• Balkhash Thermal Power Plant – Coal Fired Boilers
Samsung
Balkhash, Kazakhstan
Balkhash Project
Project involved installation of two new supercritical coal fired boilers.
3. 2016. Responsible for design of auxiliary steam, nitrogen, oxygen, carbon dioxide, and
hydrogen systems.
• City of Ames Power Station – Gas Fired Boilers/Coal Fired Boilers
City of Ames
Ames, IA, USA
Coal to Gas Conversion Project
Project involved conversion of Unit 7&8 boilers from pulverized coal to natural gas.
4. 2014. Part of the bid team that was responsible for winning this project. Traveled to the Owner’s
office and presented the mechanical scope or work and discussed our Company’s capabilities.
5. 2014. Responsible for coordinating multidiscipline preparation and review of the new
combustion equipment specification. Evaluated bids and provided a technical scoring for each
bidder.
6. 2015. Lead mechanical responsible for preparing or coordinating the design of the natural gas
system including P&IDs, demolition, isometric, and control valve sizing. Prepared numerous
studies including a hazardous area evaluation, fire plan, furnace implosion and fan study,
furnace corrosion, and a pulverized coal system layup study. Travelled to the site numerous
times to meet with the Owner, and walkdown the plant to complete the design and identify
interferences. Prepared an installation specification for the mechanical scope of the combustion
equipment and natural gas system. Presented the scope of work to all potential bidders on
behalf of the owner during a kickoff meeting. Evaluated bids and provided a technical
recommendation to the owner.
7. 2015-2016. Lead mechanical responsible for coordinating multidiscipline review of vendor
submittals and transmittal of comments. Provided owner’s engineering support for duration of
project including answering all RFIs during installation.
8. 2014-2016. Responsible for running weekly project team meetings with the owner and vendors.
Prepared and issued meeting agendas prior to each meeting. Responsible for tracking open
action items and ensuring they were resolved in a timely manner. Provided schedule updates
and tracking of manhour charges, which were used to prepare monthly project progress reports
and issued to the owner.
Turbine Controls and Steam Seal Upgrade Project
Project involved converting the Unit 7&8 turbine controls from mechanical hydraulics to electrical hydraulics
and replacement of the original Unit 8 steam seal regulator.
9. 2014. Prepared the mechanical portion of the multidiscipline equipment specification. Evaluated
bids and provided a technical recommendation to the owner.
10. 2014-2015. Responsible for preparing or coordinating the design drawings for the steam seal
work including new P&IDs, demolition, isometric, and support drawings. Travelled to the site
numerous times to meet with the Owner, and walkdown the plant to complete the design and
identify interferences. Prepared an installation specification for the mechanical scope of the
steam seal and turbine controls. Presented the scope of work to all potential bidders on behalf
of the owner during a kickoff meeting. Evaluated bids and provided a technical recommendation
to the owner.
1
11. 2015. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals
and transmittal of comments. Provided owner’s engineering support for duration of project
including answering all RFIs during installation.
Control Room Addition Project
Project involved the addition of a new control room and DCS room structure.
12. 2014-2015. Responsible for coordinating multidiscipline preparation of the design drawings for
the structure including the HVAC and fire protection design. Prepared an equipment and
installation specification of the new building structure. Responsible for coordinating
multidiscipline preparation and review of specification. Presented the scope of work to all
potential bidders on behalf of the owner during a kickoff meeting. Evaluated bids and provided a
technical recommendation to the owner.
13. 2015. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals
and transmittal of comments. Provided owner’s engineering support for duration of project
including answering all RFIs during installation.
• Tracy Power Station – Gas Fired Boilers/Combined Cycle/Simple Cycle
NV Energy
Sparks, NV, USA
Low NOx Burner Replacement Project
Project involved replacement of the 9 existing gas fired boiler burners with new low NOx burners on Unit 3.
14. 2013. Prepared an equipment and installation specification of the new burners. Responsible for
coordinating multidiscipline preparation and review of specification. Evaluated bids and provided
a technical scoring for each bidder.
15. 2014. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals
and transmittal of comments. Provided owner’s engineering support for duration of project.
• Fort Churchill Power Station – Gas Fired Boilers
NV Energy
Yerington, NV, USA
Low NOx Burner Replacement Project
Project involved replacement of the 8 existing boiler burners with new low NOx burners on Units 1 and 2.
16. 2013. Prepared an equipment and installation specification of the new burners. Responsible for
coordinating multidiscipline preparation and review of specification. Evaluated bids and provided
a technical scoring for each bidder.
17. 2013-2014. Lead mechanical responsible for coordinating multidiscipline review of vendor
submittals and transmittal of comments. Provided owner’s engineering support for duration of
project.
• North Valmy Power Station – Coal Fired Boilers
NV Energy
Valmy, NV, USA
Burner Replacement Project
Project involved replacement of the 16 existing boiler burners with new low NOx burners on Unit 2.
18. 2013-2014. Prepared an equipment and installation specification for the new burners.
Responsible for coordinating multidiscipline preparation and review of specification. Evaluated
bids and provided a technical scoring for each bidder.
19. 2014. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals
and transmittal of comments. Provided owner’s engineering support for duration of project.
2
Dry Sorbent Injection Project
Project involved the installation of a dry sorbent injection system to control HCl emissions on Unit 1.
20. 2013. Prepared an equipment and installation specification of the new burners. Responsible for
coordinating multidiscipline preparation and review of specification.
21. 2013-2014. Lead mechanical responsible for coordinating multidiscipline review of vendor
submittals and transmittal of comments. Provided owner’s engineering support for duration of
project.
Tripper Room Project
22. 2013-2014. Prepared a preliminary engineering study of the tripper room dust collection and
provided recommendations for improvements. Responsible for interviewing plant personnel,
corresponding with equipment vendors, reviewing original design documents, and obtaining
operating data.
Bottom Ash Project
Project involved modifications to the existing bottom ash recirculation system including pump replacement,
piping modification, and controls upgrades.
23. 2014. Prepared a preliminary engineering study of the Unit 2 systems and provided
recommendations for improvements. Responsible for interviewing plant personnel,
corresponding with equipment vendors, reviewing original design documents, and obtaining
operating data.
24. 2014. Prepared an equipment and installation specification for the new burners. Responsible for
coordinating multidiscipline preparation and review of specification. Evaluated bids and provided
a technical scoring for each bidder.
• Chuck Lenzie Power Station – Gas Fired Combined Cycle
NV Energy
Apex, NV, USA
Compressed Air Project
Project involved an investigation of an alternate supply of compressed air from an intermediate stage of the
combustion turbine compressor and increasing the compressed air storage capacity.
25. 2012. Prepared a preliminary engineering report that documented the results of the investigation
and provided recommendations for improvements including estimated costs and schedule.
Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing
original design documents, obtaining operating data, and performing calculations.
26. 2012. Prepared calculations and data sheets for additional air receivers. Performed walkdowns
to locate equipment and piping tie-ins.
ACC Cleaning Project
Project involved a modification to the existing air cooled condenser tube cleaning system.
27. 2012. Prepared a preliminary engineering report that evaluated the existing cleaning system
and provided recommendations for improvements including estimated costs and schedule.
Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing
original design documents, obtaining operating data, and performing calculations.
• Harvey Well – Water Well
NV Energy
Apex, NV, USA
Harvey Well Project
Project involved an evaluation of the existing well pump failures.
3
28. 2012. Evaluated existing pump failures and provided recommendations to avoid future issues.
Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing
original design documents, obtaining operating data, and performing calculations. Also prepared
an equipment specification to procure a new well pump.
• Walter M. Higgins Power Station – Gas Fired Combined Cycle
NV Energy
Primm, NV, USA
Condensate Pump Bearing Failure Study
Project involved an investigation of the frequent failure of the bearings on the condensate pumps.
29. 2012. Prepared a preliminary engineering report that documented the results of the investigation
and provided recommendations for improvements including estimated costs and schedule.
Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing
original design documents, obtaining operating data, and performing calculations.
4
SA1
• Fort Churchill Power Station – Gas Fired Boilers
NV Energy
Yerington, NV, USA
Cycling Study
Project involved an evaluation about changing the operating mode of Unit 1&2 from base load to cycling.
30. 2010. Prepared a report that documented the results of the investigation and provided
recommendations including estimated costs and schedule. Responsible for coordinating
multidiscipline review of existing plant systems and obtaining input for consolidation into a final
report. Reviews included interviewing plant personnel, reviewing original design documents,
obtaining operating data, and reviewing service reports.
• North Valmy Power Station – Coal Fired Boilers
NV Energy
Valmy, NV, USA
Demineralized Water Makeup Project
Project involved a preliminary engineering evaluation and detailed engineering/design to replace the
existing mixed bed demineralizers with electro-deionization (EDI) equipment to produce demineralized
water makeup.
31. 2012. Prepared a preliminary engineering evaluation that recommended a scope of work
including estimated costs and schedule. Responsible for interviewing plant personnel,
corresponding with equipment vendors, reviewing original design documents, obtaining
operating data, and performing calculations.
32. 2012-2013. Prepared an equipment specification of the water treatment system equipment.
Responsible for coordinating multidiscipline preparation and review of specification.
Tripper Room Project
Project involved evaluating existing Unit 1&2 vacuum cleaning system, installing a heating system,
providing water to the new dust collectors all located in the tripper room, and evaluating issues with existing
dust collection system.
33. 2010. Lead mechanical responsible for detailed engineering and design to supply water to the
new dust collectors. Prepared pump sizing calculations, equipment/ valve/instrument selections,
and coordination with equipment manufacturer.
34. 2012. Lead engineer coordinating the sizing and specification of unit heaters to provide heat to
the tripper room. Also coordinated the preparation of an installation specification and review of
vendor submittals.
35. 2012. Evaluated existing tripper room vacuum system and provided recommendations for
modifications including a list of suggested components.
Primary Air Fan Noise Project
Project involved an evaluation of high noise levels generated by the Unit 2 primary air fan.
36. 2010. Prepared a preliminary engineering study of Unit and provided recommendations for
improvements. Responsible for interviewing plant personnel, corresponding with equipment
vendors, reviewing original design documents, and obtaining operating data.
Cooling Tower Replacement Project
Project involved replacement of the Unit 1 cooling tower.
37. 2010. Prepared a preliminary engineering study evaluating different cooling tower options
including tower type, cost, location, fill type, material, and orientation.
5
38. 2010-2011. Prepared equipment and installation specifications based on the recommendations
in the previous study. Evaluated bids for supply and installation of equipment.
39. 2012. Witnessed performance test of Unit 1 cooling tower.
Bottom Ash Project
Project involved modifications to the existing bottom ash recirculation system including pump replacement,
piping modification, and controls upgrades.
40. 2011-2012. Lead mechanical responsible for detailed engineering and design to implement the
recommendations in the previous study for Unit 1. Prepared pump sizing calculations,
equipment specifications, valve/instrument selections, and coordination with original system
designer (UCC).
• Cherokee Power Station - Gas Fired Combined Cycle
Xcel Energy
Denver, CO, USA
Site Development Project
Project involved preparing the site of an existing coal fired plant for a future combined cycle plant.
41. 2011-2012. Lead mechanical engineer responsible for modifications to hydrogen, fire protection,
potable water, fuel gas, and compressed air systems. Prepared an installation specification for
the modification scope of work. Evaluated bids and provided a technical recommendation to the
owner.
Synchronous Condenser Project
Project involved retiring an existing coal fired unit and converting the generator to a synchronous
condenser.
42. 2011-2012. Lead mechanical engineer responsible for modifications to the lube oil and cooling
systems.
• Crawford Power Station – Coal Fired Boilers
Midwest Generation
Chicago, IL, USA
Repowering Study
Project involved an evaluation of the requirements and costs to repower the Unit 7 steam turbine generator
with a 2x2x1 combined-cycle power block, consisting of two F-class combustion turbine/HRSG trains.
43. 2010. Prepared a report that documented the results of the investigation and provided
recommendations including estimated costs and schedule. Responsible for coordinating
multidiscipline review of existing plant systems and obtaining input for consolidation into a final
report. Lead mechanical engineer responsible for evaluating all existing plant systems including
condensate, circ water, compressed air, etc. for reuse with the combined cycle plant.
Determined natural gas supply conditions from pipeline company and sized major pieces of new
equipment. Involved with preparation of heat balances, general arrangements, and water
balances
• Powerton Power Station – Coal Fired Boilers
Midwest Generation
Pekin, IL, USA
Auxiliary Boiler Replacement Study
Project involved an evaluation of the requirements and costs to replace the existing auxiliary boiler and
accessories for Unit 5 and Unit 6.
44. 2010. Prepared a report that documented the results of the investigation and provided
recommendations including estimated costs and schedule. Responsible for coordinating
6
multidiscipline review of existing plant systems and obtaining input for consolidation into a final
report. Lead mechanical engineer responsible for preparing aux boiler sizing calculations and
arranging equipment, piping, and ductwork.
7
A3
• North Valmy Power Station – Coal Fired Boilers
NV Energy
Valmy, NV, USA
Cooling Tower Dry Chemical Feed Project
Project involved replacement of the mag ox and soda ash dry chemical feed system on the circulating
water treatment system.
45. 2009-2010. Prepared a preliminary engineering study of the Unit 1&2 systems and provided
recommendations for improvements. Responsible for interviewing plant personnel,
corresponding with equipment vendors, reviewing original design documents, and obtaining
operating data.
46. 2010. Worked directly with sole source supplier to procure replacement equipment and
reviewed vendor submittals.
SCR/FGD Project
Project involved preparing a study for the installation of an SCR on Units 1 and 2 and WFGD on Unit 1.
The evaluation of best available technologies, preliminary sizing, layout, and total project costs were
included in the study.
47. 2009. Responsible for preparation of the study and system layout. Directed other disciplines
(electrical, structural, environmental, design, cost estimating) in providing input to the study.
Bottom Ash Project
Project involved modifications to the existing bottom ash recirculation system including pump replacement,
piping modification, and controls upgrades.
48. 2009. Prepared a preliminary engineering study of the Unit 1&2 systems and provided
recommendations for improvements. Responsible for interviewing plant personnel,
corresponding with equipment vendors, reviewing original design documents, and obtaining
operating data.
• Reid Gardner Power Station – Coal Fired Boilers
NV Energy
Moapa, NV, USA
SCR/FGD Project
Project involved preparing a preliminary engineering study for the installation of an SCR on Units 1-4 and
evaluated the existing sodium-based FGD system. The evaluation of best available technologies,
preliminary sizing, layout, and total project costs were included in the study.
49. 2009. Responsible for preparation of the study and system layout. Directed other disciplines
(electrical, structural, environmental, design, cost estimating) in providing input to the study.
Demineralized Water Makeup Project
Project involved installation of a permanent onsite water treatment system to produce demineralized water
makeup.
50. 2009. Preformed bid evaluation of water treatment system equipment. Prepared installation
specification of water treatment system equipment. Reviewed vendor drawing submittals and
worked with vendors to incorporate drawing comments.
• Riverside Power Station – Gas Fired Combined Cycle
Xcel Energy
Minneapolis, MN, USA
8
Repowering Project
Project involved conversion of existing coal fired plant to a combined cycle plant with two new HRSGs and
CTs.
51. 2006-2009. Prepared system descriptions, equipment specifications, system calculations, bid
evaluations, and system P&IDs. Responsible engineer for the design of the fire protection,
condensate, circulating water intake, and control valves. Reviewed vendor drawing submittals
and worked with vendors to incorporate drawing comments.
52. 2008. Spent seven months at the site as an engineering field liaison between the site and S&L.
Responsible for resolution of construction and start-up questions. Performed field verification
walkdowns of S&L design drawings and came up with alternate designs where necessary.
9
A2
• Big Bend Power Station – Coal Fired Boilers
Tampa Electric
Tampa Bay, FL, USA
SCR Project
Project involved design of an SCR and boiler conversion to balanced draft on Units 1-3.
53. 2006. Responsible for Units 1 and 2 preliminary ID and FD fan sizing and fan study to evaluate
replacement or retrofit options including existing fan/motor modifications, fan/motor
replacement, and control technologies. Performed final fan sizing calculations for Units 1 and 2,
designed turning vanes in new ductwork, and evaluated performance of Unit 3 booster fans.
A1
• Roundup Power Station – Coal Fired Boilers
Bull Mountain Development Co.
Roundup, MT, USA
Roundup Project
Project involved design of a mine-mouth, greenfield coal fired power plant.
54. 2005. Prepared design criteria and P&IDs for all major systems. Preformed preliminary system
design of bottom ash handling/storage and lime unloading/storage systems.
• Bruce Mansfield Power Station – Coal Fired Boilers
First Energy
Shippingport, PA, USA
FOG Project
Project involved design of a forced oxidation gypsum (FOG) system to treat the plant’s FGD waste to
produce sellable gypsum.
55. 2004-2005. Responsible for preparation of system P&IDs. Prepared equipment data sheets for
BOP equipment including pumps, expansion joints, eyewash stations, hoists. Performed
equipment bid evaluations and prepared letters of recommendation.
10

More Related Content

What's hot

Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
Steve Wonnacott
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
resume-garychu
resume-garychuresume-garychu
resume-garychuGary Chu
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins ResumeRusty Adkins
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster WheelerGareth White
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
Muthukumar RajaGounder
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16Edward Ruebling
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONElliott Molnar
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_shailendra kumar
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael Najarian
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
 

What's hot (20)

Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
KallalArunCV_TCS
KallalArunCV_TCSKallalArunCV_TCS
KallalArunCV_TCS
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Roger Berryment Resume 2
Roger Berryment Resume 2Roger Berryment Resume 2
Roger Berryment Resume 2
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster Wheeler
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
abhinav rawat
abhinav rawatabhinav rawat
abhinav rawat
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 

Viewers also liked

Porque elegiste esta carrera linda
Porque elegiste esta carrera lindaPorque elegiste esta carrera linda
Porque elegiste esta carrera linda
camila torres garma
 
Steps for Building a Planned Giving Program
Steps for Building a Planned Giving ProgramSteps for Building a Planned Giving Program
Steps for Building a Planned Giving ProgramJulia Satti Cosentino
 
Medical Tourism Comparison Rates
Medical Tourism Comparison RatesMedical Tourism Comparison Rates
Medical Tourism Comparison Rates
Meditour Team
 
Le banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina Fusco
Le banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina FuscoLe banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina Fusco
Le banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina Fusco
Istituto nazionale di statistica
 
Bail in framework for ukrainian banks bortnikov nov 2016
Bail in framework for ukrainian banks bortnikov nov 2016Bail in framework for ukrainian banks bortnikov nov 2016
Bail in framework for ukrainian banks bortnikov nov 2016
Геннадий Бортников
 
Alimentos de origen mineral
Alimentos de origen mineralAlimentos de origen mineral
Alimentos de origen mineral
Manuel Rodriguez Mercado
 
“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...
“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...
“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...
Istituto nazionale di statistica
 
Role of Panchakarma in the Management of Madhumeha
Role of Panchakarma in the Management of MadhumehaRole of Panchakarma in the Management of Madhumeha
Role of Panchakarma in the Management of Madhumeha
drprashanth
 
Gomaata
GomaataGomaata
Ayurveda simplified
Ayurveda simplifiedAyurveda simplified
Ayurveda simplified
Dr.hemanthkumar manikyam
 
Heat in metal cutting
Heat in metal cuttingHeat in metal cutting
Heat in metal cutting
Karan Prajapati
 
Cad:cam in implant dentistry
Cad:cam in implant dentistryCad:cam in implant dentistry
Cad:cam in implant dentistry
Tsung Yang
 
Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...
Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...
Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...
HimalayaInfoline
 
Understanding Udararoga w.s.r to Jalodara vis-à-vis Ascites
Understanding Udararoga w.s.r to Jalodara vis-à-vis AscitesUnderstanding Udararoga w.s.r to Jalodara vis-à-vis Ascites
Understanding Udararoga w.s.r to Jalodara vis-à-vis Ascites
Dr Amritha Edayilliam
 
International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...
International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...
International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...
Dr Amritha Edayilliam
 
Solar desalination
Solar desalinationSolar desalination
Solar desalination
Working as a Lecturer
 

Viewers also liked (17)

Porque elegiste esta carrera linda
Porque elegiste esta carrera lindaPorque elegiste esta carrera linda
Porque elegiste esta carrera linda
 
Steps for Building a Planned Giving Program
Steps for Building a Planned Giving ProgramSteps for Building a Planned Giving Program
Steps for Building a Planned Giving Program
 
Medical Tourism Comparison Rates
Medical Tourism Comparison RatesMedical Tourism Comparison Rates
Medical Tourism Comparison Rates
 
Le banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina Fusco
Le banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina FuscoLe banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina Fusco
Le banche dati stat: I.Stat e Noi Italia - Luciana Micucci, Valentina Fusco
 
Bail in framework for ukrainian banks bortnikov nov 2016
Bail in framework for ukrainian banks bortnikov nov 2016Bail in framework for ukrainian banks bortnikov nov 2016
Bail in framework for ukrainian banks bortnikov nov 2016
 
Alimentos de origen mineral
Alimentos de origen mineralAlimentos de origen mineral
Alimentos de origen mineral
 
“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...
“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...
“Progetto Statistica@scuola” - Liceo Statale “Eleonora Pimentel Fonseca” - Di...
 
Role of Panchakarma in the Management of Madhumeha
Role of Panchakarma in the Management of MadhumehaRole of Panchakarma in the Management of Madhumeha
Role of Panchakarma in the Management of Madhumeha
 
Gomaata
GomaataGomaata
Gomaata
 
Ayurveda simplified
Ayurveda simplifiedAyurveda simplified
Ayurveda simplified
 
Heat in metal cutting
Heat in metal cuttingHeat in metal cutting
Heat in metal cutting
 
Cad:cam in implant dentistry
Cad:cam in implant dentistryCad:cam in implant dentistry
Cad:cam in implant dentistry
 
Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...
Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...
Management of male infertility - Dr. B.S. Prasad, Pricipal, KLES' BMK Ayurved...
 
Understanding Udararoga w.s.r to Jalodara vis-à-vis Ascites
Understanding Udararoga w.s.r to Jalodara vis-à-vis AscitesUnderstanding Udararoga w.s.r to Jalodara vis-à-vis Ascites
Understanding Udararoga w.s.r to Jalodara vis-à-vis Ascites
 
Vamana ppt dr .p.murali krishna
Vamana ppt  dr .p.murali krishnaVamana ppt  dr .p.murali krishna
Vamana ppt dr .p.murali krishna
 
International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...
International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...
International Ayurvedic Medical Journal (IAMJ - Sep 2016) - An Ayurvedic appr...
 
Solar desalination
Solar desalinationSolar desalination
Solar desalination
 

Similar to Tim Rathsam Work History

LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015Larry Smock
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
yusuf699644
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
JuanMolina846779
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEErik NEILSEN
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)kevin breiter
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
Rushi Pru Dhvi
 

Similar to Tim Rathsam Work History (20)

CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 
Ahmed Elsonbaty Resume Oct_2016
Ahmed Elsonbaty Resume Oct_2016Ahmed Elsonbaty Resume Oct_2016
Ahmed Elsonbaty Resume Oct_2016
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
CV Jalaj Verma
CV Jalaj VermaCV Jalaj Verma
CV Jalaj Verma
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PE
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)Breiter_Kevin_BreiteK_2016 (D)
Breiter_Kevin_BreiteK_2016 (D)
 
vijay cv
vijay cvvijay cv
vijay cv
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 

Tim Rathsam Work History

  • 1. SA2 • Balkhash Thermal Power Plant – Coal Fired Boilers Samsung Balkhash, Kazakhstan Balkhash Project Project involved installation of two new supercritical coal fired boilers. 3. 2016. Responsible for design of auxiliary steam, nitrogen, oxygen, carbon dioxide, and hydrogen systems. • City of Ames Power Station – Gas Fired Boilers/Coal Fired Boilers City of Ames Ames, IA, USA Coal to Gas Conversion Project Project involved conversion of Unit 7&8 boilers from pulverized coal to natural gas. 4. 2014. Part of the bid team that was responsible for winning this project. Traveled to the Owner’s office and presented the mechanical scope or work and discussed our Company’s capabilities. 5. 2014. Responsible for coordinating multidiscipline preparation and review of the new combustion equipment specification. Evaluated bids and provided a technical scoring for each bidder. 6. 2015. Lead mechanical responsible for preparing or coordinating the design of the natural gas system including P&IDs, demolition, isometric, and control valve sizing. Prepared numerous studies including a hazardous area evaluation, fire plan, furnace implosion and fan study, furnace corrosion, and a pulverized coal system layup study. Travelled to the site numerous times to meet with the Owner, and walkdown the plant to complete the design and identify interferences. Prepared an installation specification for the mechanical scope of the combustion equipment and natural gas system. Presented the scope of work to all potential bidders on behalf of the owner during a kickoff meeting. Evaluated bids and provided a technical recommendation to the owner. 7. 2015-2016. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals and transmittal of comments. Provided owner’s engineering support for duration of project including answering all RFIs during installation. 8. 2014-2016. Responsible for running weekly project team meetings with the owner and vendors. Prepared and issued meeting agendas prior to each meeting. Responsible for tracking open action items and ensuring they were resolved in a timely manner. Provided schedule updates and tracking of manhour charges, which were used to prepare monthly project progress reports and issued to the owner. Turbine Controls and Steam Seal Upgrade Project Project involved converting the Unit 7&8 turbine controls from mechanical hydraulics to electrical hydraulics and replacement of the original Unit 8 steam seal regulator. 9. 2014. Prepared the mechanical portion of the multidiscipline equipment specification. Evaluated bids and provided a technical recommendation to the owner. 10. 2014-2015. Responsible for preparing or coordinating the design drawings for the steam seal work including new P&IDs, demolition, isometric, and support drawings. Travelled to the site numerous times to meet with the Owner, and walkdown the plant to complete the design and identify interferences. Prepared an installation specification for the mechanical scope of the steam seal and turbine controls. Presented the scope of work to all potential bidders on behalf of the owner during a kickoff meeting. Evaluated bids and provided a technical recommendation to the owner. 1
  • 2. 11. 2015. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals and transmittal of comments. Provided owner’s engineering support for duration of project including answering all RFIs during installation. Control Room Addition Project Project involved the addition of a new control room and DCS room structure. 12. 2014-2015. Responsible for coordinating multidiscipline preparation of the design drawings for the structure including the HVAC and fire protection design. Prepared an equipment and installation specification of the new building structure. Responsible for coordinating multidiscipline preparation and review of specification. Presented the scope of work to all potential bidders on behalf of the owner during a kickoff meeting. Evaluated bids and provided a technical recommendation to the owner. 13. 2015. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals and transmittal of comments. Provided owner’s engineering support for duration of project including answering all RFIs during installation. • Tracy Power Station – Gas Fired Boilers/Combined Cycle/Simple Cycle NV Energy Sparks, NV, USA Low NOx Burner Replacement Project Project involved replacement of the 9 existing gas fired boiler burners with new low NOx burners on Unit 3. 14. 2013. Prepared an equipment and installation specification of the new burners. Responsible for coordinating multidiscipline preparation and review of specification. Evaluated bids and provided a technical scoring for each bidder. 15. 2014. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals and transmittal of comments. Provided owner’s engineering support for duration of project. • Fort Churchill Power Station – Gas Fired Boilers NV Energy Yerington, NV, USA Low NOx Burner Replacement Project Project involved replacement of the 8 existing boiler burners with new low NOx burners on Units 1 and 2. 16. 2013. Prepared an equipment and installation specification of the new burners. Responsible for coordinating multidiscipline preparation and review of specification. Evaluated bids and provided a technical scoring for each bidder. 17. 2013-2014. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals and transmittal of comments. Provided owner’s engineering support for duration of project. • North Valmy Power Station – Coal Fired Boilers NV Energy Valmy, NV, USA Burner Replacement Project Project involved replacement of the 16 existing boiler burners with new low NOx burners on Unit 2. 18. 2013-2014. Prepared an equipment and installation specification for the new burners. Responsible for coordinating multidiscipline preparation and review of specification. Evaluated bids and provided a technical scoring for each bidder. 19. 2014. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals and transmittal of comments. Provided owner’s engineering support for duration of project. 2
  • 3. Dry Sorbent Injection Project Project involved the installation of a dry sorbent injection system to control HCl emissions on Unit 1. 20. 2013. Prepared an equipment and installation specification of the new burners. Responsible for coordinating multidiscipline preparation and review of specification. 21. 2013-2014. Lead mechanical responsible for coordinating multidiscipline review of vendor submittals and transmittal of comments. Provided owner’s engineering support for duration of project. Tripper Room Project 22. 2013-2014. Prepared a preliminary engineering study of the tripper room dust collection and provided recommendations for improvements. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, and obtaining operating data. Bottom Ash Project Project involved modifications to the existing bottom ash recirculation system including pump replacement, piping modification, and controls upgrades. 23. 2014. Prepared a preliminary engineering study of the Unit 2 systems and provided recommendations for improvements. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, and obtaining operating data. 24. 2014. Prepared an equipment and installation specification for the new burners. Responsible for coordinating multidiscipline preparation and review of specification. Evaluated bids and provided a technical scoring for each bidder. • Chuck Lenzie Power Station – Gas Fired Combined Cycle NV Energy Apex, NV, USA Compressed Air Project Project involved an investigation of an alternate supply of compressed air from an intermediate stage of the combustion turbine compressor and increasing the compressed air storage capacity. 25. 2012. Prepared a preliminary engineering report that documented the results of the investigation and provided recommendations for improvements including estimated costs and schedule. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, obtaining operating data, and performing calculations. 26. 2012. Prepared calculations and data sheets for additional air receivers. Performed walkdowns to locate equipment and piping tie-ins. ACC Cleaning Project Project involved a modification to the existing air cooled condenser tube cleaning system. 27. 2012. Prepared a preliminary engineering report that evaluated the existing cleaning system and provided recommendations for improvements including estimated costs and schedule. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, obtaining operating data, and performing calculations. • Harvey Well – Water Well NV Energy Apex, NV, USA Harvey Well Project Project involved an evaluation of the existing well pump failures. 3
  • 4. 28. 2012. Evaluated existing pump failures and provided recommendations to avoid future issues. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, obtaining operating data, and performing calculations. Also prepared an equipment specification to procure a new well pump. • Walter M. Higgins Power Station – Gas Fired Combined Cycle NV Energy Primm, NV, USA Condensate Pump Bearing Failure Study Project involved an investigation of the frequent failure of the bearings on the condensate pumps. 29. 2012. Prepared a preliminary engineering report that documented the results of the investigation and provided recommendations for improvements including estimated costs and schedule. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, obtaining operating data, and performing calculations. 4
  • 5. SA1 • Fort Churchill Power Station – Gas Fired Boilers NV Energy Yerington, NV, USA Cycling Study Project involved an evaluation about changing the operating mode of Unit 1&2 from base load to cycling. 30. 2010. Prepared a report that documented the results of the investigation and provided recommendations including estimated costs and schedule. Responsible for coordinating multidiscipline review of existing plant systems and obtaining input for consolidation into a final report. Reviews included interviewing plant personnel, reviewing original design documents, obtaining operating data, and reviewing service reports. • North Valmy Power Station – Coal Fired Boilers NV Energy Valmy, NV, USA Demineralized Water Makeup Project Project involved a preliminary engineering evaluation and detailed engineering/design to replace the existing mixed bed demineralizers with electro-deionization (EDI) equipment to produce demineralized water makeup. 31. 2012. Prepared a preliminary engineering evaluation that recommended a scope of work including estimated costs and schedule. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, obtaining operating data, and performing calculations. 32. 2012-2013. Prepared an equipment specification of the water treatment system equipment. Responsible for coordinating multidiscipline preparation and review of specification. Tripper Room Project Project involved evaluating existing Unit 1&2 vacuum cleaning system, installing a heating system, providing water to the new dust collectors all located in the tripper room, and evaluating issues with existing dust collection system. 33. 2010. Lead mechanical responsible for detailed engineering and design to supply water to the new dust collectors. Prepared pump sizing calculations, equipment/ valve/instrument selections, and coordination with equipment manufacturer. 34. 2012. Lead engineer coordinating the sizing and specification of unit heaters to provide heat to the tripper room. Also coordinated the preparation of an installation specification and review of vendor submittals. 35. 2012. Evaluated existing tripper room vacuum system and provided recommendations for modifications including a list of suggested components. Primary Air Fan Noise Project Project involved an evaluation of high noise levels generated by the Unit 2 primary air fan. 36. 2010. Prepared a preliminary engineering study of Unit and provided recommendations for improvements. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, and obtaining operating data. Cooling Tower Replacement Project Project involved replacement of the Unit 1 cooling tower. 37. 2010. Prepared a preliminary engineering study evaluating different cooling tower options including tower type, cost, location, fill type, material, and orientation. 5
  • 6. 38. 2010-2011. Prepared equipment and installation specifications based on the recommendations in the previous study. Evaluated bids for supply and installation of equipment. 39. 2012. Witnessed performance test of Unit 1 cooling tower. Bottom Ash Project Project involved modifications to the existing bottom ash recirculation system including pump replacement, piping modification, and controls upgrades. 40. 2011-2012. Lead mechanical responsible for detailed engineering and design to implement the recommendations in the previous study for Unit 1. Prepared pump sizing calculations, equipment specifications, valve/instrument selections, and coordination with original system designer (UCC). • Cherokee Power Station - Gas Fired Combined Cycle Xcel Energy Denver, CO, USA Site Development Project Project involved preparing the site of an existing coal fired plant for a future combined cycle plant. 41. 2011-2012. Lead mechanical engineer responsible for modifications to hydrogen, fire protection, potable water, fuel gas, and compressed air systems. Prepared an installation specification for the modification scope of work. Evaluated bids and provided a technical recommendation to the owner. Synchronous Condenser Project Project involved retiring an existing coal fired unit and converting the generator to a synchronous condenser. 42. 2011-2012. Lead mechanical engineer responsible for modifications to the lube oil and cooling systems. • Crawford Power Station – Coal Fired Boilers Midwest Generation Chicago, IL, USA Repowering Study Project involved an evaluation of the requirements and costs to repower the Unit 7 steam turbine generator with a 2x2x1 combined-cycle power block, consisting of two F-class combustion turbine/HRSG trains. 43. 2010. Prepared a report that documented the results of the investigation and provided recommendations including estimated costs and schedule. Responsible for coordinating multidiscipline review of existing plant systems and obtaining input for consolidation into a final report. Lead mechanical engineer responsible for evaluating all existing plant systems including condensate, circ water, compressed air, etc. for reuse with the combined cycle plant. Determined natural gas supply conditions from pipeline company and sized major pieces of new equipment. Involved with preparation of heat balances, general arrangements, and water balances • Powerton Power Station – Coal Fired Boilers Midwest Generation Pekin, IL, USA Auxiliary Boiler Replacement Study Project involved an evaluation of the requirements and costs to replace the existing auxiliary boiler and accessories for Unit 5 and Unit 6. 44. 2010. Prepared a report that documented the results of the investigation and provided recommendations including estimated costs and schedule. Responsible for coordinating 6
  • 7. multidiscipline review of existing plant systems and obtaining input for consolidation into a final report. Lead mechanical engineer responsible for preparing aux boiler sizing calculations and arranging equipment, piping, and ductwork. 7
  • 8. A3 • North Valmy Power Station – Coal Fired Boilers NV Energy Valmy, NV, USA Cooling Tower Dry Chemical Feed Project Project involved replacement of the mag ox and soda ash dry chemical feed system on the circulating water treatment system. 45. 2009-2010. Prepared a preliminary engineering study of the Unit 1&2 systems and provided recommendations for improvements. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, and obtaining operating data. 46. 2010. Worked directly with sole source supplier to procure replacement equipment and reviewed vendor submittals. SCR/FGD Project Project involved preparing a study for the installation of an SCR on Units 1 and 2 and WFGD on Unit 1. The evaluation of best available technologies, preliminary sizing, layout, and total project costs were included in the study. 47. 2009. Responsible for preparation of the study and system layout. Directed other disciplines (electrical, structural, environmental, design, cost estimating) in providing input to the study. Bottom Ash Project Project involved modifications to the existing bottom ash recirculation system including pump replacement, piping modification, and controls upgrades. 48. 2009. Prepared a preliminary engineering study of the Unit 1&2 systems and provided recommendations for improvements. Responsible for interviewing plant personnel, corresponding with equipment vendors, reviewing original design documents, and obtaining operating data. • Reid Gardner Power Station – Coal Fired Boilers NV Energy Moapa, NV, USA SCR/FGD Project Project involved preparing a preliminary engineering study for the installation of an SCR on Units 1-4 and evaluated the existing sodium-based FGD system. The evaluation of best available technologies, preliminary sizing, layout, and total project costs were included in the study. 49. 2009. Responsible for preparation of the study and system layout. Directed other disciplines (electrical, structural, environmental, design, cost estimating) in providing input to the study. Demineralized Water Makeup Project Project involved installation of a permanent onsite water treatment system to produce demineralized water makeup. 50. 2009. Preformed bid evaluation of water treatment system equipment. Prepared installation specification of water treatment system equipment. Reviewed vendor drawing submittals and worked with vendors to incorporate drawing comments. • Riverside Power Station – Gas Fired Combined Cycle Xcel Energy Minneapolis, MN, USA 8
  • 9. Repowering Project Project involved conversion of existing coal fired plant to a combined cycle plant with two new HRSGs and CTs. 51. 2006-2009. Prepared system descriptions, equipment specifications, system calculations, bid evaluations, and system P&IDs. Responsible engineer for the design of the fire protection, condensate, circulating water intake, and control valves. Reviewed vendor drawing submittals and worked with vendors to incorporate drawing comments. 52. 2008. Spent seven months at the site as an engineering field liaison between the site and S&L. Responsible for resolution of construction and start-up questions. Performed field verification walkdowns of S&L design drawings and came up with alternate designs where necessary. 9
  • 10. A2 • Big Bend Power Station – Coal Fired Boilers Tampa Electric Tampa Bay, FL, USA SCR Project Project involved design of an SCR and boiler conversion to balanced draft on Units 1-3. 53. 2006. Responsible for Units 1 and 2 preliminary ID and FD fan sizing and fan study to evaluate replacement or retrofit options including existing fan/motor modifications, fan/motor replacement, and control technologies. Performed final fan sizing calculations for Units 1 and 2, designed turning vanes in new ductwork, and evaluated performance of Unit 3 booster fans. A1 • Roundup Power Station – Coal Fired Boilers Bull Mountain Development Co. Roundup, MT, USA Roundup Project Project involved design of a mine-mouth, greenfield coal fired power plant. 54. 2005. Prepared design criteria and P&IDs for all major systems. Preformed preliminary system design of bottom ash handling/storage and lime unloading/storage systems. • Bruce Mansfield Power Station – Coal Fired Boilers First Energy Shippingport, PA, USA FOG Project Project involved design of a forced oxidation gypsum (FOG) system to treat the plant’s FGD waste to produce sellable gypsum. 55. 2004-2005. Responsible for preparation of system P&IDs. Prepared equipment data sheets for BOP equipment including pumps, expansion joints, eyewash stations, hoists. Performed equipment bid evaluations and prepared letters of recommendation. 10