SlideShare a Scribd company logo
John P. Chan (661)-747-5999
Bakersfield, CA 93309 jsurfer88@yahoo.com
SUMARY
Professional Mechanical Project Engineer in the Petrochemical industry with over 20
years of experience to ensure projects are design per agreed scope and delivered on
time and within budget. Skills used include:
HANDS-ON to obtain all pertinent information to create the scope
TEAM PLAYER that gets project by-in from operators as well as management
MULTI DISCIPLINE- understand basics of other disciplines to oversee entire project
DETAIL ORIENTED to ensure cost is within budget and project is on track
PROFESSIONAL EXPERIENCE
California Resources Corporation 8/2011- 9/2015
Engineering Advisor Facilities – Team member on the Reservoir Management Team
(RMT) for several on-shore locations in California ensuring surface facilities capacity is
sufficient to receive production forecast. Facilities are used to process, heavy and light
oil as well as gas only production.
DUTIES
• To evaluate existing facility capacities, recommend expansion to meet forecast
then develop preliminary scope & cost for the project.
• Supervise facility design to ensure all company & industry codes are met.
• Ensure P&IDs are accurate then conduct Process Hazard Analysis (PHA) to
ensure facility has sufficient migrating elements for safe operation.
• Design mechanical and controls per the P&IDs, ensure equipment specified per
process requirements & design package is sufficient (P&IDs, plot plan, electrical,
mechanical, civil, equipment & equipment specs, cause & effect document, etc)
• Manage construction team to ensure quality and specs are met & projects follows
scheduled milestones & tracks projected cost.
• Document changes in Management of Change program (MOC).
• Prepare training & instruction manuals for operations, conduct system checks &
final Process Safety System Review (PSSR) before handing over projects to
Operations.
ACCOMPLISHMENTS
• Install equipment for H2S, BTU & moisture control to process gas for sale to
utility. Increase facility capacity from 1 to 4MMSCFD & eliminated facility
shutdown because of off-spec gas.
• Design & construction mobile facility to handle 10,000BFPD & 800MSCFD gas.
• Rehabilitate pipeline for transporting 3-phase fluid with accommodations to bleed
gas to reduce pumping head at wells.
Trained as accident investigator to develop root causes with effective corrective actions.
Page 1 of 2
John P. Chan (661)-747-5999
Bakersfield, CA 93309 jsurfer88@yahoo.com
Chevron Global Manufacturing (Richmond Refinery) 3/2006-9/2010
Design Engineer – Support maintenance of various plants in the refinery by responding
to daily & capital needs as requested.
Daily support to prepare engineering work orders (EWO) per ASME, API, ANSI or
company requirements containing revised P&IDs, sketches to explain the work, pipe
specs & welding procedures, pre & post inspections as required for quality. While the
work is done, visit job site to check progress, answer contractor question, check for
safety and quality concerns and update stakeholders on work progress.
Involved in plant shutdown (SD) preparations:
• Working with a team made up of Ops, Maint & Inspections to define shutdown
scope. Based on data collected from past SD reports as well as maint history &
inspection reports, create scope to enhance design to ensure reliability.
• After scope freeze, start preparing work orders & get them approved by EWO
due date. Spec out & purchase equipment then monitor equipment construction
to ensure quality & schedule are met.
• During SD, support maint crews & contractors by inspecting work during
construction & after completion to make sure all work is done according to scope,
revise EWO if changes needed.
ACCOMPLISHMENTS
Involve in $50MM turnaround for crude unit to ensure 4 year meantime between
shutdown achieved.
$45MM turnaround for FCC unit with same objective.
GWF Power Systems, Pittsburg, CA 2000-2006
Project Engineer – Involved in process & safety improvement projects at 5 plants that
burn petroleum coke in fluidized bed boilers to generate a total of 10MW or electrical
power for sale to PG&E.
Completed the following projects:
• $4mil for secondary fuel feed system at 3 plants. System allowed plants to burn
delayed coke when fluid coke was unavailable. Preventing plant shutdown
creating lost revenue and breach of contract.
• $72K to replace cooling tower fill at 1 plant. Allowed plant to maintain max
production during summer months additional 1MW of power generated.
• Coordinated project to supply demineralizing filters for a simple cycle peaker
plant.
Education:
Successfully completed CA PE exam (Cert# M34355)
Successfully completed CA EIT exam
University of Texas at Arlington - Bachelor of Science in Mechanical Engineering
Page 2 of 2

More Related Content

What's hot

Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
Arun Goyle
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
Thad Gilbert
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
Afaq Ahmad
 
Edward J
Edward JEdward J
Edward J
Edward Key
 
Edward J Key
Edward J KeyEdward J Key
Edward J Key
Edward Key
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
Leslie Banks
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael Bower
Michael Bower
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
Ritu kumar mishra
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
Steve Wonnacott
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
Prasad naik
 
Audie Maxey Resume
Audie Maxey ResumeAudie Maxey Resume
Audie Maxey Resume
Audie Maxey
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
Hussein Khalil
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work History
Tim Rathsam
 
vijay cv
vijay cvvijay cv
vijay cv
vijay prakash
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
Sunil Pillai
 
Ravi-LPG
Ravi-LPGRavi-LPG
Ravi-LPG
Ravikiran GN
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
Muthukumar RajaGounder
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
Gary Chu
 

What's hot (20)

Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Resume Thad Gilbert
Resume Thad GilbertResume Thad Gilbert
Resume Thad Gilbert
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Edward J
Edward JEdward J
Edward J
 
Edward J Key
Edward J KeyEdward J Key
Edward J Key
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
Resume of Michael Bower
Resume of Michael BowerResume of Michael Bower
Resume of Michael Bower
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
Audie Maxey Resume
Audie Maxey ResumeAudie Maxey Resume
Audie Maxey Resume
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work History
 
vijay cv
vijay cvvijay cv
vijay cv
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Ravi-LPG
Ravi-LPGRavi-LPG
Ravi-LPG
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
resume-garychu
resume-garychuresume-garychu
resume-garychu
 

Viewers also liked

Hussam C.V Updated
Hussam C.V UpdatedHussam C.V Updated
Hussam C.V Updated
HUSAM HASSAN
 
Process Engineer
Process EngineerProcess Engineer
Process Engineer
Faith Biongcog
 
02-CERTIFICATE Bagging Machine
02-CERTIFICATE Bagging Machine02-CERTIFICATE Bagging Machine
02-CERTIFICATE Bagging Machine
Yusron Heryono Bn Humaedi
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
Shehreyar Khan
 
Riaz Cv
Riaz CvRiaz Cv
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
MAHMOOD AHMED
 
AlrazizeResumeRotaryequipment
AlrazizeResumeRotaryequipmentAlrazizeResumeRotaryequipment
AlrazizeResumeRotaryequipment
Abdualrhman Alrazize
 
Ram resume
Ram resumeRam resume
An introduction to International Petrochemicals Pvt Ltd.
An introduction to International Petrochemicals Pvt Ltd.An introduction to International Petrochemicals Pvt Ltd.
An introduction to International Petrochemicals Pvt Ltd.
International Petrochemicals (Pvt.) Limited
 
Process engineer
Process engineerProcess engineer
Process engineer
mohamed ahmed abd ellatif
 
Danny Zepeda, Rotor Optics LLC.
Danny Zepeda, Rotor Optics LLC.Danny Zepeda, Rotor Optics LLC.
Danny Zepeda, Rotor Optics LLC.
sUAS News
 
Chemical Process Conception
Chemical Process ConceptionChemical Process Conception
Chemical Process Conception
Gerard B. Hawkins
 
Pressure Systems, Pressure Relief Streams & Protective Devices, Pressure Vessels
Pressure Systems, Pressure Relief Streams & Protective Devices, Pressure VesselsPressure Systems, Pressure Relief Streams & Protective Devices, Pressure Vessels
Pressure Systems, Pressure Relief Streams & Protective Devices, Pressure Vessels
Gerard B. Hawkins
 
major petrochemicals
major petrochemicalsmajor petrochemicals
major petrochemicals
Afzal Zubair
 
Global Petrochemical Marketing Company Profile
Global Petrochemical Marketing Company ProfileGlobal Petrochemical Marketing Company Profile
Global Petrochemical Marketing Company Profile
GPMC Bahrain
 
Petrochemicals
PetrochemicalsPetrochemicals
Petrochemicals
zadabboud
 
petrochemical industry
petrochemical industrypetrochemical industry
petrochemical industry
Siti Nadzifah Ghazali
 
The basic of safety for petrochemicals industries 1
The basic of safety for petrochemicals industries 1The basic of safety for petrochemicals industries 1
The basic of safety for petrochemicals industries 1
Anand Dhouni
 
Air Cooled Heat Exchanger Design
Air Cooled Heat Exchanger DesignAir Cooled Heat Exchanger Design
Air Cooled Heat Exchanger Design
Gerard B. Hawkins
 

Viewers also liked (19)

Hussam C.V Updated
Hussam C.V UpdatedHussam C.V Updated
Hussam C.V Updated
 
Process Engineer
Process EngineerProcess Engineer
Process Engineer
 
02-CERTIFICATE Bagging Machine
02-CERTIFICATE Bagging Machine02-CERTIFICATE Bagging Machine
02-CERTIFICATE Bagging Machine
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
AlrazizeResumeRotaryequipment
AlrazizeResumeRotaryequipmentAlrazizeResumeRotaryequipment
AlrazizeResumeRotaryequipment
 
Ram resume
Ram resumeRam resume
Ram resume
 
An introduction to International Petrochemicals Pvt Ltd.
An introduction to International Petrochemicals Pvt Ltd.An introduction to International Petrochemicals Pvt Ltd.
An introduction to International Petrochemicals Pvt Ltd.
 
Process engineer
Process engineerProcess engineer
Process engineer
 
Danny Zepeda, Rotor Optics LLC.
Danny Zepeda, Rotor Optics LLC.Danny Zepeda, Rotor Optics LLC.
Danny Zepeda, Rotor Optics LLC.
 
Chemical Process Conception
Chemical Process ConceptionChemical Process Conception
Chemical Process Conception
 
Pressure Systems, Pressure Relief Streams & Protective Devices, Pressure Vessels
Pressure Systems, Pressure Relief Streams & Protective Devices, Pressure VesselsPressure Systems, Pressure Relief Streams & Protective Devices, Pressure Vessels
Pressure Systems, Pressure Relief Streams & Protective Devices, Pressure Vessels
 
major petrochemicals
major petrochemicalsmajor petrochemicals
major petrochemicals
 
Global Petrochemical Marketing Company Profile
Global Petrochemical Marketing Company ProfileGlobal Petrochemical Marketing Company Profile
Global Petrochemical Marketing Company Profile
 
Petrochemicals
PetrochemicalsPetrochemicals
Petrochemicals
 
petrochemical industry
petrochemical industrypetrochemical industry
petrochemical industry
 
The basic of safety for petrochemicals industries 1
The basic of safety for petrochemicals industries 1The basic of safety for petrochemicals industries 1
The basic of safety for petrochemicals industries 1
 
Air Cooled Heat Exchanger Design
Air Cooled Heat Exchanger DesignAir Cooled Heat Exchanger Design
Air Cooled Heat Exchanger Design
 

Similar to John P Chan II

John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
John Snyder
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Robert Dimanawa
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
JuanMolina846779
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
yusuf699644
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
Stephen Davidson
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
Jessica Rearick
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
michael burns
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
Dean McNulty
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
Thomas Mathew
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
Hisham Hegab
 
Res414
Res414Res414
Res414
pgh35757
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
SAQIB MANIAR
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
ehsan nazeer
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
ehsan nazeer
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
Marcel Paul
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
Marcel Paul
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
Rashid Faruqi
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
SAQIB MANIAR
 
Curriculum vitae of qasir abbas
Curriculum vitae of qasir abbasCurriculum vitae of qasir abbas
Curriculum vitae of qasir abbas
QASIR ABBAS
 

Similar to John P Chan II (20)

John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Resume-Thomas Mathew
Resume-Thomas MathewResume-Thomas Mathew
Resume-Thomas Mathew
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
Res414
Res414Res414
Res414
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03Marcel - 3 cv Rev 03
Marcel - 3 cv Rev 03
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Curriculum vitae of qasir abbas
Curriculum vitae of qasir abbasCurriculum vitae of qasir abbas
Curriculum vitae of qasir abbas
 

John P Chan II

  • 1. John P. Chan (661)-747-5999 Bakersfield, CA 93309 jsurfer88@yahoo.com SUMARY Professional Mechanical Project Engineer in the Petrochemical industry with over 20 years of experience to ensure projects are design per agreed scope and delivered on time and within budget. Skills used include: HANDS-ON to obtain all pertinent information to create the scope TEAM PLAYER that gets project by-in from operators as well as management MULTI DISCIPLINE- understand basics of other disciplines to oversee entire project DETAIL ORIENTED to ensure cost is within budget and project is on track PROFESSIONAL EXPERIENCE California Resources Corporation 8/2011- 9/2015 Engineering Advisor Facilities – Team member on the Reservoir Management Team (RMT) for several on-shore locations in California ensuring surface facilities capacity is sufficient to receive production forecast. Facilities are used to process, heavy and light oil as well as gas only production. DUTIES • To evaluate existing facility capacities, recommend expansion to meet forecast then develop preliminary scope & cost for the project. • Supervise facility design to ensure all company & industry codes are met. • Ensure P&IDs are accurate then conduct Process Hazard Analysis (PHA) to ensure facility has sufficient migrating elements for safe operation. • Design mechanical and controls per the P&IDs, ensure equipment specified per process requirements & design package is sufficient (P&IDs, plot plan, electrical, mechanical, civil, equipment & equipment specs, cause & effect document, etc) • Manage construction team to ensure quality and specs are met & projects follows scheduled milestones & tracks projected cost. • Document changes in Management of Change program (MOC). • Prepare training & instruction manuals for operations, conduct system checks & final Process Safety System Review (PSSR) before handing over projects to Operations. ACCOMPLISHMENTS • Install equipment for H2S, BTU & moisture control to process gas for sale to utility. Increase facility capacity from 1 to 4MMSCFD & eliminated facility shutdown because of off-spec gas. • Design & construction mobile facility to handle 10,000BFPD & 800MSCFD gas. • Rehabilitate pipeline for transporting 3-phase fluid with accommodations to bleed gas to reduce pumping head at wells. Trained as accident investigator to develop root causes with effective corrective actions. Page 1 of 2
  • 2. John P. Chan (661)-747-5999 Bakersfield, CA 93309 jsurfer88@yahoo.com Chevron Global Manufacturing (Richmond Refinery) 3/2006-9/2010 Design Engineer – Support maintenance of various plants in the refinery by responding to daily & capital needs as requested. Daily support to prepare engineering work orders (EWO) per ASME, API, ANSI or company requirements containing revised P&IDs, sketches to explain the work, pipe specs & welding procedures, pre & post inspections as required for quality. While the work is done, visit job site to check progress, answer contractor question, check for safety and quality concerns and update stakeholders on work progress. Involved in plant shutdown (SD) preparations: • Working with a team made up of Ops, Maint & Inspections to define shutdown scope. Based on data collected from past SD reports as well as maint history & inspection reports, create scope to enhance design to ensure reliability. • After scope freeze, start preparing work orders & get them approved by EWO due date. Spec out & purchase equipment then monitor equipment construction to ensure quality & schedule are met. • During SD, support maint crews & contractors by inspecting work during construction & after completion to make sure all work is done according to scope, revise EWO if changes needed. ACCOMPLISHMENTS Involve in $50MM turnaround for crude unit to ensure 4 year meantime between shutdown achieved. $45MM turnaround for FCC unit with same objective. GWF Power Systems, Pittsburg, CA 2000-2006 Project Engineer – Involved in process & safety improvement projects at 5 plants that burn petroleum coke in fluidized bed boilers to generate a total of 10MW or electrical power for sale to PG&E. Completed the following projects: • $4mil for secondary fuel feed system at 3 plants. System allowed plants to burn delayed coke when fluid coke was unavailable. Preventing plant shutdown creating lost revenue and breach of contract. • $72K to replace cooling tower fill at 1 plant. Allowed plant to maintain max production during summer months additional 1MW of power generated. • Coordinated project to supply demineralizing filters for a simple cycle peaker plant. Education: Successfully completed CA PE exam (Cert# M34355) Successfully completed CA EIT exam University of Texas at Arlington - Bachelor of Science in Mechanical Engineering Page 2 of 2