• Quality is conformance to requirements (Ph.Crosby)
• Quality is fitness for use ( Joseph Juran )
• Quality is continuous improvement through
reduced variation (Deming).
What is Quality?
GURUS
QUALITY
MANAGEMENT
GRADE
GIVEN
THE
CUSTOME
R Extras
ISO 9000 Family
The ISO 9000 family of standards listed below has been developed to
assist organizations, of all types and sizes, to implement and operate
effective quality management systems.
— ISO 9000 describes fundamentals of quality management systems
and specifies the terminology for quality management systems.
— ISO 9001 specifies requirements for a quality management system
where an organization needs to demonstrate its ability to provide
products that fulfil customer and applicable regulatory requirements
and aims to enhance customer satisfaction.
— ISO 9004 provides guidelines that consider both the effectiveness
and efficiency of the quality management system. The aim of this
standard is improvement of the performance of the organization and
satisfaction of customers and other interested parties.
— ISO 19011 provides guidance on auditing quality and environmental
management systems. Together they form a coherent set of quality
management system standards facilitating mutual understanding in
national and international trade.
ISO 9001:2015 (QMS)
International Standard for QMS
ISO 9001:2015 (QMS)
International Standard for QMS
Organization Quality Management
System (QMS)
Project Quality Plan (PQP)
QMS
Quality Management System (QMS) for any organization must be complied
with ISO 9001 requirements.
All requirements of ISO 9001:2015 (QMS) are generic and are intended to be
applicable to all organizations, regardless of type, size and product provided.
Project Quality Plan
(PQP)
The Project Quality Plan (PQP) forms part of SBG-ABCD overall Quality
Management system
(QMS). Its goals are to increase confidence that specified requirements will be met,
provide
greater assurance that processes is in control, to engender motivation and to provide
a structured
approach to project execution. The entirety of SBG-ABCD QMS is based upon the
Plan-Do-Check-
Act (PDCA) cycle for continuous improvement depicted below.
Quality Policy
Quality Objectives
KPI’s
1
.
‫العليا‬ ‫االدارة‬ ‫التزام‬
.
2
.
‫الجودة‬ ‫لتحسين‬ ‫فريق‬
.
3
.
‫الجودة‬ ‫مقاييس‬
.
4
.
‫الجودة‬ ‫تكلفة‬ ‫تحديد‬
.
5
.
‫بالجودة‬ ‫الوعي‬
.
6
.
‫التصحيحية‬ ‫اإلجراءات‬
.
7
.
‫تن‬ ‫على‬ ‫بالتأكد‬ ‫بالمنشأة‬ ‫العمل‬ ‫بيئة‬ ‫بتهيئة‬ ‫العيوب‬ ‫انعدام‬ ‫أي‬ ‫الصفرية‬ ‫للعيوب‬ ‫التخطيط‬
‫العيوب‬ ‫برامج‬ ‫فيذ‬
‫الصفرية‬
.
8
.
‫الجودة‬ ‫تحسين‬ ‫في‬ ‫بدورهم‬ ‫القيام‬ ‫على‬ ‫المشرفون‬ ‫تدريب‬
.
9
.
‫ال‬ ‫يوم‬ ‫عليه‬ ‫ويطلق‬ ،‫لألحسن‬ ‫تغيير‬ ‫هناك‬ ‫بأن‬ ‫العاملين‬ ‫إلشعار‬ ‫وذلك‬ ‫يوم‬ ‫أو‬ ‫مناسبة‬ ‫تخصيص‬
‫معيب‬
‫الصفري‬
.
10
.
‫المنظمة‬ ‫أو‬ ‫بالمنشاة‬ ‫الفردي‬ ‫االبتكار‬ ‫وتشجيع‬ ، ‫األهداف‬ ‫وضع‬
.
11
‫ال‬ ‫حل‬ ‫على‬ ‫قدرتهم‬ ‫عدم‬ ‫حالة‬ ‫في‬ ‫باإلدارة‬ ‫االتصال‬ ‫على‬ ‫العاملين‬ ‫بتشجيع‬ ، ‫األخطاء‬ ‫أسباب‬ ‫إزالة‬ ‫ـ‬
‫مشاكل‬
‫العيوب‬ ‫من‬ ‫الخالي‬ ‫األداء‬ ‫تحقيق‬ ‫سبيل‬ ‫في‬ ‫تقف‬ ‫التي‬
.
12
‫التقدير‬ ‫ـ‬
:
‫تح‬ ‫في‬ ‫جيدة‬ ‫أداء‬ ‫مؤشرات‬ ‫حققوا‬ ‫الذين‬ ‫للعاملين‬ ‫والتحفيز‬ ‫للمكافئات‬ ‫برنامج‬ ‫عمل‬
‫الجودة‬ ‫سين‬
.
13
-
‫الجودة‬ ‫مجالس‬ ‫تأسيس‬
.
14
-
‫منتهية‬ ‫وغير‬ ‫مستمرة‬ ‫التحسين‬ ‫عمليات‬ ‫أن‬ ‫من‬ ‫للتأكد‬ ، ‫السابقة‬ ‫الخطوات‬ ‫تكرار‬
‫الجودة‬ ‫تحسين‬ ‫خطوات‬
QUALITY
SYSTEM &
PROCEDURES
Flow Chart
One Of
Quality
Tools And
Techniques
Project References
 PROJECT SPECS.
 Project Contracts
 PROJECT UPDATED DRAWING (DD & SD).
 REQUEST FOR INFORMATION RECORD (RFI.
RECORD)
 MATERIAL APPROVAL
 PROJECT QUALITY PLAN
 INTERNATIONAL
STANDARDS(ACI,ASTM,BS,DIN,..)
 Organizational Process Assets (OPA) and
Project Management Performance.
 QA is defined as a procedure or set of procedures
intended to ensure that a product or service under
development (before work is complete, as opposed
to afterwards) meets specified requirements.
 Do we work as planned or not.
 Auditing the quality requirements and the results
from the quality control measurements to ensure
appropriate quality standards are used
 Using quality auditing and Process analysis.
 ISO (WRITE WHAT YOU DO & DO WHAT YOU
WRITE)
QUALITY ASSURANCE
Audit During Activities Documentation
FORMS
 WORK INSPECTION REQUEST
 STAGES OF INSPECTION
 SAFETY PRE POURING INSPECTION REQUEST
 CONCRETE POURING RECORD
 MATERIALS INSPECTION REQUEST
 TRANSMITTAL FOR APPROVAL
 DOCUMENTS FOR INFORMATION
 REQUEST FOR INFORMATION
 …….
Final FormsFinal Forms 21-04-2014ExcelCopy of 00-FINAL
INDEX.xlsx
QUALITY CONTROL
 Quality control (QC) is a procedure or set of procedures intended to ensure
that a manufactured product or performed service adheres to a defined set
of quality criteria or meets the requirements of the client or customer.
 Monitoring and recording results of executing the quality activities to
assess performance and recommend necessary changes
 Preparing corrective action and preventive action
 Using Inspection And Testing.
 Validate Scope is the process of formalizing acceptance of the completed
project deliverables. The key benefit of this process is that it brings
objectivity to the acceptance process and increases the chance of final
product, service, or result acceptance by validating each deliverable.
Inspections Testing
After
Deliverables
Testing
Piling Static Load Test Steel Bend & Rebend
Testing
Electromechanical tests Electromechanical tests
Project Quality Management
 Includes the processes and activities of the performing organization that determine
quality policies, objectives, and responsibilities so that the project will satisfy the
needs for which it was undertaken.
 It implements the quality management system through policy and procedures with
continuous process improvement activities conducted throughout, as appropriate.
D D D
Project Life Time
QC
QC
QC
QA
QA
QA
QA
QA
QA
Product
Method Statement
MOS
Inspection and Test Plan
ITP
HOW WE WILL EXECUTE THE ACTIVITY:-
METHOD OF STATEMENT (M.O.S)
The Method statement should explain in detail the work that is to be
undertaken and the necessary remedial measures that need to be in
place in order to protect the site workforce and in some cases members
of the pubic who may be affected by work actions.
1.Scope/Objectives
2.References
3.Health and Safety Hazards
4.Responsibilities
5.Procedures /Method to be Employed
6.Manpower Requirements
7.Material Requirements
8.Equipment Requirements
9.Health and Safety Provisions
10.Q.C Approvals and other Documentation
11.Site Safety Engineer’s Approvals
12.Risk Assessments
Table of Contents
‫بند‬ ‫ألي‬ ‫التنفيذ‬ ‫طريقه‬ ‫عمل‬ ‫كيفيه‬
•
‫ك‬ ‫عليه‬ ‫المتعارف‬ ‫و‬ ‫الطبيعي‬ ‫الترتيب‬ ‫حسب‬ ‫الخطوات‬ ‫كتابه‬ ‫يتم‬
‫خطوط‬
‫عريضه‬
•
‫السابقه‬ ‫الخطوات‬ ‫من‬ ‫خطوه‬ ‫كل‬ ‫تفصيل‬ ‫يتم‬
•
‫درا‬ ‫و‬ ‫للبند‬ ‫التنفيذيه‬ ‫و‬ ‫التصميميه‬ ‫المخططات‬ ‫كافه‬ ‫تجميع‬ ‫يتم‬
‫جيد‬ ‫بشكل‬ ‫ستها‬
•
‫بالبند‬ ‫عالقه‬ ‫لها‬ ‫التي‬ ‫المواصفات‬ ‫دراسه‬ ‫يتم‬
•
‫من‬ ‫البند‬ ‫متطلبات‬ ‫كافه‬ ‫تحديد‬ ‫يتم‬
(
‫المواد‬
,
‫االدوات‬ ‫و‬ ‫المعدات‬
,
‫العم‬
‫اله‬
)
•
‫الصله‬ ‫ذات‬ ‫األقسام‬ ‫كافه‬ ‫من‬ ‫التنفيذ‬ ‫خطوات‬ ‫و‬ ‫طريقه‬ ‫مراجعه‬ ‫يتم‬
•
‫البند‬ ‫تنفيذ‬ ‫اثناء‬ ‫توافرها‬ ‫الواجب‬ ‫االحتياطات‬ ‫جميع‬ ‫تحديد‬ ‫يتم‬
•
‫ل‬ ‫الفعلي‬ ‫الترتيب‬ ‫الي‬ ‫نصل‬ ‫حتي‬ ‫اخري‬ ‫مرة‬ ‫الترتيب‬ ‫مراجعه‬ ‫يتم‬
‫و‬ ‫لخطوات‬
‫خطوه‬ ‫كل‬ ‫نهايه‬ ‫و‬ ‫بدايه‬
•
‫خط‬ ‫و‬ ‫لطريقه‬ ‫التوضيح‬ ‫من‬ ‫تزيد‬ ‫تفاصيل‬ ‫او‬ ‫صور‬ ‫اي‬ ‫اضافه‬ ‫يتم‬
‫وات‬
‫التنفيذ‬
•
‫الجودة‬ ‫قسم‬ ‫من‬ ‫اعتمادها‬ ‫يتم‬

‫السالمه‬ ‫و‬ ‫األمن‬ ‫قسم‬

‫المشروع‬ ‫ادارة‬
•
‫المالك‬ ‫لممثل‬ ‫لالعتماد‬ ‫تقديمها‬ ‫يتم‬
(
‫البند‬ ‫تنفيذ‬ ‫في‬ ‫البدء‬ ‫قبل‬
‫الموقع‬ ‫في‬
)
‫بند‬ ‫ألي‬ ‫التنفيذ‬ ‫طريقه‬ ‫واعتماد‬ ‫مراجعه‬ ‫طريقه‬
•
‫هناك‬
3
‫تنفيذ‬ ‫طريقه‬ ‫اي‬ ‫واعتماد‬ ‫لمراجعه‬ ‫طرق‬
.1
‫المالحظات‬ ‫كافه‬ ‫كتابه‬ ‫مع‬ ‫التفصيليه‬ ‫المراجعه‬
(
‫كان‬ ‫صغيرة‬
‫او‬ ‫ت‬
‫كبيرة‬
)
‫كافه‬ ‫استيفاء‬ ‫بعد‬ ‫اخري‬ ‫مرة‬ ‫تقديمها‬ ‫اعادة‬ ‫طلب‬ ‫مع‬
‫المالحظات‬
Code C
.2
‫تجع‬ ‫و‬ ‫المالك‬ ‫حق‬ ‫تضمن‬ ‫عامه‬ ‫مالحظات‬ ‫كتابه‬ ‫مع‬ ‫العامه‬ ‫المراجعه‬
‫ل‬
‫اعتمادها‬ ‫مع‬ ‫وحده‬ ‫المقاول‬ ‫علي‬ ‫المسئوليه‬
Code B
.3
‫فقط‬ ‫الكبيرة‬ ‫المالحظات‬ ‫كتابه‬ ‫مع‬ ‫التفصيليه‬ ‫المراجعه‬
(
‫ال‬
‫سوف‬ ‫تي‬
‫مباشر‬ ‫بشكل‬ ‫التنفيذ‬ ‫طريقه‬ ‫في‬ ‫تؤثر‬
( )
Code B or C
‫حسب‬
‫الحاله‬
)
Inspection and Test Plan
(ITP)
ITP definition :
Inspection & Test Plan (ITP) – An Inspection & Test Plan is the program of
inspection, testing of materials, and survey shall be prepared and submitted by
the contractor to the Engineer for approval before usage and application to the
site.
Inspection and Test Plans are often used as a way to satisfy the ISO 9001
requirements in ‘8.2 Monitoring and Measurement’ in the ISO 9001 standard:
‘‘The organization shall monitor and measure the characteristics of the product
to verify that product requirements have been met. This shall be carried out at
appropriate stages of the product realization process in accordance with the
planned arrangements’’
For each activity on a construction site, there would be a corresponding Method
Statement as well as Inspection and Test Plan including Checklist shall be
developed.
Preparation, Review and Approval
Inspection and Test Plan is made and issued by the Quality Engineer, it should
then be reviewed by the Quality Manager, Construction Manager and approved
• The QA/QC Engineer shall maintain a register of all Inspection and Test
Plan (ITP) including Checklists.
• The QA/QC Engineer shall maintain a complete master set of approved
Inspection and Test Plan
• The inspection process shall have the inspection criteria for every
Inspection and Test Plan item. Here are the following:
 Surveillance ( S ) = random attendance at site, no signature required on the
Inspection Request ( IR ) or its accompanying documentation.
 Witness (W) = attendance at the site is expected, the signature is required
on check sheet of Inspection Request ( IR ) and Checklist, but if the
signatory is not present to sign at the time, follow on work may proceed and
the document(s) to be singed later.
 Hold Point (H) = attendance at the site is mandatory and signature is
required on the check sheet of Inspection Request at the time of the
inspection to release the following work.
 Review ( R ) = documents to be reviewed, no signature required on the
Inspection Request or its accompanying documentation.
 Records (RE) = documentation to be recorded, no signature required on the
Inspection Request or its accompanying documentation.
 Test ( T ) = attendance is required, signature required on check sheet of
Inspection request and checklist
How to prepare an ITP
• In general the ITP should follow the sequence of operations and clearly define who is
responsible for signing off each check.
First decide when in the process you want to conduct an inspection or check. Common
hold points are prior to a phase of high cost/ high value work, where any pre-exisiting
problems will create difficulties at the next stage, or will mean a high cost of re-work when
discovered later in the process.
For each check point you need to specify exactly what to look for (perhaps refer to another
document for details), how the check is recorded, and who must perform/signoff the
inspection.
• The main items that need to be specified in an Inspection and Test Plan are :
1. the item that will be checked/inspected/tested (e.g. Concrete strength)
2. the document that requires this item to be checked (usually it is the contract or similar
document-specification)
3. the document that according to, this item will be inspected/tested (usually a standard or
a statutory requirement)
4. the kind of inspection that needs to be performed (visual inspection, document
approval etc.)
5. the frequency that this inspection needs to be performed (e.g. for concrete slump test =
once for every track)
6. the objective criteria/tolerance parameters that will determine if the inspection/test for
that item has passed or not
7. the kind of document that will be prepared and saved as a record of pass or failure
(usually a signed-off form, a testing machine print-out, a photo etc.)
8. if this record needs to be a deliverable, meaning that it needs to be kept and handed
over to the Client at the end of the Project as part of the As-Built Folders
9. the responsibilities of every party involved (Contractor, QC Engineer, Client’s

More Related Content

Similar to presentation quality awareness draft02.pptx

Apply quality standards.pdf
Apply quality standards.pdfApply quality standards.pdf
Apply quality standards.pdf
Danilign Mekonnen
 
Controlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioControlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioWaqas Ali Tunio
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
Isidro Sid Calayag
 
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCESOFTWARE RELIABILITY AND QUALITY ASSURANCE
Concept of sop
Concept of sopConcept of sop
Concept of sop
ArtiSindhav
 
Quality Audit
Quality AuditQuality Audit
Quality Audit
Hafsa Munir
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.ppt
Oswaldo Gonzales
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
Pharmaceutical
 
Software Quality.pptx
Software Quality.pptxSoftware Quality.pptx
Software Quality.pptx
AnupamaSharma80
 
4S Akademi - QAI - Software Testing Principles and Concepts
4S Akademi - QAI - Software Testing Principles and Concepts4S Akademi - QAI - Software Testing Principles and Concepts
4S Akademi - QAI - Software Testing Principles and Concepts
Serdar Zeybek
 
Top gun aerospace website presentation
Top gun aerospace website presentationTop gun aerospace website presentation
Top gun aerospace website presentation
seanzeeeee
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
Shankar Maind Patil
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
VIDYA VIKAS INSTITUTE OF ENGINEERING AND TECHNOLOGY
 
OM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTOM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPT
AynetuTerefe2
 
07 Quality Control
07 Quality Control07 Quality Control
07 Quality Control
akashpadole
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
KanriConsulting
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
Prinka Choudhary
 

Similar to presentation quality awareness draft02.pptx (20)

Apply quality standards.pdf
Apply quality standards.pdfApply quality standards.pdf
Apply quality standards.pdf
 
Controlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioControlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali Tunio
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCESOFTWARE RELIABILITY AND QUALITY ASSURANCE
SOFTWARE RELIABILITY AND QUALITY ASSURANCE
 
Concept of sop
Concept of sopConcept of sop
Concept of sop
 
Quality Audit
Quality AuditQuality Audit
Quality Audit
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.ppt
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Software Quality.pptx
Software Quality.pptxSoftware Quality.pptx
Software Quality.pptx
 
4S Akademi - QAI - Software Testing Principles and Concepts
4S Akademi - QAI - Software Testing Principles and Concepts4S Akademi - QAI - Software Testing Principles and Concepts
4S Akademi - QAI - Software Testing Principles and Concepts
 
Top gun aerospace website presentation
Top gun aerospace website presentationTop gun aerospace website presentation
Top gun aerospace website presentation
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
OM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTOM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPT
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
07 Quality Control
07 Quality Control07 Quality Control
07 Quality Control
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

presentation quality awareness draft02.pptx

  • 1. • Quality is conformance to requirements (Ph.Crosby) • Quality is fitness for use ( Joseph Juran ) • Quality is continuous improvement through reduced variation (Deming). What is Quality?
  • 5. ISO 9000 Family The ISO 9000 family of standards listed below has been developed to assist organizations, of all types and sizes, to implement and operate effective quality management systems. — ISO 9000 describes fundamentals of quality management systems and specifies the terminology for quality management systems. — ISO 9001 specifies requirements for a quality management system where an organization needs to demonstrate its ability to provide products that fulfil customer and applicable regulatory requirements and aims to enhance customer satisfaction. — ISO 9004 provides guidelines that consider both the effectiveness and efficiency of the quality management system. The aim of this standard is improvement of the performance of the organization and satisfaction of customers and other interested parties. — ISO 19011 provides guidance on auditing quality and environmental management systems. Together they form a coherent set of quality management system standards facilitating mutual understanding in national and international trade.
  • 7.
  • 8. ISO 9001:2015 (QMS) International Standard for QMS Organization Quality Management System (QMS) Project Quality Plan (PQP)
  • 9. QMS Quality Management System (QMS) for any organization must be complied with ISO 9001 requirements. All requirements of ISO 9001:2015 (QMS) are generic and are intended to be applicable to all organizations, regardless of type, size and product provided.
  • 10. Project Quality Plan (PQP) The Project Quality Plan (PQP) forms part of SBG-ABCD overall Quality Management system (QMS). Its goals are to increase confidence that specified requirements will be met, provide greater assurance that processes is in control, to engender motivation and to provide a structured approach to project execution. The entirety of SBG-ABCD QMS is based upon the Plan-Do-Check- Act (PDCA) cycle for continuous improvement depicted below.
  • 14. 1 . ‫العليا‬ ‫االدارة‬ ‫التزام‬ . 2 . ‫الجودة‬ ‫لتحسين‬ ‫فريق‬ . 3 . ‫الجودة‬ ‫مقاييس‬ . 4 . ‫الجودة‬ ‫تكلفة‬ ‫تحديد‬ . 5 . ‫بالجودة‬ ‫الوعي‬ . 6 . ‫التصحيحية‬ ‫اإلجراءات‬ . 7 . ‫تن‬ ‫على‬ ‫بالتأكد‬ ‫بالمنشأة‬ ‫العمل‬ ‫بيئة‬ ‫بتهيئة‬ ‫العيوب‬ ‫انعدام‬ ‫أي‬ ‫الصفرية‬ ‫للعيوب‬ ‫التخطيط‬ ‫العيوب‬ ‫برامج‬ ‫فيذ‬ ‫الصفرية‬ . 8 . ‫الجودة‬ ‫تحسين‬ ‫في‬ ‫بدورهم‬ ‫القيام‬ ‫على‬ ‫المشرفون‬ ‫تدريب‬ . 9 . ‫ال‬ ‫يوم‬ ‫عليه‬ ‫ويطلق‬ ،‫لألحسن‬ ‫تغيير‬ ‫هناك‬ ‫بأن‬ ‫العاملين‬ ‫إلشعار‬ ‫وذلك‬ ‫يوم‬ ‫أو‬ ‫مناسبة‬ ‫تخصيص‬ ‫معيب‬ ‫الصفري‬ . 10 . ‫المنظمة‬ ‫أو‬ ‫بالمنشاة‬ ‫الفردي‬ ‫االبتكار‬ ‫وتشجيع‬ ، ‫األهداف‬ ‫وضع‬ . 11 ‫ال‬ ‫حل‬ ‫على‬ ‫قدرتهم‬ ‫عدم‬ ‫حالة‬ ‫في‬ ‫باإلدارة‬ ‫االتصال‬ ‫على‬ ‫العاملين‬ ‫بتشجيع‬ ، ‫األخطاء‬ ‫أسباب‬ ‫إزالة‬ ‫ـ‬ ‫مشاكل‬ ‫العيوب‬ ‫من‬ ‫الخالي‬ ‫األداء‬ ‫تحقيق‬ ‫سبيل‬ ‫في‬ ‫تقف‬ ‫التي‬ . 12 ‫التقدير‬ ‫ـ‬ : ‫تح‬ ‫في‬ ‫جيدة‬ ‫أداء‬ ‫مؤشرات‬ ‫حققوا‬ ‫الذين‬ ‫للعاملين‬ ‫والتحفيز‬ ‫للمكافئات‬ ‫برنامج‬ ‫عمل‬ ‫الجودة‬ ‫سين‬ . 13 - ‫الجودة‬ ‫مجالس‬ ‫تأسيس‬ . 14 - ‫منتهية‬ ‫وغير‬ ‫مستمرة‬ ‫التحسين‬ ‫عمليات‬ ‫أن‬ ‫من‬ ‫للتأكد‬ ، ‫السابقة‬ ‫الخطوات‬ ‫تكرار‬ ‫الجودة‬ ‫تحسين‬ ‫خطوات‬
  • 15. QUALITY SYSTEM & PROCEDURES Flow Chart One Of Quality Tools And Techniques
  • 16. Project References  PROJECT SPECS.  Project Contracts  PROJECT UPDATED DRAWING (DD & SD).  REQUEST FOR INFORMATION RECORD (RFI. RECORD)  MATERIAL APPROVAL  PROJECT QUALITY PLAN  INTERNATIONAL STANDARDS(ACI,ASTM,BS,DIN,..)  Organizational Process Assets (OPA) and Project Management Performance.
  • 17.
  • 18.
  • 19.  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is complete, as opposed to afterwards) meets specified requirements.  Do we work as planned or not.  Auditing the quality requirements and the results from the quality control measurements to ensure appropriate quality standards are used  Using quality auditing and Process analysis.  ISO (WRITE WHAT YOU DO & DO WHAT YOU WRITE) QUALITY ASSURANCE Audit During Activities Documentation
  • 20. FORMS  WORK INSPECTION REQUEST  STAGES OF INSPECTION  SAFETY PRE POURING INSPECTION REQUEST  CONCRETE POURING RECORD  MATERIALS INSPECTION REQUEST  TRANSMITTAL FOR APPROVAL  DOCUMENTS FOR INFORMATION  REQUEST FOR INFORMATION  ……. Final FormsFinal Forms 21-04-2014ExcelCopy of 00-FINAL INDEX.xlsx
  • 21. QUALITY CONTROL  Quality control (QC) is a procedure or set of procedures intended to ensure that a manufactured product or performed service adheres to a defined set of quality criteria or meets the requirements of the client or customer.  Monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes  Preparing corrective action and preventive action  Using Inspection And Testing.  Validate Scope is the process of formalizing acceptance of the completed project deliverables. The key benefit of this process is that it brings objectivity to the acceptance process and increases the chance of final product, service, or result acceptance by validating each deliverable. Inspections Testing After Deliverables
  • 22. Testing Piling Static Load Test Steel Bend & Rebend
  • 24. Project Quality Management  Includes the processes and activities of the performing organization that determine quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken.  It implements the quality management system through policy and procedures with continuous process improvement activities conducted throughout, as appropriate. D D D Project Life Time QC QC QC QA QA QA QA QA QA Product
  • 26.
  • 27. HOW WE WILL EXECUTE THE ACTIVITY:- METHOD OF STATEMENT (M.O.S) The Method statement should explain in detail the work that is to be undertaken and the necessary remedial measures that need to be in place in order to protect the site workforce and in some cases members of the pubic who may be affected by work actions.
  • 28. 1.Scope/Objectives 2.References 3.Health and Safety Hazards 4.Responsibilities 5.Procedures /Method to be Employed 6.Manpower Requirements 7.Material Requirements 8.Equipment Requirements 9.Health and Safety Provisions 10.Q.C Approvals and other Documentation 11.Site Safety Engineer’s Approvals 12.Risk Assessments Table of Contents
  • 29. ‫بند‬ ‫ألي‬ ‫التنفيذ‬ ‫طريقه‬ ‫عمل‬ ‫كيفيه‬ • ‫ك‬ ‫عليه‬ ‫المتعارف‬ ‫و‬ ‫الطبيعي‬ ‫الترتيب‬ ‫حسب‬ ‫الخطوات‬ ‫كتابه‬ ‫يتم‬ ‫خطوط‬ ‫عريضه‬ • ‫السابقه‬ ‫الخطوات‬ ‫من‬ ‫خطوه‬ ‫كل‬ ‫تفصيل‬ ‫يتم‬ • ‫درا‬ ‫و‬ ‫للبند‬ ‫التنفيذيه‬ ‫و‬ ‫التصميميه‬ ‫المخططات‬ ‫كافه‬ ‫تجميع‬ ‫يتم‬ ‫جيد‬ ‫بشكل‬ ‫ستها‬ • ‫بالبند‬ ‫عالقه‬ ‫لها‬ ‫التي‬ ‫المواصفات‬ ‫دراسه‬ ‫يتم‬ • ‫من‬ ‫البند‬ ‫متطلبات‬ ‫كافه‬ ‫تحديد‬ ‫يتم‬ ( ‫المواد‬ , ‫االدوات‬ ‫و‬ ‫المعدات‬ , ‫العم‬ ‫اله‬ ) • ‫الصله‬ ‫ذات‬ ‫األقسام‬ ‫كافه‬ ‫من‬ ‫التنفيذ‬ ‫خطوات‬ ‫و‬ ‫طريقه‬ ‫مراجعه‬ ‫يتم‬ • ‫البند‬ ‫تنفيذ‬ ‫اثناء‬ ‫توافرها‬ ‫الواجب‬ ‫االحتياطات‬ ‫جميع‬ ‫تحديد‬ ‫يتم‬ • ‫ل‬ ‫الفعلي‬ ‫الترتيب‬ ‫الي‬ ‫نصل‬ ‫حتي‬ ‫اخري‬ ‫مرة‬ ‫الترتيب‬ ‫مراجعه‬ ‫يتم‬ ‫و‬ ‫لخطوات‬ ‫خطوه‬ ‫كل‬ ‫نهايه‬ ‫و‬ ‫بدايه‬ • ‫خط‬ ‫و‬ ‫لطريقه‬ ‫التوضيح‬ ‫من‬ ‫تزيد‬ ‫تفاصيل‬ ‫او‬ ‫صور‬ ‫اي‬ ‫اضافه‬ ‫يتم‬ ‫وات‬ ‫التنفيذ‬ • ‫الجودة‬ ‫قسم‬ ‫من‬ ‫اعتمادها‬ ‫يتم‬ ‫السالمه‬ ‫و‬ ‫األمن‬ ‫قسم‬ ‫المشروع‬ ‫ادارة‬ • ‫المالك‬ ‫لممثل‬ ‫لالعتماد‬ ‫تقديمها‬ ‫يتم‬ ( ‫البند‬ ‫تنفيذ‬ ‫في‬ ‫البدء‬ ‫قبل‬ ‫الموقع‬ ‫في‬ )
  • 30. ‫بند‬ ‫ألي‬ ‫التنفيذ‬ ‫طريقه‬ ‫واعتماد‬ ‫مراجعه‬ ‫طريقه‬ • ‫هناك‬ 3 ‫تنفيذ‬ ‫طريقه‬ ‫اي‬ ‫واعتماد‬ ‫لمراجعه‬ ‫طرق‬ .1 ‫المالحظات‬ ‫كافه‬ ‫كتابه‬ ‫مع‬ ‫التفصيليه‬ ‫المراجعه‬ ( ‫كان‬ ‫صغيرة‬ ‫او‬ ‫ت‬ ‫كبيرة‬ ) ‫كافه‬ ‫استيفاء‬ ‫بعد‬ ‫اخري‬ ‫مرة‬ ‫تقديمها‬ ‫اعادة‬ ‫طلب‬ ‫مع‬ ‫المالحظات‬ Code C .2 ‫تجع‬ ‫و‬ ‫المالك‬ ‫حق‬ ‫تضمن‬ ‫عامه‬ ‫مالحظات‬ ‫كتابه‬ ‫مع‬ ‫العامه‬ ‫المراجعه‬ ‫ل‬ ‫اعتمادها‬ ‫مع‬ ‫وحده‬ ‫المقاول‬ ‫علي‬ ‫المسئوليه‬ Code B .3 ‫فقط‬ ‫الكبيرة‬ ‫المالحظات‬ ‫كتابه‬ ‫مع‬ ‫التفصيليه‬ ‫المراجعه‬ ( ‫ال‬ ‫سوف‬ ‫تي‬ ‫مباشر‬ ‫بشكل‬ ‫التنفيذ‬ ‫طريقه‬ ‫في‬ ‫تؤثر‬ ( ) Code B or C ‫حسب‬ ‫الحاله‬ )
  • 31. Inspection and Test Plan (ITP) ITP definition : Inspection & Test Plan (ITP) – An Inspection & Test Plan is the program of inspection, testing of materials, and survey shall be prepared and submitted by the contractor to the Engineer for approval before usage and application to the site. Inspection and Test Plans are often used as a way to satisfy the ISO 9001 requirements in ‘8.2 Monitoring and Measurement’ in the ISO 9001 standard: ‘‘The organization shall monitor and measure the characteristics of the product to verify that product requirements have been met. This shall be carried out at appropriate stages of the product realization process in accordance with the planned arrangements’’ For each activity on a construction site, there would be a corresponding Method Statement as well as Inspection and Test Plan including Checklist shall be developed. Preparation, Review and Approval Inspection and Test Plan is made and issued by the Quality Engineer, it should then be reviewed by the Quality Manager, Construction Manager and approved
  • 32. • The QA/QC Engineer shall maintain a register of all Inspection and Test Plan (ITP) including Checklists. • The QA/QC Engineer shall maintain a complete master set of approved Inspection and Test Plan • The inspection process shall have the inspection criteria for every Inspection and Test Plan item. Here are the following:  Surveillance ( S ) = random attendance at site, no signature required on the Inspection Request ( IR ) or its accompanying documentation.  Witness (W) = attendance at the site is expected, the signature is required on check sheet of Inspection Request ( IR ) and Checklist, but if the signatory is not present to sign at the time, follow on work may proceed and the document(s) to be singed later.  Hold Point (H) = attendance at the site is mandatory and signature is required on the check sheet of Inspection Request at the time of the inspection to release the following work.  Review ( R ) = documents to be reviewed, no signature required on the Inspection Request or its accompanying documentation.  Records (RE) = documentation to be recorded, no signature required on the Inspection Request or its accompanying documentation.  Test ( T ) = attendance is required, signature required on check sheet of Inspection request and checklist
  • 33. How to prepare an ITP • In general the ITP should follow the sequence of operations and clearly define who is responsible for signing off each check. First decide when in the process you want to conduct an inspection or check. Common hold points are prior to a phase of high cost/ high value work, where any pre-exisiting problems will create difficulties at the next stage, or will mean a high cost of re-work when discovered later in the process. For each check point you need to specify exactly what to look for (perhaps refer to another document for details), how the check is recorded, and who must perform/signoff the inspection. • The main items that need to be specified in an Inspection and Test Plan are : 1. the item that will be checked/inspected/tested (e.g. Concrete strength) 2. the document that requires this item to be checked (usually it is the contract or similar document-specification) 3. the document that according to, this item will be inspected/tested (usually a standard or a statutory requirement) 4. the kind of inspection that needs to be performed (visual inspection, document approval etc.) 5. the frequency that this inspection needs to be performed (e.g. for concrete slump test = once for every track) 6. the objective criteria/tolerance parameters that will determine if the inspection/test for that item has passed or not 7. the kind of document that will be prepared and saved as a record of pass or failure (usually a signed-off form, a testing machine print-out, a photo etc.) 8. if this record needs to be a deliverable, meaning that it needs to be kept and handed over to the Client at the end of the Project as part of the As-Built Folders 9. the responsibilities of every party involved (Contractor, QC Engineer, Client’s