In response to traffic congestion on St Clair Avenue West around Keele Street and Old Weston Road, City Council has directed staff to carry out an Environmental Assessment (EA) Study of the St. Clair Avenue / Rail Crossing between Keele Street and Old Weston Road. This project will investigate solutions to the traffic concerns in this area
Genesee Valley Greenway State Park - HistoryJoan Schumaker
This show covers canal and railroad history of the historic transportation corridor that transitioned to the Genesee Valley Greenway and now the GVGSP, New York State's newest linear park.
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
Genesee Valley Greenway State Park - HistoryJoan Schumaker
This show covers canal and railroad history of the historic transportation corridor that transitioned to the Genesee Valley Greenway and now the GVGSP, New York State's newest linear park.
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
Leigh Meadow & Towlston Basin project was substantially completed on October 29, 2021. This project consists of 1,660 feet of stream restoration, a 22,300 cubic foot Regenerative Stormwater Conveyance (RSC) facility and a 28,500 cubic foot sand filter. The scope of work also included grading, excavation, pollution and sediment removal, and restoration planting.
South Lakes Drive Walkway was substantially completed on September 17, 2021. The project included construction of 3,370 linear feet of sidewalk, pedestrian ramps, pedestrian signals, handrail, bus shelter and loading pads, curbs and gutters, asphalt milling and paving, pavement markings and signage, fire hydrant relocation, and drainage adjustment.
The Telegraph Walkway Project was substantially completed on time and under budget on September 13, 2021. This project consisted of construction of 5’ concrete sidewalk, curb ramp, curb & gutter, drilled shaft for slope stability, RW-3, handrail, pavement mill and overlay, pavement marking, water line relocation and some other related items.
Presentation provided to the Marrowstone Island Community Presentation by the North Olympic Salmon Coalition to discuss the Kilisut Harbor Restoration Project.
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014Sarah Doyle
Presentation provided to Marrowstone Community by the North Olympic Salmon Coalition. The presentation provides and overview of the upcoming Kilisut Harbor Restoration Project.
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County
The Leigh Meadow basin retrofit and stream restoration project will improve watershed conditions, mitigate flooding where possible, reduce erosion and protect infrastructure.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
South Lakes Drive Walkway was substantially completed on September 17, 2021. The project included construction of 3,370 linear feet of sidewalk, pedestrian ramps, pedestrian signals, handrail, bus shelter and loading pads, curbs and gutters, asphalt milling and paving, pavement markings and signage, fire hydrant relocation, and drainage adjustment.
The Telegraph Walkway Project was substantially completed on time and under budget on September 13, 2021. This project consisted of construction of 5’ concrete sidewalk, curb ramp, curb & gutter, drilled shaft for slope stability, RW-3, handrail, pavement mill and overlay, pavement marking, water line relocation and some other related items.
Presentation provided to the Marrowstone Island Community Presentation by the North Olympic Salmon Coalition to discuss the Kilisut Harbor Restoration Project.
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014Sarah Doyle
Presentation provided to Marrowstone Community by the North Olympic Salmon Coalition. The presentation provides and overview of the upcoming Kilisut Harbor Restoration Project.
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County
The Leigh Meadow basin retrofit and stream restoration project will improve watershed conditions, mitigate flooding where possible, reduce erosion and protect infrastructure.
Restore ~1,400 feet by returning the form and function of the channel to dynamic equilibrium and improve the ecological processes of the riparian corridor.
Stabilize the eroding stream banks
Water quality improvement
Sustainability
Infrastructure protection
Habitat improvement
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014SCVTA
This presentation was delivered to SPUR San Jose by Ying Smith, VTA Transportation Planning Manager. It covers not only the history and context of VTA's light rail system, but also some of the challenges it faces and solutions planned to make it faster and more appealing in the future.
Railway Level Crossing Accidents Preventer is an exiting research in the railway department which provides safety and prevents the accidents in the nation.
The main objective of this project is to fabricate a fully automated manned & unmanned railway crossing. In this project, the sensor checks the train before reaching the level crossing from a particular distance depending on the capacity of the sensor and gives a command to the receiver units.
When a train approaches the level crossing an alarm sound is produced and the RED light displayed. At that time our device fixed vehicles that is nearing the level crossing will receive the message and will be stopped.
Similarly after the train crosses the level crossing, the sensor senses the train has crossed the level crossing, and gives a command to the receiver units. Now the alarm stops and the GREEN light glows and the signal allows the vehicles to moves on.
CPR Yards Crossing Study - open house panelsCrowdbrite
CPR Yards Crossing Study
Welcome to our open house
Today we’re talking about ideas to replace the
Arlington Street Bridge and improve crossings over the
CPR Yards. We look forward to hearing your views.
Public Meeting #2 Presentation - November 11, 2014Thomas Downs
STATUS UPDATES
The 2nd of 4 public meetings have been held. To date, the project team and the public have reviewed the existing data, ideas, and potential options for creating a multi-modal transportation corridor. Please review the presentations for more detailed information on concepts considered for the corridor.
http://louisvilleky.gov/government/advanced-planning/lexington-road-corridor-transportation-plan
Mountain View Double-Track Project May 22 PresentationSCVTA
This presentation and the slides at the end was delivered at a May 22, 2014 public input meeting. The meeting was held to gather input about the draft environmental document that VTA released on May 15
The Flagler Street Enhanced Bus Service Implementation Plan builds on earlier enhanced bus service (EBS) corridor studies and plans in the Miami area, namely for the NW 27th Avenue and Biscayne Boulevard corridors, and proposes a plan for the operation of EBS along the Flagler Street corridor. The objective of the plan is to improve transit service along the corridor by providing high-frequency service and enhanced passenger amenities, (i.e. bus stop shelters/benches) thereby improving the transit experience of existing riders and attracting new riders that would have otherwise used a private automobile to complete their trip. The Flagler Street Enhanced Bus Service Implementation Plan was developed by the Miami-Dade Metropolitan Planning Organization in coordination with Miami-Dade Transit (MDT).
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayFairfax County
The Glade Drive Walkway improvement project from Middle Creek Lane to Glade Bank Way included construction of pedestrian access improvements along the north side of Glade Drive to include approximately 643 linear feet of curb-abutted sidewalk, pedestrian ramps, curb and gutter, asphalt trail, and mill and overlay.
The City of Toronto is in the final stages of detailed design for the new pedestrian / cycling bridge to be constructed over the Metrolinx Union Station Rail Corridor, from Douro Street to the western leg of Western Battery Road.
We invite you to view the latest drawings and information on our recently updated web page:
www.toronto.ca/king-liberty-bridge
The City of Toronto in partnership with Toronto and Region Conservation Authority(TRCA) is constructing a new 1.1km long multi-use trail south of Eglinton Avenue West and parallel to the Etobicoke Creek.
These panels were displayed at the Six Points Interchange Reconfiguration public event held on May 11, 2017 in Toronto. For assistance reading these files, contact rshyllit@toronto.ca 416-392-3358
Presentation slides from Community Workshop 1 for the Park Lawn Lake Shore Transportation Master Plan, that took place on November 24 and December 3 2016.
This session provides a comprehensive overview of the latest updates to the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (commonly known as the Uniform Guidance) outlined in the 2 CFR 200.
With a focus on the 2024 revisions issued by the Office of Management and Budget (OMB), participants will gain insight into the key changes affecting federal grant recipients. The session will delve into critical regulatory updates, providing attendees with the knowledge and tools necessary to navigate and comply with the evolving landscape of federal grant management.
Learning Objectives:
- Understand the rationale behind the 2024 updates to the Uniform Guidance outlined in 2 CFR 200, and their implications for federal grant recipients.
- Identify the key changes and revisions introduced by the Office of Management and Budget (OMB) in the 2024 edition of 2 CFR 200.
- Gain proficiency in applying the updated regulations to ensure compliance with federal grant requirements and avoid potential audit findings.
- Develop strategies for effectively implementing the new guidelines within the grant management processes of their respective organizations, fostering efficiency and accountability in federal grant administration.
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...OECDregions
Preliminary findings from OECD field visits for the project: Enhancing EU Mining Regional Ecosystems to Support the Green Transition and Secure Mineral Raw Materials Supply.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Presentation by Jared Jageler, David Adler, Noelia Duchovny, and Evan Herrnstadt, analysts in CBO’s Microeconomic Studies and Health Analysis Divisions, at the Association of Environmental and Resource Economists Summer Conference.
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOChristina Parmionova
The 2024 World Health Statistics edition reviews more than 50 health-related indicators from the Sustainable Development Goals and WHO’s Thirteenth General Programme of Work. It also highlights the findings from the Global health estimates 2021, notably the impact of the COVID-19 pandemic on life expectancy and healthy life expectancy.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Donate to charity during this holiday seasonSERUDS INDIA
For people who have money and are philanthropic, there are infinite opportunities to gift a needy person or child a Merry Christmas. Even if you are living on a shoestring budget, you will be surprised at how much you can do.
Donate Us
https://serudsindia.org/how-to-donate-to-charity-during-this-holiday-season/
#charityforchildren, #donateforchildren, #donateclothesforchildren, #donatebooksforchildren, #donatetoysforchildren, #sponsorforchildren, #sponsorclothesforchildren, #sponsorbooksforchildren, #sponsortoysforchildren, #seruds, #kurnool
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
ZGB - The Role of Generative AI in Government transformation.pdf
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
1. LEA Consulting Ltd.
St. Clair Avenue West / Rail CrossingSt. Clair Avenue West / Rail Crossing
Environmental Assessment StudyEnvironmental Assessment Study
Status Update December 2, 2014
2. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 2
In 2012, City Council directed staff to:
“Initiate and carry out an Environmental
Assessment (EA) Study of the St. Clair Avenue /
Rail Crossing between Keele Street and Old
Weston Road”
Background
3. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 3
What is an EA and why is one required?
• Under the Provincial Environmental Assessment Act, it’s a
process that ensures good planning by determining and
managing the potential effects of a project prior to
implementation.
• The process ensures that public concerns are heard.
• The process balances the economic, social, cultural and
natural environmental needs.
• Schedule C projects are large-scale, complex projects that
have the potential for significant environmental effects:
– new roads or road extensions
– new bridges and rehabilitation of bridges
– interchanges and grade separations
Background
4. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 4
Background
5. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 5
This study, which we have identified as a Functional Planning
Study, represents the first phase of the Environmental
Assessment (EA) Process.
Project objectives:
•Identify the existing constraints, problems and issues in the
study area.
•Identify short-term and long-term solutions that can improve
vehicular operations along St. Clair Avenue West between Keele
Street and Old Weston Road.
•Develop functional designs and cost estimates for the
alternatives
•Short-list improvements that the City can implement (with or
without an EA Study).
Project Objectives
6. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 6
The Functional Planning Study looks at the
feasibility of alternatives in order to reduce the scope
of the subsequent phases of the Environmental
Assessment (EA) Study.
Functional Planning Study Schedule:
•Existing Conditions Review – Dec 2013 to 2014
•Develop and Assess of Alternatives – Late 2014
•Correspondence with stakeholders – On-going
•Functional Planning study Completion - Mar 2015
Study Process
1) Functional Planning Study
(1.5 Years)
2) Environmental Assessment
( 1.5 Years)
3) Preliminary Design
(1 Year)
4) Property Acquisition
(Concurrent)
5) Detailed Design
(1 Year)
6) Construction
(3-5+ Years)
WE ARE HERE
7. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 7
Study AreaStudy Area
Rail underpass constructed in 1931-32Rail underpass constructed in 1931-32
St. Clair streetcar constructed in dedicated
right-of-way in 2010
St. Clair streetcar constructed in dedicated
right-of-way in 2010
Project Location and Background
Junction Road crossing closed intermittently
between 2012 and 2014 for rail-rail grade
separation project
Junction Road crossing closed intermittently
between 2012 and 2014 for rail-rail grade
separation project
8. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 8
Existing Conditions
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
To Keele
9. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 9
Existing Conditions
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
To Keele
10. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 10
To Keele Existing Conditions
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
Study network requires new links and
connections to remove unnecessary
traffic flows from St. Clair Avenue West.
Study network requires new links and
connections to remove unnecessary
traffic flows from St. Clair Avenue West.
11. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 11
What types of alternatives will the Functional Planning Study
evaluate?
•Shared Use of Transit Lanes
•Extension of Turn Lanes
•Widen St. Clair Avenue West at Underpass
• Replace existing underpass with a wider bridge
• Additional underpass on the south side of St. Clair Avenue West
• New overpass to replace underpass adjacent to south side of St. Clair
•Additional Crossing of Rail Corridor North of St. Clair Avenue West
•Additional Crossing of Rail Corridor South of St. Clair Avenue West
•Extension of Keele Street to the south
• To new rail corridor crossing north of St. Clair Avenue West
• To Davenport Road
Functional Planning Study
12. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 12
Alternatives to be Considered
The streetcar lane would
be opened to general
traffic between Old Weston
Road and Keele Street
during part or all of the
day.
Shared Transit
Lanes
Shared Transit
Lanes
Shared Transit Lanes
(example from King Street West)
Dedicated Streetcar Lanes
13. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 13
Alternatives to be Considered (cont.)
This involves providing a
receiving lane for the
westbound movement at
the intersection of Old
Weston Road and St. Clair
Avenue West .
This may require relocation
of the westbound streetcar
stop at Old Weston Road.
This can be implemented in
combination with other
alternatives.
Extension to Turn LanesExtension to Turn Lanes
Retail
14. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 14
This involves replacing the
St. Clair West underpass
between Weston Road /
Keele Street and Old
Weston Road with a wider
structure or adding a new
span to the south to
provide one additional
traffic lane in each
direction.
This allows for additional
east-west vehicle queue
storage between
intersections. Any new
underpass structure will
need to accommodate new
vertical and horizontal
clearance requirements.
A dedicated streetcar ROW
would be maintained.
Widen St. Clair
Avenue at
Underpass
Widen St. Clair
Avenue at
Underpass
Alternatives to be Considered (cont.)
Replace existing underpass with wider structure
New structure south of St. Clair Avenue West
New St. Clair
Avenue Overpass
New St. Clair
Avenue Overpass
This involves replacing the
St. Clair underpass with a
new overpass to the south
of St. Clair Ave West
A dedicated streetcar ROW
would be maintained.
15. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 15
Alternatives to be Considered (cont.)
An easterly extension of
Gunns Road across the rail
corridor to Union Street
and/or Old Weston Road
can provide an alternate
east-west travel route in
the area thereby relieving
demand on St. Clair Avenue
at the rail corridor.
Rail Crossing North
of St. Clair
(Gunns Road)
Rail Crossing North
of St. Clair
(Gunns Road)
16. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 16
Alternatives to be Considered (cont.)
A westerly extension of
Davenport Road across the
rail corridor to Keele Street
can provide an alternate
east-west travel route in
the area thereby relieving
demand on St. Clair Avenue
at the rail corridor.
Rail Crossing South
of St. Clair
(Davenport Road)
Rail Crossing South
of St. Clair
(Davenport Road)
17. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 17
Alternatives to be Considered (cont.)
A southerly extension of
Keele Street to Union
Street and/or the Gunns
Road extension can provide
an alternate north-south
travel route in the area.
This would allow for
additional route choice for
crossing through the area.
This alternative can be
combined with a full or
partial extension of Gunns
Road to improve network
connectivity north of St.
Clair Avenue.
Keele Extension
(to Gunns Road)
Keele Extension
(to Gunns Road)
18. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 18
Alternatives to be Considered (cont.)
Keele Extension
(to Davenport Road)
Keele Extension
(to Davenport Road)
An extension of Keele
Street to connect with
Davenport Road via a new
overpass structure for auto
traffic over St. Clair Avenue
West.
This alternative allows
north-south traffic to avoid
St. Clair Avenue entirely.
This alternative can be
combined with the Gunns
Road extension and/or the
Davenport Road extension
alternatives.
Keele Extension over St. Clair Avenue West
19. LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 19
Between now and March 2015, the study team will:
•Assess alternatives to determine the technical feasibility, outline
the design constraints, develop cost estimates, and identify
required approvals and property requirements associated with
each alternative
•Shortlist alternatives to take forward into the subsequent
phases of the Environmental Assessment Study
Next Steps