S. SANKARASUBRAMANIAN
Contact: +97455273966, +974 44622538, +914522373401 (India)
E-mail: sansuresh2000@yahoo.com
JOB OBJECTIVE
Seeking assignments in Project Scheduling & Planning/Project Control with an organisation of repute preferably in Gulf
regions
PROFILE SUMMARY
 An astute professional with 20 years of experience of which 4 years team leader role in:
Project Scheduling & Planning Cost Estimation Budgeting Change Order Management
Risk Management Claims Reporting and Trending Subcontract Management
 Proficiency in CPM, Resource levelling, Schedule compression and Earned Value Management.
 Well versed in Planning function of project controls for Green field and Brown field of Oil & Gas, Petrochemical,
Fertilizers, Air Separation Plants, Power & Desalination Plants, Pipe Line, Substation, HVAC, MEP and Shutdown
projects involving all phases in a project life-cycle – Engineering (Detailed), Procurement, Fabrication, Installation,
Testing, Mechanical Completion, Hook up and Commissioning.
 Skilled in preparation of:
- Planning packages for EPIC projects which includes Level1, Level2 and Level3 Schedules, Resource
histograms and S-Curves.
- Proposal schedules for EPC and construction bids.
- Close up reports with lesson learned from the assigned project.
 Experienced in Project Risk Management which includes identify risks, prepare risk response plan, monitor and control
known and unknown risks.
 Proficient in scheduling software: Primavera Version (3.1, 5, 6, 7, 7.2 & 8) and MS-Project.
 Proficient in handling operations and accountable for timely completion of the projects
 An effective communicator with excellent analytical and negotiation skills
CORE COMPETENCIES
 Thorough understanding of contract, scope of work, estimation and procurement plan for assigned projects.
 Develop WBS, project coding system and definition of work packages.
 Develop Master schedule with logical sequence and interface milestones.
 Monitor the schedule and report activity progress. Publish schedule update which includes narrative, tabular reports
and recommend remedial action.
 Finalise progress measurement philosophy to develop the progress S-curve to monitor Plan Vs. Actual progress
 Prepare look ahead schedules to ensure timely completion of scheduled activities
 Prepare schedules for projects involving different phase which includes construction phases schedule,
system/subsystem schedule, commissioning schedule and start-up schedule.
 Analysis of current and potential areas of concern, progress variance, productivity and forecast trends
 Develop multi-level CPM schedule for all phase of projects.
 Participate in higher management progress review meetings.
 Analyse variances between project baseline dates and current forecast dates. Raise flag to project management about
risk and opportunities.
 Prepare Weekly/Monthly progress reports and monthly management presentation highlighting achievements and
areas of concerns.
 Tracking of Invoice register and Subcontract payment register.
 Follow up procurement activities which includes co-ordinate with supplier for timely delivery of materials.
 Prepare internal and external cost report which includes analysis of budget vs. actual cost variance, cost FAC, risk and
opportunities with respect to the budget and revenue.
 Administering construction team and subcontractor to facilitate smooth project progress and expediting the project
schedule. Conduct the Project planning and progress review meetings with Leads / Discipline engineers for discussing
critical activities / constraints.
 Identify variations to original scope of work to maximise the project revenue.
 Implement procedures for managing Project Control work.
 Cost loading and monitoring of cash flow & project progress using SPI, CPI and Earned Value Analysis
 Prepare detailed documentation for extension of time (EOT) for the project. Good proficiency in Time Impact Analysis
and Impacted As Planned.
 Assuring the strategic utilization & deployment of available resources to achieve organizational objectives
 Executing cost saving techniques / measures and modifications to achieve substantial reduction in O&M expenditures
and work within the budget
 Effectively leading a team of Planning engineers, Cost engineers and QS to align them to the Corporate Project Control
requirements
NOTEWORTHY ACCOLADES ACROSS THE CAREER
 Distinction of receiving:
- The Certificate of Recognition for an important part of the team showing by commitment and hardworking in
supporting Jetty‐Boil off Gas Recovery Project
- Certificte of Appreciation awarded to the excellent contribution to the construction, completion of the
mechanical, piping and civil scope of the Jetty‐Boil off Gas Recovery Project
- Certificate for attending the Team Building "Pipe Rack and Compressor Management Workshop" for Jetty‐Boil
off Gas Recovery Project
- Certiciate of Appreciation for personal commitment to the JBOG Safety which led to the Project achieving 15
million work hours without a Lost Time Incident.
 Distinction of getting selected by Qcon due to:
- Good skills in Primavera software for attending the Primavera Enterprise Version 5 & 7 on Company expense
- Good project management skill for attending the Advanced Project Management: Cost Engineering and Cost
Management course on Company expense
 Made an effective use of Primavera and project management skills and was able to complete two projects on time
due to proper resource levelling on primavera Company has been able to complete the project within the budget
ORGANISATIONAL EXPERIENCE
Since Apr’15 Qatar Fertiliser Company, Qatar as Senior Planning Engineer
Role:
Project: Ammonia 1 & 2 Revamp and New Plant Option - QAFCO 7
Serving as a Senior planning engineer for FEED phase and EPCC project tendering and bidding phase for Ammonia.
Prepare preliminary schedule and establish key dates for Feed phase, Tendering phase and Execution phase
Provide Input to ITB package preparation and bid evaluation.
Participate in bid evaluation and analyse contractor plant to support award recommendation.
Prepare input to monthly reports.
Review and analyse of bidders planning package (schedules, critical path, resources and planning & progress procedures)
and prepare bid evaluation report.
Provide scheduling input to decision gate reviews.
Project Risk Register administration for risk and opportunities.
Liaise with Cost Control within project team to prepare budget for all phases (FEED, tendering and execution phase) and
prepare monthly provisions.
Monitor and Analyse FEED contractor’s progress report and schedule to identify potential slippages and provide
mitigation actions.
Verify FEED contractors’ claimed monthly progress against invoices and variation orders.
Jun’05 - Mar’15 Qatar Engineering and Construction Company, Qatar as Senior Planning Engineer
Client & Owner: Qatar Gas and Fluor
Role:
 Serving as Project Control Lead and heading a team of 10 members of planners, civil & mechanical QS and cost
control engineers
 Carried out Time Impact Analysis and Impacted As Planned for Extension to the time for Completion of Work for
Jetty Boil Off Gas Recovery Project of claim worth 50 mn USD
Period: Since Mar’11
Title: Jetty Boil-Off Gas Recovery Project
Scope: Offplot & CCA – Civil, Mechanical and Structural and Piping works
Off Plot:
 It involved all civil work like sleepers, pipe foundations, thrust boring and removal of armour rock, piping - 20 km of
sleeper piping size of 60”, 48”, 34” & 30” and scope involved in rolling pre commissioning, commissioning, RFSU and
performance test
On Plot (Central Compressor Area):
 It comprised of all civil work includes major compressor foundations, precast pipe racks, paving and trench works
 It involved 3 Nos. substation (132/33 KV/11KV) civil and concrete works and construction of precast pipe rack.
Installation of HP, MP and LP compressors and associated lube oil skids and coolers. Fabrication and Erection of 20
km of pipe rack and compressors piping. Scope includes also roll in testing, pre-commissioning, commissioning, RFSU
and upto Performance test
Client: Qatar Petroleum
Nature of Project: June’10 – Feb’11
Description:
 The project dealt with EPIC of low pressure associated gas compressor and related civil, mechanical, E&I work at Halul
Offshore its scope included E&P of LP compressor and associated civil, mechanical and E&I works and Installation,
pre-commissioning and commissioning of LP compressor at QP’s Halul offshore facility
Client: Qatar Fertilisers Company
Nature of Project: Sep’06 – May’10
Project Description:
 The 60,000 TPD Melamine EPC project consists of Complete Construction of new Melamine Plant, and Revamp of the
existing Urea-1 Plant, including all the interconnecting piping and structures between and within the two plants. This
includes detail civil and structural engineering, procurement of structural steel and Construction of warehouse,
132KV/33KV/11KV substation (control building) including all related MEP services/Electrical and Instrumentation
works. The project also includes installation and erection of new equipment, machinery, piping and steel structures at
Urea-1 plant which will be divided into two phases online and shutdown. Scope also includes roll in
precommissioning, commissioning and upto performance test. This project involved all disciplines
(Civil/Mechanical/Electrical/Instrumentation).
Client: RAS GAS
Contractor: IHI & MHI, Japan
Description:
 The project comprised of construction activity in LNG Tank 4, 5 and 6 including all piping and steel structures
installation and E&I related to tanks during Jun2005-Oct2006
Dec’02 – Jun’05 Belleli Energy S.P.A, (The Hanover Company Mantova), Italy as Planner
Client: Oryx-GTL Qatar
Main Contractor: Technip SPA, Italy
Description:
 The GTL project involved Erection of Heavy Steel Structure at Ras Laffan Industrial City, Qatar
Client: RAS Laffan Power Company
Main Contractor: Enel Power SPA, Italy
Description:
 The project dealt with fabrication and installation of Boiler Piping like AS, CS, SS and GRP, Installation of Equipments
(Tanks and Pumps), Supply and Installation of Steel Structure and Supports at Ras Laffan Industrial City, Qatar during
2003-2005
Client: RAS Laffan Power Company
Main Contractor: Fisia Italimpianti – Group Impregilo, Italy
Description:
 The project involved construction and installation of evaporator – 4 nos. installation of Brine Heaters, Steel Structures
and Auxiliary Platforms at Ras Laffan Industrial City, Qatar, during 2002-2003
Oct’01 – Nov’02 Engineering Maintenance Company (A Division of ETA-Ascon Group of Companies, Dubai)
as Planning Engineer
May’96 – May’01 NEO Structo Construction Limited, Surat, Gujarat as Planning Engineer
EDUCATION
 B.Sc. Applied Sciences (Faculty of Engineering) from Thiagarajar College of Engineering, Madurai Kamaraj University,
Madurai, India in 1994.
Other:
 Primavera Project Planner from Engineers CADD Centre Private Limited, Chennai, India
 Primavera Enterprise Version 5 & 6 – MICA, Doha, Qatar
 Advance Project Management Cost Engineering from Marcusevans Professional, Doha, Qatar
 Cost Management Training Course from MICA, Doha, Qatar
 Completed training course for Advanced PMP Certification
IT SKILLS
 Conversant with Primavera Enterprise Network Version (3.1,5.0,6.0,7.0 & 8.0) for E&C, Primavera Project Planner 3.1
and MS-Project, MS-Office 2010
PERSONAL DETAILS
Date of Birth: 19th November, 1972
Permanent Address: FT-04, Anirudh Apartments, Vasudara Complex, Andalpuram, Madurai – 625003, Tamil Nadu
Languages Known: English, Hindi, Tamil and Malayalam
Nationality: Indian
Passport Details: Z1916275, Valid up to 23-01-2020
Marital Status Married
Driving License Status: Qatar Driving License Holder
Visa Status: Residence (Holding NOC)
No. of Dependants: 2
(Pls. refer annexure for project details)
ANNEXURE
Oct’01 – Nov’02 Engineering Maintenance Company (A Division of ETA-Ascon Group of Companies, Dubai)
as Planning Engineer
Client: Qatar Water and Electricity Company, Qatar
Main Contractor: Alstom Power Italia, Italy
Description:
 The project comprised of Supply, Installation, Testing and Commissioning of HVAC System at RAS ABU Fontas B1
Station, Qatar during 2001-2002
May’96 – May’01 NEO Structo Construction Limited, Surat, Gujarat as Planning Engineer
Projects Involved
Client: Jindal Praxair Oxygen Company Limited
Main Contractor: Kvaerner Power Gas Limited, India
Description:
 The project involved erection and alignment of heavy equipments such as air compressor, nitrogen and oxygen tanks,
fabrication and erection of piping (CS, SS, Monel & U/G piping), fabrication and erection of steel structural at Jindal
Praxair Oxygen Company Limited Site, Toranagallu, Karnataka, India for Phase I & II Air Separation Plant – 2500 TPD
during 1998-2001
Client: Sundaram Fasteners Limited
Main Contractor: Praxair India Limited, India
Description:
 The project involved erection of Cold Box and Alignment of Compressors & Nitrogen Tanks, Supply and Installation of
piping (CS & SS), Supply and Installation of Steel Structural at Sundaram Fasteners Limited site, Hosur, Tamil Nadu,
India during 1999-2000
Client: Reliance Industries Limited
Main Contractor: Larsen & Toubro Limited, India
Description:
 The project comprised of Propylene Terminal Facility of Erection of Heavy Equipments such as Compressors/Motors,
Fabrication and Erection of Piping (CS,SS & U/G piping), Fabrication and Erection of Steel Structural at Hazira site,
Gujarat, India during 1996-97
Client: Reliance Industries Limited
Main Contractor: Larsen & Toubro Limited, India
Description:
 The project involved fabrication and erection of Cold Box, erection and alignment of heavy equipment such as Air
compressors, Nitrogen & Oxygen tanks and Fabrication
 Erection of Cold Box, Inside and Outside piping (CS, SS, Monel & U/G piping), Fabrication and Erection of Steel
Structural at Hazira site, Gujarat, India during 1995-1996

More Related Content

What's hot

Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineersailesh konduru
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
Ahmed Mahdi, MRICS, PMP®, MSc, B.Eng
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
GOPAKUMAR BALAKRISHNA PILLAI
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
James Ct
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
AKSHAY SHARMA
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Amir Mohammed
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
Anas M H
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
robinjacob0101
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
Mohammad Khan
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 

What's hot (20)

Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineer
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
 

Similar to Cv s.sankarasubramanian - senior planning engineer

LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar BeheraTarun Behera
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Dylan Gonsalves
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
Rushi Pru Dhvi
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - LatestPeter White
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 

Similar to Cv s.sankarasubramanian - senior planning engineer (20)

LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
RESUME
RESUMERESUME
RESUME
 
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
 
Topside
TopsideTopside
Topside
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
CV Asif Rashid
CV Asif Rashid CV Asif Rashid
CV Asif Rashid
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 

Recently uploaded

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

Cv s.sankarasubramanian - senior planning engineer

  • 1. S. SANKARASUBRAMANIAN Contact: +97455273966, +974 44622538, +914522373401 (India) E-mail: sansuresh2000@yahoo.com JOB OBJECTIVE Seeking assignments in Project Scheduling & Planning/Project Control with an organisation of repute preferably in Gulf regions PROFILE SUMMARY  An astute professional with 20 years of experience of which 4 years team leader role in: Project Scheduling & Planning Cost Estimation Budgeting Change Order Management Risk Management Claims Reporting and Trending Subcontract Management  Proficiency in CPM, Resource levelling, Schedule compression and Earned Value Management.  Well versed in Planning function of project controls for Green field and Brown field of Oil & Gas, Petrochemical, Fertilizers, Air Separation Plants, Power & Desalination Plants, Pipe Line, Substation, HVAC, MEP and Shutdown projects involving all phases in a project life-cycle – Engineering (Detailed), Procurement, Fabrication, Installation, Testing, Mechanical Completion, Hook up and Commissioning.  Skilled in preparation of: - Planning packages for EPIC projects which includes Level1, Level2 and Level3 Schedules, Resource histograms and S-Curves. - Proposal schedules for EPC and construction bids. - Close up reports with lesson learned from the assigned project.  Experienced in Project Risk Management which includes identify risks, prepare risk response plan, monitor and control known and unknown risks.  Proficient in scheduling software: Primavera Version (3.1, 5, 6, 7, 7.2 & 8) and MS-Project.  Proficient in handling operations and accountable for timely completion of the projects  An effective communicator with excellent analytical and negotiation skills CORE COMPETENCIES  Thorough understanding of contract, scope of work, estimation and procurement plan for assigned projects.  Develop WBS, project coding system and definition of work packages.  Develop Master schedule with logical sequence and interface milestones.  Monitor the schedule and report activity progress. Publish schedule update which includes narrative, tabular reports and recommend remedial action.  Finalise progress measurement philosophy to develop the progress S-curve to monitor Plan Vs. Actual progress  Prepare look ahead schedules to ensure timely completion of scheduled activities  Prepare schedules for projects involving different phase which includes construction phases schedule, system/subsystem schedule, commissioning schedule and start-up schedule.  Analysis of current and potential areas of concern, progress variance, productivity and forecast trends  Develop multi-level CPM schedule for all phase of projects.  Participate in higher management progress review meetings.  Analyse variances between project baseline dates and current forecast dates. Raise flag to project management about risk and opportunities.  Prepare Weekly/Monthly progress reports and monthly management presentation highlighting achievements and areas of concerns.  Tracking of Invoice register and Subcontract payment register.  Follow up procurement activities which includes co-ordinate with supplier for timely delivery of materials.  Prepare internal and external cost report which includes analysis of budget vs. actual cost variance, cost FAC, risk and opportunities with respect to the budget and revenue.  Administering construction team and subcontractor to facilitate smooth project progress and expediting the project schedule. Conduct the Project planning and progress review meetings with Leads / Discipline engineers for discussing critical activities / constraints.  Identify variations to original scope of work to maximise the project revenue.  Implement procedures for managing Project Control work.  Cost loading and monitoring of cash flow & project progress using SPI, CPI and Earned Value Analysis  Prepare detailed documentation for extension of time (EOT) for the project. Good proficiency in Time Impact Analysis and Impacted As Planned.  Assuring the strategic utilization & deployment of available resources to achieve organizational objectives  Executing cost saving techniques / measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget
  • 2.  Effectively leading a team of Planning engineers, Cost engineers and QS to align them to the Corporate Project Control requirements NOTEWORTHY ACCOLADES ACROSS THE CAREER  Distinction of receiving: - The Certificate of Recognition for an important part of the team showing by commitment and hardworking in supporting Jetty‐Boil off Gas Recovery Project - Certificte of Appreciation awarded to the excellent contribution to the construction, completion of the mechanical, piping and civil scope of the Jetty‐Boil off Gas Recovery Project - Certificate for attending the Team Building "Pipe Rack and Compressor Management Workshop" for Jetty‐Boil off Gas Recovery Project - Certiciate of Appreciation for personal commitment to the JBOG Safety which led to the Project achieving 15 million work hours without a Lost Time Incident.  Distinction of getting selected by Qcon due to: - Good skills in Primavera software for attending the Primavera Enterprise Version 5 & 7 on Company expense - Good project management skill for attending the Advanced Project Management: Cost Engineering and Cost Management course on Company expense  Made an effective use of Primavera and project management skills and was able to complete two projects on time due to proper resource levelling on primavera Company has been able to complete the project within the budget ORGANISATIONAL EXPERIENCE Since Apr’15 Qatar Fertiliser Company, Qatar as Senior Planning Engineer Role: Project: Ammonia 1 & 2 Revamp and New Plant Option - QAFCO 7 Serving as a Senior planning engineer for FEED phase and EPCC project tendering and bidding phase for Ammonia. Prepare preliminary schedule and establish key dates for Feed phase, Tendering phase and Execution phase Provide Input to ITB package preparation and bid evaluation. Participate in bid evaluation and analyse contractor plant to support award recommendation. Prepare input to monthly reports. Review and analyse of bidders planning package (schedules, critical path, resources and planning & progress procedures) and prepare bid evaluation report. Provide scheduling input to decision gate reviews. Project Risk Register administration for risk and opportunities. Liaise with Cost Control within project team to prepare budget for all phases (FEED, tendering and execution phase) and prepare monthly provisions. Monitor and Analyse FEED contractor’s progress report and schedule to identify potential slippages and provide mitigation actions. Verify FEED contractors’ claimed monthly progress against invoices and variation orders. Jun’05 - Mar’15 Qatar Engineering and Construction Company, Qatar as Senior Planning Engineer Client & Owner: Qatar Gas and Fluor Role:  Serving as Project Control Lead and heading a team of 10 members of planners, civil & mechanical QS and cost control engineers  Carried out Time Impact Analysis and Impacted As Planned for Extension to the time for Completion of Work for Jetty Boil Off Gas Recovery Project of claim worth 50 mn USD Period: Since Mar’11 Title: Jetty Boil-Off Gas Recovery Project Scope: Offplot & CCA – Civil, Mechanical and Structural and Piping works Off Plot:  It involved all civil work like sleepers, pipe foundations, thrust boring and removal of armour rock, piping - 20 km of sleeper piping size of 60”, 48”, 34” & 30” and scope involved in rolling pre commissioning, commissioning, RFSU and performance test On Plot (Central Compressor Area):  It comprised of all civil work includes major compressor foundations, precast pipe racks, paving and trench works  It involved 3 Nos. substation (132/33 KV/11KV) civil and concrete works and construction of precast pipe rack. Installation of HP, MP and LP compressors and associated lube oil skids and coolers. Fabrication and Erection of 20 km of pipe rack and compressors piping. Scope includes also roll in testing, pre-commissioning, commissioning, RFSU and upto Performance test
  • 3. Client: Qatar Petroleum Nature of Project: June’10 – Feb’11 Description:  The project dealt with EPIC of low pressure associated gas compressor and related civil, mechanical, E&I work at Halul Offshore its scope included E&P of LP compressor and associated civil, mechanical and E&I works and Installation, pre-commissioning and commissioning of LP compressor at QP’s Halul offshore facility Client: Qatar Fertilisers Company Nature of Project: Sep’06 – May’10 Project Description:  The 60,000 TPD Melamine EPC project consists of Complete Construction of new Melamine Plant, and Revamp of the existing Urea-1 Plant, including all the interconnecting piping and structures between and within the two plants. This includes detail civil and structural engineering, procurement of structural steel and Construction of warehouse, 132KV/33KV/11KV substation (control building) including all related MEP services/Electrical and Instrumentation works. The project also includes installation and erection of new equipment, machinery, piping and steel structures at Urea-1 plant which will be divided into two phases online and shutdown. Scope also includes roll in precommissioning, commissioning and upto performance test. This project involved all disciplines (Civil/Mechanical/Electrical/Instrumentation). Client: RAS GAS Contractor: IHI & MHI, Japan Description:  The project comprised of construction activity in LNG Tank 4, 5 and 6 including all piping and steel structures installation and E&I related to tanks during Jun2005-Oct2006 Dec’02 – Jun’05 Belleli Energy S.P.A, (The Hanover Company Mantova), Italy as Planner Client: Oryx-GTL Qatar Main Contractor: Technip SPA, Italy Description:  The GTL project involved Erection of Heavy Steel Structure at Ras Laffan Industrial City, Qatar Client: RAS Laffan Power Company Main Contractor: Enel Power SPA, Italy Description:  The project dealt with fabrication and installation of Boiler Piping like AS, CS, SS and GRP, Installation of Equipments (Tanks and Pumps), Supply and Installation of Steel Structure and Supports at Ras Laffan Industrial City, Qatar during 2003-2005 Client: RAS Laffan Power Company Main Contractor: Fisia Italimpianti – Group Impregilo, Italy Description:  The project involved construction and installation of evaporator – 4 nos. installation of Brine Heaters, Steel Structures and Auxiliary Platforms at Ras Laffan Industrial City, Qatar, during 2002-2003 Oct’01 – Nov’02 Engineering Maintenance Company (A Division of ETA-Ascon Group of Companies, Dubai) as Planning Engineer May’96 – May’01 NEO Structo Construction Limited, Surat, Gujarat as Planning Engineer EDUCATION  B.Sc. Applied Sciences (Faculty of Engineering) from Thiagarajar College of Engineering, Madurai Kamaraj University, Madurai, India in 1994. Other:  Primavera Project Planner from Engineers CADD Centre Private Limited, Chennai, India  Primavera Enterprise Version 5 & 6 – MICA, Doha, Qatar  Advance Project Management Cost Engineering from Marcusevans Professional, Doha, Qatar  Cost Management Training Course from MICA, Doha, Qatar  Completed training course for Advanced PMP Certification IT SKILLS
  • 4.  Conversant with Primavera Enterprise Network Version (3.1,5.0,6.0,7.0 & 8.0) for E&C, Primavera Project Planner 3.1 and MS-Project, MS-Office 2010 PERSONAL DETAILS Date of Birth: 19th November, 1972 Permanent Address: FT-04, Anirudh Apartments, Vasudara Complex, Andalpuram, Madurai – 625003, Tamil Nadu Languages Known: English, Hindi, Tamil and Malayalam Nationality: Indian Passport Details: Z1916275, Valid up to 23-01-2020 Marital Status Married Driving License Status: Qatar Driving License Holder Visa Status: Residence (Holding NOC) No. of Dependants: 2 (Pls. refer annexure for project details) ANNEXURE Oct’01 – Nov’02 Engineering Maintenance Company (A Division of ETA-Ascon Group of Companies, Dubai) as Planning Engineer Client: Qatar Water and Electricity Company, Qatar Main Contractor: Alstom Power Italia, Italy Description:  The project comprised of Supply, Installation, Testing and Commissioning of HVAC System at RAS ABU Fontas B1 Station, Qatar during 2001-2002 May’96 – May’01 NEO Structo Construction Limited, Surat, Gujarat as Planning Engineer Projects Involved Client: Jindal Praxair Oxygen Company Limited Main Contractor: Kvaerner Power Gas Limited, India Description:  The project involved erection and alignment of heavy equipments such as air compressor, nitrogen and oxygen tanks, fabrication and erection of piping (CS, SS, Monel & U/G piping), fabrication and erection of steel structural at Jindal Praxair Oxygen Company Limited Site, Toranagallu, Karnataka, India for Phase I & II Air Separation Plant – 2500 TPD during 1998-2001 Client: Sundaram Fasteners Limited Main Contractor: Praxair India Limited, India Description:  The project involved erection of Cold Box and Alignment of Compressors & Nitrogen Tanks, Supply and Installation of piping (CS & SS), Supply and Installation of Steel Structural at Sundaram Fasteners Limited site, Hosur, Tamil Nadu, India during 1999-2000 Client: Reliance Industries Limited Main Contractor: Larsen & Toubro Limited, India Description:  The project comprised of Propylene Terminal Facility of Erection of Heavy Equipments such as Compressors/Motors, Fabrication and Erection of Piping (CS,SS & U/G piping), Fabrication and Erection of Steel Structural at Hazira site, Gujarat, India during 1996-97 Client: Reliance Industries Limited Main Contractor: Larsen & Toubro Limited, India Description:  The project involved fabrication and erection of Cold Box, erection and alignment of heavy equipment such as Air compressors, Nitrogen & Oxygen tanks and Fabrication  Erection of Cold Box, Inside and Outside piping (CS, SS, Monel & U/G piping), Fabrication and Erection of Steel Structural at Hazira site, Gujarat, India during 1995-1996