District of Columbia Water and Sewer Authority
George S. Hawkins, General Manager
August 18, 2016
Briefing for
DEPARTMENT OF TRANSPORTATION OFFICE
OF PLANNING AND ENVIRONMENT
“DC CLEAN RIVERS” PROJECT
DCCR Background
Separate and Combined Sewer Systems
100% of
suburbs
67% of D.C.
1
DCCR Background
Long Term Control Plan Development
January 14, 2016 –
Consent Decree
Modification
Entered in Federal
Court
2
Public Participation Public Participation
DCCR Background
Current Plan
• DC Clean Rivers Project: $2.6 Billion
• Nitrogen Removal: $950 Million
• Total > $ 3.5 Billion
• 25 yr implementation (2005 – 2030)
• 96% reduction in CSOs & flood relief in Northeast
Boundary
• Approx 1 million lbs/yr nitrogen reduction predicted
DC CLEAN RIVERS PROJECT AND
NITROGEN REMOVAL PROGRAMS
3
2142
1063
49
3254
1282
638
43
1963
54 79 5
138
0
500
1000
1500
2000
2500
3000
3500
Anacostia River Potomac River Rock Creek Total System
CSOOverflow(mg/avgyear)
1996 2013 LTCP Completed
(DC Water Formed)
4
Total System
96% CSO
Reduction
DC Clean Rivers Project Overview:
Magnitude of the Problem, Progress to Date and Benefits
Program Completion2016
Project Benefits: Flood Relief
Rhode Island Metro
First & P St NW
Flagler St NW
Rhode Island & T St NW
Rhode Island Between First & 2nd St
Rhode Island & T St NW
Rhode Island & First St NW
First & V St NW
5
More than $1.3 B in Contracts have
been let for the Anacostia River
Projects
A Blue Plains Tunnel
B Tingey Street Diversions
C CSO 019 Overflow and Diversion Structures
D JBAB Overflow and Potomac Outfall Sewer Diversion
E M Street Diversion Sewer (CSOs 015, 016 and 017)
G CSO 007 Diversion Structure and Diversion Sewer
H Anacostia River Tunnel
I Main Pumping Station and Tingey Street Diversions
J Northeast Boundary Tunnel
Y Blue Plains Dewatering Pumping Station and ECF
Z Poplar Point Pumping Station Replacement
Blue
Plains
Tunnel
Poplar Point PS
Anacostia River Tun.
Main PS Diversions
Tingey St Diversions
CSO 007
CSO 019
Northeast
Boundary
Tunnel
M St Div. Sewer
First St Tunnel
JBAB Diversions
J
Legend
Completed
Construction
Procurement
Design
6
LID at DC
Water
Facilities
Lady Bird Emerges
Typical Tunnel Facilities
CSO
Anacostia River
Tunnel
Pumping Station
cavern
Diversion
Structure
Drop Shaft
AditShaft
Access
Shafts
Tunnel
Overflow
Screening
Shaft
LEGEND
Below grade
Surface access req’d to construct, but
finished facility can be below grade
Above-grade facilities typically required
Plan
Pumping
Station
Screening
Shaft
Diversion
Structure Drop Shaft
Adit
Access Shafts
Shaft
Profile
Buildings typically
provided
Existing CSO
7
Located at Blue Plains
Blue Plains – 2015
Denite
reactors
Nitrification
Sedimentation
Dual Purpose
Sedimentation
Nitrification
Reactors
West Secondary
Sedimentation
Secondary Reactors
East Secondary
Sedimentation
East Secondary
SedimentationWarehouse & Visitors
Center
Solids
Processing
Bldg
Digesters
Central
Maintenance
Facility
Wet Weather
Treatment Facility
(under construction)
City of
Alexandria
Central Operations
Facility
Naval Research Lab
8
Assemble Lady Bird
Mine Tunnel
Lady Bird Emerges
Anacostia River Tunnel System
Blue Plains Tunnel
23 feet in diameter
24,207 feet long
05/2011 to 08/2015
$330M By Traylor-Skanska-JayDee 9
Anacostia River Tunnel System
Blue Plains Tunnel- Dewatering
10
10
Anacostia River Tunnel System
Blue Plains Tunnel- Dewatering Shaft
11
A Look Inside a TBM
Lady Bird
12
A Look Inside a TBM
Assembling Lady Bird
13
A Look Inside A DCCR TBM
Tunneling Photos
TBM Utilities in conduit
Lokie (diesel powered locomotive)
Inside Blue Plains Tunnel
Continuous conveyor belt for
excavated soils removal
Inside Lady Bird
14
MAIN PUMPING STATIONS DIVERSIONS
15
Main Pumping
Station
Diversion
Chambers
Tingey St SE
M St SE
SouthCapitolSt
DDOT
Anacostia River
Navy
Yard
Div. I Project Location
N
CSO 009/011A
Shaft
Internals
CSO 012
Ventilation
Equipment
Air Handling
Above
ground
structures
Above
ground
structures
Main Pumping Station Diversions 3D View
Proposed Above-Ground Structures
Approved by HPRB, CFA, and NCPC
Tide Gate StructureShaft Structure 8-ft black fence
(Future)
Note: Building on The Yards “Parcel L”
(multi-story building on the left of both
illustrations) is shown for illustration
purposes only.
Front view of Main
Pumping Station.
Tide Gate Structure and Shaft Structure.
Support of Excavation Methods
 Four Foot Diameter Secant Piles
(completed)
 18 Inch Diameter Auger Piles (completed)
 Liner Plate Shafts
 Limited Sheet Piles
Planned work activity
Driven sheet piles detail
Sheet piles – 2 -3 weeks
duration
Installation of thinner Sheets
(more vibration) – 1-2 days (
5-6 sheets left)
Planned Work Activities
 Construction Staging Areas: Intersection of Tingey Street SE,
New Jersey Avenue SE, and N Street SE
 Structures to be constructed:
 Tiber Creek Sewer Diversion Chamber (CSO 012)
 B Street New Jersey Trunk Sewer Diversion Chamber (CSO 011A)
 Junction sewers
 Venting control chamber
 Surge storage chamber
 Approach channel
 Main Pumping Station drop shaft
 Restore roadway to current configuration
Main Pumping Station Diversions to be
complete and operational by 2018
20
Current Construction Activities in Area (4th and
Tingey St – Old trapeze school)
Division I – Construction Activities
Distance from US DOT – 230ft
Construction Activities
 Excavation (CSO 009/011 Diversion
chamber)
 Sheet Pile driving
 Installing 11ft diameter flume pipe in
Tiber Creek Sewer Excavation
 Hauling operations - Include hauling off
site material, stone and concrete
delivery
Location of Vibration
Instrumentation
At 98 ft.
Noise Monitoring
At 95 ft.
The fully constructed combined sewer overflow (CSO)
control program will reduce CSOs by 96% and 98% in the
Anacostia River alone, relieve flooding throughout the
District, and is part of the strategy to reduce nitrogen
discharged into the Potomac River.
Benefits of the Fully Constructed
DC Clean Rivers Project
2323

More Related Content

What's hot

Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Fairfax County
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectFairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationFairfax County
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Fairfax County
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Fairfax County
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectFairfax County
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream ImprovementFairfax County
 
Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Fairfax County
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationFairfax County
 
Lebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationLebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationCity of Lebanon
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Fairfax County
 
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Black & Veatch
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayFairfax County
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park NorthFairfax County
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectFairfax County
 
Piney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration ProjectPiney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration ProjectFairfax County
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectFairfax County
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Fairfax County
 

What's hot (20)

Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Sunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement ProjectSunset Hills Road Drainage Improvement Project
Sunset Hills Road Drainage Improvement Project
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
 
Lebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting PresentationLebanon CSO 11 Public Meeting Presentation
Lebanon CSO 11 Public Meeting Presentation
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
 
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
 
Piney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter WayPiney Run Tributary at Lamplighter Way
Piney Run Tributary at Lamplighter Way
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Pike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization ProjectPike Branch at Wilton Road Stream Stabilization Project
Pike Branch at Wilton Road Stream Stabilization Project
 
New York and New Jersey Tital Barriers
New York and New Jersey Tital BarriersNew York and New Jersey Tital Barriers
New York and New Jersey Tital Barriers
 
Piney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration ProjectPiney Run at Lake Werowance Stream Restoration Project
Piney Run at Lake Werowance Stream Restoration Project
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
 
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public meeting February 18, 2015
 

Similar to 2016-08-18-DCCR Presentation for DOT rev2

Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Fairfax County
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation VDOT Northern Virginia
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitFairfax County
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairFairfax County
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairFairfax County
 
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Fairfax County
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveFairfax County
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectFairfax County
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectFairfax County
 
ACJ presentation
ACJ presentationACJ presentation
ACJ presentationretzcanter
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project listAhmad Mousa
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06HartTWI
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
 
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Fairfax County
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018Crosstown TO
 

Similar to 2016-08-18-DCCR Presentation for DOT rev2 (20)

Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
 
Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2Flatlick Sewer Rehabilitation Project Phase 1 and 2
Flatlick Sewer Rehabilitation Project Phase 1 and 2
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
 
Green Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer RepairGreen Hill Estates Emergency Sewer Repair
Green Hill Estates Emergency Sewer Repair
 
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
ACJ presentation
ACJ presentationACJ presentation
ACJ presentation
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
 
Ccwf restoration apwa
Ccwf restoration apwaCcwf restoration apwa
Ccwf restoration apwa
 
Ccwf restoration apwa
Ccwf restoration apwaCcwf restoration apwa
Ccwf restoration apwa
 
Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities Rehabilitation of Three Equalization Basins and Ancillary Facilities
Rehabilitation of Three Equalization Basins and Ancillary Facilities
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2018
 

2016-08-18-DCCR Presentation for DOT rev2

  • 1. District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 18, 2016 Briefing for DEPARTMENT OF TRANSPORTATION OFFICE OF PLANNING AND ENVIRONMENT “DC CLEAN RIVERS” PROJECT
  • 2. DCCR Background Separate and Combined Sewer Systems 100% of suburbs 67% of D.C. 1
  • 3. DCCR Background Long Term Control Plan Development January 14, 2016 – Consent Decree Modification Entered in Federal Court 2 Public Participation Public Participation
  • 4. DCCR Background Current Plan • DC Clean Rivers Project: $2.6 Billion • Nitrogen Removal: $950 Million • Total > $ 3.5 Billion • 25 yr implementation (2005 – 2030) • 96% reduction in CSOs & flood relief in Northeast Boundary • Approx 1 million lbs/yr nitrogen reduction predicted DC CLEAN RIVERS PROJECT AND NITROGEN REMOVAL PROGRAMS 3
  • 5. 2142 1063 49 3254 1282 638 43 1963 54 79 5 138 0 500 1000 1500 2000 2500 3000 3500 Anacostia River Potomac River Rock Creek Total System CSOOverflow(mg/avgyear) 1996 2013 LTCP Completed (DC Water Formed) 4 Total System 96% CSO Reduction DC Clean Rivers Project Overview: Magnitude of the Problem, Progress to Date and Benefits Program Completion2016
  • 6. Project Benefits: Flood Relief Rhode Island Metro First & P St NW Flagler St NW Rhode Island & T St NW Rhode Island Between First & 2nd St Rhode Island & T St NW Rhode Island & First St NW First & V St NW 5
  • 7. More than $1.3 B in Contracts have been let for the Anacostia River Projects A Blue Plains Tunnel B Tingey Street Diversions C CSO 019 Overflow and Diversion Structures D JBAB Overflow and Potomac Outfall Sewer Diversion E M Street Diversion Sewer (CSOs 015, 016 and 017) G CSO 007 Diversion Structure and Diversion Sewer H Anacostia River Tunnel I Main Pumping Station and Tingey Street Diversions J Northeast Boundary Tunnel Y Blue Plains Dewatering Pumping Station and ECF Z Poplar Point Pumping Station Replacement Blue Plains Tunnel Poplar Point PS Anacostia River Tun. Main PS Diversions Tingey St Diversions CSO 007 CSO 019 Northeast Boundary Tunnel M St Div. Sewer First St Tunnel JBAB Diversions J Legend Completed Construction Procurement Design 6 LID at DC Water Facilities Lady Bird Emerges
  • 8. Typical Tunnel Facilities CSO Anacostia River Tunnel Pumping Station cavern Diversion Structure Drop Shaft AditShaft Access Shafts Tunnel Overflow Screening Shaft LEGEND Below grade Surface access req’d to construct, but finished facility can be below grade Above-grade facilities typically required Plan Pumping Station Screening Shaft Diversion Structure Drop Shaft Adit Access Shafts Shaft Profile Buildings typically provided Existing CSO 7 Located at Blue Plains
  • 9. Blue Plains – 2015 Denite reactors Nitrification Sedimentation Dual Purpose Sedimentation Nitrification Reactors West Secondary Sedimentation Secondary Reactors East Secondary Sedimentation East Secondary SedimentationWarehouse & Visitors Center Solids Processing Bldg Digesters Central Maintenance Facility Wet Weather Treatment Facility (under construction) City of Alexandria Central Operations Facility Naval Research Lab 8
  • 10. Assemble Lady Bird Mine Tunnel Lady Bird Emerges Anacostia River Tunnel System Blue Plains Tunnel 23 feet in diameter 24,207 feet long 05/2011 to 08/2015 $330M By Traylor-Skanska-JayDee 9
  • 11. Anacostia River Tunnel System Blue Plains Tunnel- Dewatering 10 10
  • 12. Anacostia River Tunnel System Blue Plains Tunnel- Dewatering Shaft 11
  • 13. A Look Inside a TBM Lady Bird 12
  • 14. A Look Inside a TBM Assembling Lady Bird 13
  • 15. A Look Inside A DCCR TBM Tunneling Photos TBM Utilities in conduit Lokie (diesel powered locomotive) Inside Blue Plains Tunnel Continuous conveyor belt for excavated soils removal Inside Lady Bird 14
  • 16. MAIN PUMPING STATIONS DIVERSIONS 15
  • 17. Main Pumping Station Diversion Chambers Tingey St SE M St SE SouthCapitolSt DDOT Anacostia River Navy Yard Div. I Project Location N
  • 18. CSO 009/011A Shaft Internals CSO 012 Ventilation Equipment Air Handling Above ground structures Above ground structures Main Pumping Station Diversions 3D View
  • 19. Proposed Above-Ground Structures Approved by HPRB, CFA, and NCPC Tide Gate StructureShaft Structure 8-ft black fence (Future) Note: Building on The Yards “Parcel L” (multi-story building on the left of both illustrations) is shown for illustration purposes only. Front view of Main Pumping Station. Tide Gate Structure and Shaft Structure.
  • 20. Support of Excavation Methods  Four Foot Diameter Secant Piles (completed)  18 Inch Diameter Auger Piles (completed)  Liner Plate Shafts  Limited Sheet Piles Planned work activity Driven sheet piles detail Sheet piles – 2 -3 weeks duration Installation of thinner Sheets (more vibration) – 1-2 days ( 5-6 sheets left)
  • 21. Planned Work Activities  Construction Staging Areas: Intersection of Tingey Street SE, New Jersey Avenue SE, and N Street SE  Structures to be constructed:  Tiber Creek Sewer Diversion Chamber (CSO 012)  B Street New Jersey Trunk Sewer Diversion Chamber (CSO 011A)  Junction sewers  Venting control chamber  Surge storage chamber  Approach channel  Main Pumping Station drop shaft  Restore roadway to current configuration Main Pumping Station Diversions to be complete and operational by 2018 20
  • 22. Current Construction Activities in Area (4th and Tingey St – Old trapeze school)
  • 23. Division I – Construction Activities Distance from US DOT – 230ft Construction Activities  Excavation (CSO 009/011 Diversion chamber)  Sheet Pile driving  Installing 11ft diameter flume pipe in Tiber Creek Sewer Excavation  Hauling operations - Include hauling off site material, stone and concrete delivery Location of Vibration Instrumentation At 98 ft. Noise Monitoring At 95 ft.
  • 24. The fully constructed combined sewer overflow (CSO) control program will reduce CSOs by 96% and 98% in the Anacostia River alone, relieve flooding throughout the District, and is part of the strategy to reduce nitrogen discharged into the Potomac River. Benefits of the Fully Constructed DC Clean Rivers Project 2323