Summer internship at
patel infrastructure
Duration: 2/6/2019 to 15/6/2019
Site Location :- sathana (kgbot 2)
ajmer rajasthan
Base camp
Date 3rd to 7th June
• 5 days were allocated for understanding laboratory
experiment.
• Ongoing experiment were explained by engineers in
working hours.
• Mainly for concrete, aggregate, soil, and bitumen
Soil tests
• Grain size analysis text
• Proctor compaction test
• California bearing ratio test
• As property of soil changes by different locations tests
were carried for that portion
• And for each location optimum moisture content and
maximum dry density is find out
Concrete and aggregate test
• For concrete : compression test were carried out and for
aggregate impact test is carried out
• Cubes were casted at working site and bring to laboratory for
curing and to test at 3, 7, & 28 days
• At time of testing senior engineers come for verification of
strength of cube
Bitumen test
• At time of internship we learned DBM (Dense bitumen
macadam) test and grain size analysis test for bitumen
• From DBM test we can find out optimum bitumen content
From 8th to 12th June
• Next 5 days we went for on site road construction it was
of widening of existing road
• At site leveling of original ground level is done by auto
level instrument
• Site engineer explained how to do surveying and
levelling and to how to use the instrument .
• And earthwork is carried out
GSB layer
• After the Earth Work the Sub-Base of the road is
constructed with Granular sub-base (GSB) and
compacted in layers not exceeding 100mm.
WBM Base-Course
• Once the Sub-Base is prepared, the base course is required to
provide the strength to the road.
• Generally, the base course is constructed with the help of stone
metal and other suitable materials.
WBM Base-Course
Water Bound Macadam (WBM) base course is constructed with graded aggregate
in two or three layers as per the design. Thereafter, binding material is applied
and sprinkling of water is repeated
From 13th to 15th june
• Last 3 days we went for observation of bridge construction
• At site construction of bridge girder is done.
• Placing of reinforcement and form work was carried out that
time.
Summer internship at patel infrastructure

More Related Content

What's hot

Comparison between different method of under water canal
Comparison between different method of under water canalComparison between different method of under water canal
Comparison between different method of under water canal
Shivam Mittal
 
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit  iii 3d0f5751f8e65e10a1c08bba8255d4bcHe unit  iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
saibabu48
 
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
Sagar Kaptan
 
Design pavement
Design pavementDesign pavement
Design pavement
ArianneDenice
 
Soil Stabilisation using cement
Soil Stabilisation using cement Soil Stabilisation using cement
Soil Stabilisation using cement
EVERSENDAI ENGINEERING (L.L.C.)
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPT
Aniket Pateriya
 
Highway materials - soil
Highway materials - soil Highway materials - soil
Highway materials - soil
GARRE RAVI KUMAR
 
CONFLEX PAVE
CONFLEX PAVECONFLEX PAVE
CONFLEX PAVE
sathish sak
 
Transportation engineering various experiments
Transportation engineering various experimentsTransportation engineering various experiments
Transportation engineering various experiments
gayathrysatheesan1
 
soil stabilization using lime and polypropylene
soil stabilization using lime and polypropylenesoil stabilization using lime and polypropylene
soil stabilization using lime and polypropylene
MalothHarish
 
Widening of roads
Widening of roadsWidening of roads
Widening of roads
Sanjeev B
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
Anshul Shakya
 
Geotextile fo soil stabilization
Geotextile fo soil stabilizationGeotextile fo soil stabilization
Geotextile fo soil stabilization
Aglaia Connect
 
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out TestPredicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
IJRESJOURNAL
 
Soil Properties and Foundation
Soil Properties and FoundationSoil Properties and Foundation
Soil Properties and Foundation
Reasat E Noor
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
Naresh Ambesh
 
Comparative studies on properties mould sands of different mesh sizes
Comparative studies on properties mould sands  of different mesh sizesComparative studies on properties mould sands  of different mesh sizes
Comparative studies on properties mould sands of different mesh sizes
Umesh Naralchitti
 
Soil testing
Soil testingSoil testing
Soil testing
karthik V
 
Pavement materials and testing
Pavement materials and testingPavement materials and testing
Pavement materials and testing
Archana Shagoti
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
Anitha Jacob
 

What's hot (20)

Comparison between different method of under water canal
Comparison between different method of under water canalComparison between different method of under water canal
Comparison between different method of under water canal
 
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit  iii 3d0f5751f8e65e10a1c08bba8255d4bcHe unit  iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
 
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
 
Design pavement
Design pavementDesign pavement
Design pavement
 
Soil Stabilisation using cement
Soil Stabilisation using cement Soil Stabilisation using cement
Soil Stabilisation using cement
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPT
 
Highway materials - soil
Highway materials - soil Highway materials - soil
Highway materials - soil
 
CONFLEX PAVE
CONFLEX PAVECONFLEX PAVE
CONFLEX PAVE
 
Transportation engineering various experiments
Transportation engineering various experimentsTransportation engineering various experiments
Transportation engineering various experiments
 
soil stabilization using lime and polypropylene
soil stabilization using lime and polypropylenesoil stabilization using lime and polypropylene
soil stabilization using lime and polypropylene
 
Widening of roads
Widening of roadsWidening of roads
Widening of roads
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
Geotextile fo soil stabilization
Geotextile fo soil stabilizationGeotextile fo soil stabilization
Geotextile fo soil stabilization
 
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out TestPredicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
 
Soil Properties and Foundation
Soil Properties and FoundationSoil Properties and Foundation
Soil Properties and Foundation
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
 
Comparative studies on properties mould sands of different mesh sizes
Comparative studies on properties mould sands  of different mesh sizesComparative studies on properties mould sands  of different mesh sizes
Comparative studies on properties mould sands of different mesh sizes
 
Soil testing
Soil testingSoil testing
Soil testing
 
Pavement materials and testing
Pavement materials and testingPavement materials and testing
Pavement materials and testing
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 

Similar to Summer internship at patel infrastructure

Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road construction
Vijaypal Bagariya
 
TRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdfTRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdf
Dr. BASWESHWAR JIRWANKAR
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
Rohan chansoriya
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
Adnan. Ali
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
KriShna Sharma
 
Siol cement ppt
Siol cement pptSiol cement ppt
Siol cement ppt
Narasimha Rao
 
PROJECTT MAIN PPT.pptx
PROJECTT MAIN PPT.pptxPROJECTT MAIN PPT.pptx
PROJECTT MAIN PPT.pptx
RajeshKumar25548
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
y Sahaja
 
green Concrete
green Concrete green Concrete
Concrete,Electrically conductive concrete IDM13
Concrete,Electrically conductive concrete IDM13Concrete,Electrically conductive concrete IDM13
Concrete,Electrically conductive concrete IDM13
Qatar University- Young Scientists Center (Al-Bairaq)
 
Construction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roadsConstruction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roads
ssuserdcb186
 
soilexplorationpartion-02.pdf
soilexplorationpartion-02.pdfsoilexplorationpartion-02.pdf
soilexplorationpartion-02.pdf
KASHYAP CHINTU
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
Avinash Kumar Gupta
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
Lovely Professional University
 
Introduction of Concrete.pdf
Introduction of Concrete.pdfIntroduction of Concrete.pdf
Building Better Roads - An idea requiring validation
Building Better Roads - An idea requiring validationBuilding Better Roads - An idea requiring validation
Building Better Roads - An idea requiring validation
Sudhanshu Singh MBA,PMP
 
Ppt on cement grade project
Ppt on cement grade projectPpt on cement grade project
Ppt on cement grade project
Er. Zahir Gulamjilani Mahida
 
Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete
Qatar University- Young Scientists Center (Al-Bairaq)
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete
Sreekutty S
 
Building Cons Report .pdf
 Building Cons Report .pdf Building Cons Report .pdf
Building Cons Report .pdf
RuHiPraveen2
 

Similar to Summer internship at patel infrastructure (20)

Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road construction
 
TRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdfTRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdf
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
 
Siol cement ppt
Siol cement pptSiol cement ppt
Siol cement ppt
 
PROJECTT MAIN PPT.pptx
PROJECTT MAIN PPT.pptxPROJECTT MAIN PPT.pptx
PROJECTT MAIN PPT.pptx
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
green Concrete
green Concrete green Concrete
green Concrete
 
Concrete,Electrically conductive concrete IDM13
Concrete,Electrically conductive concrete IDM13Concrete,Electrically conductive concrete IDM13
Concrete,Electrically conductive concrete IDM13
 
Construction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roadsConstruction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roads
 
soilexplorationpartion-02.pdf
soilexplorationpartion-02.pdfsoilexplorationpartion-02.pdf
soilexplorationpartion-02.pdf
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
Introduction of Concrete.pdf
Introduction of Concrete.pdfIntroduction of Concrete.pdf
Introduction of Concrete.pdf
 
Building Better Roads - An idea requiring validation
Building Better Roads - An idea requiring validationBuilding Better Roads - An idea requiring validation
Building Better Roads - An idea requiring validation
 
Ppt on cement grade project
Ppt on cement grade projectPpt on cement grade project
Ppt on cement grade project
 
Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete
 
Building Cons Report .pdf
 Building Cons Report .pdf Building Cons Report .pdf
Building Cons Report .pdf
 

Recently uploaded

A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 

Recently uploaded (20)

A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 

Summer internship at patel infrastructure

  • 1. Summer internship at patel infrastructure Duration: 2/6/2019 to 15/6/2019 Site Location :- sathana (kgbot 2) ajmer rajasthan
  • 3. Date 3rd to 7th June • 5 days were allocated for understanding laboratory experiment. • Ongoing experiment were explained by engineers in working hours. • Mainly for concrete, aggregate, soil, and bitumen
  • 4. Soil tests • Grain size analysis text • Proctor compaction test • California bearing ratio test • As property of soil changes by different locations tests were carried for that portion • And for each location optimum moisture content and maximum dry density is find out
  • 5.
  • 6. Concrete and aggregate test • For concrete : compression test were carried out and for aggregate impact test is carried out • Cubes were casted at working site and bring to laboratory for curing and to test at 3, 7, & 28 days • At time of testing senior engineers come for verification of strength of cube
  • 7. Bitumen test • At time of internship we learned DBM (Dense bitumen macadam) test and grain size analysis test for bitumen • From DBM test we can find out optimum bitumen content
  • 8. From 8th to 12th June • Next 5 days we went for on site road construction it was of widening of existing road • At site leveling of original ground level is done by auto level instrument • Site engineer explained how to do surveying and levelling and to how to use the instrument . • And earthwork is carried out
  • 9. GSB layer • After the Earth Work the Sub-Base of the road is constructed with Granular sub-base (GSB) and compacted in layers not exceeding 100mm.
  • 10. WBM Base-Course • Once the Sub-Base is prepared, the base course is required to provide the strength to the road. • Generally, the base course is constructed with the help of stone metal and other suitable materials.
  • 11. WBM Base-Course Water Bound Macadam (WBM) base course is constructed with graded aggregate in two or three layers as per the design. Thereafter, binding material is applied and sprinkling of water is repeated
  • 12. From 13th to 15th june • Last 3 days we went for observation of bridge construction • At site construction of bridge girder is done. • Placing of reinforcement and form work was carried out that time.