The document summarizes the findings of an electrical audit conducted at Sutherland's Malad facility in Mumbai. It identifies opportunities to optimize infrastructure capacity and control wastage, which could lead to significant opex and capex savings. Specific recommendations include lowering the contract demand from 500kVA to 400kVA, replacing the 500kVA generator with a 400kVA one, replacing the 3x60kVA UPS system with 3x40kVA, and controlling lighting and desktop wastage. Annual savings of nearly Rs. 10 lakh are estimated from infrastructure optimization and over Rs. 22 lakh from wastage control measures.