ELEVATING ERIE CONCEPT PLAN
DEWITT, NY FINAL REPORT OCTOBER 2017
This report was developed with funding assistance through the
Environmental Protection Fund
Local Waterfront Revitalization Program
Elevating Erie Concept Plan - DeWitt, NY
Town of Dewitt
Sam Gordon, Director of Planning and Zoning
Stephanie Guereschi, Environmental Planner
EDR Environmental Design and Research
Andrew Obemesser
Erica Tauzer
Alta Planning + Design
Jeff Olson, Principal
Phil Goff, Project Manager
Lindsay Vera, PE, Project Engineer
Charles Creagh, Project Planner
ACKNOWLEDGEMENTS CONTENTS
Introduction...................................................1
Existing Conditions Assesment.....................3
Concept Plan Recommendations.................15
Design Features Toolkit...............................16
Project Recommendations Map...................18
Cross Section Locations Map.......................19
Cross Sections:
•	 A.......................................................20
•	 B.......................................................24
•	 C.......................................................26
Evaluation Criteria........................................30
•	 D.......................................................32
•	 E.......................................................34
•	 F.......................................................36
•	 G......................................................38
Conclusion + Next Steps..............................40
This report was developed with funding assistance through the
Environmental Protection Fund
Local Waterfront Revitalization Program
ii
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
The Elevating Erie Concept Plan seeks to help DeWitt achieve the following goals:
1.	 Provide a multi-use trail along the former Erie Canal alignment through the
Town of DeWitt
2.	 Increase recreational and active transportation opportunities for residents,
employees and visitors
3.	 Improve economic redevelopment opportunities along the trail corridor
4.	 Brand DeWitt as a more green and sustainable community
5.	 Leverage funding to improve multi-modal mobility, safety and aesthetics along
Erie Boulevard
The recommendations in this study will reduce one of the most critical gaps in the Erie
Canalway Trail. Currently, the trail is comprised of a nearly 360 mile network between
Buffalo and Albany, linking Rochester, Syracuse and Utica. Over 75% of the existing trail
is off-road, utilizing the historic towpaths and railroads. When fully complete, the Erie
Canalway Trail will be a key destination for heritage tourism, and a centerpiece for the
Town of DeWitt.
Introduction
Only small remnants of the historic Erie Canal exist along the former alignment
in DeWitt. Over the past century, the Canal has been replaced by a portion of
Interstate 481, local roadways and Erie Boulevard, a six-lane state highway. The
Town of DeWitt led a visionary effort called “Elevating Erie” to re-imagine the Canal
as a key part of the community’s future.
The Elevating Erie Concept Plan proposes to bring the Canal back to life in DeWitt,
with a new multi-use trail along the former Erie Canal alignment. This would
extend the current terminus of the Erie Canalway Trail at Old Erie Canalway State
Park through the Town of DeWitt to the Syracuse City Line at Thompson Road. The
recommended alignment incorporates public rights of way along Butternut Drive,
Kinne Road, Towpath Road, Bridge Street and Erie Boulevard. The proposed trail
is anticipated to run within Erie Boulevard to Downtown Syracuse and beyond, in
order to link with the existing Erie Canalway Trail in Camillus, a total gap of 14 miles.
The 14 mile gap is currently in the process of a subsequent planning and design
study as part of the Empire State Trail (EST). As envisioned by Gov. Andrew
Cuomo, the EST will link the Erie Canalway Trail, the Hudson River Greenway and
the Champlain Valley route into a 750-mile statewide multi-use trail network, the
largest in the U.S.
EXECUTIVE SUMMARY
EXECUTIVESUMMARY
1
The proposed path along the historic route of the Erie Canal in DeWitt will transform the community.
Elevating Erie Concept Plan - DeWitt, NY
12’ 13’13’ 4.5’12’13’ 13’4.5’ 30’
6’ 7’11’ 11’7’ 6’11’ 11’ 7’ 4’6’ 6’7’ 12’
115’
Sidewalk
Sidewalk
Buffer
Buffer
Buffer
Buffer
Shoulder
Shoulder
TravelLane
TravelLane
Sidewalk
Sidewalk
TravelLane
TravelLane
TravelLane
TravelLane
TravelLane
TravelLane
Median
TravelLane
TravelLane
115’
Stonedust
Erie
Canalway
Trail
Erie Canalway Trail Recommendations
To meet the Town’s goals, the recommended trail alignment
follows the historic route of the canal. This includes portions of
the historic towpath road between Kinne Road and Celi Drive
and a segment of Erie Boulevard East between Bridge Street
and Thompson Road. Recommendations for the 3-mile section
include a paved pathway with parallel stonedust shoulder within
Erie Boulevard’s median, striped bike lanes, a shared use path
within the shoulder, a new trail bridge over I-481 and a sidepath
along Butternut Drive. Intersection enhancements will tie all of
the various sections together. In aggregate, the majority of the
route will be separated from motor vehicle traffic. The trail will
be designed to safely accommodate a wide range of people of all
ages and abilities, including pedestrians, runners, and bicyclists.
The proposed Erie Boulevard Trail concept is proposed in the
following sections:
Erie Boulevard East
Taking advantage of the unused paved median, a shared use
path will run through the center and be buffered from traffic.
Specially designed intersection enhancements will accommodate
crossings at Bridge Street and Thompson Road for the connection
into Syracuse. A “road diet” to repurpose one travel lane in each
direction provides the opportunity to widen sidewalks and add
new street trees and can be developed as a second phase of
the project. The quality of the design is intended to promote
economic redevelopment along Erie Boulevard.
Towpath Road
Because of low traffic volumes and speeds west of Widewaters
Parkway, standard bicycle lanes will provide the two-wheeled
connection from Erie Boulevard further east. Pedestrian traffic
will be accommodated on a new sidewalk on the north side. East
of Widewaters Parkway, pedestrians, runners, and bicyclists will
utilize a wide shoulder of Towpath Road, separated from traffic by
Final Feasibility Concept Design for Erie Boulevard East
a striped buffer and delineator posts. Adjacent to the path, a narrow remnant of the Erie Canal
reminds users of the historical significance of the trail route.
Connection to Old Erie Canal State Park
From the east end of Towpath Road, the connection to Old Erie Canal State Park will be made using
a trail bridge over I-481, adjacent to the Kinne Road Bridge. A new sidepath along Butternut Drive
connects the bridge to the trailhead of the existing Canalway Trail that runs 38 miles from DeWitt
to Rome, New York. Project recommendations include an enhanced trailhead with additional
amenities such as bike racks, seating, an interpretive kiosk and restrooms.
2
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
EXISTING CONDITIONS ASSESSMENT
3
Elevating Erie Concept Plan - DeWitt, NY
Erie Canalway Trail
Syracuse / DeWitt area
Completed Portion
Gaps
Existing Studies
Numerous reports over the past 20 years have solidified the
importance of “closing the gap” in the Erie Canalway Trail in Central
New York. The Canalway Trail Gap Segment Assessment Report
(November 1998) report prepared by Parks & Trails New York (PTNY)
was one of many prepared by PTNY to address critical trail gaps
throughout the state. The preferred option east of the Syracuse
border: Utilize National Grid right-of-way adjacent to Rote 690,
crossing Thompson Road and Bridge Street, to enterprise Parkway,
Towpath Road and Kinne Road, to Cedar Bay Park in Dewitt.
The Canalway Trail Through Syracuse report (February 1999)
was developed in concert with the Bicycle/Pedestrian Advisory
Committee of the SMTC.
The Closing the Gaps: A Progress Report on the Erie Canalway Trail
(2010, 2011, 2012) prepared by the Canalway Trail Association New
York (CTANY) in concert with Parks Trails New York (PTNY) released
an annual report to “update Canalway corridor communities
on recent progress and the current trail status across the state.”
Progress in closing each of the gaps as well as obstacles present
in closing additional trail gaps in the state are outlined in each
report. The Closing the Gaps reports will provide insight into how
construction is progressing through existing challenging areas in
other ‘gap’ communities.
The Campaign to Close the Gaps (Fall 2010) initiated by Senator
Kristen Gillibrand’s office involved hosting a series of roundtable
discussions to gather ideas for closing the gaps that existing along
the trail between Utica and Albany.
The Cycling the Erie Canalway: A guide to 400 miles of adventure
and history along the Erie Canalway Trail (2007, 2012) guidebooks
published by PTNY is a useful tool for cyclists or any trail user
interested in planning a trip or locating improved areas. An on-road
segment between DeWitt and Camillus is highlighted.
The Friends of the Onondaga Canalway Trail (FOCT) is a public interest
group advancing completion of the trail between Camillus and DeWitt. The
FOCt was “designated by the Canalway Trail Management Organization (a
partnership project of the NYSCC, the National Park Service Rivers, Trails and
Conservation Assistance Program, and the New York Parks and Conservation
Association) as the group responsible for public participation in trailway
activities such as volunteer trail maintenance in the Syracuse area.” The FOCT
stopped meeting in 2003, and the maps detailing the preferred routing of the
Erie Canalway Trail between the Towns of DeWitt and Camillus were “never
officially adopted or accepted.”
“Completing the gap in the Syracuse portion of the trail would link Syracuse and its
surrounding communities to 281 miles of Erie Canalway Trail that are currently open to the
public.” - (Page 6, Erie Canalway Trail Syracuse Connector Route Project, Part II)
4
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Summary of The Erie Canalway Trail -
Syracuse Connector Route Project report
Part 1: June 2013 - Short Term
The Erie Canalway Trail - Syracuse Connector Route Project (June, 2013)
report published by the Syracuse Metropolitan Transportation
Council divided the study into two sections: Part I, the short-term
route, and Part II: the long-term route.
The short-term route is focused on the unsigned on-road Erie
Canalway Trail. The Cycling the Erie Canalway (CEC) Bike Tour
utilizes a version of this route each July. The development of
this route included input from the New York State Canalway
Corporation (NYSCC), the City of Syracuse, Towns of Camillus and
DeWitt and the SMTC. The short-term on-road route was to be
utilized until an appropriate off-road route could be planned,
developed, designed, and constructed. The on-road route has
been adjusted to reflect changes in roadway reconstruction
activity. The on-road route has been signed through Syracuse
but not in DeWitt.
Public Involvement
The June 2013 report Erie Canalway Trail - Syracuse Connector
Route Project includes a Public Involvement section that details
the robust level of public involvement. A Study Advisory
Committee (SAC), Working Group, and Stakeholders list were
developed with the purpose of involving the public during the
planning process. The SAC met four times, the first meeting
was held in July 2012 to introduce the project. At this meeting
the SMTC provided an introduction to the project, answered
project questions, solicited Working Group members, and asked
attendees to answer survey questions. The public drew desired
routes on large maps displaying the Syracuse Gap in the Erie
Canalway Trail. . Subsequent meetings were held in March, 2014.
The Syracuse Metropolitan Transportation Council (SMTC) held
a Working Group meeting in November 2012 to gain insight into the on-road
Erie Canalway Trail route. The Working Group consisted of volunteers from the
July 2012 meeting as well as participants solicited through an online survey. A
general stakeholders list was maintained, including each attendee from the first
public meeting. The stakeholders list is used to disseminate pertinent project
information and to notify people of upcoming public meetings.
The final public meeting was held in December, 2015 at the Museum of Science
and Technology in Syracuse. The SMTC “provided an introduction to the Erie
Canalway Trail project, an overview of the completed Part I portion of the
project, and an overview of the Part II suggested trail route options and Points
of Study, followed by a Q & A period.” (Page 12, Erie Canalway trail Syracuse
Connector Route Project, Part II.)
Part 2: June 2016 - Long Term
The long term or permanent route will address the Syracuse Gap by developing
a route that meets the intent of the Erie Canalway Trail across the state as a
designated shared-use path that is separated from motor vehicle traffic.
Routes
The analysis and potential permanent route development process began at
the first public meeting in 2012 and continues today. Input from stakeholders,
Working Group members, Study Advisory Committee members, and cyclists (as
part of both the SMTC’s Bike Corridor Study as well as from the annual Cycling
the Erie Canal event survey) was invaluable in the initial production of potential
route alignments. The report includes detailed maps that show the various
routing options.
Map 3-6: potential permanent route options in DeWitt from SMTC 2016 report
EXISTINGCONDITIONSASSESSMENT
5
Elevating Erie Concept Plan - DeWitt, NY
Elevating Erie Ideas Competition
The Elevating Erie Design Competition was a collaborative effort
between the Town of DeWitt and City of Syracuse to investigate
ideas to close the 14 mile gap in the Erie Canalway Trail. In the fall of
2015, both communities solicited design ideas that would identify
innovative ways to create a trail within the 4 mile gap between
SyracusesndDeWitt.Althoughburiedunderpavementforacentury,
the canalway corridor has remained significant in the region as a
primary means of transporting people and goods east and west.
Filling this gap in the system is crucial, as it will help achieve the goal
of creating the longest continuous bicycle and pedestrian trail in
North America. The Elevating Erie Ideas Competition was an effort
to both celebrate the heritage of the 200 year old canal system and
initiate a dialogue in the community discussing how to best utilize
and design the corridor to stimulate economic investment.
Four differently branded sites within DeWitt and Syracuse were
identified for potential improvements, including:
•	 Boulevard: a four mile stretch of Erie Blvd. through both
DeWitt and Syracuse
•	 Block: a single block of Erie Blvd. in Syracuse that
investigated design issues at a higher level of detail
•	 Branch: redesign of the Widewaters area at the intersection
of Towpath Road and Erie Blvd. in DeWitt
•	 Bridge: a trail and open space bridge over I-481, where the
current Erie Canalway Trail terminates at Butternut Drive in
DeWitt
Sixty-four competition entries were received from 16 different
countries, covering the four identified sites. According to www.
elevatingerie.com, the ideas competition “was a first step towards
initiating a community discussion about the importance of the
canal corridor, and how best to reclaim its heritage in a celebratory
and stimulating fashion.”
Public Survey
During the competition, an on-line survey was promoted to the
public to gain an understanding of:
•	 The importance of the corridor, which included a
establishing a set of prioritites for the built and natural
environment
•	 Where to focus investments, including a determination
of why more specific elements and trail amenities were
important
Developing Alternatives
The consultant team reviewed the survey results and noticed several
recurring themes throughout the 1,264 completed surveys. These
themes influenced the way in which we viewed potential design
ideasandultimatelyaffectedthepreferredalignment.Thefollowing
is a brief summary of the results from each survey question:
A collection of concepts from the Elevating Erie Competition website
6
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
The four categories that competition entries focused on during the Elevating Erie Ideas Competition
Priorities
The highest priorities by rank include:
•	 Pedestrian & Bicycle Transportation
•	 Connectivity and Safety
•	 Economic Development
Community Character - What needs the most improvement?
•	 More attractive streetscapes
•	 Redevelopment of vacant buildings and lots
•	 Improved development quality and attractiveness
Eco-friendly Design - Which of these will most benefit the
corridor?
•	 Green infrastructure
•	 Increase tree canopy
•	 Landscaping the median
Conectivity and Safety - Which improvments would make you
feel safer?
•	 Protected bike lanes
•	 Pedestrian refuge areas
•	 Traffic calming
Economc Development - Which development type do you favor
on Erie Boulevard?
•	 Commercial / mixed-use developments
•	 Retail / services
•	 Parks / pocket parks / playgrounds
Parks + Recreation - Which amenities would you prefer along
Erie Boulevard?
•	 Trails
•	 Open spaces / event spaces / playgrounds
•	 Picnic areas / restrooms / drinking fountains
The survey responses helped to inform the development of design
concepts for the DeWitt portion of the Erie Canal gap in metro
Syracuse. Due to the clear preferences expressed in the survey, final
design recomendations included a separation of the the Canalway
Trail from traffic where feasible; streetscape improvements to
encourage redevelopment and additional landscape buffers to evoke
a green corridor along the former route of the Erie Canal.
EXISTINGCONDITIONSASSESSMENT
7
Elevating Erie Concept Plan - DeWitt, NY
This infographic summarizes the Elevating Erie competition entry ideas
8
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY 9
Elevating Erie Concept Plan - DeWitt, NY
BridgeSt
Demong Dr
FisherRd
Kinne Rd
ElyDr
Carnegie Dr
EdwardsDr
ManorDr
KittellRd
Carlton
Dr
Arbor Ln
E Genesee St
The
H
am
let
Ro
BurrowsSt
Randall Rd
SedaliaCir
LyndonRd
E Manlius St
Mapleview
Rd
Widewaters
Pkwy
DeW
itt Rd
LuddingtonSt
Terraceview
Rd
AmbergateRd
DroversLn
ThompsonRd
HillsboroPkwy
FirtreeLn
Butternut Dr
Southgate Rd
CharlesSt
Doll
Pkwy
WilliamSt
Caton
Dr
PelhamRd
BrandonRd
SmithSt
Fayette
Blvd
Caleb Ave
Mountainview Ave
3rd
St
CeliDr
MastersRd
SalemRd
Haddonfield
Pl
Towpath Rd
Hobson Ave
Ethridge
Rd
McCool
Ave
ArchSt
Lockwood Rd
Springwater
Dr
Gifford
Pkwy
ButternutDr
Sutton
Pl
Bradford
Pkwy
Pyle Dr
Crst
Euclid
Ave
NorthridgeRd
W 1st St
Springfield Rd
Hillsboro
Pkwy
Pe
Hi
Phillips Rd
Salt Springs Rd
Hampshire Dr
Pelham Rd
Alpine
Dr
Phelps St
Paula Dr
ThompsonRd
Bradford
Pkwy
W
instonW
ay
Melbourne
Ave
Canterbury Rd
StantonDr
Brampton Dr
ClaretCir
RevereRd
lmsfordRd
Sunnyside
ParkRd
AberdeenTer
PosterLn
Litchfield
Dr
Kravec
Dr
Lynbrook
Cir
Dr
Commons
Park
W 2nd St
HathawayRd
Polk St
Erie Blvd
Manlius
Center Rd
Oakmont
Dr
Edgemont Dr WexfordRd
AgwayDr
Clearview
Rd
LynacresBlvd
C E D A R
B A Y
W I D E W A T E R S
P O N D
M
E A
D
O
W
B R O
O
K
L E Y
C R E E K
Canalway Trail: Old Erie CanalStatePark
SYRACUSE
DEWITT
Cedar Bay Park
DeWitt
Town
Park
DeWitt
Town Hall
The redevelopment of the shopping plaza on Erie Blvd. includes a well-
designed sidewalk and green buffer.
The following pages provide an assessment of the Erie
Canalway Trail corridor. The photo tour maps provide context
regarding the varying roadway / travel lane / shoulder widths
found on the roads within the site. The subsequent maps
illustrate:
•	 Motor vehicle traffic levels within the site
•	 Opportunities and challenges to creating a trail
connection through the corridor
Existing Conditions Assessment + Analysis
Long portions of Erie Blvd. in DeWitt feature a 30’ wide paved median.
Old Erie Canalway trailhead sits at the base of the sloped portion of
Butternut Drive and below the grade of the adjacent I-481.
Towpath Rd. slopes to the north from Kinne Rd. and includes a 4’ shoulder
on one side and 10’-12’ on the opposite side.
West of Widewaters Pkwy, traffic volumes along Towpath Rd. drop
significantly.
10
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
BridgeSt
Demong Dr
FisherRd
Kinne Rd
ElyDr
Carnegie Dr
EdwardsDr
ManorDr
KittellRd
Carlton
Dr
Arbor Ln
E Genesee St
The
H
am
let
Ro
BurrowsSt
Randall Rd
SedaliaCir
LyndonRd
E Manlius St
Mapleview
Rd
Widewaters
Pkwy
DeW
itt Rd
LuddingtonSt
Terraceview
Rd
AmbergateRd
DroversLn
ThompsonRd
HillsboroPkwy
FirtreeLn
Butternut Dr
Southgate Rd
CharlesSt
Doll
Pkwy
WilliamSt
Caton
Dr
PelhamRd
BrandonRd
SmithSt
Fayette
Blvd
Caleb Ave
Mountainview Ave
3rd
St
CeliDr
MastersRd
SalemRd
Haddonfield
Pl
Towpath Rd
Hobson Ave
Ethridge
Rd
McCool
Ave
ArchSt
Lockwood Rd
Springwater
Dr
Gifford
Pkwy
ButternutDr
Sutton
Pl
Bradford
Pkwy
Pyle Dr
Crst
Euclid
Ave
NorthridgeRd
W 1st St
Springfield Rd
Hillsboro
Pkwy
Pe
Hi
Phillips Rd
Salt Springs Rd
Hampshire Dr
Pelham Rd
Alpine
Dr
Phelps St
Paula Dr
ThompsonRd
Bradford
Pkwy
W
instonW
ay
Melbourne
Ave
Canterbury Rd
StantonDr
Brampton Dr
ClaretCir
RevereRd
lmsfordRd
Sunnyside
ParkRd
AberdeenTer
PosterLn
Litchfield
Dr
Kravec
Dr
Lynbrook
Cir
Dr
Commons
Park
W 2nd St
HathawayRd
Polk St
Erie Blvd
Manlius
Center Rd
Oakmont
Dr
Edgemont Dr
WexfordRd
AgwayDr
Clearview
Rd
LynacresBlvd
C E D A R
B A Y
W I D E W A T E R S
P O N D
M
E A
D
O
W
B R O
O
K
L E Y
C R E E K
Canalway Trail: Old Erie CanalStatePark
SYRACUSE
DEWITT
Cedar Bay Park
DeWitt
Town
Park
DeWitt
Town Hall
EXISTINGCONDITIONS-PHOTOTOUR
Portions of Erie Blvd. feature damaged sidewalks...
The intersection of Bridge St. and Celi Dr. is nearly impossible for
pedestrians and bicyclists to cross.
The 10’-12’ wide shoulder provides the foundation for a trail connection
from Butternut Dr. to Erie Blvd.
The Kinne Rd. bridge features a narrow sidewalk on the north side without
curb ramps.
...or none at all in some places.
The Bridge St. approach to Erie Blvd. provides space on the north side
(right) for a spur trail.
11
Elevating Erie Concept Plan - DeWitt, NY
TRAFFICVOLUME+ENVIRONMENTALCONDITIONSMAP
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
BridgeSt
FisherRd
Kinne Rd
Carnegie Dr
EdwardsDr
KittellRd
Carlton
Dr
Arbor Ln
E Genesee St
Royal
Birkdale
BurrowsSt
Randall Rd
LyndonRd
Mapleview
Rd
Widewaters
Pkwy
Ralph
Ln
DeW
itt Rd
LuddingtonSt
Terraceview
Rd
AmbergateRd
DroversLn
ThompsonRd
HillsboroPkwy
FirtreeLn
Butternut Dr
Southgate Rd
Doll
Pkwy
Caton
Dr
PelhamRd
BrandonRd
SmithSt
Fayette
Blvd
Caleb Ave
Mountainview Ave
CeliDr
MastersRd
WestminsterRd
Towpath Rd
Hobson Ave
Ethridge
Rd
Lockwood Rd
Springwater
Dr
Gifford
Pkwy
ButternutDr
Sutton
Pl
Pyle Dr
Thistlewood Ln
NorthridgeRd
Springfield Rd
Hillsboro
Pkwy
Peck
HillRd
Highbridge Rd
Phillips Rd
Salt Springs Rd
Hampshire Dr
Pelham Rd
Alpine
Dr
Paula Dr
ThompsonRd
Bradford
Pkwy
Melbourne
Ave
StantonDr
Brampton Dr
ClaretCir
RevereRd
ElmsfordRd
PosterLn
Kravec
Dr
Lynbrook
Cir
Commons
Park
W 2nd St
Robbins
LnHathawayRd
Erie Blvd
Manlius
Center Rd
Edgemont Dr
WexfordRd
AgwayDr
Clearview
Rd
LynacresBlvd
C E D A R
B A Y
W I D E W A T E R S
P O N D
BUTTERNUTCREEK
M
E A
D
O
W
B R O
O
K
L E Y
C R E E K
CANALWAY TRAIL
Existing
Proposed by
canals/ny.gov*
Proposed by LWRP
SMTC Option 2
Wetlands
Flood plain
Environmental
Remediation Area
*http://www.canals.ny.gov/maps/index.
html?layer=trail
TRAFFIC + TRANSIT
Proposed Alignment
Existing Conditions
Average Daily Trips
0 0.4 0.8 1.2 1.6 20.2
Miles
0 - 2,999
3,000 - 8,000
8,001 - 15,000
15,001 - 60,000
60,001 - 256,390
Sidewalks
Trails
Proposed
Trails
Bus Stops$
SYRACUSE
DEWITT
690
481
Cedar Bay Park
N
12
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
OPPORTUNITIESANDCHALLENGESMAP
BridgeSt
FisherRd
Kinne Rd
Edwa
Arbor Ln
Widewaters
Pkwy
R
alph
Ln
DeW
itt Rd
ThompsonRd
Butternut Dr
3rd
St
CeliDr
Towpath Rd
Gifford
Pkwy
ButternutDr
Sutton
Pl
W 1st St
Springfield Rd
Salt Springs Rd
Hampshire Dr
Pelham Rd
ClaretCir
Erie Blvd
WexfordRd
AgwayDr
C E D A R
B A Y
W I D E W A T E R S
P O N D
M
E A
D
O
W
L E Y
C R E E K
BUTTERNUTCREEK
0 0.5 1 Mile
Above-grade portion
of I-481 and ramps
Butternut Dr.
6-8% slope from
trailhead to bridge
Kinne Rd. bridge features
narrow shoulders and a 5’
sidewalk on one side only
Erie CanalwayTrail
runs 34 miles to Rome
Existing path between trail
head andTown Hall / park
12’wide shoulder narrows
on approach to intersection
Overgrown reeds and guardrail
obscure pond to passing traffic
Long vacant Country Club
building has become an eyesore
Road / driveway crossings
of 12’wide shoulder path
Sloped section
ofTowpath Rd.
Parking lot and trail
head lacks a significant
visual presence
Town-owned property contains
vestiges of original Erie Canal
12’wide shoulder provides 2-way
access for walkers and bicyclistsTraffic volumes drop significantly
west of intersection
Tow Path Rd. R.O.W.
likely includes direct
connection to Erie Blvd.
Widewaters Pond could offer a significant
amenity for nearby redevelopment
Two-lane road with
narrow shoulders
Lack of sidewalks
on Bridge St.
Potential trail
alignment contains
significant wetlands
Significant cross-slope
within median
Extremely challenging intersection
to cross on foot or by bike
Need to transition westbound
CanalwayTrail bicyclists from south
side to north side
Double left-turn
lanes to Bridge St.
Existing footpath
Traffic speeds and multiple commercial curb
cuts make for a challenging environment
for walking and bicycling on Erie Blvd.
30’wide portion
of paved median
At approximately 20,000 vehicles per day, Erie
Blvd. remains under capacity for its 6-lane design
Syracuse section of Erie
Blvd. contains wide
landscaped median
Explanation of Challenge
Corridor Challenge
Spot Challenge
Wide Intersection With
High Turn Volumes
CHALLENGES
Text
Explanation of Opportunity
Corridor Opportunity
OPPORTUNITIES
Text
N
13
Elevating Erie Concept Plan - DeWitt, NY
Pedestrians Crossing Erie Blvd. At:
Crosswalk: 10
Mid-Block: 10
Pedestrians Crossing Erie Blvd. At:
Crosswalk: 10
Mid-Block: 10
Pedestrians Crossing Erie Blvd. At:
Crosswalk: 16
Mid-Block: 1
Pedestrians Crossing Erie Blvd. At:
Crosswalk: 25
Mid-Block: 4
Pedestrians Crossing Erie Blvd. At:
Crosswalk: 26
Mid-Block: 4
Pedestrians Crossing Side Streets At:
Crosswalk: 34
Mid-Block: 5
Pedestrians Crossing Side Streets At:
Crosswalk: 44
Mid-Block: 3
Pedestrians Crossing Side Streets At:
Crosswalk: 21
Mid-Block: 4
Pedestrians Crossing Side Streets At:
Crosswalk: 32
Mid-Block: 11
Pedestrians Crossing Side Streets At:
Crosswalk: 19
Mid-Block: 10
Pedestrian and Bicycle Counts
Lack of bike facilities, poor sidewalk conditions and gaps in the
sidewalk network along Erie Boulevard create an uncomfortable
environment for pedestrians and bicyclists. Despite that, a
significant number of people walk or bicycle along the corridor.
Recent counts along Erie Boulevard counts performed by
Syracuse Metropolitan Transportation Council (SMTC) show that
clearly there is significant use of the corridor by people on foot
and bicyclists. The counts performed covered an 18-hour period
(5:00am - 11:00pm) and included ten intersections between
Kinne Road in Dewitt and South Crouse Street in Syracuse.
In that 4 mile stretch, SMTC counted 1,355 pedestrians and 85
bicyclists. Within the DeWitt section of the counts, the numbers
of pedestrians crossing Erie Boulevard are:
•	 Pedestrians crossing at crosswalks: 237
•	 Pedestrians crossing at midblock locations: 62
•	 Total pedestrians counted: 299
There were 42 bicyclists recorded riding along Erie Blvd. in
DeWitt.
Map Source: Syracuse Metropolitan Transportation Council
BICYCLEANDPEDESTRIANCOUNTLOCATIONSMAP
14
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
CONCEPT PLAN RECOMMENDATIONS
15
Elevating Erie Concept Plan - DeWitt, NY
Shared lane markings are used to mark a designated bike route. They are placed in the travel lane,
encouraging cyclists to travel away from the door-zone or parked vehicles. These symbols highlight the
fact that the roadway is a shared space. The dotted lines represent Enhanced Sharrows - these provide
extra awareness to motorists that they are sharing the lane with bicycles.
Raised separated bicycle lanes are vertically
separated from motor vehicle traffic. A
furnishing zone between the bicycle lane and
curb or motor vehicle traffic is a common feature.
At intersections, the raised bicycle lane can be
dropped down to the street level.
Raised separated bicycle lanes are vertically separated from motor vehicle traffic. A furnishing zone
between the bicycle lane and curb or motor vehicle traffic is a common feature. At intersections, the
raised bicycle lane can be dropped down to the street level.
Bike lanes designate an exclusive space for
bicycles through the use of pavement markings
and signage. Bike lanes are typically located
adjacent to motor vehicle traffic and travel in
the same direction as motor vehicles.
Advisory bike lanes are bicycle priority areas
delineated by broken white lines, separate
from a center one-lane two-way travel area.
Motorists may only enter the bicycle zone
when no bicycles are present. Motorists must
overtakebicyclistswithcautionduetopotential
oncoming traffic.
These bikeways are at street-level and use a
variety of methods for physical protection
from passing traffic. A parking lane, flexible
delineator posts, or flower boxes may provide
the physical separation from motor vehicle
traffic.
Shared Lane Marking (SLM) A.K.A. Sharrow
Enhanced SLMStandard SLM
Separated Bike Lane -
Sidewalk Level
Shared Use Path - Separated from Motor Vehicle Traffic
Separated Bike Lane -
Street LevelBike Lane Advisory Bike Lane
Design Features Toolkit - Bicycle
During the development of the design options for the individual segments, a toolkit of design elements for bicycle facilities was considered. Whole some may ultimately not be used, all were
considered during the development of the design options phase of the study.
Photo Credit: www.thedartmouth.com
16
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Residential zone sidewalks are important in providing pedestrians
access to schools, businesses, and recreation areas. Four feet is the
minimum preferred standard, and a 5-foot sidewalk is common.
Commercial zone sidewalks provide pedestrians access directly
to local businesses and act as important public gathering spaces
for socializing and recreation. Six feet is the minimum preferred
standard. The furniture zone buffer should be between motor
vehicle traffic and the pedestrian through zone.
Signalized road crossings are typically locations where rail trails
or paths cross roadways with high traffic volumes or speed and/or
connect to schools.
A steeper-pitched raised crosswalk is ideal for some college
campus or downtown core locations where significant pedestrian
crossings occur regularly or frequently. One result of a steeper
crossing is motor vehicle traffic slowed to approximately 10 MPH or
less. Mobility-impaired individuals have an easier time crossing as
they do not have change in grade.
Residential Zone Sidewalk
Signalized Road CrossingRaised Crosswalk
Commercial Zone Sidewalk
Design Features Toolkit - Pedestrian
Pedestrian design features create a more comfortable and safe environment for pedestrians. Many of these are designed to slow motor vehicle traffic as well.
Crosswalk signage at unsignalized crossings can alert motorists to
the presence of pedestrians at these locations.
Crosswalk Signage
Pedestrian refuge islands limit pedestrian exposure in the
intersection. They are recommended where a pedestrian must
cross more than two lanes of traffic in one direction, locations with
high pedestrian-collision rates, and locations where there are high
traffic volumes and speeds. Medians or safety islands create a two-
stage crossing for pedestrians, which is easier and safer.
Raised Refuge Island
DESIGNFEATURESTOOLKIT
17
Elevating Erie Concept Plan - DeWitt, NY
FisherRd
Kinne Rd
Arbor Ln
Widewaters
Pkwy
DeW
itt Rd
ThompsonRd
o
Butternut Dr
3r
St
CeliDr
Towpath Rd
Gifford
Pkwy
ButternutDr
Sutton
Pl
Salt Springs Rd
Hampshire Dr
Pelham Rd
ClaretCir
Cir
Erie Blvd
AgwayDr
C E D A R
B A Y
W I D E W A T E R S
P O N D
M
E A
D
O
W
B R O
O
K
C R E E K
0.50.25 0.75 1.0 Mile0
Butternut Drive: (See Section F)
• Add shared use sidepath on west side
Enhanced Erie Canalway trailhead
and Butternut Drive crossing
Tow Path Road East: (See Section E)
• Narrow travel lanes and add
buffer with delineator posts
PotentialWidewaters Common
redevelopment area
Erie Blvd. Road Diet: (See Sections A + B)
• Recommendation: Incorporate Erie
CanalwayTrail into median with striped
road diet
• Final Feasibility Concept: Incorporate Erie
CanalwayTrail into median with improved
streetscape and sidewalks
Kinne Road Bridge:
• Construct new trail bridge adjacent to
existing bridge
Towpath RoadWest: (See Section D)
• Recommendation: 5’wide
shoulder bikeway
• Final Feasibility concept: One-way
roadway eastbound, with
12’wide shared use path
Erie CanalwayTrail connection
to downtown Syracuse
Off-street path connection
to Erie Blvd. within
Towpath Rd. right-of-way
Natural surface path loop
on south side of former
canal alignment
In long term, intersection
would be a good candidate for
a trail overpass in long term to
avoid the heavy traffic and
turning movements (Gateway
to Le Moyne College)
N
690
481Existing Shared Use Path (Paved)
Proposed Shared Use Path (Paved)
Proposed Natural Surface Path
Proposed On-Street Improvements
Special Intersection Treatment
Future Road Connections
LEGEND
The following page displays a map that details each
section drawing location along the corridor.
ERIECANALWAYTRAILALIGNMENT/RECOMMENDATIONSMAP
18
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
CROSSSECTIONLOCATIONSMAP
Erie Boulevard at Thompson Road
Erie Boulevard at Texas Roadhouse
Erie Boulevard at Kravec Drive
Towpath Road - West of Widewaters Parkway
Towpath Road - East of Widewaters Parkway
Kinne Road Bridge
Butternut Drive
SECTION LOCATIONS
A
B
C
D
E
F
G
19
Elevating Erie Concept Plan - DeWitt, NY
Section A
Erie Boulevard East at Thompson Rd
Existing Conditions
From Bridge Street to the Syracuse City line at Thompson
Road, Erie Boulevard’s fluctuating median width, numerous
wide travel lanes, and lack of sidewalks pose both a
challenge to pedestrian mobility and an opportunity for trail
development. Speed limit is posted at 40 MPH, and Average
Annual Daily Trips (AADT) is approximately 19,300 according
to 2013 NYS DOT data.
Locator Map
12’12’12’12’ 12’ 5’12’ 12’ 9’12’5’
115’
SnowShelf
SnowShelf
TravelLane
TravelLane
TravelLane
TravelLane
TravelLane
TravelLane
TurnLane
TurnLane
Median
Erie Boulevard east looking west towards the Thompson Road intersection
20
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Section A
Erie Boulevard East at Thompson Rd
Recommendation: Trail in median
This option would require a narrowing of all travel
lanes from 12’ to 11’, and the removal of one through-
lane traveling both directions. The resulting width
of the median would more closely match the 30’
existing median to the east. A guide rail would protect
bicyclists from westbound traffic while a 7’ landscaped
area creates a buffer between walkers, joggers, and
east bound motor vehicle traffic.
Final Feasibility Concept: Trail in Me-
dian with streetscape enhancements
and wider sidewalks
In the longer term, the Town of DeWitt aspires for a
more holistic enhancement of Erie Blvd. that includes
an improved pedestrian environment along the
edges. A new sidewalk, street trees and additional
landscaping will enhance economic redevelopment
opportunities as well.
115’
11’11’ 11’ 11’ 5’11’ 11’ 7’ 2’5’ 12’
Sidewalk
Sidewalk
Buffer
StripedBuffer
TravelLane
TravelLane
TravelLane
TurnLane
TurnLane
TravelLane
Erie
Canalway
Trail
115’
11’11’ 11’ 11’ 5’11’ 11’ 7’ 2’6’ 6’7’ 12’
Sidewalk
Sidewalk
Buffer
Buffer
Shoulder
TravelLane
TravelLane
TravelLane
TurnLane
TurnLane
TravelLane
Erie
Canalway
Trail
Recommendation
Final Feasibility Concept
ERIEBOULEVARDRECOMMENDATIONS
21
Elevating Erie Concept Plan - DeWitt, NY
Erie Boulevard East at Thompson Road
Existing Conditions
Thompson Road is a difficult intersection
for bicyclists and pedestrians to cross
22
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
BUS
Gas
Vacant
Auto Zone
ERIE BLVD EAST
THOMPSONRD
Recommendation: Trail In Median
ERIEBOULEVARDRECOMMENDATIONS
23
Elevating Erie Concept Plan - DeWitt, NY
12’ 13’13’ 4.5’12’13’ 13’4.5’ 20’
Sidewalk
Sidewalk
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Median
105’
Erie Boulevard East at Texas Road House Restaurant
Existing Conditions
At this section of roadway near the Texas Roadhouse restaurant, Erie Boulevard’s
20’ median has a substantial slope within the cross section. This poses a challenge
to the development of a trail within the median area without widening it.
Locator Map
Section B
24
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Erie Boulevard East at Texas Road
House Restaurant
Recommendation: Trail in median
This option requires the removal of the existing
crash barrier fence and filling in on the down-slope
portion to create an even trail bed. Raising the trail to
be above the west-bound motorists is the preferred
construction practice here.
Final Feasibility Concept: Trail in Me-
dian with streetscape enhancements
and wider sidewalks
In the longer term, the Town of DeWitt aspires for a
more holistic enhancement of Erie Blvd. that includes
an improved pedestrian environment along the
edges. A new sidewalk, street trees and additional
landscaping will enhance economic redevelopment
opportunities as well.
5’11’ 11’11’ 11’5’
105’
Sidewalk
Sidewalk
7’ 2’
Buffer
13’
Buffer
4’
StoneDust
12’ 7’
Buffer
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
12’ 13’13’ 4.5’12’13’ 13’4.5’ 20’
5’11’ 11’11’ 11’6’ 6’7’
105’
Sidewalk
Sidewalk
Buffer
7’2’ 2’
Buffer
4’
StoneDust
12’
Erie
Canalway
Trail
7’
Buffer
Shoulder
Sidewalk
Sidewalk
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Travel
Lane
Median
105’
Recommendation
Final Feasibility Concept
Section B
ERIEBOULEVARDRECOMMENDATIONS
25
Elevating Erie Concept Plan - DeWitt, NY
12’ 13’13’ 4.5’12’13’ 13’4.5’ 30’
Sidewalk
Sidewalk
TravelLane
TravelLane
TravelLane
TravelLane
TravelLane
TravelLane
Median
115’
Locator Map
Erie Boulevard East at Kravec Drive
Existing Conditions
From Bridge Street to the Syracuse City line at Thompson Road, Erie Boulevard’s fluctuating
median width (maximum of 30’ width), numerous wide travel lanes, and lack of sidewalks pose
both a challenge to pedestrian mobility and an opportunity for trail development. Speed limit is
posted at 40 MPH, and Average Annual Daily Trips (AADT) is approximately 21,500 according to
2013 NYS DOT data.
Section C
26
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Erie Boulevard East at Kravec Drive
Recommendation: Trail in median
This option would transform the existing 30’ median into
an Erie Canalway Trail segment. The existing space in the
median is situated perfectly for tansformation into a trail
with a landscaped area to buffer trail users from motor
vehicle traffic. Along most portions of the roadway, one
travel lane is each direction closest to the median is
transformed into a hatched shoulder area. This road diet
approach provides the opportunity to widen the median
where needed, typically the approaches to intersections
where left turn lanes are needed.
Final Feasibility Concept: Trail in Median
with streetscape enhancements and
wider sidewalks
In the longer term, the Town of DeWitt aspires for a
more holistic enhancement of Erie Blvd. that includes
an improved pedestrian environment along the edges.
New sidewalks, street trees and additional landscaping
will enhance economic redevelopment opportunities as
well. Like the recommendation above, these amenities
require reallocation of one travel lane in each direction,
but incorporate the outer lanes, rather than replacing
the inner travel lanes with a hatched shoulder zone.
6’ 7’11’ 11’7’ 6’11’ 11’ 7’ 4’6’ 6’7’ 12’
115’
Sidewalk
Sidewalk
Buffer
Buffer
Buffer
Buffer
Shoulder
Shoulder
TravelLane
TravelLane
TravelLane
TravelLane
Stonedust
Erie
Canalway
Trail
7’ 5’
Sidewalk
5’
Sidewalk
Buffer
4’
Stonedust
7’
Buffer
Buffer
Lane
11’
Travel
Lane
11’
Travel
Lane
11’
Travel
Lane
11’
Travel
Lane
12’ 13’
Buffer
Lane
13’
Erie
Canalway
Trail
Recommendation
Final Feasibility Concept
Section C
ERIEBOULEVARDRECOMMENDATIONS
27
Elevating Erie Concept Plan - DeWitt, NY
Erie Boulevard East at Thompson Road
Recommendation: Trail in median Photo simulation
Precedent project: Brooklyn, NY
Section C
28
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Erie Boulevard East at Bridge Street
Existing Conditions
Recommendation: Trail in Median
Vacant
BRIDGEST
ERIEBLVD
ORRICK RD
ERIEBOULEVARDRECOMMENDATIONS
29
Elevating Erie Concept Plan - DeWitt, NY
Evaluation Criteria
The consultant team and the Town of DeWitt agreed upon a common set
of evaluation crtieria to determine which would be the one favored by
town officials and NYSDOT. The eight criteria included:
1.	 Trail user safety at mid-block locations
2.	 Trail user safety at intersections
3.	 Trail user access to businesses
4.	 Opportunities for stormwater treatment facilities
5.	 Opportunities for enhanced landscaping and trees
6.	 Impacts to motor vehicle traffic flow
7.	 Potential to improve transit access and service
8.	 Economic development potential
In order to arrive at the recommendation for a design that included a
shared use path in the center median, the team compared the concept
with one that included bike lanes on each side of Erie Blvd, separated from
traffic by a narrow, raised median. The clear preference following this
scoring exercise was the Shared-use path within existing center median
option. This offers an opportunity to have a separate facility for bicycles
while allowing peestrians either to use the shared facility or use upgraded
sidewalks along the edge of Erie Boulevard. Note that in the long term,
the Town of DeWitt’s aspiration is to also provide additional landscaped
buffers, green infrastructure, benches, lights and signage.
Rendered image of the bike lane design option (Option 2) that was used during the early stages of the planning project
Summary Scores of Evaluation Exercise
30
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Confirmation of Road Diet Proposal
Of the two design options for Erie Blvd. between Thompson Road (Syracuse
City Line) and Bridge Street, both involved the reduction of one travel lane in
each direction. At minimum, the “road diet” retained two thru lanes, along
with the left and right turn lanes. The traffic analysis used a Synchro Analysis
model in order to determine the intersection level of service (LOS), the
amount of delay (in seconds) and the queue lengths on the approach to the
traffic signal at Bridge Street. The extent of this study did not allow for analysis
of additional signalized intersections.
The results of the Erie Blvd./Bridge Street intersection Synchros Analysis
resulted in what the consultant team would consider acceptable level of
changes to the performance of the intersection for motor vehicle drivers. The
results illustrated in the adjacent table show that LOS during the PM peak
period remains relatively unchanged between today’s roadway conditions
and the proposed road diet condition. Delays go up slightly and queue
lengths go up somewhat significantly. While increased queue lengths can be
a red flag for some road diet projects, the LOS and delay scores imply that a
motorist would be able to proceed through the intersection roughly as he
or she would today. The primary change is that the line of cars waiting to
get through the signal would simply be longer. In other words, the amount
of green time for Erie Blvd. traffic allows roughly the same number of cars
to flush through the Bridge Street intersection whether there are the three
existing thru lanes in each direction or the proposed two. It should be noted
that more-detailed and additional traffic analysis will be required at all
intersections along the Erie Blvd corridor in DeWitt and ultimately Syracuse.
Table 1: Summary of Erie Blvd. Synchro Analysis
Bridge Road Intersection Synchro Analysis Summary
ERIEBOULEVARDRECOMMENDATIONS
31
Elevating Erie Concept Plan - DeWitt, NY
11’ 11’3’ 3’
28’
Shoulder
Shoulder
TravelLane
TravelLane
Towpath Road - West of Widewaters Parkway
Existing Conditions
FromtheintersectionofCeliDrivetoWidewatersParkway,Towpath
Road features one lane in each direction with narrow shoulders.
The roadway width is approximately 28’. There is no sidewalk
but traffic volume is quite low however, making for a reasonably
comfortable bicycling environment.
Locator MapSection D
32
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Final Feasibility Concept: One-way motor vehicle travel lane and 12’
Erie Canalway Trail
This option would require signing and
striping the roadway to become a one-way
road for motor vehicles. The resulting space
would enable a comfortably wide Erie
Canalway Trail, buffered from motor vehicle
traffic by a 3’ painted area with reflective
bollards. The new roadway shown in the
diagram at lower right could accommodate
either one-way traffic (using the existing
roadway) or two-way traffic on a new road.
If the latter, the entire width of Towpath
Road could become a Pedestrian / Bike
promenade, in conjunction with adjacent redevelopment. In either case, the trail would run
alongside Widewaters Pond -- a nod to the actual Erie Canal Waterway of the past and a way for
trail users to enjoy the aesthetic waterway.
Towpath Road - West of Widewaters Parkway
Recommendation: Bikeable Shoulders with bi-di-
rectional travel lane
This option would require re-striping of the existing roadway to accom-
modate a 5’ wide shoulders in each direction with no double center
line striping (resulting in a 18’ wide bi-directional travel lane).
Sho
Sho
Travel
Travel
18’5’
28’
Shoulder
5’
Shoulder
TravelLanes5’ +/- 18’ 5’
28’
Shoulder
Shoulder
TravelLane
Diagram shows the proposed alignment of one-way roads
within the area slated for potential future re-development.
FisherRd
Kinne Rd
E Manlius St
Widewaters
Pkwy
ThompsonRd
Butternut Dr
Ave
3rd
St
CeliDr
Towpath Rd
McCool
Ave
Gifford
Pkwy
ButternutDr
W 1st St
Salt Springs Rd
ret
Erie Blvd
AgwayDr
C E D A R
B A Y
L E Y
C R E E K
New road with
west-bound or
two-way traffic
East-bound
trafficFuture Erie
Canalway trail
690
Final Feasibility Concept
RecommendationSection D
Shoul
Shoul
TravelLa
5’ +/- 18’ 5’
28’
Shoulder
Shoulder
TravelLane12’ 11’3’ 2’
28’
TravelLane
Buffer
Buffer
Erie
Canalway
Trail
TOWPATHROADRECOMMENDATIONS
33
Elevating Erie Concept Plan - DeWitt, NY
12’10’-12’
Shoulder
Shoulder
TravelLane
12’ ~14’
TravelLane
GrassBuffer
36’
Towpath Road - East of Widewaters Parkway
Existing Conditions
From the intersection of Widewaters Parkway to Kinne Road,
Towpath road features one lane in each direction and a wide
shoulder on the south / west side of the road. At approximately
10’ in width, the shoulder provides a relatively comfortable facility
for walkers and bicyclists wanting to follow the original Erie Canal
alignment. It also connects with a similar width shoulder on
Widewaters from Towpath Road to Bridge Street.
Locator Map
Section E
Existing conditions include a 10’ - 12’ wide paved shoulder, ideal for striping improvements.
34
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Towpath Road - East of Widewaters Parkway
Recommendation: Narrow travel lanes + install
10’ wide Erie Canalway Trail
This recommendation requires the narrowing of the existing travel
lanes from 12’ to 11’, and creating a stronger visual buffer between
the Canalway trail and the travel lanes with a painted hatch-
pattern and delineator posts. Building a sidewalk on the opposite
side would be an additional optional amentity.
Precedent project: Springdale, AR
G
11’10’
Erie
Canalway
Trail
Shoulder
TravelLane
11’ 8’
TravelLane
GrassBuffer
Buffer
5’
Sidewalk
Recommendation
Sidewalk
Optional
Section E
TOWPATHROADRECOMMENDATIONS
35
Elevating Erie Concept Plan - DeWitt, NY
12’ 12’4’ 3’ 4’
35’
Shoulder
Shoulder
Sidewalk
Travel
Lane
Travel
Lane
35’
Kinne Road Bridge
Existing Conditions
The Kinne Road Bridge has 2 12’ wide travel lanes, 3’ - 4’ shoulders, and a 4’
wide sidewalk on the north side. The bridge is a critical link over I-481 in the
Erie Canalway Trail system.
Section F
Existing conditions include a narrow sidewalk on the north side of the bridge.
36
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Section F
Kinne Road Bridge
Recommendation: New trail bridge
The recommended crossing over I-481 is a new trail bridge
adjacent to the Kinne Road Bridge. The bridge would provide a
seamless connection from the south end of Towpath Road to the
recommended sidepath allong Butternut Drive (see next section).
An enhanced crosswalk and other improvements would be needed
at the Towpath / Kinne intersection to safely accommodate access to
the trail bridge.
Recommendation
12’ 12’ 14’4’ 3’ 4’
35’ 14’
Shoulder
Shoulder
Sidewalk
Travel
Lane
Erie
Canalway
Trail
Travel
Lane
Precedent project: Eugene, OR
KINNEROADBRIDGERECOMMENDATIONS
37
Elevating Erie Concept Plan - DeWitt, NY
11’ 11’3’ 3’
28’
Shoulder
Shoulder
TravelLane
TravelLane
Butternut Drive - Between Trailhead and Bridge
Existing Conditions
From the intersection of Kinne Road to Town Hall, Butternut Drive is a
sloping roadway with one lane in each direction. A 300’ long segment
north of Kinne Road sits up on an embankment above the adjacent
I-481 and contains guide rails. The road flattens out where it intersects
with the Old Erie Canal State Park parking lot.
Locator MapSection G
38
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
Butternut Drive - Between Trailhead and Bridge
Recommendation: Sidepath on West Side
This option leaves the existing travel lanes, shoulders, and guid
rails in heir current location. A retaining wall will need to be built to
accommodate the preferred width of the Erie Canalway Trail. To avoid
a closed drainage system the trail can be built at roadway grade with
a guide rail as barrier.
Back-up Option: Install Sidewalk on West Side +
Stripe Bike Lanes
This option requires narrowing the existing 11’ travel lanes to 10’.
This allows for a 4’ bike lane to be striped in both directions, as well
as a sidewak. The back-up option does not require any relocation of
guide rails.
11’ 11’3’ 3’
28’
Shoulder
Shoulder
TravelLane
TravelLane
10’ 10’4’6’ 4’
28’
BikeLane
BikeLane
Sidewalk
TravelLane
TravelLane
11’ 11’2’12’ 2’
28’
Shoulder
Shoulder
TravelLane
TravelLane
Erie
Canalway
Trail
Recommendation
Back-up Option
Section G
BUTTERNUTDRIVERECOMMENDATIONS
39
Elevating Erie Concept Plan - DeWitt, NY
Conclusion and Next Steps
This Elevating Erie Concept Plan has identified a recommended route to
overcome the existing challenges and develop a safe and comfortable Erie
Canalway Trail (ECT) through the Town of DeWitt. This project would not be
possiblewithoutthededicatedeffortsofthemanyadvocacygroups,Townand
City planning offices and their dedicated staff, elected officials, and countless
trail enthusiasts that have been working towards this goal for decades.
The timing of DeWitt’s planning work is fortuitous. In April 2017, the State’s
apdopted budget included $200 million to fulfill Governor Cuomo’s vision
to complete the Empire State Trail, which includes closing the 14-mile gap
in the Syracuse metro area. The proposed route of the EST can capitalize on
the Elevating Erie project and close the gap in the Erie Canal Trail through the
Syracuse region. This is an historic opportunity for DeWitt, for the trail, and for
the State of New York.
Implementation of the recommendations in this report will extend many of the off-road trail qualities found
along the Erie Canalway Trail through the Town of DeWitt and beyond.
CONCLUSIONANDNEXTSTEPS
40
ERIECANALWAYTRAIL-ERIEBOULEVARD
Elevating Erie Concept Plan - DeWitt, NY
[ PAGE LEFT INTENTIONALLY BLANK ]
41

More Related Content

What's hot

The Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable StreetscapeThe Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable Streetscape
Center for Neighborhood Technology
 
Cranbrook Yahk Assessment Report
Cranbrook Yahk Assessment ReportCranbrook Yahk Assessment Report
Cranbrook Yahk Assessment Report
Trails BC
 
Clifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersClifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - Posters
Jake Henderson
 
JKRAJEWSKI_ODOT2014_Light Rail Presentation
JKRAJEWSKI_ODOT2014_Light Rail PresentationJKRAJEWSKI_ODOT2014_Light Rail Presentation
JKRAJEWSKI_ODOT2014_Light Rail Presentation
Joe Krajewski
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2
Matthew White
 
Task 10: Community Meeting Notes & Comments
Task 10:  Community Meeting Notes & CommentsTask 10:  Community Meeting Notes & Comments
Task 10: Community Meeting Notes & Comments
Eastern Neighborhoods Transportation Implementation Planning Study
 
APWA mid atlantic awards
APWA mid atlantic awardsAPWA mid atlantic awards
APWA mid atlantic awards
Sandon Rogers, P.E., LS
 
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Fairfax County
 
portchicago20080318
portchicago20080318portchicago20080318
portchicago20080318
Bill Gram-Reefer
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the Year
OHM Advisors
 
Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...
Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...
Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...
COHVCO
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
CirculateSD
 
USACE National Award of Excellance-Tailrace Launch
USACE National Award of Excellance-Tailrace LaunchUSACE National Award of Excellance-Tailrace Launch
USACE National Award of Excellance-Tailrace Launch
Michael Lowe
 
Brookfield Park Wet Pond Construction
Brookfield Park Wet Pond ConstructionBrookfield Park Wet Pond Construction
Brookfield Park Wet Pond Construction
Fairfax County
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
CirculateSD
 
Senior Project PSR
Senior Project PSRSenior Project PSR
Senior Project PSR
Betzaida Perez
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
onthewight
 
"West Houston (TX): An introduction to the plan that links people, places and...
"West Houston (TX): An introduction to the plan that links people, places and..."West Houston (TX): An introduction to the plan that links people, places and...
"West Houston (TX): An introduction to the plan that links people, places and...
Champions Real Estate Group
 
Erie Bayfront Master Plan
Erie Bayfront Master PlanErie Bayfront Master Plan
Erie Bayfront Master Plan
David VanAmburg
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
Fairfax County
 

What's hot (20)

The Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable StreetscapeThe Cermak/Blue Island Sustainable Streetscape
The Cermak/Blue Island Sustainable Streetscape
 
Cranbrook Yahk Assessment Report
Cranbrook Yahk Assessment ReportCranbrook Yahk Assessment Report
Cranbrook Yahk Assessment Report
 
Clifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - PostersClifton Avenue Streetscape Design - Posters
Clifton Avenue Streetscape Design - Posters
 
JKRAJEWSKI_ODOT2014_Light Rail Presentation
JKRAJEWSKI_ODOT2014_Light Rail PresentationJKRAJEWSKI_ODOT2014_Light Rail Presentation
JKRAJEWSKI_ODOT2014_Light Rail Presentation
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2
 
Task 10: Community Meeting Notes & Comments
Task 10:  Community Meeting Notes & CommentsTask 10:  Community Meeting Notes & Comments
Task 10: Community Meeting Notes & Comments
 
APWA mid atlantic awards
APWA mid atlantic awardsAPWA mid atlantic awards
APWA mid atlantic awards
 
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
Georgetown Pike at Dolley Madison Blvd Pedestrian Improvements July 2020 july...
 
portchicago20080318
portchicago20080318portchicago20080318
portchicago20080318
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the Year
 
Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...
Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...
Rollins Pass Road: Public Input Boulder County Public Hearing - February 13, ...
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
 
USACE National Award of Excellance-Tailrace Launch
USACE National Award of Excellance-Tailrace LaunchUSACE National Award of Excellance-Tailrace Launch
USACE National Award of Excellance-Tailrace Launch
 
Brookfield Park Wet Pond Construction
Brookfield Park Wet Pond ConstructionBrookfield Park Wet Pond Construction
Brookfield Park Wet Pond Construction
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Senior Project PSR
Senior Project PSRSenior Project PSR
Senior Project PSR
 
East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014East Cowes - Proposed development - Solent Gateways - Dec 2014
East Cowes - Proposed development - Solent Gateways - Dec 2014
 
"West Houston (TX): An introduction to the plan that links people, places and...
"West Houston (TX): An introduction to the plan that links people, places and..."West Houston (TX): An introduction to the plan that links people, places and...
"West Houston (TX): An introduction to the plan that links people, places and...
 
Erie Bayfront Master Plan
Erie Bayfront Master PlanErie Bayfront Master Plan
Erie Bayfront Master Plan
 
Dead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation ProjectDead Run Force Main Rehabilitation Project
Dead Run Force Main Rehabilitation Project
 

Similar to De witt final_report_180213

What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came down
emilypeckenham
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
GardinerEast
 
Rails to-green rails green space is the future for rail stations and rail cor...
Rails to-green rails green space is the future for rail stations and rail cor...Rails to-green rails green space is the future for rail stations and rail cor...
Rails to-green rails green space is the future for rail stations and rail cor...
Dania Abdel-aziz
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
GardinerEast
 
Srdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_reportSrdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_report
Paul Vernon
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
R Ray Saikus
 
GuidryNews.com_Columbia Tap Hike and Bike Trail 2011
GuidryNews.com_Columbia Tap Hike and Bike Trail 2011GuidryNews.com_Columbia Tap Hike and Bike Trail 2011
GuidryNews.com_Columbia Tap Hike and Bike Trail 2011
Jose Enriquez
 
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit PresentationKingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
The Kingston Land Trust
 
20130225 rail trail presentation
20130225 rail trail presentation20130225 rail trail presentation
20130225 rail trail presentation
edmund015
 
Take Me to the River Executive Summary
Take Me to the River Executive SummaryTake Me to the River Executive Summary
Take Me to the River Executive Summary
West Harlem Art Fund
 
Genesee Valley Greenway State Park - History
Genesee Valley Greenway State Park - HistoryGenesee Valley Greenway State Park - History
Genesee Valley Greenway State Park - History
Joan Schumaker
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank
 
Conneaut Charrette
Conneaut Charrette Conneaut Charrette
Conneaut Charrette
ksuCUDC
 
INFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docx
INFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docxINFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docx
INFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docx
jaggernaoma
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
Daniel X. O'Neil
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
Daniel X. O'Neil
 
Ottawa County Parks 2019 Annual Report
Ottawa County Parks 2019 Annual ReportOttawa County Parks 2019 Annual Report
Ottawa County Parks 2019 Annual Report
Jessica VanGinhoven
 
04-Brooklyn-Bridge-Park-1.pdf
04-Brooklyn-Bridge-Park-1.pdf04-Brooklyn-Bridge-Park-1.pdf
04-Brooklyn-Bridge-Park-1.pdf
OmniyaSheikha2
 
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxCase StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
troutmanboris
 
Making Winston Drive Complete 091212
Making Winston Drive Complete 091212Making Winston Drive Complete 091212
Making Winston Drive Complete 091212
Philip Evans
 

Similar to De witt final_report_180213 (20)

What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came down
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 
Rails to-green rails green space is the future for rail stations and rail cor...
Rails to-green rails green space is the future for rail stations and rail cor...Rails to-green rails green space is the future for rail stations and rail cor...
Rails to-green rails green space is the future for rail stations and rail cor...
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
 
Srdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_reportSrdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_report
 
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River JewelCitizens Vision - Cleveland OH Scranton Peninsula River Jewel
Citizens Vision - Cleveland OH Scranton Peninsula River Jewel
 
GuidryNews.com_Columbia Tap Hike and Bike Trail 2011
GuidryNews.com_Columbia Tap Hike and Bike Trail 2011GuidryNews.com_Columbia Tap Hike and Bike Trail 2011
GuidryNews.com_Columbia Tap Hike and Bike Trail 2011
 
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit PresentationKingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
 
20130225 rail trail presentation
20130225 rail trail presentation20130225 rail trail presentation
20130225 rail trail presentation
 
Take Me to the River Executive Summary
Take Me to the River Executive SummaryTake Me to the River Executive Summary
Take Me to the River Executive Summary
 
Genesee Valley Greenway State Park - History
Genesee Valley Greenway State Park - HistoryGenesee Valley Greenway State Park - History
Genesee Valley Greenway State Park - History
 
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
 
Conneaut Charrette
Conneaut Charrette Conneaut Charrette
Conneaut Charrette
 
INFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docx
INFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docxINFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docx
INFRASTRUCTURE DEVELOPMENT AND THE GROWTH OF CHICAGO5.docx
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
Ottawa County Parks 2019 Annual Report
Ottawa County Parks 2019 Annual ReportOttawa County Parks 2019 Annual Report
Ottawa County Parks 2019 Annual Report
 
04-Brooklyn-Bridge-Park-1.pdf
04-Brooklyn-Bridge-Park-1.pdf04-Brooklyn-Bridge-Park-1.pdf
04-Brooklyn-Bridge-Park-1.pdf
 
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docxCase StudyManaging Projects from Start to CompletionThe Rivers.docx
Case StudyManaging Projects from Start to CompletionThe Rivers.docx
 
Making Winston Drive Complete 091212
Making Winston Drive Complete 091212Making Winston Drive Complete 091212
Making Winston Drive Complete 091212
 

Recently uploaded

CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
Congressional Budget Office
 
Call Girls Kolkata { 7014168258 } Book High Class Models In Kolkata
Call Girls Kolkata { 7014168258 } Book High Class Models In KolkataCall Girls Kolkata { 7014168258 } Book High Class Models In Kolkata
Call Girls Kolkata { 7014168258 } Book High Class Models In Kolkata
aakashkumar5545
 
一比一原版加拿大麦科文大学毕业证如何办理
一比一原版加拿大麦科文大学毕业证如何办理一比一原版加拿大麦科文大学毕业证如何办理
一比一原版加拿大麦科文大学毕业证如何办理
qypomky
 
GRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptx
GRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptxGRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptx
GRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptx
Gavin Malala
 
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdfGUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
ProexportColombia1
 
一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理
一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理
一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理
yzxexy
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Congressional Budget Office
 
Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...
Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...
Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...
deepakrana121234
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
vfefek
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
Energy for One World
 
Sponsor a Child for Education & Food.pptx
Sponsor a Child for Education & Food.pptxSponsor a Child for Education & Food.pptx
Sponsor a Child for Education & Food.pptx
SERUDS INDIA
 
Delhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your Doorstep
Delhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your DoorstepDelhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your Doorstep
Delhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your Doorstep
gragneelam30
 
The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...
ResolutionFoundation
 
2024: The FAR - Federal Acquisition Regulations, Part 43
2024: The FAR - Federal Acquisition Regulations, Part 432024: The FAR - Federal Acquisition Regulations, Part 43
2024: The FAR - Federal Acquisition Regulations, Part 43
JSchaus & Associates
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
ProexportColombia1
 
All Loan Insorance Are Money Problem.docx 1
All Loan Insorance Are Money Problem.docx 1All Loan Insorance Are Money Problem.docx 1
All Loan Insorance Are Money Problem.docx 1
arushiyadavp11
 
7339748667 Call Girls Kolkata with Trusted Models
 7339748667 Call Girls Kolkata with Trusted Models 7339748667 Call Girls Kolkata with Trusted Models
7339748667 Call Girls Kolkata with Trusted Models
Russian Escorts Delhi | 9711199171 | To Enjoy Every Moments Of Life!
 
UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024
Energy for One World
 
Luxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in Noida
Luxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in NoidaLuxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in Noida
Luxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in Noida
gurkirankumar98700
 
Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...
Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...
Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...
khannsohil539
 

Recently uploaded (20)

CBO's Immigration Projections - Presentation
CBO's Immigration Projections - PresentationCBO's Immigration Projections - Presentation
CBO's Immigration Projections - Presentation
 
Call Girls Kolkata { 7014168258 } Book High Class Models In Kolkata
Call Girls Kolkata { 7014168258 } Book High Class Models In KolkataCall Girls Kolkata { 7014168258 } Book High Class Models In Kolkata
Call Girls Kolkata { 7014168258 } Book High Class Models In Kolkata
 
一比一原版加拿大麦科文大学毕业证如何办理
一比一原版加拿大麦科文大学毕业证如何办理一比一原版加拿大麦科文大学毕业证如何办理
一比一原版加拿大麦科文大学毕业证如何办理
 
GRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptx
GRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptxGRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptx
GRASSROOT-MODEL GRASSROOT-MODEL GRASSROOT-MODEL.pptx
 
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdfGUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
GUIA_LEGAL_CHAPTER_8_COLOMBIAN ENVIROMENTAL REGIME.pdf
 
一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理
一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理
一比一原版(uob学位证书)英国伯明翰大学毕业证如何办理
 
Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034Health Insurance Coverage for the U.S. Population, 2024 to 2034
Health Insurance Coverage for the U.S. Population, 2024 to 2034
 
Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...
Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...
Call Girls in Kolkata (West Bengal) call me [🔝9352988975🔝] Escort In Kolkata ...
 
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
一比一原版(uoit毕业证书)加拿大安大略理工大学毕业证如何办理
 
G7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdfG7 Apulia Leaders Communique, June 2024 (1).pdf
G7 Apulia Leaders Communique, June 2024 (1).pdf
 
Sponsor a Child for Education & Food.pptx
Sponsor a Child for Education & Food.pptxSponsor a Child for Education & Food.pptx
Sponsor a Child for Education & Food.pptx
 
Delhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your Doorstep
Delhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your DoorstepDelhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your Doorstep
Delhi Call Girls Service | 9873940964 | Housewife Ready 4x7 At Your Doorstep
 
The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...The cost of poor health: What does rising health-related benefit spending mea...
The cost of poor health: What does rising health-related benefit spending mea...
 
2024: The FAR - Federal Acquisition Regulations, Part 43
2024: The FAR - Federal Acquisition Regulations, Part 432024: The FAR - Federal Acquisition Regulations, Part 43
2024: The FAR - Federal Acquisition Regulations, Part 43
 
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdfGUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
GUIA_LEGAL_CHAPTER_6_IMMIGRATION_REGIME.pdf
 
All Loan Insorance Are Money Problem.docx 1
All Loan Insorance Are Money Problem.docx 1All Loan Insorance Are Money Problem.docx 1
All Loan Insorance Are Money Problem.docx 1
 
7339748667 Call Girls Kolkata with Trusted Models
 7339748667 Call Girls Kolkata with Trusted Models 7339748667 Call Girls Kolkata with Trusted Models
7339748667 Call Girls Kolkata with Trusted Models
 
UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024UN SDSN Sustainable Development Report 2024
UN SDSN Sustainable Development Report 2024
 
Luxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in Noida
Luxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in NoidaLuxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in Noida
Luxury Call Girls Noida {9873940964} VVIP POOJA Call Girls in Noida
 
Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...
Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...
Russian Call Girls Visakhapatnam 8800000000 Low Rate HIgh Profile Visakhapatn...
 

De witt final_report_180213

  • 1. ELEVATING ERIE CONCEPT PLAN DEWITT, NY FINAL REPORT OCTOBER 2017 This report was developed with funding assistance through the Environmental Protection Fund Local Waterfront Revitalization Program
  • 2. Elevating Erie Concept Plan - DeWitt, NY Town of Dewitt Sam Gordon, Director of Planning and Zoning Stephanie Guereschi, Environmental Planner EDR Environmental Design and Research Andrew Obemesser Erica Tauzer Alta Planning + Design Jeff Olson, Principal Phil Goff, Project Manager Lindsay Vera, PE, Project Engineer Charles Creagh, Project Planner ACKNOWLEDGEMENTS CONTENTS Introduction...................................................1 Existing Conditions Assesment.....................3 Concept Plan Recommendations.................15 Design Features Toolkit...............................16 Project Recommendations Map...................18 Cross Section Locations Map.......................19 Cross Sections: • A.......................................................20 • B.......................................................24 • C.......................................................26 Evaluation Criteria........................................30 • D.......................................................32 • E.......................................................34 • F.......................................................36 • G......................................................38 Conclusion + Next Steps..............................40 This report was developed with funding assistance through the Environmental Protection Fund Local Waterfront Revitalization Program ii
  • 3. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY The Elevating Erie Concept Plan seeks to help DeWitt achieve the following goals: 1. Provide a multi-use trail along the former Erie Canal alignment through the Town of DeWitt 2. Increase recreational and active transportation opportunities for residents, employees and visitors 3. Improve economic redevelopment opportunities along the trail corridor 4. Brand DeWitt as a more green and sustainable community 5. Leverage funding to improve multi-modal mobility, safety and aesthetics along Erie Boulevard The recommendations in this study will reduce one of the most critical gaps in the Erie Canalway Trail. Currently, the trail is comprised of a nearly 360 mile network between Buffalo and Albany, linking Rochester, Syracuse and Utica. Over 75% of the existing trail is off-road, utilizing the historic towpaths and railroads. When fully complete, the Erie Canalway Trail will be a key destination for heritage tourism, and a centerpiece for the Town of DeWitt. Introduction Only small remnants of the historic Erie Canal exist along the former alignment in DeWitt. Over the past century, the Canal has been replaced by a portion of Interstate 481, local roadways and Erie Boulevard, a six-lane state highway. The Town of DeWitt led a visionary effort called “Elevating Erie” to re-imagine the Canal as a key part of the community’s future. The Elevating Erie Concept Plan proposes to bring the Canal back to life in DeWitt, with a new multi-use trail along the former Erie Canal alignment. This would extend the current terminus of the Erie Canalway Trail at Old Erie Canalway State Park through the Town of DeWitt to the Syracuse City Line at Thompson Road. The recommended alignment incorporates public rights of way along Butternut Drive, Kinne Road, Towpath Road, Bridge Street and Erie Boulevard. The proposed trail is anticipated to run within Erie Boulevard to Downtown Syracuse and beyond, in order to link with the existing Erie Canalway Trail in Camillus, a total gap of 14 miles. The 14 mile gap is currently in the process of a subsequent planning and design study as part of the Empire State Trail (EST). As envisioned by Gov. Andrew Cuomo, the EST will link the Erie Canalway Trail, the Hudson River Greenway and the Champlain Valley route into a 750-mile statewide multi-use trail network, the largest in the U.S. EXECUTIVE SUMMARY EXECUTIVESUMMARY 1 The proposed path along the historic route of the Erie Canal in DeWitt will transform the community.
  • 4. Elevating Erie Concept Plan - DeWitt, NY 12’ 13’13’ 4.5’12’13’ 13’4.5’ 30’ 6’ 7’11’ 11’7’ 6’11’ 11’ 7’ 4’6’ 6’7’ 12’ 115’ Sidewalk Sidewalk Buffer Buffer Buffer Buffer Shoulder Shoulder TravelLane TravelLane Sidewalk Sidewalk TravelLane TravelLane TravelLane TravelLane TravelLane TravelLane Median TravelLane TravelLane 115’ Stonedust Erie Canalway Trail Erie Canalway Trail Recommendations To meet the Town’s goals, the recommended trail alignment follows the historic route of the canal. This includes portions of the historic towpath road between Kinne Road and Celi Drive and a segment of Erie Boulevard East between Bridge Street and Thompson Road. Recommendations for the 3-mile section include a paved pathway with parallel stonedust shoulder within Erie Boulevard’s median, striped bike lanes, a shared use path within the shoulder, a new trail bridge over I-481 and a sidepath along Butternut Drive. Intersection enhancements will tie all of the various sections together. In aggregate, the majority of the route will be separated from motor vehicle traffic. The trail will be designed to safely accommodate a wide range of people of all ages and abilities, including pedestrians, runners, and bicyclists. The proposed Erie Boulevard Trail concept is proposed in the following sections: Erie Boulevard East Taking advantage of the unused paved median, a shared use path will run through the center and be buffered from traffic. Specially designed intersection enhancements will accommodate crossings at Bridge Street and Thompson Road for the connection into Syracuse. A “road diet” to repurpose one travel lane in each direction provides the opportunity to widen sidewalks and add new street trees and can be developed as a second phase of the project. The quality of the design is intended to promote economic redevelopment along Erie Boulevard. Towpath Road Because of low traffic volumes and speeds west of Widewaters Parkway, standard bicycle lanes will provide the two-wheeled connection from Erie Boulevard further east. Pedestrian traffic will be accommodated on a new sidewalk on the north side. East of Widewaters Parkway, pedestrians, runners, and bicyclists will utilize a wide shoulder of Towpath Road, separated from traffic by Final Feasibility Concept Design for Erie Boulevard East a striped buffer and delineator posts. Adjacent to the path, a narrow remnant of the Erie Canal reminds users of the historical significance of the trail route. Connection to Old Erie Canal State Park From the east end of Towpath Road, the connection to Old Erie Canal State Park will be made using a trail bridge over I-481, adjacent to the Kinne Road Bridge. A new sidepath along Butternut Drive connects the bridge to the trailhead of the existing Canalway Trail that runs 38 miles from DeWitt to Rome, New York. Project recommendations include an enhanced trailhead with additional amenities such as bike racks, seating, an interpretive kiosk and restrooms. 2
  • 5. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY EXISTING CONDITIONS ASSESSMENT 3
  • 6. Elevating Erie Concept Plan - DeWitt, NY Erie Canalway Trail Syracuse / DeWitt area Completed Portion Gaps Existing Studies Numerous reports over the past 20 years have solidified the importance of “closing the gap” in the Erie Canalway Trail in Central New York. The Canalway Trail Gap Segment Assessment Report (November 1998) report prepared by Parks & Trails New York (PTNY) was one of many prepared by PTNY to address critical trail gaps throughout the state. The preferred option east of the Syracuse border: Utilize National Grid right-of-way adjacent to Rote 690, crossing Thompson Road and Bridge Street, to enterprise Parkway, Towpath Road and Kinne Road, to Cedar Bay Park in Dewitt. The Canalway Trail Through Syracuse report (February 1999) was developed in concert with the Bicycle/Pedestrian Advisory Committee of the SMTC. The Closing the Gaps: A Progress Report on the Erie Canalway Trail (2010, 2011, 2012) prepared by the Canalway Trail Association New York (CTANY) in concert with Parks Trails New York (PTNY) released an annual report to “update Canalway corridor communities on recent progress and the current trail status across the state.” Progress in closing each of the gaps as well as obstacles present in closing additional trail gaps in the state are outlined in each report. The Closing the Gaps reports will provide insight into how construction is progressing through existing challenging areas in other ‘gap’ communities. The Campaign to Close the Gaps (Fall 2010) initiated by Senator Kristen Gillibrand’s office involved hosting a series of roundtable discussions to gather ideas for closing the gaps that existing along the trail between Utica and Albany. The Cycling the Erie Canalway: A guide to 400 miles of adventure and history along the Erie Canalway Trail (2007, 2012) guidebooks published by PTNY is a useful tool for cyclists or any trail user interested in planning a trip or locating improved areas. An on-road segment between DeWitt and Camillus is highlighted. The Friends of the Onondaga Canalway Trail (FOCT) is a public interest group advancing completion of the trail between Camillus and DeWitt. The FOCt was “designated by the Canalway Trail Management Organization (a partnership project of the NYSCC, the National Park Service Rivers, Trails and Conservation Assistance Program, and the New York Parks and Conservation Association) as the group responsible for public participation in trailway activities such as volunteer trail maintenance in the Syracuse area.” The FOCT stopped meeting in 2003, and the maps detailing the preferred routing of the Erie Canalway Trail between the Towns of DeWitt and Camillus were “never officially adopted or accepted.” “Completing the gap in the Syracuse portion of the trail would link Syracuse and its surrounding communities to 281 miles of Erie Canalway Trail that are currently open to the public.” - (Page 6, Erie Canalway Trail Syracuse Connector Route Project, Part II) 4
  • 7. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Summary of The Erie Canalway Trail - Syracuse Connector Route Project report Part 1: June 2013 - Short Term The Erie Canalway Trail - Syracuse Connector Route Project (June, 2013) report published by the Syracuse Metropolitan Transportation Council divided the study into two sections: Part I, the short-term route, and Part II: the long-term route. The short-term route is focused on the unsigned on-road Erie Canalway Trail. The Cycling the Erie Canalway (CEC) Bike Tour utilizes a version of this route each July. The development of this route included input from the New York State Canalway Corporation (NYSCC), the City of Syracuse, Towns of Camillus and DeWitt and the SMTC. The short-term on-road route was to be utilized until an appropriate off-road route could be planned, developed, designed, and constructed. The on-road route has been adjusted to reflect changes in roadway reconstruction activity. The on-road route has been signed through Syracuse but not in DeWitt. Public Involvement The June 2013 report Erie Canalway Trail - Syracuse Connector Route Project includes a Public Involvement section that details the robust level of public involvement. A Study Advisory Committee (SAC), Working Group, and Stakeholders list were developed with the purpose of involving the public during the planning process. The SAC met four times, the first meeting was held in July 2012 to introduce the project. At this meeting the SMTC provided an introduction to the project, answered project questions, solicited Working Group members, and asked attendees to answer survey questions. The public drew desired routes on large maps displaying the Syracuse Gap in the Erie Canalway Trail. . Subsequent meetings were held in March, 2014. The Syracuse Metropolitan Transportation Council (SMTC) held a Working Group meeting in November 2012 to gain insight into the on-road Erie Canalway Trail route. The Working Group consisted of volunteers from the July 2012 meeting as well as participants solicited through an online survey. A general stakeholders list was maintained, including each attendee from the first public meeting. The stakeholders list is used to disseminate pertinent project information and to notify people of upcoming public meetings. The final public meeting was held in December, 2015 at the Museum of Science and Technology in Syracuse. The SMTC “provided an introduction to the Erie Canalway Trail project, an overview of the completed Part I portion of the project, and an overview of the Part II suggested trail route options and Points of Study, followed by a Q & A period.” (Page 12, Erie Canalway trail Syracuse Connector Route Project, Part II.) Part 2: June 2016 - Long Term The long term or permanent route will address the Syracuse Gap by developing a route that meets the intent of the Erie Canalway Trail across the state as a designated shared-use path that is separated from motor vehicle traffic. Routes The analysis and potential permanent route development process began at the first public meeting in 2012 and continues today. Input from stakeholders, Working Group members, Study Advisory Committee members, and cyclists (as part of both the SMTC’s Bike Corridor Study as well as from the annual Cycling the Erie Canal event survey) was invaluable in the initial production of potential route alignments. The report includes detailed maps that show the various routing options. Map 3-6: potential permanent route options in DeWitt from SMTC 2016 report EXISTINGCONDITIONSASSESSMENT 5
  • 8. Elevating Erie Concept Plan - DeWitt, NY Elevating Erie Ideas Competition The Elevating Erie Design Competition was a collaborative effort between the Town of DeWitt and City of Syracuse to investigate ideas to close the 14 mile gap in the Erie Canalway Trail. In the fall of 2015, both communities solicited design ideas that would identify innovative ways to create a trail within the 4 mile gap between SyracusesndDeWitt.Althoughburiedunderpavementforacentury, the canalway corridor has remained significant in the region as a primary means of transporting people and goods east and west. Filling this gap in the system is crucial, as it will help achieve the goal of creating the longest continuous bicycle and pedestrian trail in North America. The Elevating Erie Ideas Competition was an effort to both celebrate the heritage of the 200 year old canal system and initiate a dialogue in the community discussing how to best utilize and design the corridor to stimulate economic investment. Four differently branded sites within DeWitt and Syracuse were identified for potential improvements, including: • Boulevard: a four mile stretch of Erie Blvd. through both DeWitt and Syracuse • Block: a single block of Erie Blvd. in Syracuse that investigated design issues at a higher level of detail • Branch: redesign of the Widewaters area at the intersection of Towpath Road and Erie Blvd. in DeWitt • Bridge: a trail and open space bridge over I-481, where the current Erie Canalway Trail terminates at Butternut Drive in DeWitt Sixty-four competition entries were received from 16 different countries, covering the four identified sites. According to www. elevatingerie.com, the ideas competition “was a first step towards initiating a community discussion about the importance of the canal corridor, and how best to reclaim its heritage in a celebratory and stimulating fashion.” Public Survey During the competition, an on-line survey was promoted to the public to gain an understanding of: • The importance of the corridor, which included a establishing a set of prioritites for the built and natural environment • Where to focus investments, including a determination of why more specific elements and trail amenities were important Developing Alternatives The consultant team reviewed the survey results and noticed several recurring themes throughout the 1,264 completed surveys. These themes influenced the way in which we viewed potential design ideasandultimatelyaffectedthepreferredalignment.Thefollowing is a brief summary of the results from each survey question: A collection of concepts from the Elevating Erie Competition website 6
  • 9. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY The four categories that competition entries focused on during the Elevating Erie Ideas Competition Priorities The highest priorities by rank include: • Pedestrian & Bicycle Transportation • Connectivity and Safety • Economic Development Community Character - What needs the most improvement? • More attractive streetscapes • Redevelopment of vacant buildings and lots • Improved development quality and attractiveness Eco-friendly Design - Which of these will most benefit the corridor? • Green infrastructure • Increase tree canopy • Landscaping the median Conectivity and Safety - Which improvments would make you feel safer? • Protected bike lanes • Pedestrian refuge areas • Traffic calming Economc Development - Which development type do you favor on Erie Boulevard? • Commercial / mixed-use developments • Retail / services • Parks / pocket parks / playgrounds Parks + Recreation - Which amenities would you prefer along Erie Boulevard? • Trails • Open spaces / event spaces / playgrounds • Picnic areas / restrooms / drinking fountains The survey responses helped to inform the development of design concepts for the DeWitt portion of the Erie Canal gap in metro Syracuse. Due to the clear preferences expressed in the survey, final design recomendations included a separation of the the Canalway Trail from traffic where feasible; streetscape improvements to encourage redevelopment and additional landscape buffers to evoke a green corridor along the former route of the Erie Canal. EXISTINGCONDITIONSASSESSMENT 7
  • 10. Elevating Erie Concept Plan - DeWitt, NY This infographic summarizes the Elevating Erie competition entry ideas 8
  • 12. Elevating Erie Concept Plan - DeWitt, NY BridgeSt Demong Dr FisherRd Kinne Rd ElyDr Carnegie Dr EdwardsDr ManorDr KittellRd Carlton Dr Arbor Ln E Genesee St The H am let Ro BurrowsSt Randall Rd SedaliaCir LyndonRd E Manlius St Mapleview Rd Widewaters Pkwy DeW itt Rd LuddingtonSt Terraceview Rd AmbergateRd DroversLn ThompsonRd HillsboroPkwy FirtreeLn Butternut Dr Southgate Rd CharlesSt Doll Pkwy WilliamSt Caton Dr PelhamRd BrandonRd SmithSt Fayette Blvd Caleb Ave Mountainview Ave 3rd St CeliDr MastersRd SalemRd Haddonfield Pl Towpath Rd Hobson Ave Ethridge Rd McCool Ave ArchSt Lockwood Rd Springwater Dr Gifford Pkwy ButternutDr Sutton Pl Bradford Pkwy Pyle Dr Crst Euclid Ave NorthridgeRd W 1st St Springfield Rd Hillsboro Pkwy Pe Hi Phillips Rd Salt Springs Rd Hampshire Dr Pelham Rd Alpine Dr Phelps St Paula Dr ThompsonRd Bradford Pkwy W instonW ay Melbourne Ave Canterbury Rd StantonDr Brampton Dr ClaretCir RevereRd lmsfordRd Sunnyside ParkRd AberdeenTer PosterLn Litchfield Dr Kravec Dr Lynbrook Cir Dr Commons Park W 2nd St HathawayRd Polk St Erie Blvd Manlius Center Rd Oakmont Dr Edgemont Dr WexfordRd AgwayDr Clearview Rd LynacresBlvd C E D A R B A Y W I D E W A T E R S P O N D M E A D O W B R O O K L E Y C R E E K Canalway Trail: Old Erie CanalStatePark SYRACUSE DEWITT Cedar Bay Park DeWitt Town Park DeWitt Town Hall The redevelopment of the shopping plaza on Erie Blvd. includes a well- designed sidewalk and green buffer. The following pages provide an assessment of the Erie Canalway Trail corridor. The photo tour maps provide context regarding the varying roadway / travel lane / shoulder widths found on the roads within the site. The subsequent maps illustrate: • Motor vehicle traffic levels within the site • Opportunities and challenges to creating a trail connection through the corridor Existing Conditions Assessment + Analysis Long portions of Erie Blvd. in DeWitt feature a 30’ wide paved median. Old Erie Canalway trailhead sits at the base of the sloped portion of Butternut Drive and below the grade of the adjacent I-481. Towpath Rd. slopes to the north from Kinne Rd. and includes a 4’ shoulder on one side and 10’-12’ on the opposite side. West of Widewaters Pkwy, traffic volumes along Towpath Rd. drop significantly. 10
  • 13. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY BridgeSt Demong Dr FisherRd Kinne Rd ElyDr Carnegie Dr EdwardsDr ManorDr KittellRd Carlton Dr Arbor Ln E Genesee St The H am let Ro BurrowsSt Randall Rd SedaliaCir LyndonRd E Manlius St Mapleview Rd Widewaters Pkwy DeW itt Rd LuddingtonSt Terraceview Rd AmbergateRd DroversLn ThompsonRd HillsboroPkwy FirtreeLn Butternut Dr Southgate Rd CharlesSt Doll Pkwy WilliamSt Caton Dr PelhamRd BrandonRd SmithSt Fayette Blvd Caleb Ave Mountainview Ave 3rd St CeliDr MastersRd SalemRd Haddonfield Pl Towpath Rd Hobson Ave Ethridge Rd McCool Ave ArchSt Lockwood Rd Springwater Dr Gifford Pkwy ButternutDr Sutton Pl Bradford Pkwy Pyle Dr Crst Euclid Ave NorthridgeRd W 1st St Springfield Rd Hillsboro Pkwy Pe Hi Phillips Rd Salt Springs Rd Hampshire Dr Pelham Rd Alpine Dr Phelps St Paula Dr ThompsonRd Bradford Pkwy W instonW ay Melbourne Ave Canterbury Rd StantonDr Brampton Dr ClaretCir RevereRd lmsfordRd Sunnyside ParkRd AberdeenTer PosterLn Litchfield Dr Kravec Dr Lynbrook Cir Dr Commons Park W 2nd St HathawayRd Polk St Erie Blvd Manlius Center Rd Oakmont Dr Edgemont Dr WexfordRd AgwayDr Clearview Rd LynacresBlvd C E D A R B A Y W I D E W A T E R S P O N D M E A D O W B R O O K L E Y C R E E K Canalway Trail: Old Erie CanalStatePark SYRACUSE DEWITT Cedar Bay Park DeWitt Town Park DeWitt Town Hall EXISTINGCONDITIONS-PHOTOTOUR Portions of Erie Blvd. feature damaged sidewalks... The intersection of Bridge St. and Celi Dr. is nearly impossible for pedestrians and bicyclists to cross. The 10’-12’ wide shoulder provides the foundation for a trail connection from Butternut Dr. to Erie Blvd. The Kinne Rd. bridge features a narrow sidewalk on the north side without curb ramps. ...or none at all in some places. The Bridge St. approach to Erie Blvd. provides space on the north side (right) for a spur trail. 11
  • 14. Elevating Erie Concept Plan - DeWitt, NY TRAFFICVOLUME+ENVIRONMENTALCONDITIONSMAP $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ BridgeSt FisherRd Kinne Rd Carnegie Dr EdwardsDr KittellRd Carlton Dr Arbor Ln E Genesee St Royal Birkdale BurrowsSt Randall Rd LyndonRd Mapleview Rd Widewaters Pkwy Ralph Ln DeW itt Rd LuddingtonSt Terraceview Rd AmbergateRd DroversLn ThompsonRd HillsboroPkwy FirtreeLn Butternut Dr Southgate Rd Doll Pkwy Caton Dr PelhamRd BrandonRd SmithSt Fayette Blvd Caleb Ave Mountainview Ave CeliDr MastersRd WestminsterRd Towpath Rd Hobson Ave Ethridge Rd Lockwood Rd Springwater Dr Gifford Pkwy ButternutDr Sutton Pl Pyle Dr Thistlewood Ln NorthridgeRd Springfield Rd Hillsboro Pkwy Peck HillRd Highbridge Rd Phillips Rd Salt Springs Rd Hampshire Dr Pelham Rd Alpine Dr Paula Dr ThompsonRd Bradford Pkwy Melbourne Ave StantonDr Brampton Dr ClaretCir RevereRd ElmsfordRd PosterLn Kravec Dr Lynbrook Cir Commons Park W 2nd St Robbins LnHathawayRd Erie Blvd Manlius Center Rd Edgemont Dr WexfordRd AgwayDr Clearview Rd LynacresBlvd C E D A R B A Y W I D E W A T E R S P O N D BUTTERNUTCREEK M E A D O W B R O O K L E Y C R E E K CANALWAY TRAIL Existing Proposed by canals/ny.gov* Proposed by LWRP SMTC Option 2 Wetlands Flood plain Environmental Remediation Area *http://www.canals.ny.gov/maps/index. html?layer=trail TRAFFIC + TRANSIT Proposed Alignment Existing Conditions Average Daily Trips 0 0.4 0.8 1.2 1.6 20.2 Miles 0 - 2,999 3,000 - 8,000 8,001 - 15,000 15,001 - 60,000 60,001 - 256,390 Sidewalks Trails Proposed Trails Bus Stops$ SYRACUSE DEWITT 690 481 Cedar Bay Park N 12
  • 15. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY OPPORTUNITIESANDCHALLENGESMAP BridgeSt FisherRd Kinne Rd Edwa Arbor Ln Widewaters Pkwy R alph Ln DeW itt Rd ThompsonRd Butternut Dr 3rd St CeliDr Towpath Rd Gifford Pkwy ButternutDr Sutton Pl W 1st St Springfield Rd Salt Springs Rd Hampshire Dr Pelham Rd ClaretCir Erie Blvd WexfordRd AgwayDr C E D A R B A Y W I D E W A T E R S P O N D M E A D O W L E Y C R E E K BUTTERNUTCREEK 0 0.5 1 Mile Above-grade portion of I-481 and ramps Butternut Dr. 6-8% slope from trailhead to bridge Kinne Rd. bridge features narrow shoulders and a 5’ sidewalk on one side only Erie CanalwayTrail runs 34 miles to Rome Existing path between trail head andTown Hall / park 12’wide shoulder narrows on approach to intersection Overgrown reeds and guardrail obscure pond to passing traffic Long vacant Country Club building has become an eyesore Road / driveway crossings of 12’wide shoulder path Sloped section ofTowpath Rd. Parking lot and trail head lacks a significant visual presence Town-owned property contains vestiges of original Erie Canal 12’wide shoulder provides 2-way access for walkers and bicyclistsTraffic volumes drop significantly west of intersection Tow Path Rd. R.O.W. likely includes direct connection to Erie Blvd. Widewaters Pond could offer a significant amenity for nearby redevelopment Two-lane road with narrow shoulders Lack of sidewalks on Bridge St. Potential trail alignment contains significant wetlands Significant cross-slope within median Extremely challenging intersection to cross on foot or by bike Need to transition westbound CanalwayTrail bicyclists from south side to north side Double left-turn lanes to Bridge St. Existing footpath Traffic speeds and multiple commercial curb cuts make for a challenging environment for walking and bicycling on Erie Blvd. 30’wide portion of paved median At approximately 20,000 vehicles per day, Erie Blvd. remains under capacity for its 6-lane design Syracuse section of Erie Blvd. contains wide landscaped median Explanation of Challenge Corridor Challenge Spot Challenge Wide Intersection With High Turn Volumes CHALLENGES Text Explanation of Opportunity Corridor Opportunity OPPORTUNITIES Text N 13
  • 16. Elevating Erie Concept Plan - DeWitt, NY Pedestrians Crossing Erie Blvd. At: Crosswalk: 10 Mid-Block: 10 Pedestrians Crossing Erie Blvd. At: Crosswalk: 10 Mid-Block: 10 Pedestrians Crossing Erie Blvd. At: Crosswalk: 16 Mid-Block: 1 Pedestrians Crossing Erie Blvd. At: Crosswalk: 25 Mid-Block: 4 Pedestrians Crossing Erie Blvd. At: Crosswalk: 26 Mid-Block: 4 Pedestrians Crossing Side Streets At: Crosswalk: 34 Mid-Block: 5 Pedestrians Crossing Side Streets At: Crosswalk: 44 Mid-Block: 3 Pedestrians Crossing Side Streets At: Crosswalk: 21 Mid-Block: 4 Pedestrians Crossing Side Streets At: Crosswalk: 32 Mid-Block: 11 Pedestrians Crossing Side Streets At: Crosswalk: 19 Mid-Block: 10 Pedestrian and Bicycle Counts Lack of bike facilities, poor sidewalk conditions and gaps in the sidewalk network along Erie Boulevard create an uncomfortable environment for pedestrians and bicyclists. Despite that, a significant number of people walk or bicycle along the corridor. Recent counts along Erie Boulevard counts performed by Syracuse Metropolitan Transportation Council (SMTC) show that clearly there is significant use of the corridor by people on foot and bicyclists. The counts performed covered an 18-hour period (5:00am - 11:00pm) and included ten intersections between Kinne Road in Dewitt and South Crouse Street in Syracuse. In that 4 mile stretch, SMTC counted 1,355 pedestrians and 85 bicyclists. Within the DeWitt section of the counts, the numbers of pedestrians crossing Erie Boulevard are: • Pedestrians crossing at crosswalks: 237 • Pedestrians crossing at midblock locations: 62 • Total pedestrians counted: 299 There were 42 bicyclists recorded riding along Erie Blvd. in DeWitt. Map Source: Syracuse Metropolitan Transportation Council BICYCLEANDPEDESTRIANCOUNTLOCATIONSMAP 14
  • 17. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY CONCEPT PLAN RECOMMENDATIONS 15
  • 18. Elevating Erie Concept Plan - DeWitt, NY Shared lane markings are used to mark a designated bike route. They are placed in the travel lane, encouraging cyclists to travel away from the door-zone or parked vehicles. These symbols highlight the fact that the roadway is a shared space. The dotted lines represent Enhanced Sharrows - these provide extra awareness to motorists that they are sharing the lane with bicycles. Raised separated bicycle lanes are vertically separated from motor vehicle traffic. A furnishing zone between the bicycle lane and curb or motor vehicle traffic is a common feature. At intersections, the raised bicycle lane can be dropped down to the street level. Raised separated bicycle lanes are vertically separated from motor vehicle traffic. A furnishing zone between the bicycle lane and curb or motor vehicle traffic is a common feature. At intersections, the raised bicycle lane can be dropped down to the street level. Bike lanes designate an exclusive space for bicycles through the use of pavement markings and signage. Bike lanes are typically located adjacent to motor vehicle traffic and travel in the same direction as motor vehicles. Advisory bike lanes are bicycle priority areas delineated by broken white lines, separate from a center one-lane two-way travel area. Motorists may only enter the bicycle zone when no bicycles are present. Motorists must overtakebicyclistswithcautionduetopotential oncoming traffic. These bikeways are at street-level and use a variety of methods for physical protection from passing traffic. A parking lane, flexible delineator posts, or flower boxes may provide the physical separation from motor vehicle traffic. Shared Lane Marking (SLM) A.K.A. Sharrow Enhanced SLMStandard SLM Separated Bike Lane - Sidewalk Level Shared Use Path - Separated from Motor Vehicle Traffic Separated Bike Lane - Street LevelBike Lane Advisory Bike Lane Design Features Toolkit - Bicycle During the development of the design options for the individual segments, a toolkit of design elements for bicycle facilities was considered. Whole some may ultimately not be used, all were considered during the development of the design options phase of the study. Photo Credit: www.thedartmouth.com 16
  • 19. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Residential zone sidewalks are important in providing pedestrians access to schools, businesses, and recreation areas. Four feet is the minimum preferred standard, and a 5-foot sidewalk is common. Commercial zone sidewalks provide pedestrians access directly to local businesses and act as important public gathering spaces for socializing and recreation. Six feet is the minimum preferred standard. The furniture zone buffer should be between motor vehicle traffic and the pedestrian through zone. Signalized road crossings are typically locations where rail trails or paths cross roadways with high traffic volumes or speed and/or connect to schools. A steeper-pitched raised crosswalk is ideal for some college campus or downtown core locations where significant pedestrian crossings occur regularly or frequently. One result of a steeper crossing is motor vehicle traffic slowed to approximately 10 MPH or less. Mobility-impaired individuals have an easier time crossing as they do not have change in grade. Residential Zone Sidewalk Signalized Road CrossingRaised Crosswalk Commercial Zone Sidewalk Design Features Toolkit - Pedestrian Pedestrian design features create a more comfortable and safe environment for pedestrians. Many of these are designed to slow motor vehicle traffic as well. Crosswalk signage at unsignalized crossings can alert motorists to the presence of pedestrians at these locations. Crosswalk Signage Pedestrian refuge islands limit pedestrian exposure in the intersection. They are recommended where a pedestrian must cross more than two lanes of traffic in one direction, locations with high pedestrian-collision rates, and locations where there are high traffic volumes and speeds. Medians or safety islands create a two- stage crossing for pedestrians, which is easier and safer. Raised Refuge Island DESIGNFEATURESTOOLKIT 17
  • 20. Elevating Erie Concept Plan - DeWitt, NY FisherRd Kinne Rd Arbor Ln Widewaters Pkwy DeW itt Rd ThompsonRd o Butternut Dr 3r St CeliDr Towpath Rd Gifford Pkwy ButternutDr Sutton Pl Salt Springs Rd Hampshire Dr Pelham Rd ClaretCir Cir Erie Blvd AgwayDr C E D A R B A Y W I D E W A T E R S P O N D M E A D O W B R O O K C R E E K 0.50.25 0.75 1.0 Mile0 Butternut Drive: (See Section F) • Add shared use sidepath on west side Enhanced Erie Canalway trailhead and Butternut Drive crossing Tow Path Road East: (See Section E) • Narrow travel lanes and add buffer with delineator posts PotentialWidewaters Common redevelopment area Erie Blvd. Road Diet: (See Sections A + B) • Recommendation: Incorporate Erie CanalwayTrail into median with striped road diet • Final Feasibility Concept: Incorporate Erie CanalwayTrail into median with improved streetscape and sidewalks Kinne Road Bridge: • Construct new trail bridge adjacent to existing bridge Towpath RoadWest: (See Section D) • Recommendation: 5’wide shoulder bikeway • Final Feasibility concept: One-way roadway eastbound, with 12’wide shared use path Erie CanalwayTrail connection to downtown Syracuse Off-street path connection to Erie Blvd. within Towpath Rd. right-of-way Natural surface path loop on south side of former canal alignment In long term, intersection would be a good candidate for a trail overpass in long term to avoid the heavy traffic and turning movements (Gateway to Le Moyne College) N 690 481Existing Shared Use Path (Paved) Proposed Shared Use Path (Paved) Proposed Natural Surface Path Proposed On-Street Improvements Special Intersection Treatment Future Road Connections LEGEND The following page displays a map that details each section drawing location along the corridor. ERIECANALWAYTRAILALIGNMENT/RECOMMENDATIONSMAP 18
  • 21. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY CROSSSECTIONLOCATIONSMAP Erie Boulevard at Thompson Road Erie Boulevard at Texas Roadhouse Erie Boulevard at Kravec Drive Towpath Road - West of Widewaters Parkway Towpath Road - East of Widewaters Parkway Kinne Road Bridge Butternut Drive SECTION LOCATIONS A B C D E F G 19
  • 22. Elevating Erie Concept Plan - DeWitt, NY Section A Erie Boulevard East at Thompson Rd Existing Conditions From Bridge Street to the Syracuse City line at Thompson Road, Erie Boulevard’s fluctuating median width, numerous wide travel lanes, and lack of sidewalks pose both a challenge to pedestrian mobility and an opportunity for trail development. Speed limit is posted at 40 MPH, and Average Annual Daily Trips (AADT) is approximately 19,300 according to 2013 NYS DOT data. Locator Map 12’12’12’12’ 12’ 5’12’ 12’ 9’12’5’ 115’ SnowShelf SnowShelf TravelLane TravelLane TravelLane TravelLane TravelLane TravelLane TurnLane TurnLane Median Erie Boulevard east looking west towards the Thompson Road intersection 20
  • 23. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Section A Erie Boulevard East at Thompson Rd Recommendation: Trail in median This option would require a narrowing of all travel lanes from 12’ to 11’, and the removal of one through- lane traveling both directions. The resulting width of the median would more closely match the 30’ existing median to the east. A guide rail would protect bicyclists from westbound traffic while a 7’ landscaped area creates a buffer between walkers, joggers, and east bound motor vehicle traffic. Final Feasibility Concept: Trail in Me- dian with streetscape enhancements and wider sidewalks In the longer term, the Town of DeWitt aspires for a more holistic enhancement of Erie Blvd. that includes an improved pedestrian environment along the edges. A new sidewalk, street trees and additional landscaping will enhance economic redevelopment opportunities as well. 115’ 11’11’ 11’ 11’ 5’11’ 11’ 7’ 2’5’ 12’ Sidewalk Sidewalk Buffer StripedBuffer TravelLane TravelLane TravelLane TurnLane TurnLane TravelLane Erie Canalway Trail 115’ 11’11’ 11’ 11’ 5’11’ 11’ 7’ 2’6’ 6’7’ 12’ Sidewalk Sidewalk Buffer Buffer Shoulder TravelLane TravelLane TravelLane TurnLane TurnLane TravelLane Erie Canalway Trail Recommendation Final Feasibility Concept ERIEBOULEVARDRECOMMENDATIONS 21
  • 24. Elevating Erie Concept Plan - DeWitt, NY Erie Boulevard East at Thompson Road Existing Conditions Thompson Road is a difficult intersection for bicyclists and pedestrians to cross 22
  • 25. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY BUS Gas Vacant Auto Zone ERIE BLVD EAST THOMPSONRD Recommendation: Trail In Median ERIEBOULEVARDRECOMMENDATIONS 23
  • 26. Elevating Erie Concept Plan - DeWitt, NY 12’ 13’13’ 4.5’12’13’ 13’4.5’ 20’ Sidewalk Sidewalk Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Median 105’ Erie Boulevard East at Texas Road House Restaurant Existing Conditions At this section of roadway near the Texas Roadhouse restaurant, Erie Boulevard’s 20’ median has a substantial slope within the cross section. This poses a challenge to the development of a trail within the median area without widening it. Locator Map Section B 24
  • 27. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Erie Boulevard East at Texas Road House Restaurant Recommendation: Trail in median This option requires the removal of the existing crash barrier fence and filling in on the down-slope portion to create an even trail bed. Raising the trail to be above the west-bound motorists is the preferred construction practice here. Final Feasibility Concept: Trail in Me- dian with streetscape enhancements and wider sidewalks In the longer term, the Town of DeWitt aspires for a more holistic enhancement of Erie Blvd. that includes an improved pedestrian environment along the edges. A new sidewalk, street trees and additional landscaping will enhance economic redevelopment opportunities as well. 5’11’ 11’11’ 11’5’ 105’ Sidewalk Sidewalk 7’ 2’ Buffer 13’ Buffer 4’ StoneDust 12’ 7’ Buffer Travel Lane Travel Lane Travel Lane Travel Lane 12’ 13’13’ 4.5’12’13’ 13’4.5’ 20’ 5’11’ 11’11’ 11’6’ 6’7’ 105’ Sidewalk Sidewalk Buffer 7’2’ 2’ Buffer 4’ StoneDust 12’ Erie Canalway Trail 7’ Buffer Shoulder Sidewalk Sidewalk Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Travel Lane Median 105’ Recommendation Final Feasibility Concept Section B ERIEBOULEVARDRECOMMENDATIONS 25
  • 28. Elevating Erie Concept Plan - DeWitt, NY 12’ 13’13’ 4.5’12’13’ 13’4.5’ 30’ Sidewalk Sidewalk TravelLane TravelLane TravelLane TravelLane TravelLane TravelLane Median 115’ Locator Map Erie Boulevard East at Kravec Drive Existing Conditions From Bridge Street to the Syracuse City line at Thompson Road, Erie Boulevard’s fluctuating median width (maximum of 30’ width), numerous wide travel lanes, and lack of sidewalks pose both a challenge to pedestrian mobility and an opportunity for trail development. Speed limit is posted at 40 MPH, and Average Annual Daily Trips (AADT) is approximately 21,500 according to 2013 NYS DOT data. Section C 26
  • 29. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Erie Boulevard East at Kravec Drive Recommendation: Trail in median This option would transform the existing 30’ median into an Erie Canalway Trail segment. The existing space in the median is situated perfectly for tansformation into a trail with a landscaped area to buffer trail users from motor vehicle traffic. Along most portions of the roadway, one travel lane is each direction closest to the median is transformed into a hatched shoulder area. This road diet approach provides the opportunity to widen the median where needed, typically the approaches to intersections where left turn lanes are needed. Final Feasibility Concept: Trail in Median with streetscape enhancements and wider sidewalks In the longer term, the Town of DeWitt aspires for a more holistic enhancement of Erie Blvd. that includes an improved pedestrian environment along the edges. New sidewalks, street trees and additional landscaping will enhance economic redevelopment opportunities as well. Like the recommendation above, these amenities require reallocation of one travel lane in each direction, but incorporate the outer lanes, rather than replacing the inner travel lanes with a hatched shoulder zone. 6’ 7’11’ 11’7’ 6’11’ 11’ 7’ 4’6’ 6’7’ 12’ 115’ Sidewalk Sidewalk Buffer Buffer Buffer Buffer Shoulder Shoulder TravelLane TravelLane TravelLane TravelLane Stonedust Erie Canalway Trail 7’ 5’ Sidewalk 5’ Sidewalk Buffer 4’ Stonedust 7’ Buffer Buffer Lane 11’ Travel Lane 11’ Travel Lane 11’ Travel Lane 11’ Travel Lane 12’ 13’ Buffer Lane 13’ Erie Canalway Trail Recommendation Final Feasibility Concept Section C ERIEBOULEVARDRECOMMENDATIONS 27
  • 30. Elevating Erie Concept Plan - DeWitt, NY Erie Boulevard East at Thompson Road Recommendation: Trail in median Photo simulation Precedent project: Brooklyn, NY Section C 28
  • 31. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Erie Boulevard East at Bridge Street Existing Conditions Recommendation: Trail in Median Vacant BRIDGEST ERIEBLVD ORRICK RD ERIEBOULEVARDRECOMMENDATIONS 29
  • 32. Elevating Erie Concept Plan - DeWitt, NY Evaluation Criteria The consultant team and the Town of DeWitt agreed upon a common set of evaluation crtieria to determine which would be the one favored by town officials and NYSDOT. The eight criteria included: 1. Trail user safety at mid-block locations 2. Trail user safety at intersections 3. Trail user access to businesses 4. Opportunities for stormwater treatment facilities 5. Opportunities for enhanced landscaping and trees 6. Impacts to motor vehicle traffic flow 7. Potential to improve transit access and service 8. Economic development potential In order to arrive at the recommendation for a design that included a shared use path in the center median, the team compared the concept with one that included bike lanes on each side of Erie Blvd, separated from traffic by a narrow, raised median. The clear preference following this scoring exercise was the Shared-use path within existing center median option. This offers an opportunity to have a separate facility for bicycles while allowing peestrians either to use the shared facility or use upgraded sidewalks along the edge of Erie Boulevard. Note that in the long term, the Town of DeWitt’s aspiration is to also provide additional landscaped buffers, green infrastructure, benches, lights and signage. Rendered image of the bike lane design option (Option 2) that was used during the early stages of the planning project Summary Scores of Evaluation Exercise 30
  • 33. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Confirmation of Road Diet Proposal Of the two design options for Erie Blvd. between Thompson Road (Syracuse City Line) and Bridge Street, both involved the reduction of one travel lane in each direction. At minimum, the “road diet” retained two thru lanes, along with the left and right turn lanes. The traffic analysis used a Synchro Analysis model in order to determine the intersection level of service (LOS), the amount of delay (in seconds) and the queue lengths on the approach to the traffic signal at Bridge Street. The extent of this study did not allow for analysis of additional signalized intersections. The results of the Erie Blvd./Bridge Street intersection Synchros Analysis resulted in what the consultant team would consider acceptable level of changes to the performance of the intersection for motor vehicle drivers. The results illustrated in the adjacent table show that LOS during the PM peak period remains relatively unchanged between today’s roadway conditions and the proposed road diet condition. Delays go up slightly and queue lengths go up somewhat significantly. While increased queue lengths can be a red flag for some road diet projects, the LOS and delay scores imply that a motorist would be able to proceed through the intersection roughly as he or she would today. The primary change is that the line of cars waiting to get through the signal would simply be longer. In other words, the amount of green time for Erie Blvd. traffic allows roughly the same number of cars to flush through the Bridge Street intersection whether there are the three existing thru lanes in each direction or the proposed two. It should be noted that more-detailed and additional traffic analysis will be required at all intersections along the Erie Blvd corridor in DeWitt and ultimately Syracuse. Table 1: Summary of Erie Blvd. Synchro Analysis Bridge Road Intersection Synchro Analysis Summary ERIEBOULEVARDRECOMMENDATIONS 31
  • 34. Elevating Erie Concept Plan - DeWitt, NY 11’ 11’3’ 3’ 28’ Shoulder Shoulder TravelLane TravelLane Towpath Road - West of Widewaters Parkway Existing Conditions FromtheintersectionofCeliDrivetoWidewatersParkway,Towpath Road features one lane in each direction with narrow shoulders. The roadway width is approximately 28’. There is no sidewalk but traffic volume is quite low however, making for a reasonably comfortable bicycling environment. Locator MapSection D 32
  • 35. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Final Feasibility Concept: One-way motor vehicle travel lane and 12’ Erie Canalway Trail This option would require signing and striping the roadway to become a one-way road for motor vehicles. The resulting space would enable a comfortably wide Erie Canalway Trail, buffered from motor vehicle traffic by a 3’ painted area with reflective bollards. The new roadway shown in the diagram at lower right could accommodate either one-way traffic (using the existing roadway) or two-way traffic on a new road. If the latter, the entire width of Towpath Road could become a Pedestrian / Bike promenade, in conjunction with adjacent redevelopment. In either case, the trail would run alongside Widewaters Pond -- a nod to the actual Erie Canal Waterway of the past and a way for trail users to enjoy the aesthetic waterway. Towpath Road - West of Widewaters Parkway Recommendation: Bikeable Shoulders with bi-di- rectional travel lane This option would require re-striping of the existing roadway to accom- modate a 5’ wide shoulders in each direction with no double center line striping (resulting in a 18’ wide bi-directional travel lane). Sho Sho Travel Travel 18’5’ 28’ Shoulder 5’ Shoulder TravelLanes5’ +/- 18’ 5’ 28’ Shoulder Shoulder TravelLane Diagram shows the proposed alignment of one-way roads within the area slated for potential future re-development. FisherRd Kinne Rd E Manlius St Widewaters Pkwy ThompsonRd Butternut Dr Ave 3rd St CeliDr Towpath Rd McCool Ave Gifford Pkwy ButternutDr W 1st St Salt Springs Rd ret Erie Blvd AgwayDr C E D A R B A Y L E Y C R E E K New road with west-bound or two-way traffic East-bound trafficFuture Erie Canalway trail 690 Final Feasibility Concept RecommendationSection D Shoul Shoul TravelLa 5’ +/- 18’ 5’ 28’ Shoulder Shoulder TravelLane12’ 11’3’ 2’ 28’ TravelLane Buffer Buffer Erie Canalway Trail TOWPATHROADRECOMMENDATIONS 33
  • 36. Elevating Erie Concept Plan - DeWitt, NY 12’10’-12’ Shoulder Shoulder TravelLane 12’ ~14’ TravelLane GrassBuffer 36’ Towpath Road - East of Widewaters Parkway Existing Conditions From the intersection of Widewaters Parkway to Kinne Road, Towpath road features one lane in each direction and a wide shoulder on the south / west side of the road. At approximately 10’ in width, the shoulder provides a relatively comfortable facility for walkers and bicyclists wanting to follow the original Erie Canal alignment. It also connects with a similar width shoulder on Widewaters from Towpath Road to Bridge Street. Locator Map Section E Existing conditions include a 10’ - 12’ wide paved shoulder, ideal for striping improvements. 34
  • 37. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Towpath Road - East of Widewaters Parkway Recommendation: Narrow travel lanes + install 10’ wide Erie Canalway Trail This recommendation requires the narrowing of the existing travel lanes from 12’ to 11’, and creating a stronger visual buffer between the Canalway trail and the travel lanes with a painted hatch- pattern and delineator posts. Building a sidewalk on the opposite side would be an additional optional amentity. Precedent project: Springdale, AR G 11’10’ Erie Canalway Trail Shoulder TravelLane 11’ 8’ TravelLane GrassBuffer Buffer 5’ Sidewalk Recommendation Sidewalk Optional Section E TOWPATHROADRECOMMENDATIONS 35
  • 38. Elevating Erie Concept Plan - DeWitt, NY 12’ 12’4’ 3’ 4’ 35’ Shoulder Shoulder Sidewalk Travel Lane Travel Lane 35’ Kinne Road Bridge Existing Conditions The Kinne Road Bridge has 2 12’ wide travel lanes, 3’ - 4’ shoulders, and a 4’ wide sidewalk on the north side. The bridge is a critical link over I-481 in the Erie Canalway Trail system. Section F Existing conditions include a narrow sidewalk on the north side of the bridge. 36
  • 39. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Section F Kinne Road Bridge Recommendation: New trail bridge The recommended crossing over I-481 is a new trail bridge adjacent to the Kinne Road Bridge. The bridge would provide a seamless connection from the south end of Towpath Road to the recommended sidepath allong Butternut Drive (see next section). An enhanced crosswalk and other improvements would be needed at the Towpath / Kinne intersection to safely accommodate access to the trail bridge. Recommendation 12’ 12’ 14’4’ 3’ 4’ 35’ 14’ Shoulder Shoulder Sidewalk Travel Lane Erie Canalway Trail Travel Lane Precedent project: Eugene, OR KINNEROADBRIDGERECOMMENDATIONS 37
  • 40. Elevating Erie Concept Plan - DeWitt, NY 11’ 11’3’ 3’ 28’ Shoulder Shoulder TravelLane TravelLane Butternut Drive - Between Trailhead and Bridge Existing Conditions From the intersection of Kinne Road to Town Hall, Butternut Drive is a sloping roadway with one lane in each direction. A 300’ long segment north of Kinne Road sits up on an embankment above the adjacent I-481 and contains guide rails. The road flattens out where it intersects with the Old Erie Canal State Park parking lot. Locator MapSection G 38
  • 41. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY Butternut Drive - Between Trailhead and Bridge Recommendation: Sidepath on West Side This option leaves the existing travel lanes, shoulders, and guid rails in heir current location. A retaining wall will need to be built to accommodate the preferred width of the Erie Canalway Trail. To avoid a closed drainage system the trail can be built at roadway grade with a guide rail as barrier. Back-up Option: Install Sidewalk on West Side + Stripe Bike Lanes This option requires narrowing the existing 11’ travel lanes to 10’. This allows for a 4’ bike lane to be striped in both directions, as well as a sidewak. The back-up option does not require any relocation of guide rails. 11’ 11’3’ 3’ 28’ Shoulder Shoulder TravelLane TravelLane 10’ 10’4’6’ 4’ 28’ BikeLane BikeLane Sidewalk TravelLane TravelLane 11’ 11’2’12’ 2’ 28’ Shoulder Shoulder TravelLane TravelLane Erie Canalway Trail Recommendation Back-up Option Section G BUTTERNUTDRIVERECOMMENDATIONS 39
  • 42. Elevating Erie Concept Plan - DeWitt, NY Conclusion and Next Steps This Elevating Erie Concept Plan has identified a recommended route to overcome the existing challenges and develop a safe and comfortable Erie Canalway Trail (ECT) through the Town of DeWitt. This project would not be possiblewithoutthededicatedeffortsofthemanyadvocacygroups,Townand City planning offices and their dedicated staff, elected officials, and countless trail enthusiasts that have been working towards this goal for decades. The timing of DeWitt’s planning work is fortuitous. In April 2017, the State’s apdopted budget included $200 million to fulfill Governor Cuomo’s vision to complete the Empire State Trail, which includes closing the 14-mile gap in the Syracuse metro area. The proposed route of the EST can capitalize on the Elevating Erie project and close the gap in the Erie Canal Trail through the Syracuse region. This is an historic opportunity for DeWitt, for the trail, and for the State of New York. Implementation of the recommendations in this report will extend many of the off-road trail qualities found along the Erie Canalway Trail through the Town of DeWitt and beyond. CONCLUSIONANDNEXTSTEPS 40
  • 43. ERIECANALWAYTRAIL-ERIEBOULEVARD Elevating Erie Concept Plan - DeWitt, NY [ PAGE LEFT INTENTIONALLY BLANK ] 41