The Logical Framework Matrix Approach
LFMA
Sofia, December 2018
Mirko VARANO
varano@kth.se
What does the LFMA address?
The term “project” which means a group of activities undertaken to produce a Project
Purpose in a fixed time frame. In development terms a “programme” is taken to mean a
series of projects whose objectives together contribute to a common Overall Objective, at
sector, country or even multi-country level.
LFA
The steps of the analysis
1. Define a project concept – an idea of what project you intend to implement.
2. Decide who the target group for the project will be (the group who will directly receive
benefits and participate in the project). The final beneficiary group is likely to be the
broader community within which the target group is located.
3. Define the problems facing the target group in their situation (what is the focal
problem facing the target group, and what causes this problem)
LFA
The logical framework approach follows a hierarchical results oriented planning structure
and methodology which focuses all project planning elements on the achievement of one
project purpose
NB: no matter the type of programme or action, it is good practice to develop an LFM as a
backbone of your project
Example of problem tree
(stakeholder problem)
The Objectives Tree
Sequence to compile the framework
LFA
The results of the stakeholder, problem, objectives and strategy analysis are used as the basis for preparing the Logical Framework Matrix.
The LFM consists of a matrix with four columns and four (or more) rows, which summarise the key elements of a project plan
LFA Compilation – an example
 Goal: starting at the top and using the information from the Objective Tree write the overall objective of the project. The
overall objective may be beyond the reach of this project on its own, for instances: “To contribute to improved family
health and the general health of the rive ecosystem”.
 Purpose: it describes the desired outcome that the project will achieve. This should be clear and brief. Example: “Improved
river water quality”.
 Outputs: describe the project intervention strategy. There may be several outputs. Example: “1) Reduced volume of
wastewater directly discharged into the river system by households and factories”.
 Activities: these are the tasks that are needed to achieve these outputs. There may be several for each output. Statements
should be brief and with an emphasis on action words. Examples: “1.1) Conduct baseline survey of households and
businesses; 1.2) Complete engineering specifications for expanded sewerage network, etc.”
LFA Second stage
Objectively verifiable indicators of achievement: starting from the top to the bottom of the hierarchy of the objectives, begin to
work across the logframe identifying the Objective Verifiable Indicators for measuring the progress in terms of quantity,
quality and time. There are two kinds of indicators: 1. Impact indicators: related to the overall goal, helps to monitor the
achievement and the impact of the project. Example: “Incidence of water borne diseases, skin infections and blood
disorders caused by heavy metals, reduced by 50% by 2008, specifically among low income families living along the
river”. 2. Process (our outcome) indicators: related to the purpose and results. These measure the extent to which the
stated objectives have been achieved. Example: “Concentration of heavy metal compounds (Pb, Cd, Hg) and untreated
sewerage; reduced by 25% (compared to levels in 2003) and meets established national health/pollution control standards
by end of 2007”.
Sources and means of verification: the source of verification should be considered and specified at the same time as the
formulation of indicators. This will help to test whether or not the indicators can be realistically measured at the expense of
a reasonable amount of time, money and effort.
LFA Third stage
Assumptions: reflecting up from the bottom of the logframe, consider how, if each assumption holds, it will be possible to move
to the next stage of the project. Assumptions are external factors that have the potential to influence (or even determine)
the success of a project, but lie outside the direct control of project managers. Assumptions are usually progressively
identified during the analysis phase. The analysis of stakeholders, problems, objectives and strategies will have highlighted
a number of issues (i.e. policy, institutional, technical, social and/or economic issues) that will impact on the project
‘environment’, but over which the project may have no direct control. In the case of the river water pollution example,
important assumptions might include issues related to: 1. Rainfall and river flow (beyond the project’s control, but
potentially critical in terms of changes in levels/concentration of pollutants found in the river); 2. Householders and
businesses willingness to pay for improved sewerage connexions.
• Goal
• The higher level objective towards which the project is expected to
contribute (mention target groups)
• Purpose
• The effect which is expected to be achieved as the result of the project.
• Outputs
• The results that the project management should be able to guarantee
(mention target groups)
• Activities
• The activities that have to be undertaken by the project in order to
produce outputs.
Intervention Logic
Cause-effect relationship among objectives at several
levels
Inputs
Activities
Outputs
Purpose
Goal
under full control of project
management
beyond control of project
management
THE LOGIC OF A PROGRAMME: A SET OF LINKED
HYPOTHESES
GOAL
PURPOSE
ACTIVITIES
OUTPUTS
if
then
if
then
then
if
PLAN DOWNWARDS
Goal
Assumptions
Purpose
Assumptions
Outputs
Assumptions
Activities
Assumptions
Inputs
AND THEN
THINK UPWARDS
Summary of the logical framework
• Assumptions
• Important events, conditions or decisions outside the control of the project
which must prevail the goal.
• Important events, conditions or decisions outside control of the project
management necessary for the achievement of the purpose.
• Important events, conditions or decisions outside control of the project
management necessary for the production of outputs.
• Important events, conditions, decisions outside control of the project
management necessary for the start of the project.
Assumptions and Preconditions
• Goal
• Measures (direct or indirect) to verify to what extent the goal is fulfilled.
• Purpose
• Measures (direct or indirect) to verify to what extent the purpose is fulfilled.
• Outputs
• Measures (direct or indirect) to verify to what extent the outputs are produced.
• Activities (Inputs)
• Goods, people and services necessary to undertake the activities
Objectively Verifiable Indicators (OVI)
• Goal
• The sources of data necessary to verify status of goal level indicators.
• Purpose
• The sources of data necessary to verify status of purpose level indicators.
• Outputs
• The sources of data necessary to verify status of output level indicators.
• Activities
• The sources of data necessary to verify status of activity level indicators.
Means of verification (MOV)
Objectively Verifiable Indicators
• Indicators must be valid, reliable, precise, cost-effective and stated independently from other
levels.
• Indicators should make clear how the target group will benefit from the realisation of outputs.
• Indicators should be specific in terms of:
• Quality (what?)
• Quantity (how much?)
• Time (when, how long?)
• Target Group (who?)
• Place (where?)
Objectively Verifiable Indicators
• The process of defining indicators forces us to clarify our objectives. A good
indicator at this level is:
a. Plausible: measuring what is important in the project
b. Attributable: measuring changes caused by the project
c. Cost-effective: involving data that may be collected and analyzed inexpensively
d. Independent: not inherent to the project
e. Targeted: how much.., what kind of.., by when
f. Verifiable: to reach agreement
LFA Advantages
 During initial stages, it can be used to test project ideas and concepts for relevance and usefulness
 It guides systematic and logical analysis of the key interrelated elements
 It defines linkages between the project and external factors
 During implementation it serves as the main reference for drawing up detailed work plans, terms of
reference, budgets, etc
 It provides indicators against which the project progress and achievements can be assessed
 It provides a shared methodology and terminology among governments, donor agencies, contractors
and clients
LFA Disadvantages
 Focusing too much on problems rather than opportunities and vision
 Organisations may promote a blueprint, rigid or inflexible approach, making the logframe a
straitjacket to creativity and innovation
 Limited attention to problems of uncertainty where a learning or adaptive approach to
project design and management is required
 The strong focus on results can miss the opportunity to define and improve processes
Logical Framework Matrix – an example
Logical Framework Matrix
• Title: Innovative master programme in Performing Landscape and
Arts with Children through Education
• Erasmus+ Capacity Building - Joint Project
• “The project aims primarily at developing a new set of courses and
modules in order to reform and innovate existing Master Programmes
at the Latin American partner institutions. This will be done by focusing on
landscape architecture and landscape design combined with elements
of environmental awareness and social inclusion with an interesting
angle from a performing arts perspective.”
Logical Framework Matrix – an example
The project specific objectives are:
1. Train students, teachers and researchers with different backgrounds through
multidisciplinary approaches bringing together elements of landscape architecture
and design, performing arts, environmental awareness and social inclusion to
exploit the urban and rural landscape and become multiplier agents of social
education.
2. Create dialogue processes between performing arts and architecture, urban
and rural landscape, being sensitive to social reality of places where the local
community can take part in educational and artistic projects in a sustainable and
innovative way
3. Develop models to strength the relation between cultural, architectural, social,
environmental organizations and communities
4. Share the knowledge and experiences and increase the network of the new
field performing arts meeting landscape architecture
The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)
The logical framework matrix approach (LFMA)

More Related Content

What's hot

Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptx
Nimra zaman
 
Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and Evaluation
Len Fontanilla
 
Results based management
Results based managementResults based management
Results based management
Centre For Development Alternatives
 
Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your projectKarzen & Karzen d.o.o.
 
RBM Presentation
RBM PresentationRBM Presentation
RBM Presentation
Taye Habtie
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects
Tony
 
Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...
Comsats Institute of Information Technology Attock, Punjab Pakistan
 
M & e indicators
M & e indicatorsM & e indicators
M & e indicators
Krishna Mishra
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
Regmi Milan
 
Results-Based Management in UNDP
Results-Based Management in UNDPResults-Based Management in UNDP
Results-Based Management in UNDP
UNDP Eurasia
 
Community development - a different way to think about local economies
Community development - a different way to think about local economiesCommunity development - a different way to think about local economies
Community development - a different way to think about local economies
Julian Dobson
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
Baker Khader Abdallah, PMP
 
THEORY OF CHANGE
THEORY OF CHANGE THEORY OF CHANGE
THEORY OF CHANGE
ICCO Cooperation
 
Results based planning and management
Results based planning and managementResults based planning and management
Results based planning and management
Bilal Naqeeb
 
Monitoring evaluation
Monitoring evaluationMonitoring evaluation
Monitoring evaluationCarlo Magno
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Change
tiffanycfslc
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
Dr. Saima Baig
 

What's hot (20)

Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptx
 
Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and Evaluation
 
Results based management
Results based managementResults based management
Results based management
 
Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your project
 
RBM Presentation
RBM PresentationRBM Presentation
RBM Presentation
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects
 
Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...
 
M & e indicators
M & e indicatorsM & e indicators
M & e indicators
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Results-Based Management in UNDP
Results-Based Management in UNDPResults-Based Management in UNDP
Results-Based Management in UNDP
 
Community development - a different way to think about local economies
Community development - a different way to think about local economiesCommunity development - a different way to think about local economies
Community development - a different way to think about local economies
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
THEORY OF CHANGE
THEORY OF CHANGE THEORY OF CHANGE
THEORY OF CHANGE
 
Results based planning and management
Results based planning and managementResults based planning and management
Results based planning and management
 
Monitoring evaluation
Monitoring evaluationMonitoring evaluation
Monitoring evaluation
 
Problem tree analysis
Problem tree analysisProblem tree analysis
Problem tree analysis
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Change
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
 

Similar to The logical framework matrix approach (LFMA)

Logical Framwwork-1.pptx
Logical Framwwork-1.pptxLogical Framwwork-1.pptx
Logical Framwwork-1.pptx
dgmonari
 
M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptx
bipuait
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Project management
Project managementProject management
Project management
university of sindh
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
SabrinaScott22
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
Logical framework analysis
Logical framework analysisLogical framework analysis
Logical framework analysis
Tilahun Nigatu Haregu
 
Project management professional
Project management professionalProject management professional
Project management professional
Reema
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
Reema
 
Introduction-to-Project-Management systems
Introduction-to-Project-Management systemsIntroduction-to-Project-Management systems
Introduction-to-Project-Management systems
AbshirAhmed8
 
Project Management
Project ManagementProject Management
Project Management
irfan ali
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
ermiasalex30
 
Assignment
Assignment Assignment
Assignment
BarryAllen147
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
PiyushKumar621
 
Logframe brainstormers
Logframe brainstormersLogframe brainstormers
Logframe brainstormers
Nicolentombifikile
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
Tony
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notesTony
 
0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt
AbelMuluqen
 
Project formulation
Project formulationProject formulation

Similar to The logical framework matrix approach (LFMA) (20)

Logical Framwwork-1.pptx
Logical Framwwork-1.pptxLogical Framwwork-1.pptx
Logical Framwwork-1.pptx
 
M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptx
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Project management
Project managementProject management
Project management
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
Logical framework analysis
Logical framework analysisLogical framework analysis
Logical framework analysis
 
Lfa
LfaLfa
Lfa
 
Project management professional
Project management professionalProject management professional
Project management professional
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Introduction-to-Project-Management systems
Introduction-to-Project-Management systemsIntroduction-to-Project-Management systems
Introduction-to-Project-Management systems
 
Project Management
Project ManagementProject Management
Project Management
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
 
Assignment
Assignment Assignment
Assignment
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
 
Logframe brainstormers
Logframe brainstormersLogframe brainstormers
Logframe brainstormers
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notes
 
0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt0. Foundations of project management (2).ppt
0. Foundations of project management (2).ppt
 
Project formulation
Project formulationProject formulation
Project formulation
 

More from PhDSofiaUniversity

Project UniverCity - Community Research Awards - ToT session III
Project UniverCity - Community Research Awards - ToT session IIIProject UniverCity - Community Research Awards - ToT session III
Project UniverCity - Community Research Awards - ToT session III
PhDSofiaUniversity
 
Project UniverCity - Community Research Awards - ToT session II
Project UniverCity - Community Research Awards - ToT session IIProject UniverCity - Community Research Awards - ToT session II
Project UniverCity - Community Research Awards - ToT session II
PhDSofiaUniversity
 
Project UniverCity - Community Research Awards - ToT session I
Project UniverCity - Community Research Awards - ToT session IProject UniverCity - Community Research Awards - ToT session I
Project UniverCity - Community Research Awards - ToT session I
PhDSofiaUniversity
 
Платформата Early Birds
Платформата Early BirdsПлатформата Early Birds
Платформата Early Birds
PhDSofiaUniversity
 
Big Data in Economic Research: Twitter, Phone calls and Political events
Big Data in Economic Research: Twitter, Phone calls and Political eventsBig Data in Economic Research: Twitter, Phone calls and Political events
Big Data in Economic Research: Twitter, Phone calls and Political events
PhDSofiaUniversity
 
Legal Research on Europe: Possiblity and Challenges of Intredisciplinarity
Legal Research on Europe: Possiblity and Challenges of IntredisciplinarityLegal Research on Europe: Possiblity and Challenges of Intredisciplinarity
Legal Research on Europe: Possiblity and Challenges of Intredisciplinarity
PhDSofiaUniversity
 
Финансиране от Фонд "Научни изследвания"
Финансиране от Фонд "Научни изследвания"Финансиране от Фонд "Научни изследвания"
Финансиране от Фонд "Научни изследвания"
PhDSofiaUniversity
 
European project management
European project managementEuropean project management
European project management
PhDSofiaUniversity
 
Erasmus+ Knowledge Alliances
Erasmus+ Knowledge AlliancesErasmus+ Knowledge Alliances
Erasmus+ Knowledge Alliances
PhDSofiaUniversity
 
Effective development and management of joint programmes
Effective development and management of joint programmesEffective development and management of joint programmes
Effective development and management of joint programmes
PhDSofiaUniversity
 
Erasmus+ Strategic Partnership
Erasmus+ Strategic PartnershipErasmus+ Strategic Partnership
Erasmus+ Strategic Partnership
PhDSofiaUniversity
 
Erasmus+ Capacity Building
Erasmus+ Capacity BuildingErasmus+ Capacity Building
Erasmus+ Capacity Building
PhDSofiaUniversity
 
Erasmus Mundus Joint Master Degrees
Erasmus Mundus Joint Master DegreesErasmus Mundus Joint Master Degrees
Erasmus Mundus Joint Master Degrees
PhDSofiaUniversity
 
Erasmus+ International Credit Mobility
Erasmus+ International Credit MobilityErasmus+ International Credit Mobility
Erasmus+ International Credit Mobility
PhDSofiaUniversity
 
Wos su june2017
Wos su june2017Wos su june2017
Wos su june2017
PhDSofiaUniversity
 
Marie Sklodowska Curie Actions
Marie Sklodowska Curie ActionsMarie Sklodowska Curie Actions
Marie Sklodowska Curie Actions
PhDSofiaUniversity
 
The Logical Framework Matrix Approach
The Logical Framework Matrix ApproachThe Logical Framework Matrix Approach
The Logical Framework Matrix Approach
PhDSofiaUniversity
 
The EU Legal Framework on Higher Education Policies and International Coopera...
The EU Legal Framework on Higher Education Policies and International Coopera...The EU Legal Framework on Higher Education Policies and International Coopera...
The EU Legal Framework on Higher Education Policies and International Coopera...
PhDSofiaUniversity
 
Erasmus+ Knowledge Alliances
Erasmus+ Knowledge AlliancesErasmus+ Knowledge Alliances
Erasmus+ Knowledge Alliances
PhDSofiaUniversity
 
The Internationalization of Higher Education
The Internationalization of Higher EducationThe Internationalization of Higher Education
The Internationalization of Higher Education
PhDSofiaUniversity
 

More from PhDSofiaUniversity (20)

Project UniverCity - Community Research Awards - ToT session III
Project UniverCity - Community Research Awards - ToT session IIIProject UniverCity - Community Research Awards - ToT session III
Project UniverCity - Community Research Awards - ToT session III
 
Project UniverCity - Community Research Awards - ToT session II
Project UniverCity - Community Research Awards - ToT session IIProject UniverCity - Community Research Awards - ToT session II
Project UniverCity - Community Research Awards - ToT session II
 
Project UniverCity - Community Research Awards - ToT session I
Project UniverCity - Community Research Awards - ToT session IProject UniverCity - Community Research Awards - ToT session I
Project UniverCity - Community Research Awards - ToT session I
 
Платформата Early Birds
Платформата Early BirdsПлатформата Early Birds
Платформата Early Birds
 
Big Data in Economic Research: Twitter, Phone calls and Political events
Big Data in Economic Research: Twitter, Phone calls and Political eventsBig Data in Economic Research: Twitter, Phone calls and Political events
Big Data in Economic Research: Twitter, Phone calls and Political events
 
Legal Research on Europe: Possiblity and Challenges of Intredisciplinarity
Legal Research on Europe: Possiblity and Challenges of IntredisciplinarityLegal Research on Europe: Possiblity and Challenges of Intredisciplinarity
Legal Research on Europe: Possiblity and Challenges of Intredisciplinarity
 
Финансиране от Фонд "Научни изследвания"
Финансиране от Фонд "Научни изследвания"Финансиране от Фонд "Научни изследвания"
Финансиране от Фонд "Научни изследвания"
 
European project management
European project managementEuropean project management
European project management
 
Erasmus+ Knowledge Alliances
Erasmus+ Knowledge AlliancesErasmus+ Knowledge Alliances
Erasmus+ Knowledge Alliances
 
Effective development and management of joint programmes
Effective development and management of joint programmesEffective development and management of joint programmes
Effective development and management of joint programmes
 
Erasmus+ Strategic Partnership
Erasmus+ Strategic PartnershipErasmus+ Strategic Partnership
Erasmus+ Strategic Partnership
 
Erasmus+ Capacity Building
Erasmus+ Capacity BuildingErasmus+ Capacity Building
Erasmus+ Capacity Building
 
Erasmus Mundus Joint Master Degrees
Erasmus Mundus Joint Master DegreesErasmus Mundus Joint Master Degrees
Erasmus Mundus Joint Master Degrees
 
Erasmus+ International Credit Mobility
Erasmus+ International Credit MobilityErasmus+ International Credit Mobility
Erasmus+ International Credit Mobility
 
Wos su june2017
Wos su june2017Wos su june2017
Wos su june2017
 
Marie Sklodowska Curie Actions
Marie Sklodowska Curie ActionsMarie Sklodowska Curie Actions
Marie Sklodowska Curie Actions
 
The Logical Framework Matrix Approach
The Logical Framework Matrix ApproachThe Logical Framework Matrix Approach
The Logical Framework Matrix Approach
 
The EU Legal Framework on Higher Education Policies and International Coopera...
The EU Legal Framework on Higher Education Policies and International Coopera...The EU Legal Framework on Higher Education Policies and International Coopera...
The EU Legal Framework on Higher Education Policies and International Coopera...
 
Erasmus+ Knowledge Alliances
Erasmus+ Knowledge AlliancesErasmus+ Knowledge Alliances
Erasmus+ Knowledge Alliances
 
The Internationalization of Higher Education
The Internationalization of Higher EducationThe Internationalization of Higher Education
The Internationalization of Higher Education
 

Recently uploaded

How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
Celine George
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
EduSkills OECD
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
AzmatAli747758
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
bennyroshan06
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 

Recently uploaded (20)

How to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERPHow to Create Map Views in the Odoo 17 ERP
How to Create Map Views in the Odoo 17 ERP
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 

The logical framework matrix approach (LFMA)

  • 1. The Logical Framework Matrix Approach LFMA Sofia, December 2018 Mirko VARANO varano@kth.se
  • 2. What does the LFMA address? The term “project” which means a group of activities undertaken to produce a Project Purpose in a fixed time frame. In development terms a “programme” is taken to mean a series of projects whose objectives together contribute to a common Overall Objective, at sector, country or even multi-country level.
  • 3. LFA The steps of the analysis 1. Define a project concept – an idea of what project you intend to implement. 2. Decide who the target group for the project will be (the group who will directly receive benefits and participate in the project). The final beneficiary group is likely to be the broader community within which the target group is located. 3. Define the problems facing the target group in their situation (what is the focal problem facing the target group, and what causes this problem)
  • 4. LFA The logical framework approach follows a hierarchical results oriented planning structure and methodology which focuses all project planning elements on the achievement of one project purpose NB: no matter the type of programme or action, it is good practice to develop an LFM as a backbone of your project
  • 5. Example of problem tree (stakeholder problem)
  • 7. Sequence to compile the framework
  • 8. LFA The results of the stakeholder, problem, objectives and strategy analysis are used as the basis for preparing the Logical Framework Matrix. The LFM consists of a matrix with four columns and four (or more) rows, which summarise the key elements of a project plan
  • 9. LFA Compilation – an example  Goal: starting at the top and using the information from the Objective Tree write the overall objective of the project. The overall objective may be beyond the reach of this project on its own, for instances: “To contribute to improved family health and the general health of the rive ecosystem”.  Purpose: it describes the desired outcome that the project will achieve. This should be clear and brief. Example: “Improved river water quality”.  Outputs: describe the project intervention strategy. There may be several outputs. Example: “1) Reduced volume of wastewater directly discharged into the river system by households and factories”.  Activities: these are the tasks that are needed to achieve these outputs. There may be several for each output. Statements should be brief and with an emphasis on action words. Examples: “1.1) Conduct baseline survey of households and businesses; 1.2) Complete engineering specifications for expanded sewerage network, etc.”
  • 10. LFA Second stage Objectively verifiable indicators of achievement: starting from the top to the bottom of the hierarchy of the objectives, begin to work across the logframe identifying the Objective Verifiable Indicators for measuring the progress in terms of quantity, quality and time. There are two kinds of indicators: 1. Impact indicators: related to the overall goal, helps to monitor the achievement and the impact of the project. Example: “Incidence of water borne diseases, skin infections and blood disorders caused by heavy metals, reduced by 50% by 2008, specifically among low income families living along the river”. 2. Process (our outcome) indicators: related to the purpose and results. These measure the extent to which the stated objectives have been achieved. Example: “Concentration of heavy metal compounds (Pb, Cd, Hg) and untreated sewerage; reduced by 25% (compared to levels in 2003) and meets established national health/pollution control standards by end of 2007”. Sources and means of verification: the source of verification should be considered and specified at the same time as the formulation of indicators. This will help to test whether or not the indicators can be realistically measured at the expense of a reasonable amount of time, money and effort.
  • 11. LFA Third stage Assumptions: reflecting up from the bottom of the logframe, consider how, if each assumption holds, it will be possible to move to the next stage of the project. Assumptions are external factors that have the potential to influence (or even determine) the success of a project, but lie outside the direct control of project managers. Assumptions are usually progressively identified during the analysis phase. The analysis of stakeholders, problems, objectives and strategies will have highlighted a number of issues (i.e. policy, institutional, technical, social and/or economic issues) that will impact on the project ‘environment’, but over which the project may have no direct control. In the case of the river water pollution example, important assumptions might include issues related to: 1. Rainfall and river flow (beyond the project’s control, but potentially critical in terms of changes in levels/concentration of pollutants found in the river); 2. Householders and businesses willingness to pay for improved sewerage connexions.
  • 12. • Goal • The higher level objective towards which the project is expected to contribute (mention target groups) • Purpose • The effect which is expected to be achieved as the result of the project. • Outputs • The results that the project management should be able to guarantee (mention target groups) • Activities • The activities that have to be undertaken by the project in order to produce outputs. Intervention Logic
  • 13. Cause-effect relationship among objectives at several levels Inputs Activities Outputs Purpose Goal under full control of project management beyond control of project management
  • 14. THE LOGIC OF A PROGRAMME: A SET OF LINKED HYPOTHESES GOAL PURPOSE ACTIVITIES OUTPUTS if then if then then if
  • 16. Summary of the logical framework • Assumptions • Important events, conditions or decisions outside the control of the project which must prevail the goal. • Important events, conditions or decisions outside control of the project management necessary for the achievement of the purpose. • Important events, conditions or decisions outside control of the project management necessary for the production of outputs. • Important events, conditions, decisions outside control of the project management necessary for the start of the project. Assumptions and Preconditions
  • 17. • Goal • Measures (direct or indirect) to verify to what extent the goal is fulfilled. • Purpose • Measures (direct or indirect) to verify to what extent the purpose is fulfilled. • Outputs • Measures (direct or indirect) to verify to what extent the outputs are produced. • Activities (Inputs) • Goods, people and services necessary to undertake the activities Objectively Verifiable Indicators (OVI)
  • 18. • Goal • The sources of data necessary to verify status of goal level indicators. • Purpose • The sources of data necessary to verify status of purpose level indicators. • Outputs • The sources of data necessary to verify status of output level indicators. • Activities • The sources of data necessary to verify status of activity level indicators. Means of verification (MOV)
  • 19. Objectively Verifiable Indicators • Indicators must be valid, reliable, precise, cost-effective and stated independently from other levels. • Indicators should make clear how the target group will benefit from the realisation of outputs. • Indicators should be specific in terms of: • Quality (what?) • Quantity (how much?) • Time (when, how long?) • Target Group (who?) • Place (where?)
  • 20. Objectively Verifiable Indicators • The process of defining indicators forces us to clarify our objectives. A good indicator at this level is: a. Plausible: measuring what is important in the project b. Attributable: measuring changes caused by the project c. Cost-effective: involving data that may be collected and analyzed inexpensively d. Independent: not inherent to the project e. Targeted: how much.., what kind of.., by when f. Verifiable: to reach agreement
  • 21. LFA Advantages  During initial stages, it can be used to test project ideas and concepts for relevance and usefulness  It guides systematic and logical analysis of the key interrelated elements  It defines linkages between the project and external factors  During implementation it serves as the main reference for drawing up detailed work plans, terms of reference, budgets, etc  It provides indicators against which the project progress and achievements can be assessed  It provides a shared methodology and terminology among governments, donor agencies, contractors and clients
  • 22. LFA Disadvantages  Focusing too much on problems rather than opportunities and vision  Organisations may promote a blueprint, rigid or inflexible approach, making the logframe a straitjacket to creativity and innovation  Limited attention to problems of uncertainty where a learning or adaptive approach to project design and management is required  The strong focus on results can miss the opportunity to define and improve processes
  • 23. Logical Framework Matrix – an example
  • 24. Logical Framework Matrix • Title: Innovative master programme in Performing Landscape and Arts with Children through Education • Erasmus+ Capacity Building - Joint Project • “The project aims primarily at developing a new set of courses and modules in order to reform and innovate existing Master Programmes at the Latin American partner institutions. This will be done by focusing on landscape architecture and landscape design combined with elements of environmental awareness and social inclusion with an interesting angle from a performing arts perspective.”
  • 25. Logical Framework Matrix – an example The project specific objectives are: 1. Train students, teachers and researchers with different backgrounds through multidisciplinary approaches bringing together elements of landscape architecture and design, performing arts, environmental awareness and social inclusion to exploit the urban and rural landscape and become multiplier agents of social education. 2. Create dialogue processes between performing arts and architecture, urban and rural landscape, being sensitive to social reality of places where the local community can take part in educational and artistic projects in a sustainable and innovative way 3. Develop models to strength the relation between cultural, architectural, social, environmental organizations and communities 4. Share the knowledge and experiences and increase the network of the new field performing arts meeting landscape architecture