ABHINAV RAWAT
RZ 7A/24, Puran Nagar Street No-4, Palam colony, New Delhi 110077
Contact: +91 9013258637; Email: rawat.abhinav@hotmail.com, phobos_abhi@hotmail.com
MECHANICAL ENGINEER-CONSTRUCTION & COMMISSIONING/PROJECT MANAGEMENT
Over 4+ years of experience; seeking challenging assignments across Project Management, Engineering, Procurement,
Construction & Commissioning-Power Plant & Petrochemical units
PROFILE
 Competent and Dynamic Techno-Commercial Professional with 4+ years of experience predominantly in the areas
of Project Execution & Management, Erection, Commissioning.
 Currently spearheading functions with Mekaster Eco System (Vapor Recovery Unit) as Assistant Manager.
 Exhibit strong Project Management skills including project scheduling, and monitoring coupled with structured
inputs for purchase & procurement, contracts management, materials management, site management, cost
rationalization and continuous improvement.
 Skilled leader and mentor, able to build teams cohesion inspire and empower individuals to strive toward ever-
higher levels of achievement.
Key Strength Areas
Construction, Commissioning & Fabrication  Reports/Documentation  Customer/Client Relationship Management 
Quality Enhancement  Process Improvement & Engineering  Procurement  Resource Optimization
Functional Competencies
 Knowledge of piping standards like ASME B31.1, ASME B31.3, B 16.11, B16.5 & B16.9
 NDT standards like ASME BPVC sec V,ASME Section VIII, API527
 Instrumentation work like cabling & termination, solenoid valve, actuators, Positioners, switches, pneumatic tubing etc.
 Knowledge of Auto cad, Pro E, Grant Project, Auto level,
 Gas Conditioning Skid (K.O.D, cyclone separators, filter separators, PRCS, interlocking arrangements & operation
philosophy; conducted radiographic test & hydro tests at vendors works).
 Knowledge of Gas turbines 6 FA &Auxiliaries (conducted lube oil flushing, erection of interconnected piping); Steam
turbines SC2-23 & Auxiliaries (conducted rotor centering of steam turbine & bearing inspection.)
 Knowledge of pump & shaft alignment process.
 Heat recovery steam generator & Auxiliaries (boiler feed pumps, recirculation pump, economizers, harps & insulation).
 Vapour recovery skids for petroleum products (scrubber vessel, Pressure Swing Adsorption, silencers, liquid ring
compressor & vacuum pump)
 Air Cooled Condensers & Auxiliaries (hot well, C.E.P, ejectors & interlocking etc.); Fin Fan Coolers& Auxiliaries;
Compressed air system & Auxiliaries; Bypass valves & dump tubes.
 Knowledge of W.T.P, W.W.T.P, E.T.P & S.T.P
Technical Responsibilities Performed
 Conducted Hydro test, Magnetic partial test & review stress relieving of Boiler Drums & HARP’s at H.R.S.G at vendors
works.
 Review of Radiographic test, conducted hydro test & DFT test of knock out drum, filter separators & water bath heater of
Fuel Gas Conditioning Skid vendors works.
 Involved in fabrication, erection & assembly work for Vapor Recovery unit. Conducted hydrotest, Pneumatic test &
tightness test for complete skid. Conducted instrument tubing work & also assisted in the instrumentation testing of
actuated valve, limit switches, solenoid valves, IP converters & continuity of pressure switches.
 Erection of VRU Skid, buffer vessel& loading arms at site conducting alignment of skid, pumps & compressors, fabrication
of Motor spirit vapour line, cable laying & tubing work.
 Erection & alignment of Harps & interconnecting piping of HRSG also conducted hydro test at site of complete HRSG.
 Pump Alignment work for Boiler feed pumps & other pumps in the plant.
 Conducted lube oil flushing for Gas Turbines erection of fuel Gas pipe line, IBH line, compressor bleeding line, sealing &
cooling lines.
 Involved in erection of Steam turbine, conducted bearing inspection, rotor centering & interconnecting piping.
 Fabrication& erection of Air Cool Condenser like steam duct fabrication, bundle alignment, A frame fabrication.
 Erection of Fuel Gas pipe & IBR pipeline, conducted welder qualification test & NDT for the gas & IBR pipe line. Also
conducted required preheating & stress reliving test.
 Erection of Gas conditioning skid of capacity 16.5 Kg/ sec.
 Fabrication & assembly of pipe spools & base frame of Vapor recovery unit; Steel Structures like STG building, Run down
tank platform, ACC support structures & sheds for other equipments.
 Conducted the bar bending & casting of the civil structure like STG lube oil tank foundation, cooling towers, passenger lift
& pipe support pedestals.
 Erection of FRP cooling tower. Painting procedures & conducting sand blasting D.F.T & W.F.T test to ensure the proper
thickness of paint. Conducted thermal insulation work for Stacks & wrapping coating work for underground piping.
 Conducted welder qualification test, NDT like (DPT, MPT, Radiography tests & holiday testing), cardboard blasting &
flushing for Quality assurance.
CAREER GLIMPSE
MEKASTER ECO SYSTEM (Vapor Recovery Unit) since Aug’13
Assistant Manager
 Driving efforts across overall erection & commissioning of the skid while ensuring adherence to safety parameters.
 Organizing regular inspections & meetings to ensure the established standards & procedures are complied with the
set standards.
 Coordinating on-site activities to ensure smooth work progress and conceptualized and implemented measures for
enhancing operational efficient and optimizing resource utilization.
 Accountable for Material management and handling like loading, unloading and shifting of components and
equipments to the project site for erection & Commissioning.
 Adept at performing root-cause analysis of defects while developing & improving the processes by taking corrective
actions to prevent any reoccurrences & defective issues.
 Swiftly ramping up erection & commissioning with cross-functional skills and ensuring timely deliverables within pre-
set cost parameters.
 Accountable for floating tender enquiries to the various vendors & receiving the technical & commercial offers for the
same & evaluation of the same for order finalization.
 Involved in making B.O.Q & costing of equipments, piping erection work & steel fabrication work.
 Responsible for checking the P&ID, general arrangement drawing, & other technical data sheet for various
equipment’s submitted by vendor & the consultant for approval & necessary action.
 Extending coordination & making B.O.Q, Q.A.P, finalizing the construction drawings for mechanical & civil i.e. piping
isometric drawings, equipment layout drawing, piping & support drawing & civil drawing.
 Conducted work under Hot permit & with Proper safety
BETA INFRATECH PVT LTD (GAS BASED POWER PLANT) Feb’11-Aug’13
Site Engineer
 Proactively coordinated with contractors & construction supervisors for reducing the wastage of time & man power
requirement; inspected all the equipments for erection.
 Instrumental in implementing planned and erection & commissioning to maximize operational life of all machines;
defined schedule of activities and deployed manpower judiciously to accomplish work execution within laid out
timelines.
 Planned the overall activities of the projects and identifying key milestones and critical path analysis forecasting
completion timeline and finalizing target.
SCHOLASTIC PORTFOLIO
B Tech (Mechanical Engineering); 2010
Graphic Era Institute of Technology Dehra Dun (Uttrakhand Technical University); 66.32%
Trainings Attended
 Summer training at Badarpur Thermal power station (NTPC):
o Working process involved in Thermal power plant.
o Steam Turbines; Boilers; Cola Handling Plant; Ash Handling plant & Water treatment Plant.
Computer Proficiencies: AutoCAD 2010, Pro-e 0.2 and 0.4
Date of Birth: 13th
May 1988
References: Available on Request

More Related Content

What's hot

Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
Mohammad Khan
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteRameshchandra Prajapati
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resumeiminneedofu
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resumeSteve Chu
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)

What's hot (20)

khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Latest CV of Gangadhar
Latest CV of GangadharLatest CV of Gangadhar
Latest CV of Gangadhar
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
R. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas WebsiteR. Prajapati CV for Process Engineer for Oil and Gas Website
R. Prajapati CV for Process Engineer for Oil and Gas Website
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Resume-RS
Resume-RSResume-RS
Resume-RS
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resume
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
CV.
CV.CV.
CV.
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 

Similar to abhinav rawat

CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016Kirana Devasya
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalM.Nafis Haque
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
Jose F. Gonzalez, P. Eng.
 

Similar to abhinav rawat (20)

SUMER_MECH_Er
SUMER_MECH_ErSUMER_MECH_Er
SUMER_MECH_Er
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
CV_Suhail
CV_SuhailCV_Suhail
CV_Suhail
 
CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016CV-Kiran-Sr QAQC NOV2016
CV-Kiran-Sr QAQC NOV2016
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Resume Abdulbari
Resume   AbdulbariResume   Abdulbari
Resume Abdulbari
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest Amitabha Chattopadhyay latest
Amitabha Chattopadhyay latest
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
MD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_originalMD.NAFISUL HAQUE_original
MD.NAFISUL HAQUE_original
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
Faizal CV Rev 1
Faizal CV Rev 1Faizal CV Rev 1
Faizal CV Rev 1
 
RENJITH CVpdf
RENJITH CVpdfRENJITH CVpdf
RENJITH CVpdf
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Alzagon engineering solutions dec 2017a
Alzagon engineering solutions dec  2017aAlzagon engineering solutions dec  2017a
Alzagon engineering solutions dec 2017a
 

abhinav rawat

  • 1. ABHINAV RAWAT RZ 7A/24, Puran Nagar Street No-4, Palam colony, New Delhi 110077 Contact: +91 9013258637; Email: rawat.abhinav@hotmail.com, phobos_abhi@hotmail.com MECHANICAL ENGINEER-CONSTRUCTION & COMMISSIONING/PROJECT MANAGEMENT Over 4+ years of experience; seeking challenging assignments across Project Management, Engineering, Procurement, Construction & Commissioning-Power Plant & Petrochemical units PROFILE  Competent and Dynamic Techno-Commercial Professional with 4+ years of experience predominantly in the areas of Project Execution & Management, Erection, Commissioning.  Currently spearheading functions with Mekaster Eco System (Vapor Recovery Unit) as Assistant Manager.  Exhibit strong Project Management skills including project scheduling, and monitoring coupled with structured inputs for purchase & procurement, contracts management, materials management, site management, cost rationalization and continuous improvement.  Skilled leader and mentor, able to build teams cohesion inspire and empower individuals to strive toward ever- higher levels of achievement. Key Strength Areas Construction, Commissioning & Fabrication  Reports/Documentation  Customer/Client Relationship Management  Quality Enhancement  Process Improvement & Engineering  Procurement  Resource Optimization Functional Competencies  Knowledge of piping standards like ASME B31.1, ASME B31.3, B 16.11, B16.5 & B16.9  NDT standards like ASME BPVC sec V,ASME Section VIII, API527  Instrumentation work like cabling & termination, solenoid valve, actuators, Positioners, switches, pneumatic tubing etc.  Knowledge of Auto cad, Pro E, Grant Project, Auto level,  Gas Conditioning Skid (K.O.D, cyclone separators, filter separators, PRCS, interlocking arrangements & operation philosophy; conducted radiographic test & hydro tests at vendors works).  Knowledge of Gas turbines 6 FA &Auxiliaries (conducted lube oil flushing, erection of interconnected piping); Steam turbines SC2-23 & Auxiliaries (conducted rotor centering of steam turbine & bearing inspection.)  Knowledge of pump & shaft alignment process.  Heat recovery steam generator & Auxiliaries (boiler feed pumps, recirculation pump, economizers, harps & insulation).  Vapour recovery skids for petroleum products (scrubber vessel, Pressure Swing Adsorption, silencers, liquid ring compressor & vacuum pump)  Air Cooled Condensers & Auxiliaries (hot well, C.E.P, ejectors & interlocking etc.); Fin Fan Coolers& Auxiliaries; Compressed air system & Auxiliaries; Bypass valves & dump tubes.  Knowledge of W.T.P, W.W.T.P, E.T.P & S.T.P Technical Responsibilities Performed  Conducted Hydro test, Magnetic partial test & review stress relieving of Boiler Drums & HARP’s at H.R.S.G at vendors works.  Review of Radiographic test, conducted hydro test & DFT test of knock out drum, filter separators & water bath heater of Fuel Gas Conditioning Skid vendors works.  Involved in fabrication, erection & assembly work for Vapor Recovery unit. Conducted hydrotest, Pneumatic test & tightness test for complete skid. Conducted instrument tubing work & also assisted in the instrumentation testing of actuated valve, limit switches, solenoid valves, IP converters & continuity of pressure switches.  Erection of VRU Skid, buffer vessel& loading arms at site conducting alignment of skid, pumps & compressors, fabrication of Motor spirit vapour line, cable laying & tubing work.  Erection & alignment of Harps & interconnecting piping of HRSG also conducted hydro test at site of complete HRSG.  Pump Alignment work for Boiler feed pumps & other pumps in the plant.  Conducted lube oil flushing for Gas Turbines erection of fuel Gas pipe line, IBH line, compressor bleeding line, sealing & cooling lines.  Involved in erection of Steam turbine, conducted bearing inspection, rotor centering & interconnecting piping.  Fabrication& erection of Air Cool Condenser like steam duct fabrication, bundle alignment, A frame fabrication.  Erection of Fuel Gas pipe & IBR pipeline, conducted welder qualification test & NDT for the gas & IBR pipe line. Also conducted required preheating & stress reliving test.  Erection of Gas conditioning skid of capacity 16.5 Kg/ sec.  Fabrication & assembly of pipe spools & base frame of Vapor recovery unit; Steel Structures like STG building, Run down tank platform, ACC support structures & sheds for other equipments.
  • 2.  Conducted the bar bending & casting of the civil structure like STG lube oil tank foundation, cooling towers, passenger lift & pipe support pedestals.  Erection of FRP cooling tower. Painting procedures & conducting sand blasting D.F.T & W.F.T test to ensure the proper thickness of paint. Conducted thermal insulation work for Stacks & wrapping coating work for underground piping.  Conducted welder qualification test, NDT like (DPT, MPT, Radiography tests & holiday testing), cardboard blasting & flushing for Quality assurance. CAREER GLIMPSE MEKASTER ECO SYSTEM (Vapor Recovery Unit) since Aug’13 Assistant Manager  Driving efforts across overall erection & commissioning of the skid while ensuring adherence to safety parameters.  Organizing regular inspections & meetings to ensure the established standards & procedures are complied with the set standards.  Coordinating on-site activities to ensure smooth work progress and conceptualized and implemented measures for enhancing operational efficient and optimizing resource utilization.  Accountable for Material management and handling like loading, unloading and shifting of components and equipments to the project site for erection & Commissioning.  Adept at performing root-cause analysis of defects while developing & improving the processes by taking corrective actions to prevent any reoccurrences & defective issues.  Swiftly ramping up erection & commissioning with cross-functional skills and ensuring timely deliverables within pre- set cost parameters.  Accountable for floating tender enquiries to the various vendors & receiving the technical & commercial offers for the same & evaluation of the same for order finalization.  Involved in making B.O.Q & costing of equipments, piping erection work & steel fabrication work.  Responsible for checking the P&ID, general arrangement drawing, & other technical data sheet for various equipment’s submitted by vendor & the consultant for approval & necessary action.  Extending coordination & making B.O.Q, Q.A.P, finalizing the construction drawings for mechanical & civil i.e. piping isometric drawings, equipment layout drawing, piping & support drawing & civil drawing.  Conducted work under Hot permit & with Proper safety BETA INFRATECH PVT LTD (GAS BASED POWER PLANT) Feb’11-Aug’13 Site Engineer  Proactively coordinated with contractors & construction supervisors for reducing the wastage of time & man power requirement; inspected all the equipments for erection.  Instrumental in implementing planned and erection & commissioning to maximize operational life of all machines; defined schedule of activities and deployed manpower judiciously to accomplish work execution within laid out timelines.  Planned the overall activities of the projects and identifying key milestones and critical path analysis forecasting completion timeline and finalizing target. SCHOLASTIC PORTFOLIO B Tech (Mechanical Engineering); 2010 Graphic Era Institute of Technology Dehra Dun (Uttrakhand Technical University); 66.32% Trainings Attended  Summer training at Badarpur Thermal power station (NTPC): o Working process involved in Thermal power plant. o Steam Turbines; Boilers; Cola Handling Plant; Ash Handling plant & Water treatment Plant. Computer Proficiencies: AutoCAD 2010, Pro-e 0.2 and 0.4 Date of Birth: 13th May 1988 References: Available on Request