EVANSTON YELLOW LINE STATION ENGINEERING
FEASIBILITY STUDY
City Council
Meeting
April 16, 2012
Project Overview
CTA Yellow Line (Skokie Swift)
► Line opened March 1925 as Niles Center Branch
► Line closed March 27, 1948*
► Skokie Swift began operation in April 1964
► Change to CTA Yellow Line in February 1993
Only the CTA Niles Center Local trains stopped running in 1948. North Shore Line (NSL)
interurban trains (to Waukegan, Mundelein and Milwaukee) continued to run until late January
1963, when that service was abandoned (without replacement). After about 1950-51, CTA
consolidated all rapid transit heavy maintenance work at Skokie Shops (approximately Oakton
and Hamlin), so CTA non-revenue trains operating to/from the shop also ran on the section of line
between Howard Street and Hamlin Avenue in this timeframe.
Note:
Feasibility Study Purpose
► Market Demand Study completed 2007
► Parsons Brinckerhoff selected in 2010
► Understand physical design and construction issues
► Recommend a preferred location at
Ridge, Asbury or Dodge
► Project budget of $275,000
► $220,000 in Congestion Mitigation and Air Quality
(CMAQ) funding
► $55,000 in City funds
Technical and Advisory Committee
►Technical Advisory Committee
 CMAP , CTA, RTA and PACE
►Advisory Committee
 Alderman
 CityStaff
 Saint Francis Hospital
 Residents
Advisory Committee Members
► Alderman Ann Rainey, Alderman, 8th Ward
► Alderman Melissa Wynne, Alderman, 3rd Ward (Chairman, Transportation & Parking Committee)
► Linda O'Dwyer, Director of Marketing and Public Relations, Saint Francis Hospital
► Ben Schapiro, Resident
► Tom Kepler, Resident
► Suzette Robinson, Director of Public Works
► Steve Griffin, Director of Community and Economic Development
► Matt Swentkofske, Intergovernmental Affairs Coordinator
► City Staff
 Rajeev Dahal, Senior Traffic Engineer
 Paul Schneider, City Engineer
 Susan Guderley, Neighborhood Planner
Public Involvement Process
 Public Meeting #1, Evanston Levy Center – June 2, 2011
• Introduce project, website and online survey #1
 Public Meeting #2, Saint Francis Hospital - September 15, 2011
• Concept plans, preliminary evaluation and online survey #2
• Ridge removed from further analysis
• Asbury and Dodge recommended for detailed evaluation
 Public Meeting #3, Evanston Levy Center - January 24, 2012
• Asbury recommended as preferred location
Online Survey #1 Respondents
95% from Evanston
Dodge and Oakton
had 55 responses
Online Survey #1 Responses
► Would Use a NewStop on the YellowLine:
 Ridge 90
 Asbury 137
 Dodge 228
73% of the 454 survey responses indicated a station
location preference at one or more location
Online Survey #2 Respondents
85% from Evanston
Dodge and Oakton
had 66 responses
426 Responses
Online Survey #2 Responses
► Which Station Location Do You Prefer:
 Asbury 126
 Dodge 249
12% (51) of the 426 survey responses indicated a station
location preference at both Asbury and Dodge
Study Area
Dodge
1.5 Miles from
Howard Station
Dodge
1.5 Miles from
Howard Station
Asbury
1.0 Miles from
Howard Station
Asbury
1.0 Miles from
Howard Station
Ridge
0.7 Miles from
Howard Station
Study AreaStudy Area
Oakton Historic District
Oakton Historic District
Saint Francis Hospital
Saint Francis Hospital
James Park
and Levy Center
James Park
and Levy Center
Home DepotHome Depot
Target
Dawes, Chute and Oakton
School
Dawes, Chute and Oakton
School
Removed from
consideration at PM
#2
Project Goals
► Local Access and Mobility
 Provide improved local access to the Yellow Line
► Community and Economic Development
 Revitalize Howard Street commercial area
 Increase access to local and regional employment
► Regional and Local Transit System Performance
 CTA and Pace Bus, CTA Howard Red and Purple Lines
► Neighborhood Cohesion
 Maintain and improve quality of life in Evanston
Ridge Station Evaluation Findings
► Local Access and Mobility
 Bicycle route/lane on Ridge is not feasible due to
narrow road lanes
 Traffic, operational and safety impacts on Ridge
► Community and Economic Development
 Land use along Ridge is established and developed
► Regional and Local Transit System Performance
 CTA Howard and South stations arewithin walking
distance
► Neighborhood Cohesion
 Located within theOakton Historic District
Ridge location removed from further
consideration at PM #2 on 9/15/11
Oakton Historic District
Saint Francis Hospital
Oakton School
Historic Building
CTA #97 and Pace #215
CTA #201 and #206
Asbury Avenue
• CTA #97 and #206 - most riders at
Howard/Asbury –Western, according to CTA
October 2010 data
• Pop. ¼ mile 2,348
• Pop. ½ mile 11,435
Chute School
Oakton HD
Oakton School
Historic Building
CTA #97 and Pace #215
CTA #206
Howard /Western
Shopping Area
Asbury Avenue Station Plan
Side platform configuration
Ramp access also considered
No property acquisition required
Asbury Avenue Station House
Asbury Station Platform
Dodge Avenue
• Dawes Elementary School and James Park are
within proposed station catchment area
• Max Load Point in study area (in both directions
) for CTA #93 bus is at Dodge/Howard (October
2010 data)
• Pop. ¼ mile 1,593
• Pop. ½ mile 6,600
Dawes School
Home Depot
Target
Chute School
James Park
and Levy Center
CTA #97 and Pace #215
CTA #97 and Pace #215
CTA #93, and #97
CTA #206 north of Oakton
Dodge Avenue Station Plan
Center platform configuration
No property acquisition required
Dodge Avenue Station
Detailed Evaluation
 Physical Constraints
• CTA and Road Right-of-Way Requirements
• Bridge Structure Impacts
 Public Support
• Public Meeting Comments
• Public Survey Comments
 Social/Economic Factors
• Land Use
• Population and Employment
• Economic Impact
 Environmental Factors
• Noise, Visual, Natural and Cultural
Resources
 Transportation Factors
• Transit Connectivity and Traffic
 Capital Cost
 Operating & Maintenance Cost
 Ridership Potential
► Asbury Station
 Station house can be accommodated west of the Asbury Bridge
 Station platform located below street grade
 Visual and noise impacts mitigated by trench
► Dodge Station
 Elevated station – high level of visual and noise impacts
 Requires replacement of existing 85 year old bridge to meet CTA
requirements
 Requires realignment of CTA tracks
 Requires new retaining wall structures
Screen 3
Asbury and Dodge Physical Constraints
Evaluation Criteria
Evaluation Criteria
Asbury Recommendation Findings
► Local Access and Mobility
 Over 11,000 population within ½ - mile walking distance
 Increased ridership potential
 Accessible by sidewalk network and bike routes
► Community and Economic Development
 High redevelopment potential between Asbury and Howard
 Tax Increment Finance District could support station
development
 Saint Francis Hospital within ½ - mile walking distance
 Evanston Levy Center within ½ - mile walking distance
Asbury Recommendation Findings
► Regional and Local Transit
 Distance from Howard is 1 - mile and typical of CTA
station spacing
 Bus connections to CTA #97, #206 and Pace #215
► Neighborhood Cohesion
 Visual and noise impacts mitigated with station
platform located in CTA trench
 Neighborhood station with no commuter parking
Asbury Station
Estimated Capital
Cost $23 M
Estimated 2010
840 boardings per day
Annual Ridership 263,000
2010 Estimated Asbury Cost
► Phase I - Preliminary Engineering / Environmental Study
 1 to 2 years
 Approx. $1 Million to $1.6 Million
► Phase II - Design
 1 to 2 years
 Approx. $.6 Million
► Phase III - Construction
 1.5 to 2 years
Estimated construction cost $23 Million
Skokie Oakton Station
► Feasibility study completed in 2003
► Opens May 2012
► $20 + million to construct
 Village of Skokie funding $6 + million
 Federalfunds $14 million
 Adjacent Illinois Science + Technology Park
► CTA estimates 1,200 boarding‘s per day
Potential Funding by Project Phase
Source Phase I Phase II Phase III
Revenue Sources
Federal
Flexible Highway Funds
(STP, CMAQ)
X X X
Urbanized Area Formula Funds (Section 5307) X X X
New Starts and Small Starts X X
Bus and Bus Facilities X
FHWA Transportation and Community and
System Preservation Program (TCSP)
X X X
TIGER X
Local
Naming rights X
Private sector contribution X X
Project Financing
Federal
Bonds (GANs, PABs, & BABs) X
Transportation Infrastructure Finance and
Innovation Act (TIFIA)
X
Local
Tax-Exempt Borrowing
(i.e. municipal bonds)
X X
Tax Increment Finance (TIF) X X
Transit Oriented Development (TOD) X
Next Steps
► Present findings to:
CMAP, RTA, CTA and PACE
► Advance project with state and federal representatives
► Identify state and federal
funding sources for Phase I, II, and III
► Identify local project financing
(TIF public/private partnership)
Thank You

More Related Content

What's hot

Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panels
knelischer
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
Toronto Public Consultation Unit
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
GardinerEast
 
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Toronto Public Consultation Unit
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Toronto Public Consultation Unit
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRT
Crosstown TO
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Fairfax County
 
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingRichmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Fairfax County
 
Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013
Fairfax County
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
CirculateSD
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
Milton Chamber of Commerce
 
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Fairfax County
 
Chain Bridge Road Walkway
Chain Bridge Road WalkwayChain Bridge Road Walkway
Chain Bridge Road Walkway
Fairfax County
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
Toronto Public Consultation Unit
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Fairfax County
 
Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...
Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...
Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...
Virtual ULI
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
VDOT Northern Virginia
 
BiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman WittmanBiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman Wittman
jazztothebone
 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
Toronto Public Consultation Unit
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Toronto Public Consultation Unit
 

What's hot (20)

Reimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panelsReimagining yonge_street__pic_3_display_panels
Reimagining yonge_street__pic_3_display_panels
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
Six Points Reconfiguration - Community Update June, 2013 (Poster Boards)
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
 
Public Open House - Finch West LRT
Public Open House - Finch West LRTPublic Open House - Finch West LRT
Public Open House - Finch West LRT
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
 
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information MeetingRichmond Highway Transit Center Feasibility Study: Public Information Meeting
Richmond Highway Transit Center Feasibility Study: Public Information Meeting
 
Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
 
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...
 
Chain Bridge Road Walkway
Chain Bridge Road WalkwayChain Bridge Road Walkway
Chain Bridge Road Walkway
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...
 
Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...
Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...
Bus Rapid Transit: The Next Opportunity for TO D (Jason Hellendrung) - ULI fa...
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
 
BiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman WittmanBiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman Wittman
 
Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)Oakwood Avenue Bump-outs (panels)
Oakwood Avenue Bump-outs (panels)
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 

Viewers also liked

Jovian Design - Permeable Surface Stormwater Management Feasibility Study
Jovian Design - Permeable Surface Stormwater Management Feasibility StudyJovian Design - Permeable Surface Stormwater Management Feasibility Study
Jovian Design - Permeable Surface Stormwater Management Feasibility Study
Aniruddha
 
Using Trees To Reduce Stormwater Runoff
Using Trees To Reduce Stormwater Runoff Using Trees To Reduce Stormwater Runoff
Using Trees To Reduce Stormwater Runoff
watershedprotection
 
Stormwater Filtering Design
Stormwater Filtering DesignStormwater Filtering Design
Stormwater Filtering Design
watershedprotection
 
Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study
Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility StudyKingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study
Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study
The Kingston Land Trust
 
green concrete
green concretegreen concrete
green concrete
kamaruddin vn
 
BEB801 - Oral Presentation
BEB801 - Oral PresentationBEB801 - Oral Presentation
BEB801 - Oral Presentation
Mitch Stubbings
 
Unified Systems Engineering feasibility
Unified Systems Engineering feasibilityUnified Systems Engineering feasibility
Unified Systems Engineering feasibility
Eric Verhulst
 
Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)
Bryan Agustin Oculam
 
COMFAR Expert
COMFAR Expert COMFAR Expert
COMFAR Expert
Ashkan Karbalaeifar
 

Viewers also liked (9)

Jovian Design - Permeable Surface Stormwater Management Feasibility Study
Jovian Design - Permeable Surface Stormwater Management Feasibility StudyJovian Design - Permeable Surface Stormwater Management Feasibility Study
Jovian Design - Permeable Surface Stormwater Management Feasibility Study
 
Using Trees To Reduce Stormwater Runoff
Using Trees To Reduce Stormwater Runoff Using Trees To Reduce Stormwater Runoff
Using Trees To Reduce Stormwater Runoff
 
Stormwater Filtering Design
Stormwater Filtering DesignStormwater Filtering Design
Stormwater Filtering Design
 
Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study
Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility StudyKingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study
Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study
 
green concrete
green concretegreen concrete
green concrete
 
BEB801 - Oral Presentation
BEB801 - Oral PresentationBEB801 - Oral Presentation
BEB801 - Oral Presentation
 
Unified Systems Engineering feasibility
Unified Systems Engineering feasibilityUnified Systems Engineering feasibility
Unified Systems Engineering feasibility
 
Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)Feasibility Study (Veggie Bread)
Feasibility Study (Veggie Bread)
 
COMFAR Expert
COMFAR Expert COMFAR Expert
COMFAR Expert
 

Similar to 02 cta yellow line station evanston cc 04.16.12

Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
Toronto Public Consultation Unit
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
Toronto Public Consultation Unit
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
Toronto Public Consultation Unit
 
Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County Trail
Fairfax County
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing package
WaterfrontTO
 
Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
Toronto Public Consultation Unit
 
West Ox Road Walkway
West Ox Road WalkwayWest Ox Road Walkway
West Ox Road Walkway
Fairfax County
 
Workhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadWorkhouse Arts Foundation Access Road
Workhouse Arts Foundation Access Road
Fairfax County
 
Center Road sidewalk
Center Road sidewalkCenter Road sidewalk
Center Road sidewalk
Fairfax County
 
Imagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaImagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North Carolina
RPO America
 
Summit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilSummit Parkline Presentation to City Council
Summit Parkline Presentation to City Council
Gabriela Kappes
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
Paul Schumann
 
Charlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program Proposal
Charlotte Chamber
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
Rail~Volution
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Fairfax County
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
OxfordshireCC
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
Florida Public Works Expo - 2016 - Tampa, Florida
 
Oakland County Abuses Federal Stimulus Money
Oakland County Abuses Federal Stimulus MoneyOakland County Abuses Federal Stimulus Money
Oakland County Abuses Federal Stimulus Money
burns4cc
 
Lost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and SafetyLost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and Safety
Paul Schumann
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
Crosstown TO
 

Similar to 02 cta yellow line station evanston cc 04.16.12 (20)

Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
 
Workhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County TrailWorkhouse Arts Foundation Cross-County Trail
Workhouse Arts Foundation Cross-County Trail
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing package
 
Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
 
West Ox Road Walkway
West Ox Road WalkwayWest Ox Road Walkway
West Ox Road Walkway
 
Workhouse Arts Foundation Access Road
Workhouse Arts Foundation Access RoadWorkhouse Arts Foundation Access Road
Workhouse Arts Foundation Access Road
 
Center Road sidewalk
Center Road sidewalkCenter Road sidewalk
Center Road sidewalk
 
Imagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaImagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North Carolina
 
Summit Parkline Presentation to City Council
Summit Parkline Presentation to City CouncilSummit Parkline Presentation to City Council
Summit Parkline Presentation to City Council
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
Charlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program Proposal
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 
Oakland County Abuses Federal Stimulus Money
Oakland County Abuses Federal Stimulus MoneyOakland County Abuses Federal Stimulus Money
Oakland County Abuses Federal Stimulus Money
 
Lost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and SafetyLost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and Safety
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 

More from cityofevanston

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020
cityofevanston
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015
cityofevanston
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentation
cityofevanston
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summit
cityofevanston
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentation
cityofevanston
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014
cityofevanston
 
Hs cagngfrndlyupdte
Hs cagngfrndlyupdteHs cagngfrndlyupdte
Hs cagngfrndlyupdte
cityofevanston
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentation
cityofevanston
 
Penny Park Renovations
Penny Park RenovationsPenny Park Renovations
Penny Park Renovations
cityofevanston
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
cityofevanston
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Review
cityofevanston
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Review
cityofevanston
 
A5 Chicago Ave Project Plan
A5 Chicago Ave Project PlanA5 Chicago Ave Project Plan
A5 Chicago Ave Project Plan
cityofevanston
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Development
cityofevanston
 
Sheridan Road City Council Presentation
Sheridan Road City Council PresentationSheridan Road City Council Presentation
Sheridan Road City Council Presentation
cityofevanston
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentation
cityofevanston
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitors
cityofevanston
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012
cityofevanston
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10
cityofevanston
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-town
cityofevanston
 

More from cityofevanston (20)

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentation
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summit
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentation
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014
 
Hs cagngfrndlyupdte
Hs cagngfrndlyupdteHs cagngfrndlyupdte
Hs cagngfrndlyupdte
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentation
 
Penny Park Renovations
Penny Park RenovationsPenny Park Renovations
Penny Park Renovations
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Review
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Review
 
A5 Chicago Ave Project Plan
A5 Chicago Ave Project PlanA5 Chicago Ave Project Plan
A5 Chicago Ave Project Plan
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Development
 
Sheridan Road City Council Presentation
Sheridan Road City Council PresentationSheridan Road City Council Presentation
Sheridan Road City Council Presentation
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentation
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitors
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-town
 

Recently uploaded

原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
yemqpj
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
Partito democratico
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
Abiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality UpdatesAbiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality Updates
Texas Alliance of Groundwater Districts
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Christina Parmionova
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
narinav14
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
Christina Parmionova
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
uu1psyf6
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
Cori Faklaris
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
fundraising4
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
Marked12
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
Christina Parmionova
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
9d5c8i83
 

Recently uploaded (20)

原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
原版制作(DPU毕业证书)德保罗大学毕业证Offer一模一样
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
Abiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality UpdatesAbiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality Updates
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
 
Antyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemesAntyodaya saral portal haryana govt schemes
Antyodaya saral portal haryana govt schemes
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.World Food Safety Day 2024- Communication-toolkit.
World Food Safety Day 2024- Communication-toolkit.
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
 
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your WillMilton Keynes Hospital Charity - A guide to leaving a gift in your Will
Milton Keynes Hospital Charity - A guide to leaving a gift in your Will
 
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptxPUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
PUBLIC FINANCIAL MANAGEMENT SYSTEM (PFMS) and DBT.pptx
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
 
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
在线办理美国乔治华盛顿大学毕业证(gwu毕业证书)学历学位证书原版一模一样
 

02 cta yellow line station evanston cc 04.16.12

  • 1. EVANSTON YELLOW LINE STATION ENGINEERING FEASIBILITY STUDY City Council Meeting April 16, 2012
  • 2. Project Overview CTA Yellow Line (Skokie Swift) ► Line opened March 1925 as Niles Center Branch ► Line closed March 27, 1948* ► Skokie Swift began operation in April 1964 ► Change to CTA Yellow Line in February 1993 Only the CTA Niles Center Local trains stopped running in 1948. North Shore Line (NSL) interurban trains (to Waukegan, Mundelein and Milwaukee) continued to run until late January 1963, when that service was abandoned (without replacement). After about 1950-51, CTA consolidated all rapid transit heavy maintenance work at Skokie Shops (approximately Oakton and Hamlin), so CTA non-revenue trains operating to/from the shop also ran on the section of line between Howard Street and Hamlin Avenue in this timeframe. Note:
  • 3. Feasibility Study Purpose ► Market Demand Study completed 2007 ► Parsons Brinckerhoff selected in 2010 ► Understand physical design and construction issues ► Recommend a preferred location at Ridge, Asbury or Dodge ► Project budget of $275,000 ► $220,000 in Congestion Mitigation and Air Quality (CMAQ) funding ► $55,000 in City funds
  • 4. Technical and Advisory Committee ►Technical Advisory Committee  CMAP , CTA, RTA and PACE ►Advisory Committee  Alderman  CityStaff  Saint Francis Hospital  Residents
  • 5. Advisory Committee Members ► Alderman Ann Rainey, Alderman, 8th Ward ► Alderman Melissa Wynne, Alderman, 3rd Ward (Chairman, Transportation & Parking Committee) ► Linda O'Dwyer, Director of Marketing and Public Relations, Saint Francis Hospital ► Ben Schapiro, Resident ► Tom Kepler, Resident ► Suzette Robinson, Director of Public Works ► Steve Griffin, Director of Community and Economic Development ► Matt Swentkofske, Intergovernmental Affairs Coordinator ► City Staff  Rajeev Dahal, Senior Traffic Engineer  Paul Schneider, City Engineer  Susan Guderley, Neighborhood Planner
  • 6. Public Involvement Process  Public Meeting #1, Evanston Levy Center – June 2, 2011 • Introduce project, website and online survey #1  Public Meeting #2, Saint Francis Hospital - September 15, 2011 • Concept plans, preliminary evaluation and online survey #2 • Ridge removed from further analysis • Asbury and Dodge recommended for detailed evaluation  Public Meeting #3, Evanston Levy Center - January 24, 2012 • Asbury recommended as preferred location
  • 7. Online Survey #1 Respondents 95% from Evanston Dodge and Oakton had 55 responses
  • 8. Online Survey #1 Responses ► Would Use a NewStop on the YellowLine:  Ridge 90  Asbury 137  Dodge 228 73% of the 454 survey responses indicated a station location preference at one or more location
  • 9. Online Survey #2 Respondents 85% from Evanston Dodge and Oakton had 66 responses 426 Responses
  • 10. Online Survey #2 Responses ► Which Station Location Do You Prefer:  Asbury 126  Dodge 249 12% (51) of the 426 survey responses indicated a station location preference at both Asbury and Dodge
  • 11. Study Area Dodge 1.5 Miles from Howard Station Dodge 1.5 Miles from Howard Station Asbury 1.0 Miles from Howard Station Asbury 1.0 Miles from Howard Station Ridge 0.7 Miles from Howard Station Study AreaStudy Area Oakton Historic District Oakton Historic District Saint Francis Hospital Saint Francis Hospital James Park and Levy Center James Park and Levy Center Home DepotHome Depot Target Dawes, Chute and Oakton School Dawes, Chute and Oakton School Removed from consideration at PM #2
  • 12. Project Goals ► Local Access and Mobility  Provide improved local access to the Yellow Line ► Community and Economic Development  Revitalize Howard Street commercial area  Increase access to local and regional employment ► Regional and Local Transit System Performance  CTA and Pace Bus, CTA Howard Red and Purple Lines ► Neighborhood Cohesion  Maintain and improve quality of life in Evanston
  • 13. Ridge Station Evaluation Findings ► Local Access and Mobility  Bicycle route/lane on Ridge is not feasible due to narrow road lanes  Traffic, operational and safety impacts on Ridge ► Community and Economic Development  Land use along Ridge is established and developed ► Regional and Local Transit System Performance  CTA Howard and South stations arewithin walking distance ► Neighborhood Cohesion  Located within theOakton Historic District Ridge location removed from further consideration at PM #2 on 9/15/11 Oakton Historic District Saint Francis Hospital Oakton School Historic Building CTA #97 and Pace #215 CTA #201 and #206
  • 14. Asbury Avenue • CTA #97 and #206 - most riders at Howard/Asbury –Western, according to CTA October 2010 data • Pop. ¼ mile 2,348 • Pop. ½ mile 11,435 Chute School Oakton HD Oakton School Historic Building CTA #97 and Pace #215 CTA #206 Howard /Western Shopping Area
  • 15. Asbury Avenue Station Plan Side platform configuration Ramp access also considered No property acquisition required
  • 18. Dodge Avenue • Dawes Elementary School and James Park are within proposed station catchment area • Max Load Point in study area (in both directions ) for CTA #93 bus is at Dodge/Howard (October 2010 data) • Pop. ¼ mile 1,593 • Pop. ½ mile 6,600 Dawes School Home Depot Target Chute School James Park and Levy Center CTA #97 and Pace #215 CTA #97 and Pace #215 CTA #93, and #97 CTA #206 north of Oakton
  • 19. Dodge Avenue Station Plan Center platform configuration No property acquisition required
  • 21. Detailed Evaluation  Physical Constraints • CTA and Road Right-of-Way Requirements • Bridge Structure Impacts  Public Support • Public Meeting Comments • Public Survey Comments  Social/Economic Factors • Land Use • Population and Employment • Economic Impact  Environmental Factors • Noise, Visual, Natural and Cultural Resources  Transportation Factors • Transit Connectivity and Traffic  Capital Cost  Operating & Maintenance Cost  Ridership Potential
  • 22. ► Asbury Station  Station house can be accommodated west of the Asbury Bridge  Station platform located below street grade  Visual and noise impacts mitigated by trench ► Dodge Station  Elevated station – high level of visual and noise impacts  Requires replacement of existing 85 year old bridge to meet CTA requirements  Requires realignment of CTA tracks  Requires new retaining wall structures Screen 3 Asbury and Dodge Physical Constraints
  • 25. Asbury Recommendation Findings ► Local Access and Mobility  Over 11,000 population within ½ - mile walking distance  Increased ridership potential  Accessible by sidewalk network and bike routes ► Community and Economic Development  High redevelopment potential between Asbury and Howard  Tax Increment Finance District could support station development  Saint Francis Hospital within ½ - mile walking distance  Evanston Levy Center within ½ - mile walking distance
  • 26. Asbury Recommendation Findings ► Regional and Local Transit  Distance from Howard is 1 - mile and typical of CTA station spacing  Bus connections to CTA #97, #206 and Pace #215 ► Neighborhood Cohesion  Visual and noise impacts mitigated with station platform located in CTA trench  Neighborhood station with no commuter parking
  • 27. Asbury Station Estimated Capital Cost $23 M Estimated 2010 840 boardings per day Annual Ridership 263,000
  • 28. 2010 Estimated Asbury Cost ► Phase I - Preliminary Engineering / Environmental Study  1 to 2 years  Approx. $1 Million to $1.6 Million ► Phase II - Design  1 to 2 years  Approx. $.6 Million ► Phase III - Construction  1.5 to 2 years Estimated construction cost $23 Million
  • 29. Skokie Oakton Station ► Feasibility study completed in 2003 ► Opens May 2012 ► $20 + million to construct  Village of Skokie funding $6 + million  Federalfunds $14 million  Adjacent Illinois Science + Technology Park ► CTA estimates 1,200 boarding‘s per day
  • 30. Potential Funding by Project Phase Source Phase I Phase II Phase III Revenue Sources Federal Flexible Highway Funds (STP, CMAQ) X X X Urbanized Area Formula Funds (Section 5307) X X X New Starts and Small Starts X X Bus and Bus Facilities X FHWA Transportation and Community and System Preservation Program (TCSP) X X X TIGER X Local Naming rights X Private sector contribution X X Project Financing Federal Bonds (GANs, PABs, & BABs) X Transportation Infrastructure Finance and Innovation Act (TIFIA) X Local Tax-Exempt Borrowing (i.e. municipal bonds) X X Tax Increment Finance (TIF) X X Transit Oriented Development (TOD) X
  • 31. Next Steps ► Present findings to: CMAP, RTA, CTA and PACE ► Advance project with state and federal representatives ► Identify state and federal funding sources for Phase I, II, and III ► Identify local project financing (TIF public/private partnership)

Editor's Notes

  1. Evanston welcomes and introduces project
  2. ART
  3. Tom
  4. ART
  5. Factors considered in the recommendation to remove the Ridge Station Include the close proximity to the CTA Howard and South Blvd. Station (within 1/2 mile), impacts to the Oakton Historic District, lack of a feasible bike route/lane on Ridge and other factors that would result in accessibility and traffic impacts for the Ridge station.
  6. ART
  7. Dawes Elementary School and James Park are within proposed station catchment area Max Load Point in study area (in both directions ) for CTA 93 bus is at Dodge/Howard (October 2010 data) Pop. ¼ mile 1,593 Pop. ½ mile 6,600
  8. Factors considered in the recommendation to remove the Ridge Station Include the close proximity to the CTA Howard and South Blvd. Station (within 1/2 mile), impacts to the Oakton Historic District, lack of a feasible bike route/lane on Ridge and other factors that would result in accessibility and traffic impacts for the Ridge station.
  9. Factors considered in the recommendation to remove the Ridge Station include the close proximity to the CTA Howard and South Blvd. Station (within 1/2 mile), impacts to the Oakton Historic District, lack of a feasible bike route/lane on Ridge and other factors that would result in accessibility and traffic impacts for the Ridge station.
  10. Factors considered in the recommendation to remove the Ridge Station include the close proximity to the CTA Howard and South Blvd. Station (within 1/2 mile), impacts to the Oakton Historic District, lack of a feasible bike route/lane on Ridge and other factors that would result in accessibility and traffic impacts for the Ridge station.
  11. Factors considered in the recommendation to remove the Ridge Station Include the close proximity to the CTA Howard and South Blvd. Station (within 1/2 mile), impacts to the Oakton Historic District, lack of a feasible bike route/lane on Ridge and other factors that would result in accessibility and traffic impacts for the Ridge station.
  12. Factors considered in the recommendation to remove the Ridge Station Include the close proximity to the CTA Howard and South Blvd. Station (within 1/2 mile), impacts to the Oakton Historic District, lack of a feasible bike route/lane on Ridge and other factors that would result in accessibility and traffic impacts for the Ridge station.
  13. Your interest and input is critical to the success of this project, all comments received will be considered in the study. Following today’s Public Meeting, the study team will seek to finalize the station conceptual plans, and begin the process of refining, evaluating and narrowing down the range of options. This analysis will include the technical evaluation of each station option, followed by ridership analysis, capital cost and operations and maintenance cost. station evaluation will consider: Performance in meeting evaluation criteria; And Stakeholder input.   We expect to hold a third Public Meeting near the end of the station options evaluation step to inform you of the results of the analysis and ask for your comments.
  14. Evanston