Difficult Run Tributary at Oakton Estates
(DF9045)
Contract No. CN14125123
Project No. SD-000031-102
Task Order No. 25
Sully District
June 26, 2015
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Project Details
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
The purpose of this project is to restore the eroded stream channel to a stable condition, to provide water
quality benefits as well as channel protection. This project was substantially completed within budget on June
26, 2015.
Project Overview:
• Channel improvement and stream bank stabilization of approximately 300 linear feet of an unnamed
Difficult Run tributary.
• Raising of the stream bed elevation to connect to a graded bankfull bench.
• Installation of an imbricated boulder toe and three (3) in-stream rock structures.
• Installation of root wads and log sill structures.
• Planting of native trees, shrubs, and grasses to promote the natural reforestation of the project site and
enhance habitat.
• Annual water quality benefits obtained include removal of 19 pounds of total phosphorus, 121 pounds of
total nitrogen, and 3 tons of sediment.
Project Team:
• Emma Gutzler – Stormwater Planning Department
• Suzanne Foster– Stormwater Planning Department
• Chris Triolo– Utilities Design & Construction Division
• Kenny Giles– Utilities Design & Construction Division
• Yudhie Brownson – Utilities Design & Construction Division
• Nicholas Drunasky – Urban Forest Management
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Difficult Run Tributary Project Site– Tax Map No. 46-2
Difficult Run Tributary-
Approximate Project Limits
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Existing Stream Condition Pre-Construction
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Existing Site Condition Pre-Construction
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Construction
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Post Construction
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Post Construction
Before After
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Difficult Run Tributary at Oakton Estates
Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
Irene Haske, Public Information Officer
703-324-5821, TTY 711
SWPDmail@fairfaxcounty.gov

Difficult Run Tributary at Oakton Estates

  • 1.
    A Fairfax County,VA, publication Department of Public Works and Environmental Services Working for You! Difficult Run Tributary at Oakton Estates (DF9045) Contract No. CN14125123 Project No. SD-000031-102 Task Order No. 25 Sully District June 26, 2015
  • 2.
    Difficult Run Tributaryat Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
  • 3.
    Project Details Difficult RunTributary at Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch The purpose of this project is to restore the eroded stream channel to a stable condition, to provide water quality benefits as well as channel protection. This project was substantially completed within budget on June 26, 2015. Project Overview: • Channel improvement and stream bank stabilization of approximately 300 linear feet of an unnamed Difficult Run tributary. • Raising of the stream bed elevation to connect to a graded bankfull bench. • Installation of an imbricated boulder toe and three (3) in-stream rock structures. • Installation of root wads and log sill structures. • Planting of native trees, shrubs, and grasses to promote the natural reforestation of the project site and enhance habitat. • Annual water quality benefits obtained include removal of 19 pounds of total phosphorus, 121 pounds of total nitrogen, and 3 tons of sediment. Project Team: • Emma Gutzler – Stormwater Planning Department • Suzanne Foster– Stormwater Planning Department • Chris Triolo– Utilities Design & Construction Division • Kenny Giles– Utilities Design & Construction Division • Yudhie Brownson – Utilities Design & Construction Division • Nicholas Drunasky – Urban Forest Management
  • 4.
    Difficult Run Tributaryat Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Difficult Run Tributary Project Site– Tax Map No. 46-2 Difficult Run Tributary- Approximate Project Limits
  • 5.
    Difficult Run Tributaryat Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Existing Stream Condition Pre-Construction
  • 6.
    Difficult Run Tributaryat Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Existing Site Condition Pre-Construction
  • 7.
    Difficult Run Tributaryat Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Construction
  • 8.
    Difficult Run Tributaryat Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Post Construction
  • 9.
    Difficult Run Tributaryat Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Post Construction
  • 10.
    Before After Difficult RunTributary at Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch
  • 11.
    Additional Information For additionalInformation, please call www.fairfaxcounty.gov/dpwes Difficult Run Tributary at Oakton Estates Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch Irene Haske, Public Information Officer 703-324-5821, TTY 711 SWPDmail@fairfaxcounty.gov