Experiment No.4
Objective:
To study working of each component of hydro power plant?
Theory:
Working:
Potential energy is the energy which a substance has due to its position or state.
The water behind a dam has potential energy because of its position. The water can fall from this
position and exert a force over a distance and therefore do work. In a Hydro-electric power plant
the force is used to drive a turbine, which inturn drives the electric generator. Because gravity
provides the force which makes the water fall, the energy stored in the water is called
gravitational potential energy.
Fig 4.1 (Hydropower Plant)
Layout Of Hydro Electric PowerPlant:
WaterReservoir:
In a reservoir the water collected from the catchment area is stored behind a dam. Catchment
area gets its water from rain and streams. The level of water surface in the reservoir is called
Head water level.
Note : Continuous availability of water is a basic necessity for a hydro-electric power plant.
Dam :
The purpose of the dam is to store the water and to regulate the out going flow of water. The dam
helps to store all the incoming water. It also helps to increase the head of the water. In order to
generate a required quantity of power it is necessary that a sufficient head is available.
Spillway:
Excess accumulation of water endangers the stability of dam construction. Also in order to avoid
the over flow of water out of the dam especially during rainy seasons spillways are provided.
This prevents the rise of water level in the dam.Spillways are passages which allows the excess
water to flow to a storage area away from the dam.
Gate:
A gate is used to regulate or control the flow of water from the dam.
Pressure Tunnel:
It is a passage that carries water from the reservoir to the surge tank.
Surge Tank:
A Surge tank is a small reservoir or tank in which the water level rises or falls due to sudden
changes in pressure.
Purpose of Surge Tank:
To serve as a supply tank to the turbine when the water in the pipe is accelerated during
increased load conditions and as a storage tank when the water is decelerating during reduced
load conditions.To reduce the distance between the free water surface in the dam and the turbine,
thereby reducing the water-hammer effect on penstock and also protect the upstream tunnel from
high pressure rise.
Water-Hammer Effect:
The water hammer is defined as the change in pressure rapidly above or below normal pressure
caused by sudden change in the rate of water flow through the pipe, according to the demand of
prime mover i.e. turbine.
Penstock:
Penstock is a closed pipe of steel or concrete for supplying water under pressure to the turbine.
Inlet Valve :
Water from the penstock flows to the turbine through the inlet valve. The valve may be partially
closed or open thereby regulating the pressure of water flowing to the turbine.
Hydraulic Turbine(Prime Mover) :
The hydraulic turbine converts the energy of water into mechanical energy. The mechanical
energy(rotation) available on the turbine shaft is coupled to the shaft of an electric generator and
electricity is produced. The water after performing the work on turbine blades is discharged
through the draft tube.The prime movers which are in common use are Pelton wheel, Francis
turbine and Kaplan turbine.
Draft Tube:
It is connected to the outlet of the turbine.It allows the turbine to be placed above the tail water
level.
Tail Water Level or Tail Race:
Tail water level is the water level after the discharge from the turbine. The discharged water is
sent to the river, thus the level of the river is the tail water level.
Electric Generator, Step-Up Transformer And Pylon:
As the water rushes through the turbine, it spins the turbine shaft, which is coupled to the electric
generator. The generator has a rotating electromagnet called a rotor and a stationary part called a
stator. The rotor creates a magnetic field that produces an electric charge in the stator. The
charge is transmitted as electricity. The step-up transformer increases the voltage of the current
coming from the stator. The electricity is distributed through power lines also called as pylon.
Classification of Hydro Electric Power Plants:
Hydro –electric power plants are usually classified according to the available head of water.
High Head Power Plants:
Head of water is more than 500 meters. The turbine used in such plants is Pelton wheel.
Medium Head Power Plants:
Head of water ranges from 80 to 500 meters. The turbine used in such plants is Francis turbine.
Low Head Power Plants:
Head of water ranges from 1.5 to 80 metres. The turbine used in such plants is Kaplan turbine
and Francis turbine.
Advantages Of Hydel Power Plant:
1. Water is a renewable energy source.
2. Maintenance and operation charges are very low.
3. The efficiency of the plant does not change with age.
4. In addition to power generation, hydro-electric power plants are also useful for flood
control, irrigation purposes, fishery and recreation.
5. Have a longer life(100 to 125 years) as they operate at atmospheric temperature.
6. Water stored in the hydro-electric power plants can also be used for domestic water
supply.
7. Since hydro-electric power plants run at low speeds(300 to 400 rpm) there is no
requirement of special alloy steel construction materials or specialised mechanical
maintenance.
DisadvantagesOfHydel PowerPlant :
1. The initial cost of the plant is very high.
2. Since they are located far away from the load centre, cost of transmission lines and
transmission losses will be more.
3. During drought season the power production may be reduced or even stopped due to
insufficient water in the reservoir.
4. Water in the reservoir is lost by evaporation.
Comments:
1. It is very important remember that the work also components of Hydropower plant.
2. We learn about power plant Turbines.
3. Very good experience in this procedure.
To study working of each component of hydro power plant?

More Related Content

What's hot

Hydroelectric Power
Hydroelectric PowerHydroelectric Power
Hydroelectric Powertudorgeog
 
Ventilating systems for electrical machines
Ventilating systems for electrical machinesVentilating systems for electrical machines
Ventilating systems for electrical machines
Praveen Kumar
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Pradeep Yadav
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power Plant
Paramjeet Singh Jamwal
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
snelkoli
 
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Ryan Triadhitama
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Pradeep Yadav
 
HYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANTHYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANT
Kiranmoy Samanta
 
Functions and performance requirements of excitation systems
Functions and performance requirements of excitation systemsFunctions and performance requirements of excitation systems
Functions and performance requirements of excitation systems
Rajshekar Naregal
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
pranavn007
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
Prashant Arora
 
HYDROELECTRIC POWER
HYDROELECTRIC POWERHYDROELECTRIC POWER
HYDROELECTRIC POWER
Pankaj Thakur
 
Hydroelectric power plant
Hydroelectric power plant Hydroelectric power plant
Hydroelectric power plant
Ravindra Kolhe
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant
Hussan Sheikh
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantDr. Ramesh B
 
Synchronous generator
Synchronous generatorSynchronous generator
Synchronous generator
Power System Operation
 
Single phase compensated motor
Single phase compensated motorSingle phase compensated motor
Single phase compensated motor
SayanSarkar55
 
Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT) Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT)
Jay Sonar
 
Chapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power PlantsChapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power Plants
Yimam Alemu
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generation
Maharishi Tiwari
 

What's hot (20)

Hydroelectric Power
Hydroelectric PowerHydroelectric Power
Hydroelectric Power
 
Ventilating systems for electrical machines
Ventilating systems for electrical machinesVentilating systems for electrical machines
Ventilating systems for electrical machines
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power Plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)Hydroelectric Power Plant (and Pumped Storage Power Plant)
Hydroelectric Power Plant (and Pumped Storage Power Plant)
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
HYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANTHYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANT
 
Functions and performance requirements of excitation systems
Functions and performance requirements of excitation systemsFunctions and performance requirements of excitation systems
Functions and performance requirements of excitation systems
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
HYDROELECTRIC POWER
HYDROELECTRIC POWERHYDROELECTRIC POWER
HYDROELECTRIC POWER
 
Hydroelectric power plant
Hydroelectric power plant Hydroelectric power plant
Hydroelectric power plant
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Synchronous generator
Synchronous generatorSynchronous generator
Synchronous generator
 
Single phase compensated motor
Single phase compensated motorSingle phase compensated motor
Single phase compensated motor
 
Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT) Wind Power Plant Presentation (Seminar PPT)
Wind Power Plant Presentation (Seminar PPT)
 
Chapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power PlantsChapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power Plants
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generation
 

Similar to To study working of each component of hydro power plant?

Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.
Salman Jailani
 
Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.
Salman Jailani
 
Naveen
NaveenNaveen
Naveen
vinayvickky
 
Chapter one-Introduction to Hydroelectric power plant
Chapter one-Introduction to Hydroelectric power plantChapter one-Introduction to Hydroelectric power plant
Chapter one-Introduction to Hydroelectric power plant
Yimam Alemu
 
Hydroelectric powerplant
Hydroelectric powerplantHydroelectric powerplant
Hydroelectric powerplant
Gurkirat Singh
 
RES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptxRES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptx
Engr umar
 
HS presentation .doc
HS presentation .docHS presentation .doc
HS presentation .doc
EdenBekele5
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
Pratik Diyora
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
MayurjyotiNeog
 
Presentation of hydro power plant
Presentation of hydro power plantPresentation of hydro power plant
Presentation of hydro power plant
NazakatHussain15
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecturec3b2a1
 
Hydro power
Hydro powerHydro power
Hydro power
Ibrahim R
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
ram sundar singh
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plant
Ratan Debnath
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
AmitKumar6931
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
snelkoli
 
Malay nces ppt
Malay nces pptMalay nces ppt
Malay nces ppt
9888437802
 
Hydro Energy or Hydro power conversion Technology
Hydro Energy or Hydro power conversion TechnologyHydro Energy or Hydro power conversion Technology
Hydro Energy or Hydro power conversion Technology
Tesfaye Birara
 

Similar to To study working of each component of hydro power plant? (20)

Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.
 
Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.
 
Hydroelectric powerplant
Hydroelectric powerplant Hydroelectric powerplant
Hydroelectric powerplant
 
Naveen
NaveenNaveen
Naveen
 
Chapter one-Introduction to Hydroelectric power plant
Chapter one-Introduction to Hydroelectric power plantChapter one-Introduction to Hydroelectric power plant
Chapter one-Introduction to Hydroelectric power plant
 
Hydroelectric powerplant
Hydroelectric powerplantHydroelectric powerplant
Hydroelectric powerplant
 
RES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptxRES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptx
 
HS presentation .doc
HS presentation .docHS presentation .doc
HS presentation .doc
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
 
Presentation of hydro power plant
Presentation of hydro power plantPresentation of hydro power plant
Presentation of hydro power plant
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
 
Hydro power
Hydro powerHydro power
Hydro power
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plant
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Malay nces ppt
Malay nces pptMalay nces ppt
Malay nces ppt
 
Hydro Energy or Hydro power conversion Technology
Hydro Energy or Hydro power conversion TechnologyHydro Energy or Hydro power conversion Technology
Hydro Energy or Hydro power conversion Technology
 
904787
904787904787
904787
 

More from Salman Jailani

Fan and Blowers
 Fan and Blowers Fan and Blowers
Fan and Blowers
Salman Jailani
 
Insulation and Refractories
 Insulation and Refractories Insulation and Refractories
Insulation and Refractories
Salman Jailani
 
Furnaces
 Furnaces  Furnaces
Furnaces
Salman Jailani
 
Compressed air_system ( chapter complete )
 Compressed air_system  ( chapter complete ) Compressed air_system  ( chapter complete )
Compressed air_system ( chapter complete )
Salman Jailani
 
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
Salman Jailani
 
Boilers and its types systems and boilers water treatment
Boilers and its types systems and boilers water treatment Boilers and its types systems and boilers water treatment
Boilers and its types systems and boilers water treatment
Salman Jailani
 
Global environment concerns
Global environment concernsGlobal environment concerns
Global environment concerns
Salman Jailani
 
Energy Resources and Utilization
Energy Resources  and Utilization Energy Resources  and Utilization
Energy Resources and Utilization
Salman Jailani
 
Energy management
Energy managementEnergy management
Energy management
Salman Jailani
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & audit
Salman Jailani
 
Steam leakage
Steam leakageSteam leakage
Steam leakage
Salman Jailani
 
Lab layout
Lab layoutLab layout
Lab layout
Salman Jailani
 
Lab lay out data
Lab lay out dataLab lay out data
Lab lay out data
Salman Jailani
 
Machining Technology-2 MT-474 (Practical)
Machining Technology-2 MT-474 (Practical)Machining Technology-2 MT-474 (Practical)
Machining Technology-2 MT-474 (Practical)
Salman Jailani
 
Lab report title
Lab report title Lab report title
Lab report title
Salman Jailani
 
Refrigeration and Heat Pump Systems
Refrigeration and Heat Pump SystemsRefrigeration and Heat Pump Systems
Refrigeration and Heat Pump Systems
Salman Jailani
 
Safety Inspections and Sample Safety Inspection.Health and safety training D...
Safety Inspections and Sample Safety Inspection.Health  and safety training D...Safety Inspections and Sample Safety Inspection.Health  and safety training D...
Safety Inspections and Sample Safety Inspection.Health and safety training D...
Salman Jailani
 
Cnc turning
Cnc turning Cnc turning
Cnc turning
Salman Jailani
 
Cnc milling turning
Cnc milling turning Cnc milling turning
Cnc milling turning
Salman Jailani
 
CNC machining centers
CNC machining centersCNC machining centers
CNC machining centers
Salman Jailani
 

More from Salman Jailani (20)

Fan and Blowers
 Fan and Blowers Fan and Blowers
Fan and Blowers
 
Insulation and Refractories
 Insulation and Refractories Insulation and Refractories
Insulation and Refractories
 
Furnaces
 Furnaces  Furnaces
Furnaces
 
Compressed air_system ( chapter complete )
 Compressed air_system  ( chapter complete ) Compressed air_system  ( chapter complete )
Compressed air_system ( chapter complete )
 
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
cooling tower, Factors Affecting Cooling Tower Performance,Efficient System O...
 
Boilers and its types systems and boilers water treatment
Boilers and its types systems and boilers water treatment Boilers and its types systems and boilers water treatment
Boilers and its types systems and boilers water treatment
 
Global environment concerns
Global environment concernsGlobal environment concerns
Global environment concerns
 
Energy Resources and Utilization
Energy Resources  and Utilization Energy Resources  and Utilization
Energy Resources and Utilization
 
Energy management
Energy managementEnergy management
Energy management
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & audit
 
Steam leakage
Steam leakageSteam leakage
Steam leakage
 
Lab layout
Lab layoutLab layout
Lab layout
 
Lab lay out data
Lab lay out dataLab lay out data
Lab lay out data
 
Machining Technology-2 MT-474 (Practical)
Machining Technology-2 MT-474 (Practical)Machining Technology-2 MT-474 (Practical)
Machining Technology-2 MT-474 (Practical)
 
Lab report title
Lab report title Lab report title
Lab report title
 
Refrigeration and Heat Pump Systems
Refrigeration and Heat Pump SystemsRefrigeration and Heat Pump Systems
Refrigeration and Heat Pump Systems
 
Safety Inspections and Sample Safety Inspection.Health and safety training D...
Safety Inspections and Sample Safety Inspection.Health  and safety training D...Safety Inspections and Sample Safety Inspection.Health  and safety training D...
Safety Inspections and Sample Safety Inspection.Health and safety training D...
 
Cnc turning
Cnc turning Cnc turning
Cnc turning
 
Cnc milling turning
Cnc milling turning Cnc milling turning
Cnc milling turning
 
CNC machining centers
CNC machining centersCNC machining centers
CNC machining centers
 

Recently uploaded

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
bhadouriyakaku
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 

Recently uploaded (20)

KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.pptPROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
PROJECT FORMAT FOR EVS AMITY UNIVERSITY GWALIOR.ppt
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 

To study working of each component of hydro power plant?

  • 1. Experiment No.4 Objective: To study working of each component of hydro power plant? Theory: Working: Potential energy is the energy which a substance has due to its position or state. The water behind a dam has potential energy because of its position. The water can fall from this position and exert a force over a distance and therefore do work. In a Hydro-electric power plant the force is used to drive a turbine, which inturn drives the electric generator. Because gravity provides the force which makes the water fall, the energy stored in the water is called gravitational potential energy. Fig 4.1 (Hydropower Plant)
  • 2. Layout Of Hydro Electric PowerPlant: WaterReservoir: In a reservoir the water collected from the catchment area is stored behind a dam. Catchment area gets its water from rain and streams. The level of water surface in the reservoir is called Head water level. Note : Continuous availability of water is a basic necessity for a hydro-electric power plant. Dam : The purpose of the dam is to store the water and to regulate the out going flow of water. The dam helps to store all the incoming water. It also helps to increase the head of the water. In order to generate a required quantity of power it is necessary that a sufficient head is available. Spillway: Excess accumulation of water endangers the stability of dam construction. Also in order to avoid the over flow of water out of the dam especially during rainy seasons spillways are provided. This prevents the rise of water level in the dam.Spillways are passages which allows the excess water to flow to a storage area away from the dam. Gate: A gate is used to regulate or control the flow of water from the dam. Pressure Tunnel: It is a passage that carries water from the reservoir to the surge tank. Surge Tank: A Surge tank is a small reservoir or tank in which the water level rises or falls due to sudden changes in pressure. Purpose of Surge Tank: To serve as a supply tank to the turbine when the water in the pipe is accelerated during increased load conditions and as a storage tank when the water is decelerating during reduced load conditions.To reduce the distance between the free water surface in the dam and the turbine, thereby reducing the water-hammer effect on penstock and also protect the upstream tunnel from high pressure rise.
  • 3. Water-Hammer Effect: The water hammer is defined as the change in pressure rapidly above or below normal pressure caused by sudden change in the rate of water flow through the pipe, according to the demand of prime mover i.e. turbine. Penstock: Penstock is a closed pipe of steel or concrete for supplying water under pressure to the turbine. Inlet Valve : Water from the penstock flows to the turbine through the inlet valve. The valve may be partially closed or open thereby regulating the pressure of water flowing to the turbine. Hydraulic Turbine(Prime Mover) : The hydraulic turbine converts the energy of water into mechanical energy. The mechanical energy(rotation) available on the turbine shaft is coupled to the shaft of an electric generator and electricity is produced. The water after performing the work on turbine blades is discharged through the draft tube.The prime movers which are in common use are Pelton wheel, Francis turbine and Kaplan turbine. Draft Tube: It is connected to the outlet of the turbine.It allows the turbine to be placed above the tail water level. Tail Water Level or Tail Race: Tail water level is the water level after the discharge from the turbine. The discharged water is sent to the river, thus the level of the river is the tail water level. Electric Generator, Step-Up Transformer And Pylon: As the water rushes through the turbine, it spins the turbine shaft, which is coupled to the electric generator. The generator has a rotating electromagnet called a rotor and a stationary part called a stator. The rotor creates a magnetic field that produces an electric charge in the stator. The charge is transmitted as electricity. The step-up transformer increases the voltage of the current coming from the stator. The electricity is distributed through power lines also called as pylon.
  • 4. Classification of Hydro Electric Power Plants: Hydro –electric power plants are usually classified according to the available head of water. High Head Power Plants: Head of water is more than 500 meters. The turbine used in such plants is Pelton wheel. Medium Head Power Plants: Head of water ranges from 80 to 500 meters. The turbine used in such plants is Francis turbine. Low Head Power Plants: Head of water ranges from 1.5 to 80 metres. The turbine used in such plants is Kaplan turbine and Francis turbine. Advantages Of Hydel Power Plant: 1. Water is a renewable energy source. 2. Maintenance and operation charges are very low. 3. The efficiency of the plant does not change with age. 4. In addition to power generation, hydro-electric power plants are also useful for flood control, irrigation purposes, fishery and recreation. 5. Have a longer life(100 to 125 years) as they operate at atmospheric temperature. 6. Water stored in the hydro-electric power plants can also be used for domestic water supply. 7. Since hydro-electric power plants run at low speeds(300 to 400 rpm) there is no requirement of special alloy steel construction materials or specialised mechanical maintenance. DisadvantagesOfHydel PowerPlant : 1. The initial cost of the plant is very high. 2. Since they are located far away from the load centre, cost of transmission lines and transmission losses will be more. 3. During drought season the power production may be reduced or even stopped due to insufficient water in the reservoir. 4. Water in the reservoir is lost by evaporation. Comments: 1. It is very important remember that the work also components of Hydropower plant. 2. We learn about power plant Turbines. 3. Very good experience in this procedure.