A power station in which potential or kinetic
energy of water is converted into into electrical
energy are called hydro-electric power stations.
1.Catchment area: The surrounding area of a hydro-electric power plant from where
water is collected into its reservoir is called catchment area.
2. Reservoir : A large storage rank is called a reservoir. A reservoir may be a natural lake
or an artificial one. Artificial reservoirs are made by constructing one, two or more dams
across flowing streams.
3. Dam : A strong wall with large base, behind which water s stored is called a dam.
A dam, according to its structural material, may be masonry dam, rock filled dam or
earthen dam. It Performs two functions :-
(a) It creates the necessary water head and
(b) Stores water in the reservoir.
4. Spillway: The ways or passages for water to be released from the dam, when water
increases beyond its safe level are called spillways.
5. Valve House: The cabin in which controls are kept to operate the valves of the sluice
gales of the penstock is called value house.
6. Surge Tank : An open tank connected to the penstock which regulates water
supply through the penstock or suppresses the water hammerage is called surge tank.
7. Rack: At the entrance of the tunnel racks are provided to prevent the ingress of
floating and other materials to the turbine. Racks arc built up from long flat bars
placed vertically. The space between the bars varies from 40 mm to 200 mm in
accordance with the minimum width of water passage through the turbine.
8. Penstocks : Huge steel or reinforced steel pipes that carry large quantity of water
from valve house go the scroll case of the turbines are called penstocks.
9. Water Turbines (Prime Movers) : A device or machine that converts the
hydraulic energy of water,(potential and kinetic energy) into mechanical energy
(rotatory motion) is called a water turbine or water wheel.
10. Draft tube: It is an air tight pipe of suitable diameter. It is connected at the
bottom of the scroll case of the turbine and provides outlet for the water coming from
the rotor (wheel). Draft tube discharges water in the tail race. It is provided in the
power plants to increase the head acting on the water turbine.
11. Tail race: Draft tube discharges water in the tail race, which may lead it to the
same stream or to another.
12. Alternator: An alternator is coupled to the turbine, which converts mechanical
energy into electrical energy. The alternators employed in these power plants are of
salient pole type, operating at slow speeds.
13. Control room : In the control room all the controlling equipment, protective
devices, indicating instruments etc. Are placed on the panels.
14. Switch yard : The Open place where various electrical equipment like
transformers (step up) circuit breakers, CTs, PTs etc. are installed is known as switch
yard.
As no fuel is used in this case, so there are no charges of fuel and transportation.
Operating cost is low, as fewer highly skilled engineers and operators are required at
the time of operation.
 Low maintenance cost, as the auxiliary plant is considerably smaller in size.
 As these stations are situated away from the developed areas, therefore, cost of land is
negligibly small.
 High efficiency (80 to 90%), as the stand by losses are very low.
 It is very near and clean plant, as no smoke, dust or ash is produced.
 It can be put into service instantly.
 These plants have long life.
 Very acute governing is possible with turbines, therefore, these plants have constant
speed or frequency.
 These plants, in addition to generation of electrical energy also serve other purposes
such as Irrigation, flood control etc.
These plants should be installed where adequate quantity of water is available.
The wide variation of rainfall during the year makes it necessary to store water for
continuous power generation throughout the year therefore the reserve work should
have huge capacity and large catchment area.
Water collected behind the dam must have sufficient head to deliver adequate
potential energy.
The land should be very strong to withstand the weight of dam, building and heavy
machinery.
Adequate transportation facilities must be available or there should be possibility of
providing the same to transport heavy machinery and building materials.
The site selected should be such that at the time of construction there must be
possibility of stream diversion.
On the basis of operating head, hydro-electric power stations may be
classified as;
(i) Low head p4wcr stations.
(ii) Medium head power stations.
(iii) High head power stations.
Low head hydro-electric
power stations: The simple
layout of a low head power
station is shown in fig. Mostly
in this case a dam is constructed
across the river or stream and a
fall is created. Since the head is
quite low, large quantity of
water is required for a specific
power output. Therefore, the
penstocks of larger diameter and
shorter lengths are used. As said
earlier, in low head power
stations kaplan turbines
(reaction turbines) are
employed. The generators
employed are of salient pole
type, low speed and larger
diameter.
Medium head hydro-electric power stations: A medium-head power station is
shown in fig. Depending upon the head, the characteristics of medium head power
station may be either of high head or of low head power stations. Mostly in medium
head power stations horizontal shaft francis turbines (reaction turbines) are employed.
However, if the head is quite low kaplan turbines may be employed and if the head is
quite high pelton wheels may be employed.
High head hydro-electric power
stations: The layout of high head power
station is shown in fig 20. In this case, dam
is constructed to close down the valley
which forms a reservoir for storage of
water. Since the head is quite high, small
quantity of water is required for a specific
power output, therefore, the penstocks of
small diameter and longer lengths are
required. A surge tank is constructed to
reduce the effect of water hammerage on
the penstocks in case of sudden closing or
opening of sluice gates of the water
turbines. As said earlier, in these power
stations pelton wheels (impulse turbines)
are employed. The generators employed are
of comparatively high speed and small
diameter having non-salient pole type rotor.
BY:- GURKIRAT SINGH

More Related Content

What's hot

Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Shaik Afzal
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
ram sundar singh
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Aniket Raj
 
PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANTNilanjana Sen
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Pradeep Yadav
 
Hydroelectric power plants
Hydroelectric power plantsHydroelectric power plants
Hydroelectric power plants
gosia
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Naveed Ahmed
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
Vignesh Sekar
 
HYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANTHYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANT
Kiranmoy Samanta
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
Nishkam Dhiman
 
Hydro electric power plant ppt
Hydro electric power plant pptHydro electric power plant ppt
Hydro electric power plant ppt
Mohammad Nafey
 
Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.
Salman Jailani
 
Hydro power
Hydro powerHydro power
Hydro power
Ibrahim R
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
SkFarhadHasan
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
tavinav
 
Chapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power PlantsChapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power Plants
Yimam Alemu
 
Hydroelectric power , dam and turbines
Hydroelectric power , dam and turbinesHydroelectric power , dam and turbines
Hydroelectric power , dam and turbines
Zain Ali
 
Hydro-Electric Power
Hydro-Electric PowerHydro-Electric Power
Hydro-Electric Power
GAURAV. H .TANDON
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Vinod Srivastava
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
Pratik Diyora
 

What's hot (20)

Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
 
PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANT
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydroelectric power plants
Hydroelectric power plantsHydroelectric power plants
Hydroelectric power plants
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
 
HYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANTHYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANT
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro electric power plant ppt
Hydro electric power plant pptHydro electric power plant ppt
Hydro electric power plant ppt
 
Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.Calculation Efficiency of 5GW Hydropower Plant.
Calculation Efficiency of 5GW Hydropower Plant.
 
Hydro power
Hydro powerHydro power
Hydro power
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
 
Chapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power PlantsChapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power Plants
 
Hydroelectric power , dam and turbines
Hydroelectric power , dam and turbinesHydroelectric power , dam and turbines
Hydroelectric power , dam and turbines
 
Hydro-Electric Power
Hydro-Electric PowerHydro-Electric Power
Hydro-Electric Power
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
 

Similar to Hydroelectric powerplant

Hydroelectric power Plants.ppt
Hydroelectric power Plants.pptHydroelectric power Plants.ppt
Hydroelectric power Plants.ppt
Farhan573170
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
MayurjyotiNeog
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
hariyenireddy1
 
RES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptxRES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptx
Engr umar
 
Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.
Salman Jailani
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecturec3b2a1
 
Naveen
NaveenNaveen
Naveen
vinayvickky
 
HS presentation .doc
HS presentation .docHS presentation .doc
HS presentation .doc
EdenBekele5
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
Ripuranjan Singh
 
Hydal power plant
Hydal power plantHydal power plant
Hydal power plant
JUNAID SK
 
To study working of each component of hydro power plant?
To study working of each component of hydro power plant?To study working of each component of hydro power plant?
To study working of each component of hydro power plant?
Salman Jailani
 
Malay nces ppt
Malay nces pptMalay nces ppt
Malay nces ppt
9888437802
 
Hydroelctric power u3 pwi
Hydroelctric power  u3 pwiHydroelctric power  u3 pwi
Hydroelctric power u3 pwi
Purushottam Ingle
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
snelkoli
 
HYDROELECTRIC POWER
HYDROELECTRIC POWERHYDROELECTRIC POWER
HYDROELECTRIC POWER
Pankaj Thakur
 
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
WajidMalik27
 
Lecture 20 hydro electric power plant
Lecture 20 hydro electric power plantLecture 20 hydro electric power plant
Lecture 20 hydro electric power plant
Swapnil Gadgune
 
hdro power plant by polayya chintada
 hdro power plant by polayya chintada hdro power plant by polayya chintada
hdro power plant by polayya chintada
POLAYYA CHINTADA
 
NHPC rambi
NHPC rambi NHPC rambi
NHPC rambi
Nitin kumar
 

Similar to Hydroelectric powerplant (20)

Hydroelectric power Plants.ppt
Hydroelectric power Plants.pptHydroelectric power Plants.ppt
Hydroelectric power Plants.ppt
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 
Hydroelectric powerplant
Hydroelectric powerplant Hydroelectric powerplant
Hydroelectric powerplant
 
RES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptxRES Lecture 18 Hydro.pptx
RES Lecture 18 Hydro.pptx
 
Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.Calculation Efficiency of 2GW Hydropower Plant.
Calculation Efficiency of 2GW Hydropower Plant.
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
 
Naveen
NaveenNaveen
Naveen
 
HS presentation .doc
HS presentation .docHS presentation .doc
HS presentation .doc
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydal power plant
Hydal power plantHydal power plant
Hydal power plant
 
To study working of each component of hydro power plant?
To study working of each component of hydro power plant?To study working of each component of hydro power plant?
To study working of each component of hydro power plant?
 
Malay nces ppt
Malay nces pptMalay nces ppt
Malay nces ppt
 
Hydroelctric power u3 pwi
Hydroelctric power  u3 pwiHydroelctric power  u3 pwi
Hydroelctric power u3 pwi
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
HYDROELECTRIC POWER
HYDROELECTRIC POWERHYDROELECTRIC POWER
HYDROELECTRIC POWER
 
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
369353488-Hydropower-PPT-Water-Resources-Engineering.pptx
 
Lecture 20 hydro electric power plant
Lecture 20 hydro electric power plantLecture 20 hydro electric power plant
Lecture 20 hydro electric power plant
 
hdro power plant by polayya chintada
 hdro power plant by polayya chintada hdro power plant by polayya chintada
hdro power plant by polayya chintada
 
NHPC rambi
NHPC rambi NHPC rambi
NHPC rambi
 

More from Gurkirat Singh

Benchmarking
BenchmarkingBenchmarking
Benchmarking
Gurkirat Singh
 
Transformer on no load
Transformer on no loadTransformer on no load
Transformer on no load
Gurkirat Singh
 
Starting method of induction motors
Starting method of induction motorsStarting method of induction motors
Starting method of induction motors
Gurkirat Singh
 
Semiconductor physics electronic devices
Semiconductor physics electronic devicesSemiconductor physics electronic devices
Semiconductor physics electronic devices
Gurkirat Singh
 
Interfacing microprocessor to keyboard and alphanumeric display
Interfacing microprocessor to keyboard and alphanumeric displayInterfacing microprocessor to keyboard and alphanumeric display
Interfacing microprocessor to keyboard and alphanumeric display
Gurkirat Singh
 
Effect of adding poles and zeros in system transfer function
Effect of adding poles and zeros in system transfer functionEffect of adding poles and zeros in system transfer function
Effect of adding poles and zeros in system transfer function
Gurkirat Singh
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plant
Gurkirat Singh
 
Air pollution from power plants
Air pollution from power plantsAir pollution from power plants
Air pollution from power plants
Gurkirat Singh
 
Voltage regulators
Voltage regulatorsVoltage regulators
Voltage regulators
Gurkirat Singh
 
Voltage Regulators ppt
Voltage Regulators pptVoltage Regulators ppt
Voltage Regulators ppt
Gurkirat Singh
 

More from Gurkirat Singh (10)

Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Transformer on no load
Transformer on no loadTransformer on no load
Transformer on no load
 
Starting method of induction motors
Starting method of induction motorsStarting method of induction motors
Starting method of induction motors
 
Semiconductor physics electronic devices
Semiconductor physics electronic devicesSemiconductor physics electronic devices
Semiconductor physics electronic devices
 
Interfacing microprocessor to keyboard and alphanumeric display
Interfacing microprocessor to keyboard and alphanumeric displayInterfacing microprocessor to keyboard and alphanumeric display
Interfacing microprocessor to keyboard and alphanumeric display
 
Effect of adding poles and zeros in system transfer function
Effect of adding poles and zeros in system transfer functionEffect of adding poles and zeros in system transfer function
Effect of adding poles and zeros in system transfer function
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plant
 
Air pollution from power plants
Air pollution from power plantsAir pollution from power plants
Air pollution from power plants
 
Voltage regulators
Voltage regulatorsVoltage regulators
Voltage regulators
 
Voltage Regulators ppt
Voltage Regulators pptVoltage Regulators ppt
Voltage Regulators ppt
 

Recently uploaded

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 

Recently uploaded (20)

Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 

Hydroelectric powerplant

  • 1. HYDROELECTRIC POWER PLANT  BY:- GURKIRAT SINGH
  • 2. A power station in which potential or kinetic energy of water is converted into into electrical energy are called hydro-electric power stations.
  • 3.
  • 4. 1.Catchment area: The surrounding area of a hydro-electric power plant from where water is collected into its reservoir is called catchment area. 2. Reservoir : A large storage rank is called a reservoir. A reservoir may be a natural lake or an artificial one. Artificial reservoirs are made by constructing one, two or more dams across flowing streams. 3. Dam : A strong wall with large base, behind which water s stored is called a dam. A dam, according to its structural material, may be masonry dam, rock filled dam or earthen dam. It Performs two functions :- (a) It creates the necessary water head and (b) Stores water in the reservoir. 4. Spillway: The ways or passages for water to be released from the dam, when water increases beyond its safe level are called spillways. 5. Valve House: The cabin in which controls are kept to operate the valves of the sluice gales of the penstock is called value house.
  • 5. 6. Surge Tank : An open tank connected to the penstock which regulates water supply through the penstock or suppresses the water hammerage is called surge tank. 7. Rack: At the entrance of the tunnel racks are provided to prevent the ingress of floating and other materials to the turbine. Racks arc built up from long flat bars placed vertically. The space between the bars varies from 40 mm to 200 mm in accordance with the minimum width of water passage through the turbine. 8. Penstocks : Huge steel or reinforced steel pipes that carry large quantity of water from valve house go the scroll case of the turbines are called penstocks. 9. Water Turbines (Prime Movers) : A device or machine that converts the hydraulic energy of water,(potential and kinetic energy) into mechanical energy (rotatory motion) is called a water turbine or water wheel. 10. Draft tube: It is an air tight pipe of suitable diameter. It is connected at the bottom of the scroll case of the turbine and provides outlet for the water coming from the rotor (wheel). Draft tube discharges water in the tail race. It is provided in the power plants to increase the head acting on the water turbine.
  • 6. 11. Tail race: Draft tube discharges water in the tail race, which may lead it to the same stream or to another. 12. Alternator: An alternator is coupled to the turbine, which converts mechanical energy into electrical energy. The alternators employed in these power plants are of salient pole type, operating at slow speeds. 13. Control room : In the control room all the controlling equipment, protective devices, indicating instruments etc. Are placed on the panels. 14. Switch yard : The Open place where various electrical equipment like transformers (step up) circuit breakers, CTs, PTs etc. are installed is known as switch yard.
  • 7. As no fuel is used in this case, so there are no charges of fuel and transportation. Operating cost is low, as fewer highly skilled engineers and operators are required at the time of operation.  Low maintenance cost, as the auxiliary plant is considerably smaller in size.  As these stations are situated away from the developed areas, therefore, cost of land is negligibly small.  High efficiency (80 to 90%), as the stand by losses are very low.  It is very near and clean plant, as no smoke, dust or ash is produced.  It can be put into service instantly.  These plants have long life.  Very acute governing is possible with turbines, therefore, these plants have constant speed or frequency.  These plants, in addition to generation of electrical energy also serve other purposes such as Irrigation, flood control etc.
  • 8. These plants should be installed where adequate quantity of water is available. The wide variation of rainfall during the year makes it necessary to store water for continuous power generation throughout the year therefore the reserve work should have huge capacity and large catchment area. Water collected behind the dam must have sufficient head to deliver adequate potential energy. The land should be very strong to withstand the weight of dam, building and heavy machinery. Adequate transportation facilities must be available or there should be possibility of providing the same to transport heavy machinery and building materials. The site selected should be such that at the time of construction there must be possibility of stream diversion.
  • 9. On the basis of operating head, hydro-electric power stations may be classified as; (i) Low head p4wcr stations. (ii) Medium head power stations. (iii) High head power stations.
  • 10. Low head hydro-electric power stations: The simple layout of a low head power station is shown in fig. Mostly in this case a dam is constructed across the river or stream and a fall is created. Since the head is quite low, large quantity of water is required for a specific power output. Therefore, the penstocks of larger diameter and shorter lengths are used. As said earlier, in low head power stations kaplan turbines (reaction turbines) are employed. The generators employed are of salient pole type, low speed and larger diameter.
  • 11. Medium head hydro-electric power stations: A medium-head power station is shown in fig. Depending upon the head, the characteristics of medium head power station may be either of high head or of low head power stations. Mostly in medium head power stations horizontal shaft francis turbines (reaction turbines) are employed. However, if the head is quite low kaplan turbines may be employed and if the head is quite high pelton wheels may be employed.
  • 12. High head hydro-electric power stations: The layout of high head power station is shown in fig 20. In this case, dam is constructed to close down the valley which forms a reservoir for storage of water. Since the head is quite high, small quantity of water is required for a specific power output, therefore, the penstocks of small diameter and longer lengths are required. A surge tank is constructed to reduce the effect of water hammerage on the penstocks in case of sudden closing or opening of sluice gates of the water turbines. As said earlier, in these power stations pelton wheels (impulse turbines) are employed. The generators employed are of comparatively high speed and small diameter having non-salient pole type rotor.