Having 20+ experience in both Onshore and Offshore Oil & Gas, Petrochemicals, Fertilizer, Power Plants and Shutdown projects to develop the data/package such as Scheduling, Progress Measurements systems, reporting and trending and risk assessment for planning and project control. Also having well exposure in Earned Value Analysis, Costing, Budgeting, Risk Management, Fornesic delay analysis and EOT Claims
Planning engineer cv with 9 yrs experience(1)S Ajith
I am having overall 9 years experience into project planning also i am expert in Project planning,scheduling,monitoring, cost controlling ,preparing master programe ,resource planning ,EOT , Project Invoice claiming ,tender packages(Experienced in Commercial, Highraise building, Infra projects and Oil & gas), Software expert in primavera p6.8.3, MS Office project, MS.Excel, 3D google sketchup, Autocad, 3DX Max etc, also i am available to join immediately.
Thanking you,
Thanks Regards,
S.Ajith,
Mob :UAE :+971-0527442745
:INDIA :+91-9994437210
Planning engineer cv with 9 yrs experience(1)S Ajith
I am having overall 9 years experience into project planning also i am expert in Project planning,scheduling,monitoring, cost controlling ,preparing master programe ,resource planning ,EOT , Project Invoice claiming ,tender packages(Experienced in Commercial, Highraise building, Infra projects and Oil & gas), Software expert in primavera p6.8.3, MS Office project, MS.Excel, 3D google sketchup, Autocad, 3DX Max etc, also i am available to join immediately.
Thanking you,
Thanks Regards,
S.Ajith,
Mob :UAE :+971-0527442745
:INDIA :+91-9994437210
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.
Senior Supervisor Piping & Mechanical
Piping &Pipe Line Fabrication/Erection&/ Hydro test /Mechanical Completion Pre-Commissioning
I have around17+, years ‘work experience I have done three years diploma inMechanical engineering,
I have worked as a Piping supervisor in Oil, Gas, power plant & Petro-chemical.
Dear Sir/Madam,
I am Anas M. H, a Mechanical Engineer by qualification working in Cochin Shipyard Limited INDIA as Piping Engineer. I have more than 6 years of experience in Ship Building & Ship Repair.I had 3 months work Experience in DRYDOCKS WORLD DUBAI.Due to some health problems,I resigned from there..
I am looking forward to the next challenge that draws on my professional experience. Attached herewith is my resume for your kind reference. If my qualification and experience suits for any vacancy in your reputed organization, kindly arrange for a face to face or phone in interview.
Looking forward to hear from you soon in this regard.
Thanks & Best regards,
Anas M. H
Skype ID: anasmanganattu1@skype.com
INDIA:+919747265577,+919037066990
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
Result-oriented with a fast-learning curve and an ability to take calculated risks, defining business mission and integrating resource strengths to deliver impeccable performances aligned to overall objectives .A dynamic professional offering over 15 years in the field of Site Supervisory position for (Pipeline), Erection in Pipeline, in Oil & Gas, Refinery, Petrochemicals, & Power Plant in Saudi Arabia, U.A.E, Kuwait & India for Various Eng. Construction Projects.
Over 23 years of' experience as Planning / Contracts / Project Engineer & Manager, Oil & Gas onshore & Offshore projects. predominantly in EPC Projects Planning and Project Management, includes engineering (Basic, FEED and Detailed), Procurement and Construction
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSEDuvanRamosGarzon1
AIRCRAFT GENERAL
The Single Aisle is the most advanced family aircraft in service today, with fly-by-wire flight controls.
The A318, A319, A320 and A321 are twin-engine subsonic medium range aircraft.
The family offers a choice of engines
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
1. S. SANKARASUBRAMANIAN
Contact: +97455273966, +974 44622538, +914522373401 (India)
E-mail: sansuresh2000@yahoo.com
JOB OBJECTIVE
Seeking assignments in Project Scheduling & Planning/Project Control with an organisation of repute preferably in Gulf
regions
PROFILE SUMMARY
An astute professional with 20 years of experience of which 4 years team leader role in:
Project Scheduling & Planning Cost Estimation Budgeting Change Order Management
Risk Management Claims Reporting and Trending Subcontract Management
Proficiency in CPM, Resource levelling, Schedule compression and Earned Value Management.
Well versed in Planning function of project controls for Green field and Brown field of Oil & Gas, Petrochemical,
Fertilizers, Air Separation Plants, Power & Desalination Plants, Pipe Line, Substation, HVAC, MEP and Shutdown
projects involving all phases in a project life-cycle – Engineering (Detailed), Procurement, Fabrication, Installation,
Testing, Mechanical Completion, Hook up and Commissioning.
Skilled in preparation of:
- Planning packages for EPIC projects which includes Level1, Level2 and Level3 Schedules, Resource
histograms and S-Curves.
- Proposal schedules for EPC and construction bids.
- Close up reports with lesson learned from the assigned project.
Experienced in Project Risk Management which includes identify risks, prepare risk response plan, monitor and control
known and unknown risks.
Proficient in scheduling software: Primavera Version (3.1, 5, 6, 7, 7.2 & 8) and MS-Project.
Proficient in handling operations and accountable for timely completion of the projects
An effective communicator with excellent analytical and negotiation skills
CORE COMPETENCIES
Thorough understanding of contract, scope of work, estimation and procurement plan for assigned projects.
Develop WBS, project coding system and definition of work packages.
Develop Master schedule with logical sequence and interface milestones.
Monitor the schedule and report activity progress. Publish schedule update which includes narrative, tabular reports
and recommend remedial action.
Finalise progress measurement philosophy to develop the progress S-curve to monitor Plan Vs. Actual progress
Prepare look ahead schedules to ensure timely completion of scheduled activities
Prepare schedules for projects involving different phase which includes construction phases schedule,
system/subsystem schedule, commissioning schedule and start-up schedule.
Analysis of current and potential areas of concern, progress variance, productivity and forecast trends
Develop multi-level CPM schedule for all phase of projects.
Participate in higher management progress review meetings.
Analyse variances between project baseline dates and current forecast dates. Raise flag to project management about
risk and opportunities.
Prepare Weekly/Monthly progress reports and monthly management presentation highlighting achievements and
areas of concerns.
Tracking of Invoice register and Subcontract payment register.
Follow up procurement activities which includes co-ordinate with supplier for timely delivery of materials.
Prepare internal and external cost report which includes analysis of budget vs. actual cost variance, cost FAC, risk and
opportunities with respect to the budget and revenue.
Administering construction team and subcontractor to facilitate smooth project progress and expediting the project
schedule. Conduct the Project planning and progress review meetings with Leads / Discipline engineers for discussing
critical activities / constraints.
Identify variations to original scope of work to maximise the project revenue.
Implement procedures for managing Project Control work.
Cost loading and monitoring of cash flow & project progress using SPI, CPI and Earned Value Analysis
Prepare detailed documentation for extension of time (EOT) for the project. Good proficiency in Time Impact Analysis
and Impacted As Planned.
Assuring the strategic utilization & deployment of available resources to achieve organizational objectives
Executing cost saving techniques / measures and modifications to achieve substantial reduction in O&M expenditures
and work within the budget
2. Effectively leading a team of Planning engineers, Cost engineers and QS to align them to the Corporate Project Control
requirements
NOTEWORTHY ACCOLADES ACROSS THE CAREER
Distinction of receiving:
- The Certificate of Recognition for an important part of the team showing by commitment and hardworking in
supporting Jetty‐Boil off Gas Recovery Project
- Certificte of Appreciation awarded to the excellent contribution to the construction, completion of the
mechanical, piping and civil scope of the Jetty‐Boil off Gas Recovery Project
- Certificate for attending the Team Building "Pipe Rack and Compressor Management Workshop" for Jetty‐Boil
off Gas Recovery Project
- Certiciate of Appreciation for personal commitment to the JBOG Safety which led to the Project achieving 15
million work hours without a Lost Time Incident.
Distinction of getting selected by Qcon due to:
- Good skills in Primavera software for attending the Primavera Enterprise Version 5 & 7 on Company expense
- Good project management skill for attending the Advanced Project Management: Cost Engineering and Cost
Management course on Company expense
Made an effective use of Primavera and project management skills and was able to complete two projects on time
due to proper resource levelling on primavera Company has been able to complete the project within the budget
ORGANISATIONAL EXPERIENCE
Since Apr’15 Qatar Fertiliser Company, Qatar as Senior Planning Engineer
Role:
Project: Ammonia 1 & 2 Revamp and New Plant Option - QAFCO 7
Serving as a Senior planning engineer for FEED phase and EPCC project tendering and bidding phase for Ammonia.
Prepare preliminary schedule and establish key dates for Feed phase, Tendering phase and Execution phase
Provide Input to ITB package preparation and bid evaluation.
Participate in bid evaluation and analyse contractor plant to support award recommendation.
Prepare input to monthly reports.
Review and analyse of bidders planning package (schedules, critical path, resources and planning & progress procedures)
and prepare bid evaluation report.
Provide scheduling input to decision gate reviews.
Project Risk Register administration for risk and opportunities.
Liaise with Cost Control within project team to prepare budget for all phases (FEED, tendering and execution phase) and
prepare monthly provisions.
Monitor and Analyse FEED contractor’s progress report and schedule to identify potential slippages and provide
mitigation actions.
Verify FEED contractors’ claimed monthly progress against invoices and variation orders.
Jun’05 - Mar’15 Qatar Engineering and Construction Company, Qatar as Senior Planning Engineer
Client & Owner: Qatar Gas and Fluor
Role:
Serving as Project Control Lead and heading a team of 10 members of planners, civil & mechanical QS and cost
control engineers
Carried out Time Impact Analysis and Impacted As Planned for Extension to the time for Completion of Work for
Jetty Boil Off Gas Recovery Project of claim worth 50 mn USD
Period: Since Mar’11
Title: Jetty Boil-Off Gas Recovery Project
Scope: Offplot & CCA – Civil, Mechanical and Structural and Piping works
Off Plot:
It involved all civil work like sleepers, pipe foundations, thrust boring and removal of armour rock, piping - 20 km of
sleeper piping size of 60”, 48”, 34” & 30” and scope involved in rolling pre commissioning, commissioning, RFSU and
performance test
On Plot (Central Compressor Area):
It comprised of all civil work includes major compressor foundations, precast pipe racks, paving and trench works
It involved 3 Nos. substation (132/33 KV/11KV) civil and concrete works and construction of precast pipe rack.
Installation of HP, MP and LP compressors and associated lube oil skids and coolers. Fabrication and Erection of 20
km of pipe rack and compressors piping. Scope includes also roll in testing, pre-commissioning, commissioning, RFSU
and upto Performance test
3. Client: Qatar Petroleum
Nature of Project: June’10 – Feb’11
Description:
The project dealt with EPIC of low pressure associated gas compressor and related civil, mechanical, E&I work at Halul
Offshore its scope included E&P of LP compressor and associated civil, mechanical and E&I works and Installation,
pre-commissioning and commissioning of LP compressor at QP’s Halul offshore facility
Client: Qatar Fertilisers Company
Nature of Project: Sep’06 – May’10
Project Description:
The 60,000 TPD Melamine EPC project consists of Complete Construction of new Melamine Plant, and Revamp of the
existing Urea-1 Plant, including all the interconnecting piping and structures between and within the two plants. This
includes detail civil and structural engineering, procurement of structural steel and Construction of warehouse,
132KV/33KV/11KV substation (control building) including all related MEP services/Electrical and Instrumentation
works. The project also includes installation and erection of new equipment, machinery, piping and steel structures at
Urea-1 plant which will be divided into two phases online and shutdown. Scope also includes roll in
precommissioning, commissioning and upto performance test. This project involved all disciplines
(Civil/Mechanical/Electrical/Instrumentation).
Client: RAS GAS
Contractor: IHI & MHI, Japan
Description:
The project comprised of construction activity in LNG Tank 4, 5 and 6 including all piping and steel structures
installation and E&I related to tanks during Jun2005-Oct2006
Dec’02 – Jun’05 Belleli Energy S.P.A, (The Hanover Company Mantova), Italy as Planner
Client: Oryx-GTL Qatar
Main Contractor: Technip SPA, Italy
Description:
The GTL project involved Erection of Heavy Steel Structure at Ras Laffan Industrial City, Qatar
Client: RAS Laffan Power Company
Main Contractor: Enel Power SPA, Italy
Description:
The project dealt with fabrication and installation of Boiler Piping like AS, CS, SS and GRP, Installation of Equipments
(Tanks and Pumps), Supply and Installation of Steel Structure and Supports at Ras Laffan Industrial City, Qatar during
2003-2005
Client: RAS Laffan Power Company
Main Contractor: Fisia Italimpianti – Group Impregilo, Italy
Description:
The project involved construction and installation of evaporator – 4 nos. installation of Brine Heaters, Steel Structures
and Auxiliary Platforms at Ras Laffan Industrial City, Qatar, during 2002-2003
Oct’01 – Nov’02 Engineering Maintenance Company (A Division of ETA-Ascon Group of Companies, Dubai)
as Planning Engineer
May’96 – May’01 NEO Structo Construction Limited, Surat, Gujarat as Planning Engineer
EDUCATION
B.Sc. Applied Sciences (Faculty of Engineering) from Thiagarajar College of Engineering, Madurai Kamaraj University,
Madurai, India in 1994.
Other:
Primavera Project Planner from Engineers CADD Centre Private Limited, Chennai, India
Primavera Enterprise Version 5 & 6 – MICA, Doha, Qatar
Advance Project Management Cost Engineering from Marcusevans Professional, Doha, Qatar
Cost Management Training Course from MICA, Doha, Qatar
Completed training course for Advanced PMP Certification
IT SKILLS
4. Conversant with Primavera Enterprise Network Version (3.1,5.0,6.0,7.0 & 8.0) for E&C, Primavera Project Planner 3.1
and MS-Project, MS-Office 2010
PERSONAL DETAILS
Date of Birth: 19th November, 1972
Permanent Address: FT-04, Anirudh Apartments, Vasudara Complex, Andalpuram, Madurai – 625003, Tamil Nadu
Languages Known: English, Hindi, Tamil and Malayalam
Nationality: Indian
Passport Details: Z1916275, Valid up to 23-01-2020
Marital Status Married
Driving License Status: Qatar Driving License Holder
Visa Status: Residence (Holding NOC)
No. of Dependants: 2
(Pls. refer annexure for project details)
ANNEXURE
Oct’01 – Nov’02 Engineering Maintenance Company (A Division of ETA-Ascon Group of Companies, Dubai)
as Planning Engineer
Client: Qatar Water and Electricity Company, Qatar
Main Contractor: Alstom Power Italia, Italy
Description:
The project comprised of Supply, Installation, Testing and Commissioning of HVAC System at RAS ABU Fontas B1
Station, Qatar during 2001-2002
May’96 – May’01 NEO Structo Construction Limited, Surat, Gujarat as Planning Engineer
Projects Involved
Client: Jindal Praxair Oxygen Company Limited
Main Contractor: Kvaerner Power Gas Limited, India
Description:
The project involved erection and alignment of heavy equipments such as air compressor, nitrogen and oxygen tanks,
fabrication and erection of piping (CS, SS, Monel & U/G piping), fabrication and erection of steel structural at Jindal
Praxair Oxygen Company Limited Site, Toranagallu, Karnataka, India for Phase I & II Air Separation Plant – 2500 TPD
during 1998-2001
Client: Sundaram Fasteners Limited
Main Contractor: Praxair India Limited, India
Description:
The project involved erection of Cold Box and Alignment of Compressors & Nitrogen Tanks, Supply and Installation of
piping (CS & SS), Supply and Installation of Steel Structural at Sundaram Fasteners Limited site, Hosur, Tamil Nadu,
India during 1999-2000
Client: Reliance Industries Limited
Main Contractor: Larsen & Toubro Limited, India
Description:
The project comprised of Propylene Terminal Facility of Erection of Heavy Equipments such as Compressors/Motors,
Fabrication and Erection of Piping (CS,SS & U/G piping), Fabrication and Erection of Steel Structural at Hazira site,
Gujarat, India during 1996-97
Client: Reliance Industries Limited
Main Contractor: Larsen & Toubro Limited, India
Description:
The project involved fabrication and erection of Cold Box, erection and alignment of heavy equipment such as Air
compressors, Nitrogen & Oxygen tanks and Fabrication
Erection of Cold Box, Inside and Outside piping (CS, SS, Monel & U/G piping), Fabrication and Erection of Steel
Structural at Hazira site, Gujarat, India during 1995-1996