LEA Consulting Ltd.
St. Clair Avenue West / Rail CrossingSt. Clair Avenue West / Rail Crossing
Environmental Assessment StudyEnvironmental Assessment Study
Status Update December 2, 2014
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 2
In 2012, City Council directed staff to:
“Initiate and carry out an Environmental
Assessment (EA) Study of the St. Clair Avenue /
Rail Crossing between Keele Street and Old
Weston Road”
Background
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 3
What is an EA and why is one required?
• Under the Provincial Environmental Assessment Act, it’s a
process that ensures good planning by determining and
managing the potential effects of a project prior to
implementation.
• The process ensures that public concerns are heard.
• The process balances the economic, social, cultural and
natural environmental needs.
• Schedule C projects are large-scale, complex projects that
have the potential for significant environmental effects:
– new roads or road extensions
– new bridges and rehabilitation of bridges
– interchanges and grade separations
Background
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 4
Background
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 5
This study, which we have identified as a Functional Planning
Study, represents the first phase of the Environmental
Assessment (EA) Process.
Project objectives:
•Identify the existing constraints, problems and issues in the
study area.
•Identify short-term and long-term solutions that can improve
vehicular operations along St. Clair Avenue West between Keele
Street and Old Weston Road.
•Develop functional designs and cost estimates for the
alternatives
•Short-list improvements that the City can implement (with or
without an EA Study).
Project Objectives
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 6
The Functional Planning Study looks at the
feasibility of alternatives in order to reduce the scope
of the subsequent phases of the Environmental
Assessment (EA) Study.
Functional Planning Study Schedule:
•Existing Conditions Review – Dec 2013 to 2014
•Develop and Assess of Alternatives – Late 2014
•Correspondence with stakeholders – On-going
•Functional Planning study Completion - Mar 2015
Study Process
1) Functional Planning Study
(1.5 Years)
2) Environmental Assessment
( 1.5 Years)
3) Preliminary Design
(1 Year)
4) Property Acquisition
(Concurrent)
5) Detailed Design
(1 Year)
6) Construction
(3-5+ Years)
WE ARE HERE
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 7
Study AreaStudy Area
Rail underpass constructed in 1931-32Rail underpass constructed in 1931-32
St. Clair streetcar constructed in dedicated
right-of-way in 2010
St. Clair streetcar constructed in dedicated
right-of-way in 2010
Project Location and Background
Junction Road crossing closed intermittently
between 2012 and 2014 for rail-rail grade
separation project
Junction Road crossing closed intermittently
between 2012 and 2014 for rail-rail grade
separation project
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 8
Existing Conditions
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
To Keele
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 9
Existing Conditions
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
To Keele
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 10
To Keele Existing Conditions
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
There are three (3) main
travel flow patterns in
the area:
a)East and west along St.
Clair Avenue West
b)Northwest and
southeast.
c)Northeast and
southwest
Travel is constrained by
the limited number of
crossings provided over
the various rail corridors.
Study network requires new links and
connections to remove unnecessary
traffic flows from St. Clair Avenue West.
Study network requires new links and
connections to remove unnecessary
traffic flows from St. Clair Avenue West.
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 11
What types of alternatives will the Functional Planning Study
evaluate?
•Shared Use of Transit Lanes
•Extension of Turn Lanes
•Widen St. Clair Avenue West at Underpass
• Replace existing underpass with a wider bridge
• Additional underpass on the south side of St. Clair Avenue West
• New overpass to replace underpass adjacent to south side of St. Clair
•Additional Crossing of Rail Corridor North of St. Clair Avenue West
•Additional Crossing of Rail Corridor South of St. Clair Avenue West
•Extension of Keele Street to the south
• To new rail corridor crossing north of St. Clair Avenue West
• To Davenport Road
Functional Planning Study
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 12
Alternatives to be Considered
The streetcar lane would
be opened to general
traffic between Old Weston
Road and Keele Street
during part or all of the
day.
Shared Transit
Lanes
Shared Transit
Lanes
Shared Transit Lanes
(example from King Street West)
Dedicated Streetcar Lanes
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 13
Alternatives to be Considered (cont.)
This involves providing a
receiving lane for the
westbound movement at
the intersection of Old
Weston Road and St. Clair
Avenue West .
This may require relocation
of the westbound streetcar
stop at Old Weston Road.
This can be implemented in
combination with other
alternatives.
Extension to Turn LanesExtension to Turn Lanes
Retail
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 14
This involves replacing the
St. Clair West underpass
between Weston Road /
Keele Street and Old
Weston Road with a wider
structure or adding a new
span to the south to
provide one additional
traffic lane in each
direction.
This allows for additional
east-west vehicle queue
storage between
intersections. Any new
underpass structure will
need to accommodate new
vertical and horizontal
clearance requirements.
A dedicated streetcar ROW
would be maintained.
Widen St. Clair
Avenue at
Underpass
Widen St. Clair
Avenue at
Underpass
Alternatives to be Considered (cont.)
Replace existing underpass with wider structure
New structure south of St. Clair Avenue West
New St. Clair
Avenue Overpass
New St. Clair
Avenue Overpass
This involves replacing the
St. Clair underpass with a
new overpass to the south
of St. Clair Ave West
A dedicated streetcar ROW
would be maintained.
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 15
Alternatives to be Considered (cont.)
An easterly extension of
Gunns Road across the rail
corridor to Union Street
and/or Old Weston Road
can provide an alternate
east-west travel route in
the area thereby relieving
demand on St. Clair Avenue
at the rail corridor.
Rail Crossing North
of St. Clair
(Gunns Road)
Rail Crossing North
of St. Clair
(Gunns Road)
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 16
Alternatives to be Considered (cont.)
A westerly extension of
Davenport Road across the
rail corridor to Keele Street
can provide an alternate
east-west travel route in
the area thereby relieving
demand on St. Clair Avenue
at the rail corridor.
Rail Crossing South
of St. Clair
(Davenport Road)
Rail Crossing South
of St. Clair
(Davenport Road)
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 17
Alternatives to be Considered (cont.)
A southerly extension of
Keele Street to Union
Street and/or the Gunns
Road extension can provide
an alternate north-south
travel route in the area.
This would allow for
additional route choice for
crossing through the area.
This alternative can be
combined with a full or
partial extension of Gunns
Road to improve network
connectivity north of St.
Clair Avenue.
Keele Extension
(to Gunns Road)
Keele Extension
(to Gunns Road)
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 18
Alternatives to be Considered (cont.)
Keele Extension
(to Davenport Road)
Keele Extension
(to Davenport Road)
An extension of Keele
Street to connect with
Davenport Road via a new
overpass structure for auto
traffic over St. Clair Avenue
West.
This alternative allows
north-south traffic to avoid
St. Clair Avenue entirely.
This alternative can be
combined with the Gunns
Road extension and/or the
Davenport Road extension
alternatives.
Keele Extension over St. Clair Avenue West
LEA Consulting Ltd.
St. Clair Avenue West / Rail Crossing – Environmental Assessment Study
Status Update December 2, 2014 19
Between now and March 2015, the study team will:
•Assess alternatives to determine the technical feasibility, outline
the design constraints, develop cost estimates, and identify
required approvals and property requirements associated with
each alternative
•Shortlist alternatives to take forward into the subsequent
phases of the Environmental Assessment Study
Next Steps

More Related Content

What's hot

Dolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectDolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag Project
Fairfax County
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
Fairfax County
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
Fairfax County
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton Estates
Fairfax County
 
De witt final_report_180213
De witt final_report_180213De witt final_report_180213
De witt final_report_180213
StephanieGuereschi
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk
Fairfax County
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
Fairfax County
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream Restoration
Fairfax County
 
Federal Projects - USFW Region 3
Federal Projects - USFW Region 3Federal Projects - USFW Region 3
Federal Projects - USFW Region 3
jschelkoph
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
NorthOlympicSalmonCoalition
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
Sarah Doyle
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Fairfax County
 
Fairfax County Leigh Meadow Kickoff Presentation January 2016
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County Leigh Meadow Kickoff Presentation January 2016
Fairfax County Leigh Meadow Kickoff Presentation January 2016
Fairfax County
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
Fairfax County
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2Ismael Vazquez, LSIT
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
Fairfax County
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
Fairfax County
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream Restoration
Fairfax County
 
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration ProjectDead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Fairfax County
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Fairfax County
 

What's hot (20)

Dolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectDolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag Project
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton Estates
 
De witt final_report_180213
De witt final_report_180213De witt final_report_180213
De witt final_report_180213
 
South Lakes Drive Sidewalk
South Lakes Drive Sidewalk South Lakes Drive Sidewalk
South Lakes Drive Sidewalk
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream Restoration
 
Federal Projects - USFW Region 3
Federal Projects - USFW Region 3Federal Projects - USFW Region 3
Federal Projects - USFW Region 3
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Fairfax County Leigh Meadow Kickoff Presentation January 2016
Fairfax County Leigh Meadow Kickoff Presentation January 2016Fairfax County Leigh Meadow Kickoff Presentation January 2016
Fairfax County Leigh Meadow Kickoff Presentation January 2016
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream Restoration
 
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration ProjectDead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 

Viewers also liked

TRB Light Rail Committee (2)
TRB Light Rail Committee (2)TRB Light Rail Committee (2)
TRB Light Rail Committee (2)zataraik
 
Rail road crossing safety jn
Rail road crossing safety jnRail road crossing safety jn
Rail road crossing safety jnJohn Nichols
 
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements district5united
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
SCVTA
 
RAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.S
RAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.SRAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.S
RAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.S
Sahaya Justus Antony
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
Ricky Smith CMRP, CMRT
 

Viewers also liked (6)

TRB Light Rail Committee (2)
TRB Light Rail Committee (2)TRB Light Rail Committee (2)
TRB Light Rail Committee (2)
 
Rail road crossing safety jn
Rail road crossing safety jnRail road crossing safety jn
Rail road crossing safety jn
 
Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements Capitol Expressway Light Rail Project – Pedestrian Improvements
Capitol Expressway Light Rail Project – Pedestrian Improvements
 
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
The Future of VTA Light Rail, Presentation to SPUR San Jose Nov. 12, 2014
 
RAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.S
RAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.SRAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.S
RAILWAY LEVEL CROSSING ACCIDENTS PREVENTER - SAHAYA JUSTUS ANTONY.S
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 

Similar to St. Clair Avenue West - Rail Crossing Study (Dec. 2014)

S2 s presentation180515
S2 s presentation180515S2 s presentation180515
S2 s presentation180515
Naoise
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
Toronto Public Consultation Unit
 
CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panels
Crowdbrite
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental Assessment
Fairfax County
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
Thomas Downs
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 Presentation
SCVTA
 
Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12
Miami-Dade Transportation Planning Organization
 
Florida's Turnpike Enterprise (FTE) Construction Projects Update
Florida's Turnpike Enterprise (FTE) Construction Projects UpdateFlorida's Turnpike Enterprise (FTE) Construction Projects Update
Florida's Turnpike Enterprise (FTE) Construction Projects Update
Miami-Dade Transportation Planning Organization
 
Southside Green - Team 2
Southside Green - Team 2Southside Green - Team 2
Southside Green - Team 2M. Damon Weiss
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
Toronto Public Consultation Unit
 
3870 a4 8pp brochure no bleed
3870  a4 8pp brochure no bleed3870  a4 8pp brochure no bleed
3870 a4 8pp brochure no bleedpennyschultz
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
cityofevanston
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
cityofevanston
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestPhilip Tunnah
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)GardinerEast
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Fairfax County
 
Sp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalSp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 final
cityofevanston
 
Nov. 18 Council Meeting: Local Project Updates
Nov. 18 Council Meeting:  Local Project UpdatesNov. 18 Council Meeting:  Local Project Updates
Nov. 18 Council Meeting: Local Project Updates
City of Corona
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Toronto Public Consultation Unit
 

Similar to St. Clair Avenue West - Rail Crossing Study (Dec. 2014) (20)

S2 s presentation180515
S2 s presentation180515S2 s presentation180515
S2 s presentation180515
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panels
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental Assessment
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
 
Mountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 PresentationMountain View Double-Track Project May 22 Presentation
Mountain View Double-Track Project May 22 Presentation
 
Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12
 
Florida's Turnpike Enterprise (FTE) Construction Projects Update
Florida's Turnpike Enterprise (FTE) Construction Projects UpdateFlorida's Turnpike Enterprise (FTE) Construction Projects Update
Florida's Turnpike Enterprise (FTE) Construction Projects Update
 
Southside Green - Team 2
Southside Green - Team 2Southside Green - Team 2
Southside Green - Team 2
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
3870 a4 8pp brochure no bleed
3870  a4 8pp brochure no bleed3870  a4 8pp brochure no bleed
3870 a4 8pp brochure no bleed
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes Digest
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Sp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 finalSp2- pedestrian safety presentation 10.08.12 final
Sp2- pedestrian safety presentation 10.08.12 final
 
Nov. 18 Council Meeting: Local Project Updates
Nov. 18 Council Meeting:  Local Project UpdatesNov. 18 Council Meeting:  Local Project Updates
Nov. 18 Council Meeting: Local Project Updates
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINAL
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 

More from Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Toronto Public Consultation Unit
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
Toronto Public Consultation Unit
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
Toronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
Toronto Public Consultation Unit
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
Toronto Public Consultation Unit
 
General information
General informationGeneral information
Disinfection System
Disinfection SystemDisinfection System
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
Toronto Public Consultation Unit
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
Toronto Public Consultation Unit
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
Toronto Public Consultation Unit
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
Toronto Public Consultation Unit
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Toronto Public Consultation Unit
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
Toronto Public Consultation Unit
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
Toronto Public Consultation Unit
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
Toronto Public Consultation Unit
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
Toronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
Toronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Toronto Public Consultation Unit
 

More from Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 

Recently uploaded

Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
OECDregions
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
elmerdalida001
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
JSchaus & Associates
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
johnmarimigallon
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 

Recently uploaded (20)

Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 

St. Clair Avenue West - Rail Crossing Study (Dec. 2014)

  • 1. LEA Consulting Ltd. St. Clair Avenue West / Rail CrossingSt. Clair Avenue West / Rail Crossing Environmental Assessment StudyEnvironmental Assessment Study Status Update December 2, 2014
  • 2. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 2 In 2012, City Council directed staff to: “Initiate and carry out an Environmental Assessment (EA) Study of the St. Clair Avenue / Rail Crossing between Keele Street and Old Weston Road” Background
  • 3. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 3 What is an EA and why is one required? • Under the Provincial Environmental Assessment Act, it’s a process that ensures good planning by determining and managing the potential effects of a project prior to implementation. • The process ensures that public concerns are heard. • The process balances the economic, social, cultural and natural environmental needs. • Schedule C projects are large-scale, complex projects that have the potential for significant environmental effects: – new roads or road extensions – new bridges and rehabilitation of bridges – interchanges and grade separations Background
  • 4. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 4 Background
  • 5. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 5 This study, which we have identified as a Functional Planning Study, represents the first phase of the Environmental Assessment (EA) Process. Project objectives: •Identify the existing constraints, problems and issues in the study area. •Identify short-term and long-term solutions that can improve vehicular operations along St. Clair Avenue West between Keele Street and Old Weston Road. •Develop functional designs and cost estimates for the alternatives •Short-list improvements that the City can implement (with or without an EA Study). Project Objectives
  • 6. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 6 The Functional Planning Study looks at the feasibility of alternatives in order to reduce the scope of the subsequent phases of the Environmental Assessment (EA) Study. Functional Planning Study Schedule: •Existing Conditions Review – Dec 2013 to 2014 •Develop and Assess of Alternatives – Late 2014 •Correspondence with stakeholders – On-going •Functional Planning study Completion - Mar 2015 Study Process 1) Functional Planning Study (1.5 Years) 2) Environmental Assessment ( 1.5 Years) 3) Preliminary Design (1 Year) 4) Property Acquisition (Concurrent) 5) Detailed Design (1 Year) 6) Construction (3-5+ Years) WE ARE HERE
  • 7. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 7 Study AreaStudy Area Rail underpass constructed in 1931-32Rail underpass constructed in 1931-32 St. Clair streetcar constructed in dedicated right-of-way in 2010 St. Clair streetcar constructed in dedicated right-of-way in 2010 Project Location and Background Junction Road crossing closed intermittently between 2012 and 2014 for rail-rail grade separation project Junction Road crossing closed intermittently between 2012 and 2014 for rail-rail grade separation project
  • 8. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 8 Existing Conditions There are three (3) main travel flow patterns in the area: a)East and west along St. Clair Avenue West b)Northwest and southeast. c)Northeast and southwest Travel is constrained by the limited number of crossings provided over the various rail corridors. There are three (3) main travel flow patterns in the area: a)East and west along St. Clair Avenue West b)Northwest and southeast. c)Northeast and southwest Travel is constrained by the limited number of crossings provided over the various rail corridors. To Keele
  • 9. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 9 Existing Conditions There are three (3) main travel flow patterns in the area: a)East and west along St. Clair Avenue West b)Northwest and southeast. c)Northeast and southwest Travel is constrained by the limited number of crossings provided over the various rail corridors. There are three (3) main travel flow patterns in the area: a)East and west along St. Clair Avenue West b)Northwest and southeast. c)Northeast and southwest Travel is constrained by the limited number of crossings provided over the various rail corridors. To Keele
  • 10. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 10 To Keele Existing Conditions There are three (3) main travel flow patterns in the area: a)East and west along St. Clair Avenue West b)Northwest and southeast. c)Northeast and southwest Travel is constrained by the limited number of crossings provided over the various rail corridors. There are three (3) main travel flow patterns in the area: a)East and west along St. Clair Avenue West b)Northwest and southeast. c)Northeast and southwest Travel is constrained by the limited number of crossings provided over the various rail corridors. Study network requires new links and connections to remove unnecessary traffic flows from St. Clair Avenue West. Study network requires new links and connections to remove unnecessary traffic flows from St. Clair Avenue West.
  • 11. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 11 What types of alternatives will the Functional Planning Study evaluate? •Shared Use of Transit Lanes •Extension of Turn Lanes •Widen St. Clair Avenue West at Underpass • Replace existing underpass with a wider bridge • Additional underpass on the south side of St. Clair Avenue West • New overpass to replace underpass adjacent to south side of St. Clair •Additional Crossing of Rail Corridor North of St. Clair Avenue West •Additional Crossing of Rail Corridor South of St. Clair Avenue West •Extension of Keele Street to the south • To new rail corridor crossing north of St. Clair Avenue West • To Davenport Road Functional Planning Study
  • 12. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 12 Alternatives to be Considered The streetcar lane would be opened to general traffic between Old Weston Road and Keele Street during part or all of the day. Shared Transit Lanes Shared Transit Lanes Shared Transit Lanes (example from King Street West) Dedicated Streetcar Lanes
  • 13. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 13 Alternatives to be Considered (cont.) This involves providing a receiving lane for the westbound movement at the intersection of Old Weston Road and St. Clair Avenue West . This may require relocation of the westbound streetcar stop at Old Weston Road. This can be implemented in combination with other alternatives. Extension to Turn LanesExtension to Turn Lanes Retail
  • 14. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 14 This involves replacing the St. Clair West underpass between Weston Road / Keele Street and Old Weston Road with a wider structure or adding a new span to the south to provide one additional traffic lane in each direction. This allows for additional east-west vehicle queue storage between intersections. Any new underpass structure will need to accommodate new vertical and horizontal clearance requirements. A dedicated streetcar ROW would be maintained. Widen St. Clair Avenue at Underpass Widen St. Clair Avenue at Underpass Alternatives to be Considered (cont.) Replace existing underpass with wider structure New structure south of St. Clair Avenue West New St. Clair Avenue Overpass New St. Clair Avenue Overpass This involves replacing the St. Clair underpass with a new overpass to the south of St. Clair Ave West A dedicated streetcar ROW would be maintained.
  • 15. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 15 Alternatives to be Considered (cont.) An easterly extension of Gunns Road across the rail corridor to Union Street and/or Old Weston Road can provide an alternate east-west travel route in the area thereby relieving demand on St. Clair Avenue at the rail corridor. Rail Crossing North of St. Clair (Gunns Road) Rail Crossing North of St. Clair (Gunns Road)
  • 16. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 16 Alternatives to be Considered (cont.) A westerly extension of Davenport Road across the rail corridor to Keele Street can provide an alternate east-west travel route in the area thereby relieving demand on St. Clair Avenue at the rail corridor. Rail Crossing South of St. Clair (Davenport Road) Rail Crossing South of St. Clair (Davenport Road)
  • 17. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 17 Alternatives to be Considered (cont.) A southerly extension of Keele Street to Union Street and/or the Gunns Road extension can provide an alternate north-south travel route in the area. This would allow for additional route choice for crossing through the area. This alternative can be combined with a full or partial extension of Gunns Road to improve network connectivity north of St. Clair Avenue. Keele Extension (to Gunns Road) Keele Extension (to Gunns Road)
  • 18. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 18 Alternatives to be Considered (cont.) Keele Extension (to Davenport Road) Keele Extension (to Davenport Road) An extension of Keele Street to connect with Davenport Road via a new overpass structure for auto traffic over St. Clair Avenue West. This alternative allows north-south traffic to avoid St. Clair Avenue entirely. This alternative can be combined with the Gunns Road extension and/or the Davenport Road extension alternatives. Keele Extension over St. Clair Avenue West
  • 19. LEA Consulting Ltd. St. Clair Avenue West / Rail Crossing – Environmental Assessment Study Status Update December 2, 2014 19 Between now and March 2015, the study team will: •Assess alternatives to determine the technical feasibility, outline the design constraints, develop cost estimates, and identify required approvals and property requirements associated with each alternative •Shortlist alternatives to take forward into the subsequent phases of the Environmental Assessment Study Next Steps

Editor's Notes

  1. VL testing with formatting here
  2. VL testing with formatting here
  3. VL testing with formatting here