Results from Electrical Audit of  Sutherland’s Malad Facility, Mumbai Presentation to Mr. K.P. Nair & Mr. Ramunni Nair Version 1 January 17, 2008
About This Presentation ,[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Audit Scope of Work ATS LDB Panel UPS SBP  3 x 60 kVA HVAC  Panel UPS SBP 20 KVA DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DG Backup DB5 500 kVA DG Energy meter  Chiller Plant DB5 DB5 Sever Room Main LT Panel PFC-1 100 KVAR Chiller Distribution AMF-1 AMF-2 AMF Panels  Main LT Panel  APFC  625 kVA  500 kVA  125 kVA  1 st  Floor end to end Power Distribution System 1 1 1 1 1 1 1 1 1 1
Audit Scope of Work LTG Panel UPS SBP  3 x 40 kVA HVAC  Panel DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DB5 DB5 DB5 ATS DG Backup 500 kVA DG Energy meter  Main LT Panel PFC-1 100 KVAR AMF-1 AMF Panels  Main LT Panel  APFC  2 nd   Floor end to end Power Distribution system 1 1 1 1 1
Reliance Power  Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DG Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DG Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Load Balancing on EB and DG Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
APFC Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Changeover Panel Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Power Distribution Panels Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
UPS Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Other Loads Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Loads and their Maximum Consumption Electricity Bill Unit = 1kW 2x2x80kVA UPS   (For Facility) 30 KVA UPS   (For Server Room) AHU & Chiller Plant (AHU 33.69KVA, Chiller 111 KVA) LDB  (For Lighting) Current: 58.17 kVA Current: 141.8 kVA Current: 13.47 kVA Current: 144.63 kVA Current: 52.44 kVA 3   Split A/C (2x10TR, 1x7.5TR, 2x5.5TR) Elevator A1, A2, and Pumps Current:12.2 kVA Total: 436.18 kVA Max
Capacity vs. Utilization Reliance Power ,[object Object],[object Object],[object Object],500 kVA MD utilization by Sutherland = 370/500 = 74% 370 TOTAL 0.94 0.95 0.93 PF 41.53 498.7 511.9 503.3 Current (A) 0.858 N 121 243.8 B 126 244.4 Y 123 243.9 R kVA Voltage (V) 500 kVA
Capacity vs. Utilization Generator (UPS and Chiller Plant) DG utilization = 245.7/500 = 49.14% ,[object Object],[object Object],[object Object],[object Object],[object Object],245.7 TOTAL 0.78 0.81 0.78 PF 391.5 328.5 281.5 Current (A) 93.7 237.6 B 77.0 237.1 Y 75.0 236.2 R KVA Voltage (V) 500 kVA
Capacity vs. Utilization Generator (DG-1) DG utilization = 68.2/160 = 42.6% ,[object Object],[object Object],[object Object],[object Object],68.2 TOTAL 0.76 0.79 0.83 PF 78.9 91.8 107.4 Current (A) 19.2 243.5 B 23.1 241.1 Y 25.9 240.2 R KVA Voltage (V) 160 kVA
Capacity vs. Utilization Generator (DG-2) DG utilization = 49.8/160 = 31% ,[object Object],[object Object],[object Object],[object Object],49.8 TOTAL 0.78 0.77 0.67 PF 80.6 67.1 62.2 Current (A) 19.1 236.8 B 15.9 238.9 Y 14.8 238.1 R KVA Voltage (V) 160 kVA
Capacity vs. Utilization UPS Continued... 34.4 TOTAL 0.63 0.68 0.68 PF 48.0 55.7 46.9 Current (A) 11.3 235.8 B 12.2 233.9 Y 10.9 233.0 R KVA Voltage (V) 80 kVA-1 34.9 TOTAL 0.65 0.65 0.65 PF 48.1 49.1 50.6 Current (A) 11.5 237.3 B 11.7 235.8 Y 11.7 235.0 R KVA Voltage (V) 80 kVA-2 13.47 TOTAL 0.67 0.68 0.64 PF 19.37 18.67 19.80 Current (A) 4.54 232.8 B 4.34 232.5 Y 4.59 231.5 R KVA Voltage (V) 30 kVA
Capacity vs. Utilization UPS UPS utilization = 155.27/350 = 44.3% ,[object Object],[object Object],[object Object],35.5 TOTAL 0.67 0.66 0.64 PF 52.4 49.4 51.0 Current (A) 12.2 233.9 B 11.5 233.0 Y 11.8 232.1 R KVA Voltage (V) 80 kVA-3 37.0 TOTAL 0.60 0.51 0.73 PF 40.3 57.3 60.2 Current (A) 9.5 234.4 B 13.5 233.7 Y 14.0 232.6 R KVA Voltage (V) 80 kVA-4
Capacity vs. Utilization Split AC (6 th  Floor   UPS Room) UPS Room AC-1 utilization = 5.9/18.7 = 31.5%  UPS Room AC-2 utilization = 6.17/18.7 = 33%  UPS Room AC-1 and AC-2 utilization = 32.25% Considering 1TR = 3.5KVA, 5.90 TOTAL 0.87 0.85 0.83 PF 10.31 7.52 7.63 Current (A) 2.40 233.9 B 1.74 231.6 Y 1.76 230.2 R KVA Voltage (V) 5.5TR-1 6.17 TOTAL 0.86 0.85 0.87 PF 7.88 7.83 10.65 Current (A) 1.86 234.4 B 1.84 235.0 Y 2.47 233.0 R KVA Voltage (V) 5.5TR-2
Capacity vs. Utilization Split AC (8 th   Floor   UPS Room) UPS Room AC Utilization = 11.11/26.25 = 42.3% 11.11 TOTAL 0.81 0.83 0.77 PF 16.51 15.55 15.64 Current (A) 3.87 234.0 B 3.63 232.3 Y 3.61 230.7 R KVA Voltage (V) 7.5TR
Capacity vs. Utilization Split AC (Server   UPS Room) Server Room AC-1 Utilization = 14.84/28 = 53% Server Room AC-2 Utilization = 14.42/28 = 51.5% Server Room AC-1 and AC-2 Utilization = 29.26/56 = 52.25% 14.84 TOTAL 0.71 0.77 0.80 PF 19.12 22.53 21.95 Current (A) 4.49 235.0 B 5.24 232.7 Y 5.11 231.6 R KVA Voltage (V) 8TR-1 14.42 TOTAL 0.71 0.77 0.77 PF 18.76 21.89 21.44 Current (A) 4.37 234.2 B 5.07 233.0 Y 4.98 232.6 R KVA Voltage (V) 8TR-2
Capacity vs. Utilization 6 th  Floor LDB 6 th  Floor Lighting Utilization = 9.6/58.17 = 16.5% 9.6 TOTAL 0.86 0.86 0.89 PF 10.65 9.38 20.83 Current (A) 2.51 236.3 B 2.21 235.6 Y 4.88 233.6 R KVA Voltage (V) 6 th  Floor
Capacity vs. Utilization 7 th  Floor LDB 7th Floor Lighting Utilization = 19.69/58.17 = 33.8% 19.69 TOTAL 0.76 0.75 0.72 PF 27.42 26.96 29.00 Current (A) 6.49 237.1 B 6.37 235.5 Y 6.83 233.4 R KVA Voltage (V) 7 th  Floor
Capacity vs. Utilization 8 th  Floor LDB 8th Floor Lighting Utilization = 19.29/58.17 = 33.2% 19.29 TOTAL 0.78 0.79 0.63 PF 31.97 22.62 27.81 Current (A) 7.47 234.4 B 5.31 234.6 Y 6.51 234.5 R KVA Voltage (V) 8 th  Floor
Capacity vs. Utilization 9 th  Floor LDB 9th Floor Lighting Utilization = 9.59/58.17 = 16.5% 9.59 TOTAL 0.2 0.75 0.59 PF 13.45 14.07 13.28 Current (A) 3.16 234.4 B 3.32 235.2 Y 3.11 234.1 R KVA Voltage (V) 9 th  Floor
Capacity vs. Utilization Elevator (Lift A1 and A2) Elevator A2 Utilization = 6.43/7.5 = 85.7% Elevator A1 Utilization = 5.77/7.5 = 76.9% Total Elevator (A1&A2) Utilization = 12.2/15 = 81.3% 6.43 TOTAL .081 0.79 0.42 PF 8.70 6.74 14.03 Current (A) 1.49 235.8 B 1.66 235.7 Y 3.28 233.7 R KVA Voltage (V) Lift A1 5.77 TOTAL 0.79 0.63 0.49 PF 9.84 7.84 10.07 Current (A) 1.66 236.0 B 2.92 236.6 Y 1.19 234.5 R KVA Voltage (V) Lift A2
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Electricity Bill Analysis ,[object Object],[object Object],19,888.28 19,350.00 19,674.00 22,582.00 Jan 2007 Feb 2007 Mar 2007 May 2007 ,[object Object],[object Object],[object Object],[object Object],[object Object],2 7,127.77 8,057.06 8,020.80 9,222.23 9,53,239.57 10,71,681.32 10,58,937.97 11,76,726.85 Jan 2007 Feb 2007 Mar 2007 May 2007 Consumption at HT Meter 1 PF Incentive Bill Amount Bill Date Location #
Potential Savings on Transformer * (MD charge/kVA/month of Rs. 300/-) x (demand difference of 100 kVA) x (12 months per year) 3,60,000 TOTAL 3,60,000 Shifting to 400 kVA MD instead of 500 kVA * 1 Capex Opex (Annual) Area of Saving #
Potential Savings on DG Set ** Based on new Caterpillar 500 kVA DG set price *** (Rs. 30 per lt diesel) x (15 lts/hr difference) x (12 hrs power cut per month) x (12 months per year) 15,00,000 64,800 TOTAL 64,800 ,[object Object],[object Object],15,00,000 Use existing 2x160 kVA instead of 500 kVA ** 2 Capex Opex (Annual) Area of Saving #
Potential Savings on UPS **** Requirement is met by 3x80 kVA (this includes 12% cushion and redundancy with 1x80KVA ) ***** For the 80kVA UPS, 7.2 kW per hour x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year ****** For the 80kVA UPS, Rs. 60,000.00 per year ******* For the 80kVA UPS, 7.2 kW per hr x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year 60,000 ,[object Object],[object Object],2,48,832 8,00,000 5,57,664 TOTAL 2,48,832 ,[object Object],8,00,000 Sell 1x80 kVA UPS and batteries **** 3 Capex Opex (Annual) Area of Saving #
Potential Savings Summary * (MD charge/kVA/month of Rs. 300/-) x (demand difference of 100 kVA) x (12 months per year) ** Based on new Caterpillar 500 kVA DG set price *** (Rs. 30 per lt diesel) x (15 lts/hr difference) x (12 hrs power cut per month) x (12 months per year) **** Requirement is met by 3x80 kVA (this includes 12% cushion and redundancy  with 1x80KVA ) ***** For the 80kVA UPS, 7.2 kVA per hour x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year ****** For the 80kVA UPS, Rs. 60,000.00 per year ******* For the 80kVA UPS, 7.2 kW per hr x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year 60,000 ,[object Object],3,60,000 Shifting to 400KVA MD in place of 500 kVA * 1 ,[object Object],2,48,832 23,00,000 9,82,464 TOTAL 2,48,832 ,[object Object],8,00,000 Sell 1x80 kVA UPS and batteries **** 3 64,800 ,[object Object],[object Object],15,00,000 Use existing 2x160 kVA instead of 500 kVA ** 2 Capex Opex (Annual) Area of Saving #
Further Savings from Wastage Control ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
MV Panel Room Observations Exhaust fan insufficient Doors open
MV Panel Room  Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
50KVR Capacitor Panel-1 (MV Panel Room) Observations No fuse inserted
50KVR Capacitor Panel-2 (MV Panel Room) Observations Terminals heated
50KVR Capacitor Panel-3 (MV Panel Room) Observations Terminals getting heated
50KVR Capacitor Panel-4 (MV Panel Room) Observations Terminals  getting heated
50KVR Capacitor Panel-1,2,3, and 4 Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object]
25KVA Capacitor Panel (MV Panel Room)   Observations No fuse inserted
25KVR Capacitor Panel (MV Panel Room) Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object]
UPS Input  Observations Terminals getting heated up
UPS Input Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object]
APC Panel PF Meter   Observations Wrong reading on PF display
APC Panel PF Meter  Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object]
MV Panel Incoming Cable   Observations Cables jammed
MV Panel Incoming Cable  Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object]
160KVA DG-2   Observations Fuel leakage from tank
160KVA DG-2  Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object]
800KVA Transformer   Observations
800KVA Transformer   Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
UPS Room (6 th  Floor) Observations Unused cables on ladder
UPS Room (6 th  Floor)  Observations No proper routing
UPS Room (6 th  Floor)  Observations Excess cable Improper routing and bunching
UPS Room (6 th  Floor)  Observations Cable ladders not closed properly Cables not routed properly
UPS Room (6 th  Floor)  Observations Cable ladders not closed properly Cables not routed properly
UPS Room (6 th  Floor)  Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Split A/C (6 th  Floor) Observations AC mounted on top of UPS
Split A/C (6 th  Floor) Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object]
3TR Split A/C (6 th  Floor)   Observations Permanent wires disconnected  Temporary wires connected
3TR Split A/C (6 th  Floor)   Observations No air filter
3TR Split A/C (6 th  Floor)   Observations Unprofessional way of routing No earth connection
3TR Split A/C (6 th  Floor)   Observations Filter not removable
Split AC (6 th  Floor) Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
HITA 80 kVA Battery Breaker (6 th  Floor) Observations Isolator used as MCB   between UPS and Battery  Poor labeling on panel
HITA 30 kVA Battery Breaker (6 th  Floor) Observations Isolator used between UPS and battery
HITA 80 and 30 kVA Battery Breakers  Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Cabling (7 th  Floor)   Observations Poor electrical cabling Improper routing  Excess cable
Cabling (7 th  Floor) Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Fire Alarm Panel (7 th  Floor) Observations Gland not connected to panel
Fire Alarm Panel (7 th  Floor) Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Fire Alarm Cabling (7 th  Floor)  Observations Poor cabling; no proper routing and bunching
Fire Alarm Cabling (7 th  Floor)  Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object]
Terrace Observations Unwanted materials
Terrace Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object]
Transformer Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
APFC Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object]
DG Set Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Changeover Panel Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Power Distribution Panel Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
UPS Observations and Recommendations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Loads and their Maximum Consumption First Floor 500 and 125 kVA MD Total: 346.53 kVA Max Electricity Bill Unit = 1kW 3x60 kVA UPS   (For Facility) 20 KVA UPS   (For Server Room) AHU (AHU 33.69 kVA) LDB  (For Lighting) Current: 54.89 kVA Current: 75.3 kVA Current: 6.34 kVA Current: 50.4 kVA Current: 159.6 kVA Chiller Plant (2x110 TR)
Capacity vs. Utilization Reliance Power (500 and 125 kVA MD)   ,[object Object],[object Object],[object Object],500 kVA MD utilization by Sutherland = 333/(500 +125) = 53.28% Diversity factor =sum of all the individual loads/MD >1  333 TOTAL 0.95 0.95 0.95 PF 36.62 472.8 475.5 485.4 Current (A) 2.072 N 110 233.4 B 110 231.4 Y 113 233.5 R kVA Voltage (V) 500 kVA
LDB consumption First Floor LDB First Floor Lighting consumption = 54.89 54.8 TOTAL 0.95 0.98 0.96 PF 75.6 80.2 76.1 Current (A) 17.7 235.2 B 19.0 236.1 Y 18.1 237.2 R KVA Voltage (V) LDB
Capacity vs. Utilization UPS (3 x 60 kVA Facility) UPS Consumption = 75.3  kVA ,[object Object],UPS Utilization = 75.3 /180 = 41.7% 75.3 TOTAL 0.85 0.86 0.87 PF 103.6 113.5 116.6 Current (A) 23.5 225.9 B 25.6 225.8 Y 26.2 223.6 R KVA Voltage (V) 3x60 kVA
Capacity vs. Utilization UPS (20 kVA Server ) ,[object Object],[object Object],[object Object],UPS Utilization = 6.34 /20 = 31.7% 6.34 TOTAL 0.99 0.99 1.00 PF 8.66 7.49 10.19 Current (A) 2.08 239.2 B 1.80 240.4 Y 2.46 241.0 R KVA Voltage (V) 20 kVA
AHU consumption Location : First Floor Total AHU Consumption =50.4 kVA ,[object Object],50.4 TOTAL 0.73 0.75 0.74 PF 69.1 71.8 71.3 Current (A) 16.3 236.2 B 17.0 238.1 Y 17.1 240.0 R KVA Voltage (V) ? TR
Chiller Plant consumption For both First and Second Floors Chiller Plant Consumption = 159.6  kVA ,[object Object],[object Object],159.6 TOTAL 0.75 0.74 0.73 PF 232.9 240.8 238.8 Current (A) 54.6 234.0 B 57.9 236.2 Y 47.1 237.2 R KVA Voltage (V) # TR
Reliance 500 and 125 kVA MD (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
Reliance 500 and 125 kVA MD (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Reliance 500 and 125 kVA MD (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Reliance 500 and 125 kVA MD (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Reliance 500 and 125 kVA MD (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Reliance 500 and 125 kVA MD (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Reliance 500 and 125 kVA MD (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Reliance 500 and 125 kVA MD (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Main LDB First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
Main LDB First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Main LDB First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Main LDB First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Main LDB First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Main LDB First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Main LDB First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Main LDB First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB1 First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
PDB1 First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB1 First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB1 First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB1 First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB1 First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB1 First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB1 First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB2 First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
PDB2 First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB2 First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB2 First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB2 First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB2 First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB2 First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB2 First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB3 First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
PDB3 First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB3 First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB3 First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB3 First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB3 First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB3 First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB3 First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB4 First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
PDB4 First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB4 First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB4 First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB4 First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB4 First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB4 First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB4 First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB5 First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
PDB5 First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB5 First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB5 First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB5 First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB5 First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB5 First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB5 First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB Kitchen First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
PDB Kitchen First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB Kitchen First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB Kitchen First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB Kitchen First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB Kitchen First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
PDB Kitchen First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
PDB Kitchen First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Facility UPS 3 x 60 kVA First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Server UPS 20 kVA First Floor (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU  TR  (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
AHU  TR (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU  TR (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
AHU  TR (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU  TR (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
AHU  TR (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU  TR (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
AHU  TR (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Chiller Plant Consumption (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
Chiller Plant Consumption (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Chiller Plant Consumption (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Chiller Plant Consumption (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Chiller Plant Consumption (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Chiller Plant Consumption (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Chiller Plant Consumption (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Chiller Plant Consumption (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Reliance Power Quality (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
Reliance Power Quality (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Reliance Power Quality (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Reliance Power Quality (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Reliance Power Quality (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Reliance Power Quality (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
Reliance Power Quality (N-E) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Reliance Power Quality (N-E) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
APFC Power Quality (R-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
APFC Power Quality (R-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
APFC Power Quality (Y-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
APFC Power Quality (Y-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
APFC Power Quality (B-Phase) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
APFC Power Quality (B-Phase) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 1, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 1, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 1, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 1, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 1, B-Phase;2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 1, B-Phase;2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 1, N-E ; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 1, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 2, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 2, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 2, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 2, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 2, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 2, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 2, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 2, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 3, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 3, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 3, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 3, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 3, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 3, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 3, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 3, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 4, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 4, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 4, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 4, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 4, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 4, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 4, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 4, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 5, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 5, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 5, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 5, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 5, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 5, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 5, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 5, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 6, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 6, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 6, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 6, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 6, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 6, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 6, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 6, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 7, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 7, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 7, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 7, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 7, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 7, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 7, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 7, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 8, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 8, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 8, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 8, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 8, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 8, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 8, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 8, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 9, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, R-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, R-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, Y-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, Y-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, B-Phase; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, B-Phase; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, N-E; 2 nd  Floor) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
LDB Power Quality (PDB 9&10, N-E; 2 nd  Floor) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU Power Quality (R-Phase 2 nd  Floor Cafeteria) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% KVAR Impact Standard Reading Parameter
AHU Power Quality (R-Phase 2 nd  Floor Cafeteria) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU Power Quality (Y-Phase 2 nd  Floor Cafeteria) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
AHU Power Quality (Y-Phase 2 nd  Floor Cafeteria) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU Power Quality (B-Phase 2 nd  Floor Cafeteria) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
AHU Power Quality (B-Phase 2 nd  Floor Cafeteria) Observation: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],>0.95 .89 to .92 PF ,[object Object],3-5% 2.8% Harmonics Impact Standard Reading Parameter
AHU Power Quality (N-E, 2 nd  Floor Cafeteria) Observation: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object]
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08

More Related Content

What's hot

ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...ijiert bestjournal
 
GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...
GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...
GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...ecij
 
Thermodynamic cycles4.ppt
Thermodynamic cycles4.pptThermodynamic cycles4.ppt
Thermodynamic cycles4.pptMehtab Rai
 
Solutions manual chapter 7 (1)
Solutions manual   chapter 7 (1)Solutions manual   chapter 7 (1)
Solutions manual chapter 7 (1)Omar Corral
 
Thermodynamics lecture 13
Thermodynamics lecture 13Thermodynamics lecture 13
Thermodynamics lecture 13Archit Gadhok
 
Standalone PV plant sizing guide
Standalone PV plant sizing guideStandalone PV plant sizing guide
Standalone PV plant sizing guideHashim Hasnain Hadi
 
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08pavang
 
EMVT 12 september - Pavol Bauer - TU Delft
EMVT 12 september - Pavol Bauer - TU DelftEMVT 12 september - Pavol Bauer - TU Delft
EMVT 12 september - Pavol Bauer - TU DelftDutch Power
 
Modified Bidirectional Converter with Current Fed Inverter
Modified Bidirectional Converter with Current Fed InverterModified Bidirectional Converter with Current Fed Inverter
Modified Bidirectional Converter with Current Fed InverterIJPEDS-IAES
 
Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014onepointer
 
امتحان جهد عالي 2016
امتحان  جهد عالي  2016امتحان  جهد عالي  2016
امتحان جهد عالي 2016Eslam Elfayoumy
 
J2006 termodinamik 1 unit3
J2006 termodinamik 1 unit3J2006 termodinamik 1 unit3
J2006 termodinamik 1 unit3Malaysia
 
U3 op amp applications
U3 op amp applicationsU3 op amp applications
U3 op amp applicationsKarthik Vivek
 

What's hot (18)

ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
ENHANCEMENT OF ACTIVE POWER FLOW CAPACITY OF A TRANSMISSION LINE USING MSC‐TC...
 
GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...
GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...
GRID SIDE CONVERTER CONTROL IN DFIG BASED WIND SYSTEM USING ENHANCED HYSTERES...
 
Thermodynamic cycles4.ppt
Thermodynamic cycles4.pptThermodynamic cycles4.ppt
Thermodynamic cycles4.ppt
 
Solutions manual chapter 7 (1)
Solutions manual   chapter 7 (1)Solutions manual   chapter 7 (1)
Solutions manual chapter 7 (1)
 
Poster - Plovdiv 2014
Poster - Plovdiv 2014Poster - Plovdiv 2014
Poster - Plovdiv 2014
 
Hmt lab manual
Hmt lab manualHmt lab manual
Hmt lab manual
 
Thermodynamics lecture 13
Thermodynamics lecture 13Thermodynamics lecture 13
Thermodynamics lecture 13
 
fasys
fasysfasys
fasys
 
Standalone PV plant sizing guide
Standalone PV plant sizing guideStandalone PV plant sizing guide
Standalone PV plant sizing guide
 
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08Sutherland.Malad Audit Results    Electrical (Second Floor).Final.18 Mar 08
Sutherland.Malad Audit Results Electrical (Second Floor).Final.18 Mar 08
 
EMVT 12 september - Pavol Bauer - TU Delft
EMVT 12 september - Pavol Bauer - TU DelftEMVT 12 september - Pavol Bauer - TU Delft
EMVT 12 september - Pavol Bauer - TU Delft
 
Modified Bidirectional Converter with Current Fed Inverter
Modified Bidirectional Converter with Current Fed InverterModified Bidirectional Converter with Current Fed Inverter
Modified Bidirectional Converter with Current Fed Inverter
 
Performance Evaluation and Comparison of Two Cascaded Configurations of PV Ge...
Performance Evaluation and Comparison of Two Cascaded Configurations of PV Ge...Performance Evaluation and Comparison of Two Cascaded Configurations of PV Ge...
Performance Evaluation and Comparison of Two Cascaded Configurations of PV Ge...
 
1569637039
15696370391569637039
1569637039
 
Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014
 
امتحان جهد عالي 2016
امتحان  جهد عالي  2016امتحان  جهد عالي  2016
امتحان جهد عالي 2016
 
J2006 termodinamik 1 unit3
J2006 termodinamik 1 unit3J2006 termodinamik 1 unit3
J2006 termodinamik 1 unit3
 
U3 op amp applications
U3 op amp applicationsU3 op amp applications
U3 op amp applications
 

Similar to Sutherland.Malad Audit Results Electrical.V1.24 Jan 08

OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1md muzahidul haque
 
Sample Power Audit Results
Sample Power Audit ResultsSample Power Audit Results
Sample Power Audit ResultsSandeep Changula
 
Power electronics and its applications.pptx
Power electronics and its applications.pptxPower electronics and its applications.pptx
Power electronics and its applications.pptxSHIVANICHAUUHAN1
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentationkumarmayursinha
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionShailesh Senta
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionShailesh Senta
 
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTERMODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTERijsrd.com
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxJaimohan15
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaBishal Rimal
 
Flexible ac transmission FACTs
Flexible ac transmission FACTsFlexible ac transmission FACTs
Flexible ac transmission FACTsMOHAN RAKIB
 
FACTs_Final_Presensation
FACTs_Final_PresensationFACTs_Final_Presensation
FACTs_Final_PresensationMOHAN RAKIB
 

Similar to Sutherland.Malad Audit Results Electrical.V1.24 Jan 08 (20)

OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
 
lift ppt
lift pptlift ppt
lift ppt
 
Sample Power Audit Results
Sample Power Audit ResultsSample Power Audit Results
Sample Power Audit Results
 
Latex_Final_Bryan_F
Latex_Final_Bryan_FLatex_Final_Bryan_F
Latex_Final_Bryan_F
 
AHK SMPS P4 TR Final
AHK SMPS P4 TR FinalAHK SMPS P4 TR Final
AHK SMPS P4 TR Final
 
Power electronics and its applications.pptx
Power electronics and its applications.pptxPower electronics and its applications.pptx
Power electronics and its applications.pptx
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
179 narayan p
179 narayan p179 narayan p
179 narayan p
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmission
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmission
 
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTERMODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
MODELING, ANALYSIS AND SIMULATION OF POLY-PHASE BOOST CONVERTER
 
Power Management in BMS
Power Management in BMSPower Management in BMS
Power Management in BMS
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptx
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokhara
 
POWER CAR.pptx
POWER CAR.pptxPOWER CAR.pptx
POWER CAR.pptx
 
electrical.ppt
electrical.pptelectrical.ppt
electrical.ppt
 
2010 August Harmonics & Energy Efficiency
2010 August Harmonics & Energy Efficiency2010 August Harmonics & Energy Efficiency
2010 August Harmonics & Energy Efficiency
 
Flexible ac transmission FACTs
Flexible ac transmission FACTsFlexible ac transmission FACTs
Flexible ac transmission FACTs
 
FACTs_Final_Presensation
FACTs_Final_PresensationFACTs_Final_Presensation
FACTs_Final_Presensation
 
J DJ
J DJJ DJ
J DJ
 

Recently uploaded

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Recently uploaded (20)

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

Sutherland.Malad Audit Results Electrical.V1.24 Jan 08

  • 1. Results from Electrical Audit of Sutherland’s Malad Facility, Mumbai Presentation to Mr. K.P. Nair & Mr. Ramunni Nair Version 1 January 17, 2008
  • 2.
  • 3.
  • 4. Audit Scope of Work ATS LDB Panel UPS SBP 3 x 60 kVA HVAC Panel UPS SBP 20 KVA DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DG Backup DB5 500 kVA DG Energy meter Chiller Plant DB5 DB5 Sever Room Main LT Panel PFC-1 100 KVAR Chiller Distribution AMF-1 AMF-2 AMF Panels Main LT Panel APFC 625 kVA 500 kVA 125 kVA 1 st Floor end to end Power Distribution System 1 1 1 1 1 1 1 1 1 1
  • 5. Audit Scope of Work LTG Panel UPS SBP 3 x 40 kVA HVAC Panel DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DB5 DB5 DB5 ATS DG Backup 500 kVA DG Energy meter Main LT Panel PFC-1 100 KVAR AMF-1 AMF Panels Main LT Panel APFC 2 nd Floor end to end Power Distribution system 1 1 1 1 1
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Loads and their Maximum Consumption Electricity Bill Unit = 1kW 2x2x80kVA UPS (For Facility) 30 KVA UPS (For Server Room) AHU & Chiller Plant (AHU 33.69KVA, Chiller 111 KVA) LDB (For Lighting) Current: 58.17 kVA Current: 141.8 kVA Current: 13.47 kVA Current: 144.63 kVA Current: 52.44 kVA 3  Split A/C (2x10TR, 1x7.5TR, 2x5.5TR) Elevator A1, A2, and Pumps Current:12.2 kVA Total: 436.18 kVA Max
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. Capacity vs. Utilization UPS Continued... 34.4 TOTAL 0.63 0.68 0.68 PF 48.0 55.7 46.9 Current (A) 11.3 235.8 B 12.2 233.9 Y 10.9 233.0 R KVA Voltage (V) 80 kVA-1 34.9 TOTAL 0.65 0.65 0.65 PF 48.1 49.1 50.6 Current (A) 11.5 237.3 B 11.7 235.8 Y 11.7 235.0 R KVA Voltage (V) 80 kVA-2 13.47 TOTAL 0.67 0.68 0.64 PF 19.37 18.67 19.80 Current (A) 4.54 232.8 B 4.34 232.5 Y 4.59 231.5 R KVA Voltage (V) 30 kVA
  • 22.
  • 23. Capacity vs. Utilization Split AC (6 th Floor UPS Room) UPS Room AC-1 utilization = 5.9/18.7 = 31.5% UPS Room AC-2 utilization = 6.17/18.7 = 33% UPS Room AC-1 and AC-2 utilization = 32.25% Considering 1TR = 3.5KVA, 5.90 TOTAL 0.87 0.85 0.83 PF 10.31 7.52 7.63 Current (A) 2.40 233.9 B 1.74 231.6 Y 1.76 230.2 R KVA Voltage (V) 5.5TR-1 6.17 TOTAL 0.86 0.85 0.87 PF 7.88 7.83 10.65 Current (A) 1.86 234.4 B 1.84 235.0 Y 2.47 233.0 R KVA Voltage (V) 5.5TR-2
  • 24. Capacity vs. Utilization Split AC (8 th Floor UPS Room) UPS Room AC Utilization = 11.11/26.25 = 42.3% 11.11 TOTAL 0.81 0.83 0.77 PF 16.51 15.55 15.64 Current (A) 3.87 234.0 B 3.63 232.3 Y 3.61 230.7 R KVA Voltage (V) 7.5TR
  • 25. Capacity vs. Utilization Split AC (Server UPS Room) Server Room AC-1 Utilization = 14.84/28 = 53% Server Room AC-2 Utilization = 14.42/28 = 51.5% Server Room AC-1 and AC-2 Utilization = 29.26/56 = 52.25% 14.84 TOTAL 0.71 0.77 0.80 PF 19.12 22.53 21.95 Current (A) 4.49 235.0 B 5.24 232.7 Y 5.11 231.6 R KVA Voltage (V) 8TR-1 14.42 TOTAL 0.71 0.77 0.77 PF 18.76 21.89 21.44 Current (A) 4.37 234.2 B 5.07 233.0 Y 4.98 232.6 R KVA Voltage (V) 8TR-2
  • 26. Capacity vs. Utilization 6 th Floor LDB 6 th Floor Lighting Utilization = 9.6/58.17 = 16.5% 9.6 TOTAL 0.86 0.86 0.89 PF 10.65 9.38 20.83 Current (A) 2.51 236.3 B 2.21 235.6 Y 4.88 233.6 R KVA Voltage (V) 6 th Floor
  • 27. Capacity vs. Utilization 7 th Floor LDB 7th Floor Lighting Utilization = 19.69/58.17 = 33.8% 19.69 TOTAL 0.76 0.75 0.72 PF 27.42 26.96 29.00 Current (A) 6.49 237.1 B 6.37 235.5 Y 6.83 233.4 R KVA Voltage (V) 7 th Floor
  • 28. Capacity vs. Utilization 8 th Floor LDB 8th Floor Lighting Utilization = 19.29/58.17 = 33.2% 19.29 TOTAL 0.78 0.79 0.63 PF 31.97 22.62 27.81 Current (A) 7.47 234.4 B 5.31 234.6 Y 6.51 234.5 R KVA Voltage (V) 8 th Floor
  • 29. Capacity vs. Utilization 9 th Floor LDB 9th Floor Lighting Utilization = 9.59/58.17 = 16.5% 9.59 TOTAL 0.2 0.75 0.59 PF 13.45 14.07 13.28 Current (A) 3.16 234.4 B 3.32 235.2 Y 3.11 234.1 R KVA Voltage (V) 9 th Floor
  • 30. Capacity vs. Utilization Elevator (Lift A1 and A2) Elevator A2 Utilization = 6.43/7.5 = 85.7% Elevator A1 Utilization = 5.77/7.5 = 76.9% Total Elevator (A1&A2) Utilization = 12.2/15 = 81.3% 6.43 TOTAL .081 0.79 0.42 PF 8.70 6.74 14.03 Current (A) 1.49 235.8 B 1.66 235.7 Y 3.28 233.7 R KVA Voltage (V) Lift A1 5.77 TOTAL 0.79 0.63 0.49 PF 9.84 7.84 10.07 Current (A) 1.66 236.0 B 2.92 236.6 Y 1.19 234.5 R KVA Voltage (V) Lift A2
  • 31.
  • 32.
  • 33. Potential Savings on Transformer * (MD charge/kVA/month of Rs. 300/-) x (demand difference of 100 kVA) x (12 months per year) 3,60,000 TOTAL 3,60,000 Shifting to 400 kVA MD instead of 500 kVA * 1 Capex Opex (Annual) Area of Saving #
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. MV Panel Room Observations Exhaust fan insufficient Doors open
  • 40.
  • 41. 50KVR Capacitor Panel-1 (MV Panel Room) Observations No fuse inserted
  • 42. 50KVR Capacitor Panel-2 (MV Panel Room) Observations Terminals heated
  • 43. 50KVR Capacitor Panel-3 (MV Panel Room) Observations Terminals getting heated
  • 44. 50KVR Capacitor Panel-4 (MV Panel Room) Observations Terminals getting heated
  • 45.
  • 46. 25KVA Capacitor Panel (MV Panel Room) Observations No fuse inserted
  • 47.
  • 48. UPS Input Observations Terminals getting heated up
  • 49.
  • 50. APC Panel PF Meter Observations Wrong reading on PF display
  • 51.
  • 52. MV Panel Incoming Cable Observations Cables jammed
  • 53.
  • 54. 160KVA DG-2 Observations Fuel leakage from tank
  • 55.
  • 56. 800KVA Transformer Observations
  • 57.
  • 58. UPS Room (6 th Floor) Observations Unused cables on ladder
  • 59. UPS Room (6 th Floor) Observations No proper routing
  • 60. UPS Room (6 th Floor) Observations Excess cable Improper routing and bunching
  • 61. UPS Room (6 th Floor) Observations Cable ladders not closed properly Cables not routed properly
  • 62. UPS Room (6 th Floor) Observations Cable ladders not closed properly Cables not routed properly
  • 63.
  • 64. Split A/C (6 th Floor) Observations AC mounted on top of UPS
  • 65.
  • 66. 3TR Split A/C (6 th Floor) Observations Permanent wires disconnected Temporary wires connected
  • 67. 3TR Split A/C (6 th Floor) Observations No air filter
  • 68. 3TR Split A/C (6 th Floor) Observations Unprofessional way of routing No earth connection
  • 69. 3TR Split A/C (6 th Floor) Observations Filter not removable
  • 70.
  • 71. HITA 80 kVA Battery Breaker (6 th Floor) Observations Isolator used as MCB between UPS and Battery Poor labeling on panel
  • 72. HITA 30 kVA Battery Breaker (6 th Floor) Observations Isolator used between UPS and battery
  • 73.
  • 74. Cabling (7 th Floor) Observations Poor electrical cabling Improper routing Excess cable
  • 75.
  • 76. Fire Alarm Panel (7 th Floor) Observations Gland not connected to panel
  • 77.
  • 78. Fire Alarm Cabling (7 th Floor) Observations Poor cabling; no proper routing and bunching
  • 79.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88.
  • 89. Loads and their Maximum Consumption First Floor 500 and 125 kVA MD Total: 346.53 kVA Max Electricity Bill Unit = 1kW 3x60 kVA UPS (For Facility) 20 KVA UPS (For Server Room) AHU (AHU 33.69 kVA) LDB (For Lighting) Current: 54.89 kVA Current: 75.3 kVA Current: 6.34 kVA Current: 50.4 kVA Current: 159.6 kVA Chiller Plant (2x110 TR)
  • 90.
  • 91. LDB consumption First Floor LDB First Floor Lighting consumption = 54.89 54.8 TOTAL 0.95 0.98 0.96 PF 75.6 80.2 76.1 Current (A) 17.7 235.2 B 19.0 236.1 Y 18.1 237.2 R KVA Voltage (V) LDB
  • 92.
  • 93.
  • 94.
  • 95.
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101.
  • 102.
  • 103.
  • 104.
  • 105.
  • 106.
  • 107.
  • 108.
  • 109.
  • 110.
  • 111.
  • 112.
  • 113.
  • 114.
  • 115.
  • 116.
  • 117.
  • 118.
  • 119.
  • 120.
  • 121.
  • 122.
  • 123.
  • 124.
  • 125.
  • 126.
  • 127.
  • 128.
  • 129.
  • 130.
  • 131.
  • 132.
  • 133.
  • 134.
  • 135.
  • 136.
  • 137.
  • 138.
  • 139.
  • 140.
  • 141.
  • 142.
  • 143.
  • 144.
  • 145.
  • 146.
  • 147.
  • 148.
  • 149.
  • 150.
  • 151.
  • 152.
  • 153.
  • 154.
  • 155.
  • 156.
  • 157.
  • 158.
  • 159.
  • 160.
  • 161.
  • 162.
  • 163.
  • 164.
  • 165.
  • 166.
  • 167.
  • 168.
  • 169.
  • 170.
  • 171.
  • 172.
  • 173.
  • 174.
  • 175.
  • 176.
  • 177.
  • 178.
  • 179.
  • 180.
  • 181.
  • 182.
  • 183.
  • 184.
  • 185.
  • 186.
  • 187.
  • 188.
  • 189.
  • 190.
  • 191.
  • 192.
  • 193.
  • 194.
  • 195.
  • 196.
  • 197.
  • 198.
  • 199.
  • 200.
  • 201.
  • 202.
  • 203.
  • 204.
  • 205.
  • 206.
  • 207.
  • 208.
  • 209.
  • 210.
  • 211.
  • 212.
  • 213.
  • 214.
  • 215.
  • 216.
  • 217.
  • 218.
  • 219.
  • 220.
  • 221.
  • 222.
  • 223.
  • 224.
  • 225.
  • 226.
  • 227.
  • 228.
  • 229.
  • 230.
  • 231.
  • 232.
  • 233.
  • 234.
  • 235.
  • 236.
  • 237.
  • 238.
  • 239.
  • 240.
  • 241.
  • 242.
  • 243.
  • 244.
  • 245.
  • 246.
  • 247.
  • 248.
  • 249.
  • 250.
  • 251.
  • 252.
  • 253.
  • 254.
  • 255.
  • 256.
  • 257.
  • 258.
  • 259.
  • 260.
  • 261.
  • 262.
  • 263.
  • 264.
  • 265.
  • 266.
  • 267.
  • 268.
  • 269.
  • 270.
  • 271.
  • 272.
  • 273.
  • 274.
  • 275.
  • 276.
  • 277.
  • 278.
  • 279.
  • 280.
  • 281.
  • 282.
  • 283.
  • 284.
  • 285.
  • 286.
  • 287.
  • 288.
  • 289.
  • 290.
  • 291.
  • 292.