 Introduction
 Origin
 Meaning
 Definition
 Purpose
 Characteristics
 Types
 Objectives
 Principle
 Procedure
 Team organisation
and types
 Facilities required
 Advantages
 Limitations
 Suggestions
 Most modern technique in the field of
Educational Technology.
 Concept arose in 1957.
 Best-known and commonly used plan –
Trump plan of teaching – named after
Professor J. Lloyd trump.
 Concept of Team teaching has its origin from
America during the mid-1950.
 Reached England in 1960.
 J. Freedom’s team teaching in Britain gives
an account of its growth in the country.
 Harvard University – initiated an internship
plan in 1955.
 Second mile stone – Project in Lexington
(1957-64)
 Francis Chase of the University of Chicago
has developed the need for team teaching.
 J. Leyod Trump – valuable contribution for
the success of team teaching.
 Extended to armed forces for teaching
purpose during second world war.
 Defined by several persons.
 Warwick – “Team-teaching is a form of
organization in which individual teachers
decides to pool resources, interests and
expertise in order to devise and implement a
scheme of work suitable for the needs of
their pupils and the facilities of their schools”.
 J. Lloyd Trump – “An arrangement whereby
two or more teachers with assistants plan,
instruct and evaluate co-operatively two or
more classes in order to take advantage of
their respective special competencies as
teachers”.
 Carlo–Olson – “An instructional situation
where two or more teachers possessing
complementary teaching skills cooperatively
plan and implement the instruction for a
single group of students using flexible
scheduling and grouping techniques to meet
the particular instruction”.
 “ An arrangement whereby two or more
teachers, with or without teaching-aids
cooperatively plan, instruct and evaluate one
or more class groups in an appropriate
instructional space and given length of time
so as to take advantage of the special
competencies of the team members”
 Chaplin – “Team teaching is a type of
instructional organisation involving teaching
teams and the students assigned to them, in
which two or more teachers are given
responsibility, working together for all or a
significant part of instruction of the same
group of students”.
 Goal – Improvement of teaching
 Utilizes teacher’s specialized interests, skills,
time and energy.
 Ensures preparation of lessons, materials
and aids – create motivation.
 Increases the possibility of variety of
instruction.
 Role differentiation of team members.
 Regrouping of students.
 Rescheduling of time.
 Redesign of teaching space.
 Common time or planning.
 Integration of learning in a meaningful way.
 Development of resource centres.
 Station – 2 Teachers – 4 station – circulate
within the 4 stations
 Parallel – 2 Teachers – 2 equal groups –
Each takes one
 Alternative – 2 teachers – 2 unequal groups
– Larger group taken by one teacher and
small group taken by another one.
 To make the best use of expertise of
teachers.
 To improve the quality of teaching.
 To develop the feelings of co-operation or
group work.
 To help the students.
 Principle of size and composition:
 Principle of duties assigning to teachers of
the team:
 Principle of learning environment:
 Principle of time factor:
 Principle of supervision:
 Step 1 – Planning
 Step 2 – Organizing
 Step 3 – Evaluating
 Deciding the topic
 Writing the terminal objectives
 Identify the initial behaviour
 Prepare the tentative schedule
 Assigning the duties
 Fixing the level of instruction
 Selecting appropriate teaching aids and
demonstration equipment's
 Evaluating the students performance
 Determining the level of instruction
 Presentation of lead lecture by a competent
teacher of the team
 Follow up work
 Providing motivation and reinforcement
 Supervision of students activities
 Conscious about time schedule and duties
assigned
 Asking questions – oral, written or practical
work
 Taking decision about the level of
performance
 Diagnosing the difficulties of learners
 Revising the planning and organizing the
phases
 Basic unit – teacher
 Criteria – Teacher’s experience, skill and
specialty
 Joint responsibility for instruction
 3 – 8 teachers for 75 – 240 students
 Clerical and secretarial needs cared by
clerical staff
 Single subject team:
 Interdisciplinary team:
 Hierarchical team:
 Synergetic team:
 Flexibility
 Time schedule
 Flexible school building
 Flexible school organization
 Utilizes the competencies of the teachers
 Creates learning environment for better
comprehension and mastery
 Provides an opportunity for free discussion
 Provides an opportunity to the teachers to
develop the professional status
 Develops team spirit
 Saves time and energy
 Highly flexible method of teaching
 Enables the students to become more aware
of their own approach, knowledge and other
experts
 Difficult to seek co-operation among
teachers
 Teachers do not like to deviate from the
routine method of teaching
 Success will depend upon the way it works
in practice
 Success depends upon the co-operation and
devotion of the teachers
 They themselves should prefer the activities
of teaching
 Student –teachers should be trained for this
type of teaching
 Success largely depend upon a balanced
team

Team teaching

  • 2.
     Introduction  Origin Meaning  Definition  Purpose  Characteristics  Types  Objectives  Principle  Procedure  Team organisation and types  Facilities required  Advantages  Limitations  Suggestions
  • 3.
     Most moderntechnique in the field of Educational Technology.  Concept arose in 1957.  Best-known and commonly used plan – Trump plan of teaching – named after Professor J. Lloyd trump.
  • 4.
     Concept ofTeam teaching has its origin from America during the mid-1950.  Reached England in 1960.  J. Freedom’s team teaching in Britain gives an account of its growth in the country.  Harvard University – initiated an internship plan in 1955.
  • 5.
     Second milestone – Project in Lexington (1957-64)  Francis Chase of the University of Chicago has developed the need for team teaching.  J. Leyod Trump – valuable contribution for the success of team teaching.  Extended to armed forces for teaching purpose during second world war.
  • 7.
     Defined byseveral persons.  Warwick – “Team-teaching is a form of organization in which individual teachers decides to pool resources, interests and expertise in order to devise and implement a scheme of work suitable for the needs of their pupils and the facilities of their schools”.
  • 8.
     J. LloydTrump – “An arrangement whereby two or more teachers with assistants plan, instruct and evaluate co-operatively two or more classes in order to take advantage of their respective special competencies as teachers”.
  • 9.
     Carlo–Olson –“An instructional situation where two or more teachers possessing complementary teaching skills cooperatively plan and implement the instruction for a single group of students using flexible scheduling and grouping techniques to meet the particular instruction”.
  • 10.
     “ Anarrangement whereby two or more teachers, with or without teaching-aids cooperatively plan, instruct and evaluate one or more class groups in an appropriate instructional space and given length of time so as to take advantage of the special competencies of the team members”
  • 11.
     Chaplin –“Team teaching is a type of instructional organisation involving teaching teams and the students assigned to them, in which two or more teachers are given responsibility, working together for all or a significant part of instruction of the same group of students”.
  • 12.
     Goal –Improvement of teaching  Utilizes teacher’s specialized interests, skills, time and energy.  Ensures preparation of lessons, materials and aids – create motivation.  Increases the possibility of variety of instruction.
  • 13.
     Role differentiationof team members.  Regrouping of students.  Rescheduling of time.  Redesign of teaching space.  Common time or planning.  Integration of learning in a meaningful way.  Development of resource centres.
  • 14.
     Station –2 Teachers – 4 station – circulate within the 4 stations  Parallel – 2 Teachers – 2 equal groups – Each takes one  Alternative – 2 teachers – 2 unequal groups – Larger group taken by one teacher and small group taken by another one.
  • 15.
     To makethe best use of expertise of teachers.  To improve the quality of teaching.  To develop the feelings of co-operation or group work.  To help the students.
  • 16.
     Principle ofsize and composition:  Principle of duties assigning to teachers of the team:  Principle of learning environment:  Principle of time factor:  Principle of supervision:
  • 17.
     Step 1– Planning  Step 2 – Organizing  Step 3 – Evaluating
  • 18.
     Deciding thetopic  Writing the terminal objectives  Identify the initial behaviour  Prepare the tentative schedule  Assigning the duties  Fixing the level of instruction  Selecting appropriate teaching aids and demonstration equipment's  Evaluating the students performance
  • 19.
     Determining thelevel of instruction  Presentation of lead lecture by a competent teacher of the team  Follow up work  Providing motivation and reinforcement  Supervision of students activities  Conscious about time schedule and duties assigned
  • 20.
     Asking questions– oral, written or practical work  Taking decision about the level of performance  Diagnosing the difficulties of learners  Revising the planning and organizing the phases
  • 21.
     Basic unit– teacher  Criteria – Teacher’s experience, skill and specialty  Joint responsibility for instruction  3 – 8 teachers for 75 – 240 students  Clerical and secretarial needs cared by clerical staff
  • 22.
     Single subjectteam:  Interdisciplinary team:  Hierarchical team:  Synergetic team:
  • 23.
     Flexibility  Timeschedule  Flexible school building  Flexible school organization
  • 24.
     Utilizes thecompetencies of the teachers  Creates learning environment for better comprehension and mastery  Provides an opportunity for free discussion  Provides an opportunity to the teachers to develop the professional status  Develops team spirit
  • 25.
     Saves timeand energy  Highly flexible method of teaching  Enables the students to become more aware of their own approach, knowledge and other experts
  • 26.
     Difficult toseek co-operation among teachers  Teachers do not like to deviate from the routine method of teaching
  • 27.
     Success willdepend upon the way it works in practice  Success depends upon the co-operation and devotion of the teachers  They themselves should prefer the activities of teaching  Student –teachers should be trained for this type of teaching  Success largely depend upon a balanced team