Allwyn Leo Stanley is a mechanical engineer with over 9 years of experience in oil and gas projects in Qatar. He is currently a Project Engineer at Doha Petroleum Construction Company Ltd. (DOPET) where he is responsible for project coordination, cost and budget control, subcontractor management, and ensuring adherence to quality and safety standards on projects. Some of the key projects he has worked on involve shutdown maintenance, EPIC projects, and quality assurance. He is proficient in project planning software like Primavera P6.
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
Dedicated with more than 23 years of experience in construction field (Power, Oil & Gas ) including exclusively 16 years’ experience for Flange management and Hydro testing of cross country Pipeline (CS, DSS, HDPE and GRE), Plant piping & Storage tanks in Oil & Gas industry. Worked as a Piping engineer, Hydro testing coordinator, Hydro-testing engineer, Hydro-testing Superintendent and Pre-commissioning manager. Familiar with International standards (ASME, API, ASTM, ISO & MSS SP) and Aramco standards, Petroleum Development specification, Shell DEP/ERD, Exxon Mobil specifications. Worked with ARAMCO, SHELL, PDO, ENI, EXXON MOBIL, BGC, SOC, RELIANCE, BECHTEL, GS engineering and ESSAR. Solid and extensive knowledge in the analysis on the feasibility in planning for over all Hydro-testing / Pre-commissioning activities.
Chemical Engineer with 40+ years experience in the Oil & Gas sector as an Upstream & Midstream lead process and facilities engineer with both extensive technical and project management knowledge.
2015 was a rough year for hotel data security as numerous major companies reported breaches. The 2016 "Trustwave global security report" reviewed data intrusions from around the world in 2015 to locate trends and identify common weaknesses, sharing the statistics for corporate data breaches with further breakdowns by industry.
Dedicated with more than 23 years of experience in construction field (Power, Oil & Gas ) including exclusively 16 years’ experience for Flange management and Hydro testing of cross country Pipeline (CS, DSS, HDPE and GRE), Plant piping & Storage tanks in Oil & Gas industry. Worked as a Piping engineer, Hydro testing coordinator, Hydro-testing engineer, Hydro-testing Superintendent and Pre-commissioning manager. Familiar with International standards (ASME, API, ASTM, ISO & MSS SP) and Aramco standards, Petroleum Development specification, Shell DEP/ERD, Exxon Mobil specifications. Worked with ARAMCO, SHELL, PDO, ENI, EXXON MOBIL, BGC, SOC, RELIANCE, BECHTEL, GS engineering and ESSAR. Solid and extensive knowledge in the analysis on the feasibility in planning for over all Hydro-testing / Pre-commissioning activities.
Chemical Engineer with 40+ years experience in the Oil & Gas sector as an Upstream & Midstream lead process and facilities engineer with both extensive technical and project management knowledge.
2015 was a rough year for hotel data security as numerous major companies reported breaches. The 2016 "Trustwave global security report" reviewed data intrusions from around the world in 2015 to locate trends and identify common weaknesses, sharing the statistics for corporate data breaches with further breakdowns by industry.
Career Objective
Intend to build a career with a leading organization with committed & dedicated people in a challenging and creative environment. Seeking a promising position that offers both a challenge and a good opportunity for growth and to upgrade skills to serve the company better.
11 years experience in Residential Villa , Precast structures, Petrol compact stations, Water pipe line project, Industrial projects like ( Thermal power plant, Oil & refinery plant). And Material coordinator & procurement, SAP, Piling, sheet piling,
A Competent Mechanical Engineer, seeking middle level assignments in Piping Engineering / Commissioning & Pre-Commissioning with an organisation of repute, preferably in Oil & Gas/ Petrochemicals industry Refinery, Chemical Plants.
1. CURRICULUM VITAE
Allwyn Leo Stanley
Mobile: 00974-33689879
E-mail: allwyn1103@gmail.com
Objective: To be able to work as a planning professional and utilize my skills, experience and
mechanical engineering knowledge in an organization that offers professional growth and to be
recognized as an efficient and competent individual having good interpersonal, technical and
managerial skills.
Dedicated professional with 9 year’s overall experience & 6.10 years in Oil & Gas – Qatar in both
upstream and downstream facilities
Key Skills:
• Project Coordination
• Evaluating Bids of subcontractor
• Cost & budget Control
• Subcontractor Management
• Quantity Surveying
• Project Planning (Primavera P6)
• Project schedule tracking
• Knowledge on piping, steel structure & equipment fabrication & erection.
• Knowledge of maintenance activities involved in static equipments like vessel, column,
heat exchangers, filters, tanks furnaces, heater etc
• Knowledge of estimating resources required for each activity.
Education:
Qualification Major/Courses Board/University Institute
Year of
Passing
Diploma In
Engineering
Mechanical
Engineering
Kerala state board of
technical education
GPTC Meenangadi
Kerala
2007
Higher
Secondary
Education
Science CBSE
EMGHSS Govt
School Fort cochin
2002
Additional qualification
• Completed Certification Courses in Primavera 6 (Project Planning) Conducted by Cochin CADD
Centre, at Kochi.
• Course completion certificate in CATIA5 part modeling of complex shapes and size.
• CNC Part Programming in Turning and Milling course Conducted by Keltron, Kerala.
• Foundation in Mechanical CADD conducted by CADD Centre, Kochi.
• PMP Course completed in 2015-Jan at Chicago Training centre Doha
Industrial Training Details
Page 1 of 8
2. • H2S BA Training
• TBOSIET OPITO Approved
• Permit to Work System (PTW) of different plant operations
EXPERIENCE SUMMARY:
6.10 years of experience in Shutdown projects & EPIC Project, Construction, Shutdown
Management and Quality Assurance and Control in Oil & Gas facilities. Currently designated as
Project Engineer with M/s DOPET, Doha, Qatar. Expertise in managing oil and gas facilities
shutdown and projects in both offshore and onshore facilities.
During this tenure I gained experience in project planning & execution of various project and
shutdown activities & ensuring adherence to Quality and HSE standards.
Work Experience in Qatar (6.10 years)
Years of Work Experience: : 6.10 Years
Current Position : Project Engineer
Company : Doha Petroleum Construction Company Ltd. (DOPET)
Joined : 15-Jan-2009 to Till date
Roles & Responsibilities
• Understand the scope of work/contract in depth including both contractual & pricing terms
• Client Coordination
• Preparing method statements and obtaining its approvals
• Preparing contract agreement between every subcontractors involved in the project
• Effective team member in preparing JHA & risk assessment
• Identifying, planning and mobilizing all required resources, including manpower and
equipment.
• Carry out site survey for all critical lifts involved in the project & preparing rigging study/plan
for execution
• Coordinating piping fabrication works involved in project.
• Organizing the subcontractors and monitoring them during the all phase of shutdown
• Preparing & maintaining necessary documents for scope changes during project execution.
• Supporting estimation team during the tendering period
• Project invoicing & clearing subcontractor invoices
Projects Attended
Designation : Project Engineer
Project :
EPIC For NGL-3 AGRU 1&2 Amine Regenerators And
Associated Equipment Revamp At Mesaieed
Client : QP NGL Gas Operations
Period : Nov-2015 (ongoing)
Page 2 of 8
3. Projects deals with demolition of existing & up gradation works of regenerator column, re-boiler &
its related pipe line works.
Responsibility (Train-1)
• Coordinating coating & insulation works of equipments and its related pipe line
• Make sure permits are available to carry out day to day works
• Resolve any related issues discussing with client and top management.
• Coordinating the filtration works MDEA Amine solution to achieve particle size to acceptable
level.
• Assisting Sr. Project Engineer
Designation : Pre-Commissioning Support Engineer
Project :
Produced Water treatment Plant & Crude Oil Desalter Project
& Halul Island
Client : TOTAL E&P (Offshore)
Period : April-2015 to September-2015
An expansion project by TOTAL so as to reduce the salt content from crude oil Crude Oil Desalter
plant (COD) & Produced Water treatment Plant (PWT) to achieve desired PH level prior to disposal
Responsibility
• To direct the supervisor regarding the priority (as per subsystem priority) works to be focused
• To maintain the piping reinstatement details updated including punch list items
• Worked as punch list coordinator to close the punch items as per system priorities
• Make sure required materials are available to close the punch points & prepare material
request as necessary to close the punch points (Mechanical Punch)
• Inform ICAP administrator once the punch points are closed & to get the ICAP sheets signed
off by client & monitor related punch points are closed from ICAP
• To check the system boundary limits as advised by commissioning engineer & to make sure all
mechanical related activities are completed as per procedure, this mainly includes the piping
reinstatement works and necessary structural works, to check the flow direction on valve
tracking by P&ID & Isometric drawing.
• To maintain a good track of all the work done.
Designation : Project Engineer (offshore)
Project : NFA Shutdown maintenance Works
Client : Qatar Petroleum
Period : December-2014 to April-2015
Project was a major turnaround shutdown works, project dealt with maintenance work of vessel,
columns, heat exchangers, waste heat exchangers, filters, strainers, tanks refurbishment works,
valves LG, LT, etc & piping modification works. Overhauling of 12” MOV using online isolation
method (smart plug technology) inspection activities such as IRIS & intelligent pigging for waste
heat exchangers.
Total 186 equipments.
Page 3 of 8
4. Responsibility
• Understand the scope of work completely
• Carry out site survey & identifying location for storage areas which includes load bearing
scaffolding.
• Site survey for the piping fabrication works
• Coordinating intelligent pigging works including site survey so as to place the equipments and
to prepare necessary temporary arrangements to carry out the work
• Coordinating online isolation works, obtaining past UT reports from client checking the ovality
of the pipe for proper insertion of smart plug tool
• Coordinating main subcontractor activities like scaffolding, insulation & coating works.
• Coordinating with QP operations team for smooth flow of mobilizing both manpower and
equipments.
• Mobilizing the manpower (overseas) as per schedule.
• Project invoicing & clearing subcontractor invoices
Designation : Project Engineer
Project : Shutdown Maintenance Works of FNGLCS Plant Dukhan
Client : Qatar Petroleum
Period : June-November-2014
Project was a major turnaround shutdown works, project dealt with maintenance work of vessel,
pig receiver, launcher, strainers, filters, flare tip removal replacement works overhauling works of
MOV’s valves LG, LT, water bath heater etc. inspection activities such as IRIS for fin fan coolers.
Maintenance works of UPS battery banks & switch gear
Total 56 equipments Plants has three trains (TR-1/2 & Common Train)
Responsibility
• Understand the scope of work completely
• Prepare necessary site infrastructure
• Carry out site survey for all critical lifts involved in the project & preparing rigging study/plan
for execution
• Mobilize required manpower as per approved schedules
• Monitor work progress mainly for big bore valves
• Project invoicing & clearing subcontractor invoices
• Demobilization of resources
Designation : Project Engineer
Project :
Major Turnaround Shutdown works NGL-1,2&4 Plant,
Mesaieed
Client : Qatar Petroleum Gas Operations
Period : November-2011 to March-2014
This was major turnaround shutdown; project value Qatari riyals 110 million & covering 650+
equipments from all the three plants NGL-1, NGL-2 & NGL-4 plants. Project dealt with
maintenance work of vessel, pig receiver, launcher, strainers, filters, columns, furnaces, heaters
re-boilers, exchangers, fin fan coolers LG, LT, LS piping NCR works. Inspection activities such as
Page 4 of 8
5. IRIS, ECT & FTIS for furnace/heater tubes hot oil filtration works, chemical cleaning works,
overhauling works of MOV’s ESDV, maintenance works for UPS battery banks, switch gear &
transformers works .
Responsibility
• Understand the scope of work completely
• Prepare necessary site infrastructure
• Carry out site survey for all critical lifts involved in the project & preparing rigging study/plan
for execution
• Flare tip removal replacement works NGL-4 using 250ton crane & NGL-1 using decanting
method
• Prepare all necessary method statement to carry out the works
• Mobilization of all required resources as per approved schedules
• Coordinating chemical cleaning works hot oil filtration (1um) works FTIS
• Maintain all required document for project invoicing
• Monitoring subcontractor works such as insulation, refractory, painting & scaffolding works.
• Piping works
• Maintaining scope change details.
• Single handily coordinated and invoiced all three project & clearing subcontractor invoices
• Demobilization of resources
Designation : Project Engineer
Project : Shutdown works at QAFCO-2
Client : QAFCO (Qatar Fertilizer Company)
Period : December-2010 to March-2011
Qatar Fertilizer Qafco-2 plant shutdown works scope was distributed as job packs DOPET has done
20 job packs during this shutdown which consist of demolition and erection works of exchangers,
knock out drums associated pipeline works valve overhauling, LT LG overhauling etc.
Responsibility
• Understand the scope of work completely
• Prepare necessary site infrastructure
• Carry out site survey for all critical lifts involved in the project & preparing rigging study/plan
for execution
• Piping fabrication works its structural works and its coating works.
• Equipment mobilization demobilization works.
• Worked as Night shift in charge
Designation : Project Engineer
Project : Shutdown Maintenance Works of FNGLCS Plant Dukhan
Client : Qatar Petroleum
Period : June-November 2010
Project was a major turnaround shutdown works, project dealt with maintenance work of vessel,
pig receiver, launcher, strainers, filters, flare tip removal replacement works overhauling works of
MOV’s valves LG, LT, water bath heater etc. inspection activities such as IRIS for fin fan coolers.
Page 5 of 8
6. Maintenance works of UPS battery banks & switch gear
Total 56 equipments Plants has three trains (TR-1/2 & Common Train)
Responsibility
• Understand the scope of work completely
• Prepare necessary site infrastructure
• Carry out site survey for all critical lifts involved in the project & preparing rigging study/plan
for execution
• Equipment mobilization demobilization works.
Designation : Piping Punch List Coordinator
Project : Olefin Project
Client : ORYX GTL
Period : Jun-Aug-2010
An expansion project so as to minimize the Olefin content.
Responsibility
• To monitor & follow up piping related punch points where cleared and signed off
• To check flow direction of the valves as per P&ID
Designation : Project Engineer (onshore coordination)
Project : NFA Shutdown maintenance Works
Client : Qatar Petroleum
Period : April-2010
Project was a major turnaround shutdown works, project dealt with maintenance work of vessel,
columns, heat exchangers, waste heat exchangers, filters, strainers, tanks refurbishment works,
valves LG, LT, etc & piping modification works.
Responsibility
• Providing offshore logistic support
• Mobilization of equipment and manpower and maintain its record.
Designation : Site Engineer
Project : Manpower Supply Works at QAFCO
Client : QAFCO (Qatar Fertilizer Company)
Period : January-2010 to March-2010
Skilled Manpower supply works for QAFCO 310 personnel of various category
Responsibility
• Coordinating with client of actual requirement of mobilization
• Mobilization of approved manpower from overseas as per mobilization schedule
• Maintain daily time track record
• Arrange necessary plant safety training
• Arranging logistics
Page 6 of 8
7. Designation : Jr. Engineer (off-site coordination)
Project :
Turnaround major shutdown at QP refinery (Two phases – 2
S/D)
Client : Qatar Petroleum
Period : April 2009-November 2010
Responsibility
• Providing onshore logistic support
• Mobilization of equipment and manpower and maintain its record.
• Mobilization of specialized vendors for valves, expansion bellows, UPS, battery banks etc.
Experience In India (2.9 years)
Designation : Assistant Engineer
Company : Maksel Engineers PVT LTD.
Period : May-2007 to December-2008
Responsibilities :
Assist in Supervising & coordinating the work activities as
assigned by Sr. Engineer.
Requisitions components and supplies for engineering
projects, interacting with vendors to obtain price and
product information.
Preparing Daily Reports & Monitoring the progress.
Follow up with subcontractors.
Designation : CNC Machine operator
Company : M/S Tooling Research Co., Edapally, Kochi
Period : March 2006 to February 2007
Responsibilities :
Attained experience in Part Programming
Operation in Milling and Turning
PERSONAL DETAILS:
Name : Allwyn Leo Stanley
DOB : 16-May-1984
Gender : Male
Marital Status : Married
Nationality : Indian
Languages Known : English, Hindi, Malayalam & Tamil
Permanent Address :
Evelyn villa Puthen Purackal (H) 17/1340 Mundamveli PO
Cochin 682507 Kerala India
PASSPORT DETAILS
Page 7 of 8
8. Passport No. : J-5794405
Place of Issue : Cochin
Date of Expiry : 19-June-2021
DECLARATION:
I hereby declare that the details furnished above are true to the best of my knowledge and
belief.