
= 94°19’ 55’’
180° 00’ 00’’ – 94°16’ 15’’
= 85°40’ 05’’
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
21
4.4 COMPUTE COURSE LATITUDE AND DEPARTURE
Cos β Sin β L cos β L sin β
Station Bearing, β Length, L Cosine Sine Latitude Departure
A N 00° 00’ 00’’ 48.8626 1.0000 0.0000 + 48.8626 + 0.0000
B N 87°19’ 35’’ W 29.3505 0.0466 0.9989 + 1.3691 - 29.3186
C S 00°32’ 30’’ W 47.9427 0.9999 0.0095 - 47.9406 - 0.4532
D S 85°40’ 05’’ E 29.8854 0.0755 0.9971 - 2.2574 + 29.8000
A
Total Perimeter (P) = 156.0412 Sum of
Latitude
∑∆y
= 0.0337
Sum of
Departure
∑∆x
= 0.0282
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
22
4.5 DETERMINE THE ERROR OF CLOSURE
Error in Departure
A ∑∆x = 0.0282m
Error in Latitude
Ec ∑∆y = 0.0337m
Total Error
= 0.0439m
A’
Accuracy = 1 ; (P/Ec)
For average land surveying an accuracy of about 1:3000 is typical
Ec = [ (sum of latitude)2
+ (sum of departure)2
] 1/2
= [ (0.0337)2
+ (0.0282)2
] 1/2
= 0.0439m
P = 156.0263m
Accuracy = 1 : (156.0412/0.0439)
= 1 : 3554
Therefore, the traversing is acceptable.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
23
4.6 ADJUST COURSE LATITUDE AND DEPARTURE
The Compass Rule
Correction = - [ ∑∆y ] / P x L or – [ ∑∆x ] / P x L
Where,
∑∆y and ∑∆x = The error in latitude and departure
P = Total length of perimeter of the traverse
L = Length of a particular course
Station Unadjusted Corrections Adjusted
Latitude Departure Latitude Departure Latitude Departure
A + 48.8626 + 0.0000 - 0.0106 - 0.0088 + 48.8520 - 0.0088
B + 1.3691 - 29.3186 - 0.0063 - 0.0053 + 1.3628 - 29.3239
C - 47.9406 - 0.4532 - 0.0104 - 0.0087 - 47.9510 - 0.4619
D - 2.2574 + 29.8000 - 0.0064 - 0.0054 - 2.2638 + 29.7946
Total + 0.0337 + 0.0282 - 0.0337 -0.0282 0.00 0.00
Check Check
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
24
5.0 DISCUSSION
From this fieldwork, we learnt to conduct a traverse survey by using a theodolite and
several formulas that we learnt during traversing class. Throughout this survey, we can be able to
applied the technique and knowledge thought by our lecturer, Mr. Chai.
From this survey, we know that point A, B, C and D are laid out on the site respectively.
The theodolite will be placed on point A which is our starting point and started to conduct our
survey. The angles that we get from the theodolite must be read from left to the right in order to
obtain a more accurate reading.
The zero angle will be set on point A as well and turned the theodolite to point D and
measure to get the stadia reading as well as the horizontal and vertical angles. After we get the all
the readings and the angles from one point, we switch the theodolite to another point and repeat
the same procedure again to get another point of readings.
What we found out that was really hard for us is we couldn’t get the spirit bubble into the
black circle. But after Mr. Chai had taught us, finally we can measure ourselves very fast and
accurately.
At the end of the process, the total angles must be 360°. However, in our report from the
table of the field data, the total angle was 357° 57’ 00’’. Thus, we knew that there was a
misclosure error occurred as there is a difference of 3’ 00’’. Means in every angle we measured,
there is a 45’’ of error. Therefore, we used the trigonometry traversing calculation technique to
solve it.
Lastly, at the end, we found that the latitude and departure also have a minor error of
0.0337 (Latitude) and 0.0282 (Departure). We solved it by using the compass rule. After compile
everything, the report is finally done.
TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT
25
6.0 CONCLUSION
In conclusion, this is our second fieldwork which is traversing. In this fieldwork, we were
required to carry out a closed loop traverse survey that is located at the car park. A special
characteristic of a closed loop traverse is it starts and ends at the same point, forming a closed
geometric figure called a polygon. My fellow group mates and I conduct the survey together at
the car park. Two of them is holding the leveling staff, one of a group mate is recording down the
data while one of the group member is taking the readings for the traverse survey.
As we taught in class that the horizontal reading must be taken twice which is the first
reading is taken, then turn back again to take the second reading. We also did recorded the top
stadia, middle stadia and bottom stadia readings to calculate the length of the perimeter of the
traverse since we didn’t have a measuring tape.
The angles are usually obtained through the usage of equipment provided by our lecturer.
However, we were unable to obtain the exact reading of 360°, therefore, some adjustment was
made in order to achieve 360°in our traverse survey completely.
Although the formula was really hard for us to understand and apply compare to leveling,
but we try hard to learning with a spirit of not giving up. We really do likes site surveying
because we can actually feel that we are working together.
In a nutshell, we thanks our lecturer Mr. Chai for giving us an opportunities to learn and
hands on in leveling. We hope that next time we can have a chance to conduct a survey like this
again.

More Related Content

What's hot

Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
Kai Yun Pang
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
Shze Hwa Lee
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
Est
 
Site surveying report (theodolite)
Site surveying report (theodolite)Site surveying report (theodolite)
Site surveying report (theodolite)
Erik Ong
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
Ghulam Mustafa Vira
 
Levelling
LevellingLevelling
Levelling
Arissa Loh
 
LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.
LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.
LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.
YASMINE HASLAN
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
Enoch Wong
 
Hand auger
Hand augerHand auger
Hand auger
Natalie Ulza
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
Sarchia Khursheed
 
Sand replacement
Sand replacementSand replacement
Sand replacement
Natalie Ulza
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
XinYee Khoo
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
tfkc1212
 
Laboratory soil compaction test
Laboratory soil compaction testLaboratory soil compaction test
Laboratory soil compaction test
Atul Hajong
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
Lord1911
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
Riezat Zainal
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
Sarchia Khursheed
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
Est
 

What's hot (20)

Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
Site surveying report (theodolite)
Site surveying report (theodolite)Site surveying report (theodolite)
Site surveying report (theodolite)
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 
Levelling
LevellingLevelling
Levelling
 
Fw2
Fw2Fw2
Fw2
 
LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.
LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.
LAB REPORT HYDRAULIC EXP 1 : PROPERTIES OF FLUID.
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
 
Hand auger
Hand augerHand auger
Hand auger
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Sand replacement
Sand replacementSand replacement
Sand replacement
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 
Laboratory soil compaction test
Laboratory soil compaction testLaboratory soil compaction test
Laboratory soil compaction test
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 
Closed Traverse Surveying - Report
Closed Traverse Surveying - ReportClosed Traverse Surveying - Report
Closed Traverse Surveying - Report
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 

Viewers also liked

Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
Haziq1511
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
seenyee
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
Self-employed
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii마 이환
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
Farah Sham
 
Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-LevelingShane Ah
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
Vilas Nikam
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
Student
 

Viewers also liked (10)

Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-Leveling
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 

Similar to Traversing final-report

Tranverse report
Tranverse report Tranverse report
Tranverse report
Wen Crystal
 
Ss report-2-field-data-latest
Ss report-2-field-data-latestSs report-2-field-data-latest
Ss report-2-field-data-latest
Kailyn Lee
 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 report
MELVIN tan
 
2 nd report
2 nd report2 nd report
2 nd report
fareezsham
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
Sze Ting Kuek
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS.
Ahmed Nassar
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1
Lam Yu
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
w ss
 
Traversing
TraversingTraversing
Traversing
Shao Xun Sean Thun
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
Shen Sin
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
ashleyyeap
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
Pang Shuen
 
Leveling report
Leveling reportLeveling report
Leveling report
Wen Crystal
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .ppt
NITINSURESH30
 
Traversing
TraversingTraversing
Traversing
Arissa Loh
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
Orlando Wong Khung
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
Hasif Alias
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
NkosiAnsari
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
Tee Joanne
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
 

Similar to Traversing final-report (20)

Tranverse report
Tranverse report Tranverse report
Tranverse report
 
Ss report-2-field-data-latest
Ss report-2-field-data-latestSs report-2-field-data-latest
Ss report-2-field-data-latest
 
Ss report 2 report
Ss report 2 reportSs report 2 report
Ss report 2 report
 
2 nd report
2 nd report2 nd report
2 nd report
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS.
 
Site surveying-2-done-1
Site surveying-2-done-1Site surveying-2-done-1
Site surveying-2-done-1
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 
Traversing
TraversingTraversing
Traversing
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Leveling report
Leveling reportLeveling report
Leveling report
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .ppt
 
Traversing
TraversingTraversing
Traversing
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
 

More from Felix Vong

Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MS
Felix Vong
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015
Felix Vong
 
CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015
Felix Vong
 
Individual assignment brief ct2-2014
Individual assignment brief ct2-2014Individual assignment brief ct2-2014
Individual assignment brief ct2-2014
Felix Vong
 
Presentation
PresentationPresentation
Presentation
Felix Vong
 
Ct project 1 bqs
Ct project 1 bqsCt project 1 bqs
Ct project 1 bqs
Felix Vong
 
Ct1 assignment bqs
Ct1 assignment  bqsCt1 assignment  bqs
Ct1 assignment bqs
Felix Vong
 
Assignment brief for site report bqs
Assignment brief for site report bqsAssignment brief for site report bqs
Assignment brief for site report bqs
Felix Vong
 
bqs Building materials presentation 2
bqs Building materials presentation 2bqs Building materials presentation 2
bqs Building materials presentation 2
Felix Vong
 
BQS bq assignment
BQS bq assignmentBQS bq assignment
BQS bq assignment
Felix Vong
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
Felix Vong
 
bqs Assignment no.2
bqs Assignment no.2 bqs Assignment no.2
bqs Assignment no.2
Felix Vong
 
Epc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun TempleEpc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun Temple
Felix Vong
 
Epc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara ParkEpc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara Park
Felix Vong
 
School of-architecture-group 1.1
School of-architecture-group 1.1School of-architecture-group 1.1
School of-architecture-group 1.1
Felix Vong
 
Psychology final journal 2.1
Psychology final journal 2.1Psychology final journal 2.1
Psychology final journal 2.1
Felix Vong
 
Psy journal 2 1.2
Psy journal 2 1.2Psy journal 2 1.2
Psy journal 2 1.2
Felix Vong
 
Psy 2 essay
Psy 2 essayPsy 2 essay
Psy 2 essay
Felix Vong
 
Power bank presentation
Power bank presentationPower bank presentation
Power bank presentation
Felix Vong
 
Foundation in natural built and environment Accounting FINAL
Foundation in natural built and environment Accounting FINALFoundation in natural built and environment Accounting FINAL
Foundation in natural built and environment Accounting FINAL
Felix Vong
 

More from Felix Vong (20)

Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MS
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015
 
CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015
 
Individual assignment brief ct2-2014
Individual assignment brief ct2-2014Individual assignment brief ct2-2014
Individual assignment brief ct2-2014
 
Presentation
PresentationPresentation
Presentation
 
Ct project 1 bqs
Ct project 1 bqsCt project 1 bqs
Ct project 1 bqs
 
Ct1 assignment bqs
Ct1 assignment  bqsCt1 assignment  bqs
Ct1 assignment bqs
 
Assignment brief for site report bqs
Assignment brief for site report bqsAssignment brief for site report bqs
Assignment brief for site report bqs
 
bqs Building materials presentation 2
bqs Building materials presentation 2bqs Building materials presentation 2
bqs Building materials presentation 2
 
BQS bq assignment
BQS bq assignmentBQS bq assignment
BQS bq assignment
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
bqs Assignment no.2
bqs Assignment no.2 bqs Assignment no.2
bqs Assignment no.2
 
Epc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun TempleEpc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun Temple
 
Epc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara ParkEpc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara Park
 
School of-architecture-group 1.1
School of-architecture-group 1.1School of-architecture-group 1.1
School of-architecture-group 1.1
 
Psychology final journal 2.1
Psychology final journal 2.1Psychology final journal 2.1
Psychology final journal 2.1
 
Psy journal 2 1.2
Psy journal 2 1.2Psy journal 2 1.2
Psy journal 2 1.2
 
Psy 2 essay
Psy 2 essayPsy 2 essay
Psy 2 essay
 
Power bank presentation
Power bank presentationPower bank presentation
Power bank presentation
 
Foundation in natural built and environment Accounting FINAL
Foundation in natural built and environment Accounting FINALFoundation in natural built and environment Accounting FINAL
Foundation in natural built and environment Accounting FINAL
 

Recently uploaded

Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 

Recently uploaded (20)

Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 

Traversing final-report

  • 1. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 1 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB 60103 – SITE SURVEYING SEMESTER 2 FIELDWORK 1 REPORT TRAVERSING Name Student ID Marks Hor Weng Lim 0319441 Felix Vong Zhi Wei 0318462 Kevin Lee Hee Xian 0315192 Jackson Ting Shii Hang 0324326
  • 2. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 2 Content Page Cover Page 1 Table of Content 2 1.0 Introduction to Traversing 3 1.1 Open Traverse 3 1.2 Closed Traverse 4 - 5 1.3 Northing 6 1.4 Azimuths 7 1.5 Bearing 8 2.0 Objective 9 3.0 Outline of Apparatus 10 3.1 Theodolites 10 3.2 Tripod Stand 11 3.3 Optical Plummet 12 3.4 Ranging Rod 13 3.5 Spirit Bubble 14 3.6 Plumb Bob 15 4.0 Field Data 16 4.1 Compute the Angular Error and Adjust the Angles 17 4.2 Stadia Method 18 - 19 4.3 Compute Course Bearing and Azimuth 20 4.4 Compute Course Latitude and Departure 21 4.5 Determine the Error of Closure 22 4.6 Adjust Course Latitude and Departure 23 5.0 Discussion 24 6.0 Conclusion 25
  • 3. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 3 1.0 INTRODUCTION TO TRAVERSING Traversing is a form of a control survey that requires the establishment of a series of stations that are linked together by angles and distance. It can be open traverse and close traverse. The angles are measured by theodolites and the distance can be measured by calculating the stadia’s reading or using electronic distance measuring equipment. The use of theodolites in traversing survey is one of the most common methods in engineering work to get the provision of control surveys, angle measurement and detail mapping. 1.1 OPEN TRAVERSE Figure 1.0: Open Traverse Sources: http://mygeosurvey.blogspot.my/ Open traverse is a series of measured straight lunes and angles that do not geometrically close or a surveying traverse that fails to terminate at the starting point and does not completely enclose a polygon. It ends at a station whose relative position is not previously known. It is the least desirable type of traverse because it provides no check on fieldwork or starting data.
  • 4. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 4 1.2 CLOSED TRAVERSE Closed traverse is a series of connected line which end at the starting point. It is basically a traverse proceed from one coordinate point to another. A closed traverse may be close back to its starting point or whose relative position is known. Closed traverse can be in two types:  Closed Loop Traverse Figure 1.1: Closed loop Traverse Sources: http://mygeosurvey.blogspot.my/ A closed loop traverse starts and ends on the starting point with assumed coordinates and azimuth without affecting the area, computations or relative position of the stations. It usually need at least 4 point to conduct this survey. The coordinates must be tied to an existing grid system and the traverse must start from a known station which is azimuth on that system. Closed loop traverse provides some check upon fieldwork and computations, it does not provide for check of data that may cause systematic error during the survey.
  • 5. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 5  Closed Connecting Traverse Figure 1.2: Closed Connecting Traverse Sources: http://www.globalsecurity.org/military/library/policy/army/fm/6-2/fig5-6.gif A closed connecting traverse is almost looks like an open traverse, the only different between closed loop traverse and closed connecting traverse is it begins and ends at points or lines of known position and the direction at each of the particular traverse.
  • 6. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 6 1.3 NORTHING There are 3 reference direction or datum meridian that are used as traverse reference. Which is Magnetic North, Grid North and True North (Geodetic North).  Magnetic North Angle are measured from magnetic north. Since magnetic fields fluctuate over time, this meridian is time-dependent. The magnetic fields will orientate a free swinging magnetic needle in a north or south direction.  Grid North A grid of lines parallel to the true meridian of one point on the grid, usually the origin of the grid. The angle is dependent on the map projection. Since the central meridian point to true north, when we move east or west away from the meridian, the difference between grid north and true north will increases.  True North True North is the direction along the earth’s surface towards to the geographic North Pole which all the lines of longitude converge. Historically south has occasionally been used.
  • 7. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 7 1.4 AZIMUTHS Figure 1.3: Azimuths Sources: http://www.engr.mun.ca/~sitotaw/Site/Fall2007_files/TP_Lecture9_CloseTravers- ENGI3703.pdf Azimuths defined as horizontal angles turned clockwise from the reference line. Which is between the ranges from 0°to 360°. For example: 128°, 239°and 351°. Generally, the angles should be measured only from the north.
  • 8. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 8 1.5 BEARINGS Figure 1.4: Bearings Sources: http://www.engr.mun.ca/~sitotaw/Site/Fall2007_files/TP_Lecture9_CloseTravers- ENGI3703.pdf Bearings is defined as an acute angle which is less than 90°. It is a horizontal angles measured from the meridian either east or west. Usually required two letter with an acute angle which is North (N), South (S), East (E) & West (W). The different between azimuths and bearing is bearing can be measured both either clockwise or counter clockwise. It can be measured from North or South axis of the meridian.
  • 9. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 9 2.0 OBJECTIVE  To learn the principles of running a closed field traverse.  To enhance students’ knowledge in traversing procedure.  To establish ground control for photographic mapping.  To enable students to get hands-on experience in setting up and working with the theodolites, leveling rod, tripod stand as well as other instruments and collect the data of the relevant fieldwork.  To allow students to learn the correct method in doing traversing,  To allow students to apply the theories that had been taught in classes to a hands-on situation.  To enable students to identify the error and make adjustment to the data by using the correct formula.  Learn how to compute a traverse and properly adjust the measured values of a closed traverse to achieve mathematical closure.  Determine the error of closure and compute the accuracy of work.
  • 10. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 10 3.0 OUTLINE OF APPARATUS 3.1 THEODOLITE Figure 1.5: Theodolite Sources: http://www.visurveyinstruments.co.za/image/cache/data/DT-209-500x500.jpg Theodolite is a precision instrument for measuring angles in both horizontal and vertical planes. It is used to identify the ground level and the ways to construct super structure or sub structure. A theodolites consists of a small sized movable telescope mounted within two perpendicular axis which are horizontal and vertical axis. It also able to rotate 360 degree on a tripod stand that’s where we get angles from it. When the telescope is pointed at a target object, the angle of each axis can be measured with great precision. It is commonly used to measure horizontal and vertical angles, ranging and leveling as well as controlling verticality.
  • 11. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 11 3.2 TRIPOD STAND Figure 1.6: Tripod Stand Sources: http://www.toolup.com/product-images/2161_1.jpg A tripod stand is a three-legged support platform for the level. The main function of the tripod stand is to ensure a stable instrument setup for reliable measurements. The legs of the tripod can be adjust to get the vertical height that required. Once the instrument is moved, then it must be set up again which is to loosen the screw and adjust again and lock it back tight. It usually has a flat tip and a mounting screw for instrument attachment. It is also to make sure that the leveling tripod placed horizontally. .
  • 12. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 12 3.3 OPTICAL PLUMMET Figure 1.7: Optical Plummet Sources: https://www.hayesinstrument.com/accs_TopconTribrachOP.jpg Optical Plummets is a device that used to center the instrument over a ground station. It is used in place of a plumb bob to center transits and theodolites over a given point, preferred for its steadiness in strong winds. The procedure speeds up the setting up process as well as protect the instrument from accident, because it has a lock below the optical plummet to lock the devices that used in fieldwork. Sometimes, the optical plummet can be used to perform angular or distance measurements from the survey point.
  • 13. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 13 3.4 RANGING ROD Figure 1.8: Ranging Rod Sources: http://3.imimg.com/data3/JA/BD/MY-2853543/steel-ranging-rods-500x500.jpg Ranging rod is used to mark areas and to set out straight lines on the field. It is also used to mark points that must be seen from a distance. The length of the ranging rod is either 2m or 3m. It is made up of wood or metal. Ranging rod usually painted with alternate red-white or black-white bands.
  • 14. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 14 3.5 SPIRIT BUBBLE Figure 1.8: Spirit Bubble Sources: http://g02.a.alicdn.com/kf/HTB1nZ8OJXXXXXaZXpXXq6xXFXXXw/34-20-12mm- Metal-Bullseye-Level-Circular-vials-Bubble-Spirit-Level-with-Mounting-holes-Accuracy-8.jpg The spirit bubble is used for maintaining both level rods and sighting poles in a vertical position. An out of adjustment of spirit bubble level will cause accumulative error in level lines. It can used in traversing and leveling measurements in fieldworks. In order to get an accurate measurement for both, the spirit bubble level must be inside the middle of the black circle. It is located on the optical plummet and leveling rod.
  • 15. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 15 3.6 PLUMB BOB Figure 1.9: Plumb Bob Sources: https://www.pinterest.com/pin/537687642987491772/ Plumb bob is used to check if the object are vertical. A plumb bob consist of a piece of metal pointing downwards, which is attached to cord. It is normally tie on the optical plummet by using the string. When the plumb bob is hanging free and not moving, the cord is vertical. It is used to mark a point directly under theodolite as well.
  • 16. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 16 4.0 Field Data Station Field Angles A 86°44’ 20’’ B 92°39’ 40’’ C 86°46’ 20’’ D 93°46’ 40’’ Total 357° 175’ 120’’ 359°57’ 00’
  • 17. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 17 4.1 COMPUTE THE ANGULAR ERROR AND ADJUST THE ANGLES The sum of the interior angles in any loop traverse must equal to 360°. Total angular error = 360°- 359°57’ 00’’ = 00°03’ 00’’ Error per angle = 00°03’ 00’’ / 4 = 00° 00’ 45’’ / 45’’ per angle Station Field Angle Correction Adjusted Angles A 86°44’ 20’’ + 00° 00’ 45’’ 86°45’ 05’’ B 92°39’ 40’’ + 00° 00’ 45’’ 92°40’ 25’’ C 86°46’ 20’’ + 00° 00’ 45’’ 86° 47’ 05’’ D 93°46’ 40’’ + 00° 00’ 45’’ 93°47’ 25’’ Total 357° 175’ 120’’ 357°179’ 60’’ 359°57’ 00’ 360° 00’ 00’’
  • 18. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 18 4.2 STADIA METHOD We can use stadia method to calculate the distances between the points. The horizontal and vertical distances between the survey points and the theodolites can be calculated using the equation. The differences between the top stadia readings and the bottom stadia readings must be the same while conducting the survey. Equation D = K x S x Cos2 (θ) + C x Cos D = Horizontal distance between survey point and instrument S = Difference between top stadia and bottom stadia θ = Vertical angle of telescope from the horizontal line when capturing the stadia readings. K = Multiplying constant given by the manufacturer of the theodolite, normally 100 C = Addictive factor given by the manufacturer of the theodolite, normally 0
  • 19. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 19 We can calculate the distance by using stadia method which is use top stadia and bottom stadia readings. The calculation of the stadia method is below follow by the distance: Dab = 100 x (0.4887) x Cos2 (0) + 0 x Cos (0) = 48.8626m Dbc = 100 x (0.29355) x Cos2 (0) + 0 x Cos (0) = 29.3505m Dcd = 100 x (0.4795) x Cos2 (0) + 0 x Cos (0) = 47.9427m Dda = 100 x (0.2989) x Cos2 (0) + 0 x Cos (0) = 29.8854m
  • 20. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 20 4.3 COMPUTE COURSE BEARING AND AZIMUTH A – B Azimuths Bearings 00° 00’ 00’’ N 00° 00’ 00’’ B – C Azimuths Bearings 180° 00’ 00’’ – 92°40’ 25’’ N 87° 19’ 35’’ W = 87° 19’ 35’’ C – D Azimuths Bearings 92°40’ 25’’ + 86°47’ 05’’ S 00°32’ 30’’ W = 179°27’ 30’’ 180° 00’ 00’’ – 179°27’ 30’’ = 00°32’ 30’’ D – A Azimuths Bearings 93°47’ 25’’ + 00°32’ 30’’ S 85°40’ 05’’E = 94°19’ 55’’ 180° 00’ 00’’ – 94°16’ 15’’ = 85°40’ 05’’
  • 21. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 21 4.4 COMPUTE COURSE LATITUDE AND DEPARTURE Cos β Sin β L cos β L sin β Station Bearing, β Length, L Cosine Sine Latitude Departure A N 00° 00’ 00’’ 48.8626 1.0000 0.0000 + 48.8626 + 0.0000 B N 87°19’ 35’’ W 29.3505 0.0466 0.9989 + 1.3691 - 29.3186 C S 00°32’ 30’’ W 47.9427 0.9999 0.0095 - 47.9406 - 0.4532 D S 85°40’ 05’’ E 29.8854 0.0755 0.9971 - 2.2574 + 29.8000 A Total Perimeter (P) = 156.0412 Sum of Latitude ∑∆y = 0.0337 Sum of Departure ∑∆x = 0.0282
  • 22. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 22 4.5 DETERMINE THE ERROR OF CLOSURE Error in Departure A ∑∆x = 0.0282m Error in Latitude Ec ∑∆y = 0.0337m Total Error = 0.0439m A’ Accuracy = 1 ; (P/Ec) For average land surveying an accuracy of about 1:3000 is typical Ec = [ (sum of latitude)2 + (sum of departure)2 ] 1/2 = [ (0.0337)2 + (0.0282)2 ] 1/2 = 0.0439m P = 156.0263m Accuracy = 1 : (156.0412/0.0439) = 1 : 3554 Therefore, the traversing is acceptable.
  • 23. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 23 4.6 ADJUST COURSE LATITUDE AND DEPARTURE The Compass Rule Correction = - [ ∑∆y ] / P x L or – [ ∑∆x ] / P x L Where, ∑∆y and ∑∆x = The error in latitude and departure P = Total length of perimeter of the traverse L = Length of a particular course Station Unadjusted Corrections Adjusted Latitude Departure Latitude Departure Latitude Departure A + 48.8626 + 0.0000 - 0.0106 - 0.0088 + 48.8520 - 0.0088 B + 1.3691 - 29.3186 - 0.0063 - 0.0053 + 1.3628 - 29.3239 C - 47.9406 - 0.4532 - 0.0104 - 0.0087 - 47.9510 - 0.4619 D - 2.2574 + 29.8000 - 0.0064 - 0.0054 - 2.2638 + 29.7946 Total + 0.0337 + 0.0282 - 0.0337 -0.0282 0.00 0.00 Check Check
  • 24. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 24 5.0 DISCUSSION From this fieldwork, we learnt to conduct a traverse survey by using a theodolite and several formulas that we learnt during traversing class. Throughout this survey, we can be able to applied the technique and knowledge thought by our lecturer, Mr. Chai. From this survey, we know that point A, B, C and D are laid out on the site respectively. The theodolite will be placed on point A which is our starting point and started to conduct our survey. The angles that we get from the theodolite must be read from left to the right in order to obtain a more accurate reading. The zero angle will be set on point A as well and turned the theodolite to point D and measure to get the stadia reading as well as the horizontal and vertical angles. After we get the all the readings and the angles from one point, we switch the theodolite to another point and repeat the same procedure again to get another point of readings. What we found out that was really hard for us is we couldn’t get the spirit bubble into the black circle. But after Mr. Chai had taught us, finally we can measure ourselves very fast and accurately. At the end of the process, the total angles must be 360°. However, in our report from the table of the field data, the total angle was 357° 57’ 00’’. Thus, we knew that there was a misclosure error occurred as there is a difference of 3’ 00’’. Means in every angle we measured, there is a 45’’ of error. Therefore, we used the trigonometry traversing calculation technique to solve it. Lastly, at the end, we found that the latitude and departure also have a minor error of 0.0337 (Latitude) and 0.0282 (Departure). We solved it by using the compass rule. After compile everything, the report is finally done.
  • 25. TAYLOR’S UNIVERSITY | SABD | SITE SURVEYING (QSB 60103) | TRAVERSING REPORT 25 6.0 CONCLUSION In conclusion, this is our second fieldwork which is traversing. In this fieldwork, we were required to carry out a closed loop traverse survey that is located at the car park. A special characteristic of a closed loop traverse is it starts and ends at the same point, forming a closed geometric figure called a polygon. My fellow group mates and I conduct the survey together at the car park. Two of them is holding the leveling staff, one of a group mate is recording down the data while one of the group member is taking the readings for the traverse survey. As we taught in class that the horizontal reading must be taken twice which is the first reading is taken, then turn back again to take the second reading. We also did recorded the top stadia, middle stadia and bottom stadia readings to calculate the length of the perimeter of the traverse since we didn’t have a measuring tape. The angles are usually obtained through the usage of equipment provided by our lecturer. However, we were unable to obtain the exact reading of 360°, therefore, some adjustment was made in order to achieve 360°in our traverse survey completely. Although the formula was really hard for us to understand and apply compare to leveling, but we try hard to learning with a spirit of not giving up. We really do likes site surveying because we can actually feel that we are working together. In a nutshell, we thanks our lecturer Mr. Chai for giving us an opportunities to learn and hands on in leveling. We hope that next time we can have a chance to conduct a survey like this again.