SlideShare a Scribd company logo
Welcome
Top Gun Aerospace Consulting
topgunaerospace@gmail.com
832-776-4959
Introductions
Nacaro Williams
• 24 years retired Navy Senior Chief
• 32 years of Aviation Quality Experience
• Exemplar Global Certified (AIEA) ISO 9001 / AS9100
• Completed over 600 Aerospace QMS Audits
• Expert in Aerospace Standards to include but not limited
to ISO 9000, 9001, 17021, AS9100, AS9110, AS9120,
AS9104/1, and more
Lourdes Lugo
• Technical Coordinator for several certifying bodies in the
Aerospace and Defense industries.
• Technical expert in providing and updating technical
audit files regarding Aerospace Accreditation for over
250 Aerospace clients in OASIS database for the
Aerospace Program Managers and client services in the
industry.
• ISO 9001 Certified Lead Auditor
• TGAC Customer Service Representative
Our Mission Statement
To serve our clients by providing the highest
quality professional services through the
implementation of sustainable quality
management systems.
Our Values
• Our values: Honesty, integrity, and
commitment to quality are important to us.
We are honest and straightforward in all
our dealings with clients.
• We strive for excellence and aim to
exceed expectations
Services we provide
1. Conduct and document an on-site “Gap Analysis” to determine
documentation & actions needed for successful implementation.
2. Develop a Project Road Map timeline for success that includes:
– Develop and implement the strategic direction of your company
– Integration of processes and their interactions utilizing risk based principles
– Documentation Development
– Risk Management Program
– Management Review Process
– Internal Quality Audit Program
– Continual Improvement Activities
– Supplier Development
– Corrective Action Program
– Configuration Management
Services we provide
Develop a Project Road Map for success (Cont)
– Train and develop the Leadership Representative(s)
– Identify and define the Context of the Organization and Interested Parties
– Establish a Quality Policy
– Establish the Quality Objectives
– Synergize a compliant Quality Manual if requested (Not Required for ISO 9001)
– Synergize the required Quality Procedures (Document Control System)
– Coordinate activities with HR to assure employee documentation in place
– Synergize required forms and records as needed
– Synergize a Corrective and Preventive Action System
– Synergize a calibration system
– Lead Management through the required Management Review Meeting
Services we provide
Develop a Project Road Map for success (Cont)
– Conduct and document an On-site Pre-Certification Readiness Internal Audit
– Assist in closing any open action items as a result of the Pre-Certification Readiness Internal
Audit
– Act as Company’s liaison during Certification Audit and assist with clearance of any NCR’s
issued during the course of the Certification Audit. (Optional)
Working closely with your leadership team, we utilize the Plan, Do, Check, Act Model for
implementing the necessary changes to your Quality Management System.
PLAN-DO-CHECK-ACT
Model
• Phase 1 = PLAN and perform a GAP analysis of your
QMS and develop a implementation plan.
• Phase 2 = DO, Implement necessary changes to close
the gap between your current system and AS9100C
• Phase 3 = Check, follow up assessment to validate the
changes are effectively implemented
• Phase 4 = Act, on any necessary changes needed in
preparation for the certification audit.
Phase 1 Plan: Why a GAP
Analysis?
Gap analysis is often conducted at the beginning of an
organization’s journey seeking compliance to a chosen
specification or standard. However, it may also be
conducted after some development of processes for
achieving compliance has taken place.
We’ll provide an implementation road map to Certification
Phase 1 Plan: Why a GAP
Analysis?
The main reason why gap analysis is conducted at the
beginning of the development phase or after some
development has occurred is because the organization
wants to know where it stands in regard to meeting the
standard, and it wants to know specifically what it must do
to close the gaps. A gap analysis is mainly a determination
of the degree of conformance of your organization to the
requirements of a specification or standard
Phase 1 Plan: Why a GAP
Analysis?
A gap analysis cannot be performed by a registrar or
company providing certification because they are not
allowed to provide the advice, due to an inherent conflict of
interest.
What Top Gun Aerospace
Provides you in Phase 1 Plan?
Statistical data related to:
1. Potential major and/or minor nonconformances based on
ISO:9001:2015, AS9100:2016 and AS9104/1, AS17021
2. Total Clauses that meet the requirements of ISO:
9001:2016 and/or AS9100:2016
3. Total Clauses that do NOT meet the requirements of
9001:2016 and/or AS9100:2016
What Top Gun Aerospace
Provides you in Phase 1 Plan?
Statistical data related to: (Cont)
1. Total potential nonconformances based on the Standards
2. Opportunities for Improvement
3. Areas of Concern that are not nonconformances but could lead to
nonconformances if not addressed
4. Develop a implementation plan going forward for certification as the
result of the GAP analysis.
What Top Gun Aerospace
Provides you? RESULTS!
What Top Gun Aerospace
Provides you in Phase 1 Plan?
Phase 2-DO: Implementation
Top Gun Aerospace Consulting Services goal is to make the entire
process of attaining Compliance and Certification as fast, simple and as
cost-effective as possible – without sacrificing any of the benefits your
current Quality Management System (QMS) was designed to deliver.
To that end, we make certain that:
1. Phase 2: Any gaps within you quality management system are
clearly identified and effectively implemented.
2. Phase 2: We’ll collaborate with your process owners to understand
what the requirements are and improve your processes
Phase 3-CHECK: Verification
Follow Up
1. Verification follow up assessment is performed to
validate all necessary changes are effectively
implemented and managed properly
Phase 4-ACT: Corrections
1. Make necessary corrections to the QMS in preparation for the
Certification audit.
2. Your Quality Management System can be fully implemented with 6
months or less (Dependent on the current status of your QMS)
Contact us today for a quote at 832-776-4959
Let’s get started !
Top Gun Aerospace Consulting

More Related Content

What's hot

Webinar on PMS
Webinar on PMSWebinar on PMS
Webinar on PMS
vaibhavsharma_engg
 
Internal quality audit operational procedure
Internal quality audit operational procedureInternal quality audit operational procedure
Internal quality audit operational procedure
Tuan Anh Nguyen
 
Aerospace pre registration tips
Aerospace pre registration tipsAerospace pre registration tips
Aerospace pre registration tipsIntertek CE
 
Implementing Global Quality Audits at a Tier 1 Auto Supplier
Implementing Global Quality Audits at a Tier 1 Auto SupplierImplementing Global Quality Audits at a Tier 1 Auto Supplier
Implementing Global Quality Audits at a Tier 1 Auto Supplier
Nimonik
 
Best Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemBest Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management System
PECB
 
Why are audits so important?
Why are audits so important?Why are audits so important?
Why are audits so important?
Geoff Doole
 
L9 quality assurance and documentation
L9 quality assurance and documentationL9 quality assurance and documentation
L9 quality assurance and documentationOMWOMA JACKSON
 
Expectation from qms lecture 5
Expectation from qms lecture 5Expectation from qms lecture 5
Expectation from qms lecture 5Abdul Basit
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committee
Hpm India
 
Iso 9001:2015 internal auditor Course
Iso 9001:2015  internal auditor Course Iso 9001:2015  internal auditor Course
Iso 9001:2015 internal auditor Course
Atif Alhaj
 
ASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt Reviews
Rich Laguna
 
ECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesAndrew Whittaker
 
Qms for iso_9001_2015
Qms for iso_9001_2015Qms for iso_9001_2015
Qms for iso_9001_2015
qmsWrapper
 
Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpointPat Kilbane
 
PECB Certified ISO 9001:2015 Lead Auditor
PECB Certified ISO 9001:2015 Lead AuditorPECB Certified ISO 9001:2015 Lead Auditor
PECB Certified ISO 9001:2015 Lead Auditor
PECB
 
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedAndrew Whittaker
 

What's hot (20)

Webinar on PMS
Webinar on PMSWebinar on PMS
Webinar on PMS
 
Internal quality audit operational procedure
Internal quality audit operational procedureInternal quality audit operational procedure
Internal quality audit operational procedure
 
Aerospace pre registration tips
Aerospace pre registration tipsAerospace pre registration tips
Aerospace pre registration tips
 
Implementing Global Quality Audits at a Tier 1 Auto Supplier
Implementing Global Quality Audits at a Tier 1 Auto SupplierImplementing Global Quality Audits at a Tier 1 Auto Supplier
Implementing Global Quality Audits at a Tier 1 Auto Supplier
 
Best Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemBest Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management System
 
Why are audits so important?
Why are audits so important?Why are audits so important?
Why are audits so important?
 
L9 quality assurance and documentation
L9 quality assurance and documentationL9 quality assurance and documentation
L9 quality assurance and documentation
 
Expectation from qms lecture 5
Expectation from qms lecture 5Expectation from qms lecture 5
Expectation from qms lecture 5
 
MAY 2015 Resume
MAY 2015 ResumeMAY 2015 Resume
MAY 2015 Resume
 
Kanakappa Hallikeri_Resume
Kanakappa Hallikeri_ResumeKanakappa Hallikeri_Resume
Kanakappa Hallikeri_Resume
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committee
 
Iso 9001:2015 internal auditor Course
Iso 9001:2015  internal auditor Course Iso 9001:2015  internal auditor Course
Iso 9001:2015 internal auditor Course
 
2509- CV2016
2509- CV20162509- CV2016
2509- CV2016
 
ASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt Reviews
 
ECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier ResponsibilitiesECSS-Q-ST-20C Supplier Responsibilities
ECSS-Q-ST-20C Supplier Responsibilities
 
T410 iso 19011
T410 iso 19011T410 iso 19011
T410 iso 19011
 
Qms for iso_9001_2015
Qms for iso_9001_2015Qms for iso_9001_2015
Qms for iso_9001_2015
 
Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpoint
 
PECB Certified ISO 9001:2015 Lead Auditor
PECB Certified ISO 9001:2015 Lead AuditorPECB Certified ISO 9001:2015 Lead Auditor
PECB Certified ISO 9001:2015 Lead Auditor
 
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formattedECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
ECSS-Q-ST-10C Supplier vs PA Manager Responsibilities_formatted
 

Viewers also liked

Aerospace Clusters In Mexico Webinar
Aerospace Clusters In Mexico WebinarAerospace Clusters In Mexico Webinar
Aerospace Clusters In Mexico WebinarMarketingAI
 
Top 100 Aerospace Companies (2013)
Top 100 Aerospace Companies (2013)Top 100 Aerospace Companies (2013)
Top 100 Aerospace Companies (2013)
Douglas Burdett
 
Aerospace Opportunities In Germany
Aerospace Opportunities In GermanyAerospace Opportunities In Germany
Aerospace Opportunities In Germany
Stephen Myatt
 
Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability Reporting
Jennifer H. Elder
 
Sustainability reporting
Sustainability reportingSustainability reporting
Sustainability reporting
Footprint_Forum
 
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Urjanet
 
Integrated Sustainability Reporting
Integrated Sustainability ReportingIntegrated Sustainability Reporting
Integrated Sustainability Reporting
Next Generation Consultants: Reana Rossouw
 
An introduction to sustainability reporting
An introduction to sustainability reportingAn introduction to sustainability reporting
An introduction to sustainability reporting
PReConsultants
 
Aerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material OutlookAerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material Outlook
ICF
 
Aerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMAAerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMA
India ACMA
 
Global aerospace: 2016 outlook
Global aerospace: 2016 outlookGlobal aerospace: 2016 outlook
Global aerospace: 2016 outlook
Bloomberg LP
 
composite materials in aerospace application seminar
 composite materials in aerospace application seminar composite materials in aerospace application seminar
composite materials in aerospace application seminar
Chuchu Beera
 
AEROSPACE TEXTILES
AEROSPACE TEXTILESAEROSPACE TEXTILES
AEROSPACE TEXTILES
akaashi20
 
LinkedIn powerpoint
LinkedIn powerpointLinkedIn powerpoint
LinkedIn powerpointguest2137df
 

Viewers also liked (15)

Aerospace Clusters In Mexico Webinar
Aerospace Clusters In Mexico WebinarAerospace Clusters In Mexico Webinar
Aerospace Clusters In Mexico Webinar
 
Top 100 Aerospace Companies (2013)
Top 100 Aerospace Companies (2013)Top 100 Aerospace Companies (2013)
Top 100 Aerospace Companies (2013)
 
Aerospace Opportunities In Germany
Aerospace Opportunities In GermanyAerospace Opportunities In Germany
Aerospace Opportunities In Germany
 
Sustainability Reporting
Sustainability ReportingSustainability Reporting
Sustainability Reporting
 
Sustainability reporting
Sustainability reportingSustainability reporting
Sustainability reporting
 
India aerospace
India aerospaceIndia aerospace
India aerospace
 
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
Elevating Sustainability Reporting with Advanced Energy and Water Data Collec...
 
Integrated Sustainability Reporting
Integrated Sustainability ReportingIntegrated Sustainability Reporting
Integrated Sustainability Reporting
 
An introduction to sustainability reporting
An introduction to sustainability reportingAn introduction to sustainability reporting
An introduction to sustainability reporting
 
Aerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material OutlookAerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material Outlook
 
Aerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMAAerospace and Defence Sector Diversification | ACMA
Aerospace and Defence Sector Diversification | ACMA
 
Global aerospace: 2016 outlook
Global aerospace: 2016 outlookGlobal aerospace: 2016 outlook
Global aerospace: 2016 outlook
 
composite materials in aerospace application seminar
 composite materials in aerospace application seminar composite materials in aerospace application seminar
composite materials in aerospace application seminar
 
AEROSPACE TEXTILES
AEROSPACE TEXTILESAEROSPACE TEXTILES
AEROSPACE TEXTILES
 
LinkedIn powerpoint
LinkedIn powerpointLinkedIn powerpoint
LinkedIn powerpoint
 

Similar to Top gun aerospace website presentation

ISO 9001 executive brief
ISO 9001 executive briefISO 9001 executive brief
ISO 9001 executive brief
Tim Gollner
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
AhmedAltantawi
 
Best Practices in Auditing
Best Practices in AuditingBest Practices in Auditing
Best Practices in Auditing
PECB
 
6 step guide for certification
6 step guide for certification6 step guide for certification
6 step guide for certification
TRAIB CERT LIMITED
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeOmnex Inc.
 
Quality Management- Definitions and requirements
Quality Management- Definitions and requirementsQuality Management- Definitions and requirements
Quality Management- Definitions and requirements
Rima Adika Gaekwad
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal Audit
Dinar Surtikarani
 
Auditing Principles
Auditing PrinciplesAuditing Principles
Auditing Principles
RASHID MAHMOOD
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Omnex Inc.
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
Imran Jamil
 
Iso 9001 systems
Iso 9001 systemsIso 9001 systems
Iso 9001 systems
wirelesesta
 
ISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptxISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptx
GelmelinaLeaLepitenH
 
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDITSCOTT SITTNER
 
qmpfull.ppt
qmpfull.pptqmpfull.ppt
qmpfull.ppt
ssusera85eeb1
 
xx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.pptxx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.ppt
ssusera85eeb1
 
qmpfull.ppt
qmpfull.pptqmpfull.ppt
qmpfull.ppt
perumal peru
 
Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMSArefin Khan
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRSPaul Morffew
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
Isidro Sid Calayag
 
A New Model for Building Business Process Quality
A New Model for Building Business Process QualityA New Model for Building Business Process Quality
A New Model for Building Business Process Quality
Worksoft
 

Similar to Top gun aerospace website presentation (20)

ISO 9001 executive brief
ISO 9001 executive briefISO 9001 executive brief
ISO 9001 executive brief
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Best Practices in Auditing
Best Practices in AuditingBest Practices in Auditing
Best Practices in Auditing
 
6 step guide for certification
6 step guide for certification6 step guide for certification
6 step guide for certification
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtime
 
Quality Management- Definitions and requirements
Quality Management- Definitions and requirementsQuality Management- Definitions and requirements
Quality Management- Definitions and requirements
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal Audit
 
Auditing Principles
Auditing PrinciplesAuditing Principles
Auditing Principles
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
 
Iso 9001 systems
Iso 9001 systemsIso 9001 systems
Iso 9001 systems
 
ISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptxISO 9001:2015 Requirements.pptx
ISO 9001:2015 Requirements.pptx
 
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
 
qmpfull.ppt
qmpfull.pptqmpfull.ppt
qmpfull.ppt
 
xx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.pptxx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.ppt
 
qmpfull.ppt
qmpfull.pptqmpfull.ppt
qmpfull.ppt
 
Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMS
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
 
A New Model for Building Business Process Quality
A New Model for Building Business Process QualityA New Model for Building Business Process Quality
A New Model for Building Business Process Quality
 

Recently uploaded

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 

Recently uploaded (20)

AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 

Top gun aerospace website presentation

  • 1. Welcome Top Gun Aerospace Consulting topgunaerospace@gmail.com 832-776-4959
  • 2. Introductions Nacaro Williams • 24 years retired Navy Senior Chief • 32 years of Aviation Quality Experience • Exemplar Global Certified (AIEA) ISO 9001 / AS9100 • Completed over 600 Aerospace QMS Audits • Expert in Aerospace Standards to include but not limited to ISO 9000, 9001, 17021, AS9100, AS9110, AS9120, AS9104/1, and more
  • 3. Lourdes Lugo • Technical Coordinator for several certifying bodies in the Aerospace and Defense industries. • Technical expert in providing and updating technical audit files regarding Aerospace Accreditation for over 250 Aerospace clients in OASIS database for the Aerospace Program Managers and client services in the industry. • ISO 9001 Certified Lead Auditor • TGAC Customer Service Representative
  • 4. Our Mission Statement To serve our clients by providing the highest quality professional services through the implementation of sustainable quality management systems.
  • 5. Our Values • Our values: Honesty, integrity, and commitment to quality are important to us. We are honest and straightforward in all our dealings with clients. • We strive for excellence and aim to exceed expectations
  • 6. Services we provide 1. Conduct and document an on-site “Gap Analysis” to determine documentation & actions needed for successful implementation. 2. Develop a Project Road Map timeline for success that includes: – Develop and implement the strategic direction of your company – Integration of processes and their interactions utilizing risk based principles – Documentation Development – Risk Management Program – Management Review Process – Internal Quality Audit Program – Continual Improvement Activities – Supplier Development – Corrective Action Program – Configuration Management
  • 7. Services we provide Develop a Project Road Map for success (Cont) – Train and develop the Leadership Representative(s) – Identify and define the Context of the Organization and Interested Parties – Establish a Quality Policy – Establish the Quality Objectives – Synergize a compliant Quality Manual if requested (Not Required for ISO 9001) – Synergize the required Quality Procedures (Document Control System) – Coordinate activities with HR to assure employee documentation in place – Synergize required forms and records as needed – Synergize a Corrective and Preventive Action System – Synergize a calibration system – Lead Management through the required Management Review Meeting
  • 8. Services we provide Develop a Project Road Map for success (Cont) – Conduct and document an On-site Pre-Certification Readiness Internal Audit – Assist in closing any open action items as a result of the Pre-Certification Readiness Internal Audit – Act as Company’s liaison during Certification Audit and assist with clearance of any NCR’s issued during the course of the Certification Audit. (Optional) Working closely with your leadership team, we utilize the Plan, Do, Check, Act Model for implementing the necessary changes to your Quality Management System.
  • 9. PLAN-DO-CHECK-ACT Model • Phase 1 = PLAN and perform a GAP analysis of your QMS and develop a implementation plan. • Phase 2 = DO, Implement necessary changes to close the gap between your current system and AS9100C • Phase 3 = Check, follow up assessment to validate the changes are effectively implemented • Phase 4 = Act, on any necessary changes needed in preparation for the certification audit.
  • 10. Phase 1 Plan: Why a GAP Analysis? Gap analysis is often conducted at the beginning of an organization’s journey seeking compliance to a chosen specification or standard. However, it may also be conducted after some development of processes for achieving compliance has taken place. We’ll provide an implementation road map to Certification
  • 11. Phase 1 Plan: Why a GAP Analysis? The main reason why gap analysis is conducted at the beginning of the development phase or after some development has occurred is because the organization wants to know where it stands in regard to meeting the standard, and it wants to know specifically what it must do to close the gaps. A gap analysis is mainly a determination of the degree of conformance of your organization to the requirements of a specification or standard
  • 12. Phase 1 Plan: Why a GAP Analysis? A gap analysis cannot be performed by a registrar or company providing certification because they are not allowed to provide the advice, due to an inherent conflict of interest.
  • 13. What Top Gun Aerospace Provides you in Phase 1 Plan? Statistical data related to: 1. Potential major and/or minor nonconformances based on ISO:9001:2015, AS9100:2016 and AS9104/1, AS17021 2. Total Clauses that meet the requirements of ISO: 9001:2016 and/or AS9100:2016 3. Total Clauses that do NOT meet the requirements of 9001:2016 and/or AS9100:2016
  • 14. What Top Gun Aerospace Provides you in Phase 1 Plan? Statistical data related to: (Cont) 1. Total potential nonconformances based on the Standards 2. Opportunities for Improvement 3. Areas of Concern that are not nonconformances but could lead to nonconformances if not addressed 4. Develop a implementation plan going forward for certification as the result of the GAP analysis.
  • 15. What Top Gun Aerospace Provides you? RESULTS!
  • 16. What Top Gun Aerospace Provides you in Phase 1 Plan?
  • 17. Phase 2-DO: Implementation Top Gun Aerospace Consulting Services goal is to make the entire process of attaining Compliance and Certification as fast, simple and as cost-effective as possible – without sacrificing any of the benefits your current Quality Management System (QMS) was designed to deliver. To that end, we make certain that: 1. Phase 2: Any gaps within you quality management system are clearly identified and effectively implemented. 2. Phase 2: We’ll collaborate with your process owners to understand what the requirements are and improve your processes
  • 18. Phase 3-CHECK: Verification Follow Up 1. Verification follow up assessment is performed to validate all necessary changes are effectively implemented and managed properly
  • 19. Phase 4-ACT: Corrections 1. Make necessary corrections to the QMS in preparation for the Certification audit. 2. Your Quality Management System can be fully implemented with 6 months or less (Dependent on the current status of your QMS) Contact us today for a quote at 832-776-4959 Let’s get started !
  • 20. Top Gun Aerospace Consulting