Lexington Road Corridor Transportation Plan 
Public Meeting #2 
November 11, 2014 
Welcome!! 
And Thank You for Coming Out.
Lexington Road Corridor Transportation Plan
• Clifton 
•Highlands 
• NuLu 
• Cherokee 
Park 
• Butchertown 
• Phoenix Hill 
Lexington Road Corridor Transportation Plan
Lexington Road Corridor Transportation Plan 
Purpose of the Study 
1. Assess the current safety and access issues 
for residents, business and all users – 
drivers, pedestrians, bicyclists, and transit. 
2. Identify Potential Improvements. 
3. Develop a Master Plan.
Lexington Road Corridor Transportation Plan 
Vision Statement 
To develop a multi-modal, complete street, 
neighborhood friendly road that is safe and 
efficient for all users.
Lexington Road Corridor Transportation Plan 
Study Approach – Involvement 
1. Louisville Metro Lead 
2. Internal Stakeholders – TARC, Parks, Public 
Works, Planning, EMS, Utilities, KYTC 
3. External Stakeholders—Businesses, 
Residents, Public
Lexington Road Corridor Transportation Plan 
Study Approach—Steps 
1. Assess Existing Conditions 
1. Talk with Businesses 
2. Conduct a Safety Audit 
3. Collect Traffic, Bike, and Ped Volumes, and Transit Ridership 
4. Review Crash Data 
5. Approved Developments 
2. Identify Broad Range of Design Options – November 
3. Present Recommended Concepts – December 
4. Present Final Plan – January 
5. Submit Draft and Final Report – February
• Goal 1: Create an efficient transportation 
system serving the corridor that balances 
regional and local transportation needs. 
• Goal 2: Improve safety for all users. 
• Goal 3: Provide a range of convenient 
transportation options. 
• Goal 4: Enhance the quality of life along 
the corridor.
Lexington Road Corridor Transportation Plan 
Lexington Road Complete Streets Elements 
Lane Redesign 
Bike Lanes vs. Cycle Tracks 
Sidewalks and Pedestrian Crossings 
Transit Stations 
Intersection Redesign 
Streetscapes 
Green Infrastructure / Drainage Issues 
Access to Beargrass Creek Trail 
Wayfinding Signage
Bike Lanes vs. 2-Way Cycle Track 
What is a Cycle Track: 
• Physically Separated 
• Allows for Both Directions, but on One Side of Road 
• Can be Raised or Even with Road 
• Protected Space = Perceived Comfort and Safety 
• More Attractive for a Wide Range of Bicyclists at all 
Levels and Ages
Lexington Road Corridor Transportation Plan 
Bike Lane
Lexington Road Corridor Transportation Plan 
Bike Lane
Lexington Road Corridor Transportation Plan 
Cycle Track
Lexington Road Corridor Transportation Plan 
Cycle Track
Lexington Road Corridor Transportation Plan 
Cycle Track
Lexington Road Corridor Transportation Plan 
Cycle Track 
- Better Bike Access 
to Clifton and 
Beargrass Creek 
Trail 
- Driveway 
Challenges 
- Special Signals and 
Signs 
- Buffered where 
possible
Lexington Road Corridor Transportation Plan
Lexington Road Corridor Transportation Plan 
1200 and 1300 Block 
ASSUMED: 
Permanent Parking 
on both Sides, N 
then S 
Two, 10-ft travel 
lanes 
No Center Turn 
OPTIONS: 
Bike Lanes: 2 
Traditional 5-ft Bike 
Lanes 
Cycle Track: 1, 10- 
Cycle Track on North 
Side
Lexington Road Corridor Transportation Plan 
1200 Block 
Bike Lanes 
Cycle Track
Lexington Road Corridor Transportation Plan 
1300 Block 
Bike Lanes 
Cycle Track
Lexington Road Corridor Transportation Plan 
Cycle Track
Lexington Road Corridor Transportation Plan 
Bike Lanes
Lexington Road Corridor Transportation Plan 
Lexington / Cooper / Liberty / Baxter
Lexington Road Corridor Transportation Plan 
Lexington / Cooper / Liberty / Baxter 
– Lexington at Cooper 
– Liberty under the Viaduct 
– Liberty to Chestnut 
– Baxter to Chestnut 
– Lexington at Baxter
Lexington Road Corridor Transportation Plan 
Lexington / Cooper / Liberty
Lexington Road Corridor Transportation Plan 
Lexington / Cooper / Liberty 
Cycle Track
Lexington Road Corridor Transportation Plan 
Lexington / Cooper / Liberty 
Bike Lanes
Lexington Road Corridor Transportation Plan 
Liberty to Chestnut
Lexington Road Corridor Transportation Plan 
Lexington: Between 1300 and Payne St.
Lexington Road Corridor Transportation Plan 
Lexington: Between 1300 and Payne St. 
No On-Street Parking 
No Bike Lanes 
No Left-Turn Lane
Lexington Road Corridor Transportation Plan 
Lexington: Between 1300 and Payne St. 
No On-Street Parking 
Uses Axis’s “Verge” = Cycle Track 
or Bike Lanes
Lexington Road Corridor Transportation Plan 
Lexington @ Payne
Lexington Road Corridor Transportation Plan 
Lexington @ Payne 
• Provide Left-Turn North to 
Clifton and re-time Signals 
• Reduce Crosswalk 
Distances 
• Tighten Radii 
• Sidewalk Replacement / 
Extension 
•Match Lane Design East 
and West
Lexington Road Corridor Transportation Plan 
Between Payne and Spring Street
Lexington Road Corridor Transportation Plan 
Between Payne and Spring Street 
Bike Lanes 
Cycle Track
Lexington Road Corridor Transportation Plan 
Cave Hill Wall
Lexington Road Corridor Transportation Plan 
Cave Hill Wall 
• Sidewalk on 
North side 
Bike Lanes 
• Buffer 
between 
Opposing 
Traffic 
• One lane in 
Each 
Direction 
• Cycle Track, 
or Bike Lanes Cycle Track
Lexington Road Corridor Transportation Plan 
GSA to Etley Drive
Lexington Road Corridor Transportation Plan 
GSA to Etley Drive 
• Sidewalk on 
North side 
• EB LTL and EB 
Thru Lane 
• Cycle Track, 
or Bike Lanes 
• Access to 
Beargrass 
Creek Trail 
Bike Lanes 
Cycle Track
Lexington Road Corridor Transportation Plan 
Etley to Beargrass Ave. Grinstead
Lexington Road Corridor Transportation Plan 
Etley to Beargrass Ave. Grinstead 
• Drop Bike 
Lanes at 
Eaton, and 
New Link to 
Beargrass 
Creek Trail 
•Make No 
Changes East 
– OR – 
• Carry 
Changes East 
of Grinstead 
• Drop WB 
Lane, Carry 
Cycle Track 
on Lexington 
Bike Lanes 
Cycle Track
Lexington Road Corridor Transportation Plan 
Etley to Beargrass Ave. Grinstead 
• Drop Bike 
Lanes at 
Eaton, and 
New Link to 
Beargrass 
Creek Trail 
•Make No 
Changes East 
– OR – 
• Carry 
Changes East 
of Grinstead 
• Drop WB 
Lane, Carry 
Cycle Track 
on Lexington 
Bike Lanes
Lexington Road Corridor Transportation Plan 
Etley to Beargrass Ave. Grinstead 
• Drop Bike 
Lanes at 
Eaton, and 
New Link to 
Beargrass 
Creek Trail 
•Make No 
Changes East 
– OR – 
• Carry 
Changes East 
of Grinstead 
• Drop WB 
Lane, Carry 
Cycle Track 
on Lexington 
Cycle Track
Lexington Road Corridor Transportation Plan 
Public Meeting #2 
November 11, 2014 
Thank You for Coming Out.

More Related Content

What's hot

Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16 Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16
omedina91
 
Dranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT RepavingDranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT Repaving
Fairfax County
 
Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16
omedina91
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
Toronto Public Consultation Unit
 
Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17
CirculateSD
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
CirculateSD
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24
CirculateSD
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Fairfax County
 
Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project Examples
SteveSindiong
 
Innovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, GeorgiaInnovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, Georgia
Sharon Roerty
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
CirculateSD
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
Qingxiao Lin
 
De witt final_report_180213
De witt final_report_180213De witt final_report_180213
De witt final_report_180213
StephanieGuereschi
 
Balboa Station Plan Alternatives
Balboa Station Plan AlternativesBalboa Station Plan Alternatives
Balboa Station Plan Alternatives
CirculateSD
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Fairfax County
 
Bridging History
Bridging HistoryBridging History
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)
novacsi
 
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
City of College Station
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
Fairfax County
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design Review
Crosstown TO
 

What's hot (20)

Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16 Clairemont ad hoc subcommittee presentation 11/2/16
Clairemont ad hoc subcommittee presentation 11/2/16
 
Dranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT RepavingDranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT Repaving
 
Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16Pacific Beach ad hoc subcommittee presentation 11/3/16
Pacific Beach ad hoc subcommittee presentation 11/3/16
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Pb Community Planning Group May 24
Pb Community Planning Group May 24Pb Community Planning Group May 24
Pb Community Planning Group May 24
 
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-RampReston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
Reston Parkway at Dulles Toll Road Westbound On-Ramp and Eastbound Off-Ramp
 
Sindiong Project Examples
Sindiong Project ExamplesSindiong Project Examples
Sindiong Project Examples
 
Innovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, GeorgiaInnovative Bicycle Facilities for Roswell, Georgia
Innovative Bicycle Facilities for Roswell, Georgia
 
Balboa Avenue Station Presentation
Balboa Avenue Station PresentationBalboa Avenue Station Presentation
Balboa Avenue Station Presentation
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
De witt final_report_180213
De witt final_report_180213De witt final_report_180213
De witt final_report_180213
 
Balboa Station Plan Alternatives
Balboa Station Plan AlternativesBalboa Station Plan Alternatives
Balboa Station Plan Alternatives
 
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
Pedestrian Improvements at Highland Street, Backlick Road, Amherst Ave. Inter...
 
Bridging History
Bridging HistoryBridging History
Bridging History
 
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)
 
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design Review
 

Viewers also liked

Ken's holiday
Ken's holidayKen's holiday
Ken's holiday
Ken Leonita
 
ITK CRM Experience
ITK CRM ExperienceITK CRM Experience
ITK CRM Experience
ITK Consulting
 
Ken's english test
Ken's english testKen's english test
Ken's english test
Ken Leonita
 
Reasons to Upgrade to Microsoft Dynamics CRM 2015
Reasons to Upgrade to Microsoft Dynamics CRM 2015Reasons to Upgrade to Microsoft Dynamics CRM 2015
Reasons to Upgrade to Microsoft Dynamics CRM 2015
ITK Consulting
 
Controversias en resecciones de metástasis colorectales, Colorectal liver me...
Controversias en resecciones de metástasis colorectales, Colorectal liver me...Controversias en resecciones de metástasis colorectales, Colorectal liver me...
Controversias en resecciones de metástasis colorectales, Colorectal liver me...
Carlos Florez
 
개발자를 위한 디자인 팁
개발자를 위한 디자인 팁개발자를 위한 디자인 팁
개발자를 위한 디자인 팁
Hyun myung Park
 
Eksplorasi emas
Eksplorasi emasEksplorasi emas
Eksplorasi emas
Beatriks Nasa
 

Viewers also liked (7)

Ken's holiday
Ken's holidayKen's holiday
Ken's holiday
 
ITK CRM Experience
ITK CRM ExperienceITK CRM Experience
ITK CRM Experience
 
Ken's english test
Ken's english testKen's english test
Ken's english test
 
Reasons to Upgrade to Microsoft Dynamics CRM 2015
Reasons to Upgrade to Microsoft Dynamics CRM 2015Reasons to Upgrade to Microsoft Dynamics CRM 2015
Reasons to Upgrade to Microsoft Dynamics CRM 2015
 
Controversias en resecciones de metástasis colorectales, Colorectal liver me...
Controversias en resecciones de metástasis colorectales, Colorectal liver me...Controversias en resecciones de metástasis colorectales, Colorectal liver me...
Controversias en resecciones de metástasis colorectales, Colorectal liver me...
 
개발자를 위한 디자인 팁
개발자를 위한 디자인 팁개발자를 위한 디자인 팁
개발자를 위한 디자인 팁
 
Eksplorasi emas
Eksplorasi emasEksplorasi emas
Eksplorasi emas
 

Similar to Public Meeting #2 Presentation - November 11, 2014

CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panels
Crowdbrite
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
cityofevanston
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Fairfax County
 
Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
NLandUSA
 
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
BTAOregon
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
njbikeped
 
New NY Bridge Project
New NY Bridge ProjectNew NY Bridge Project
New NY Bridge Project
NY_Bicycling
 
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
Toronto Public Consultation Unit
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
West Central Association
 
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeNorth East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
Greenlivingpedia
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
Crosstown TO
 
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan GallagherRV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
Rail~Volution
 
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
Fairfax County
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
Toronto Public Consultation Unit
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
Toronto Public Consultation Unit
 
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Fairfax County
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon DistrictProposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Fairfax County
 
Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2
Trailnet
 
Portland Sdat
Portland SdatPortland Sdat
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
GardinerEast
 

Similar to Public Meeting #2 Presentation - November 11, 2014 (20)

CPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panelsCPR Yards Crossing Study - open house panels
CPR Yards Crossing Study - open house panels
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
 
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
ATS-16: Protected Bike Lanes: Lessons Learned in Planning and Implementation,...
 
Complete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric SnyderComplete Streets Sussex - Eric Snyder
Complete Streets Sussex - Eric Snyder
 
New NY Bridge Project
New NY Bridge ProjectNew NY Bridge Project
New NY Bridge Project
 
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
St. Clair Avenue West - Rail Crossing Study (Dec. 2014)
 
Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014Fulton Market Streetscape Public Meeting 12/10/2014
Fulton Market Streetscape Public Meeting 12/10/2014
 
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra ParadeNorth East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
North East Bicycle Corridor linking Chandle Hiqhway and Alexandra Parade
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan GallagherRV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
RV 2014: Can We Get There from Here? First and Last Miles by Dan Gallagher
 
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
2017 VDOT Repaving and Restriping-Springfield, VA: Bicycle, Pedestrian, and T...
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
 
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon DistrictProposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District
 
Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2Innovations Within Our Means, Presentation 2
Innovations Within Our Means, Presentation 2
 
Portland Sdat
Portland SdatPortland Sdat
Portland Sdat
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 

Recently uploaded

RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
Cori Faklaris
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Christina Parmionova
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
ii2sh2v
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
Aggregage
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
yemqpj
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
JSchaus & Associates
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
JSchaus & Associates
 
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptxPAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS_Team
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
narinav14
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
ajatjamwal123
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
Bharat Mata
 
Abiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality UpdatesAbiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality Updates
Texas Alliance of Groundwater Districts
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
ahcitycouncil
 
Circular Economy implementation in the EU
Circular Economy implementation in the EUCircular Economy implementation in the EU
Circular Economy implementation in the EU
HasanHamdan9
 

Recently uploaded (20)

RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
 
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
原版制作(Hope毕业证书)利物浦霍普大学毕业证文凭证书一模一样
 
How To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity JourneyHow To Cultivate Community Affinity Throughout The Generosity Journey
How To Cultivate Community Affinity Throughout The Generosity Journey
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 422024: The FAR - Federal Acquisition Regulations, Part 42
2024: The FAR - Federal Acquisition Regulations, Part 42
 
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptxPAS PSDF Mop Up Workshop Presentation 2024 .pptx
PAS PSDF Mop Up Workshop Presentation 2024 .pptx
 
Indira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAYIndira awas yojana housing scheme renamed as PMAY
Indira awas yojana housing scheme renamed as PMAY
 
China Politics social economic political
China Politics social economic politicalChina Politics social economic political
China Politics social economic political
 
Bharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdfBharat Mata - History of Indian culture.pdf
Bharat Mata - History of Indian culture.pdf
 
Abiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality UpdatesAbiy Berehe - Texas Commission on Environmental Quality Updates
Abiy Berehe - Texas Commission on Environmental Quality Updates
 
PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)PPT Item # 4 - 434 College Blvd. (sign. review)
PPT Item # 4 - 434 College Blvd. (sign. review)
 
Circular Economy implementation in the EU
Circular Economy implementation in the EUCircular Economy implementation in the EU
Circular Economy implementation in the EU
 

Public Meeting #2 Presentation - November 11, 2014

  • 1. Lexington Road Corridor Transportation Plan Public Meeting #2 November 11, 2014 Welcome!! And Thank You for Coming Out.
  • 2. Lexington Road Corridor Transportation Plan
  • 3. • Clifton •Highlands • NuLu • Cherokee Park • Butchertown • Phoenix Hill Lexington Road Corridor Transportation Plan
  • 4. Lexington Road Corridor Transportation Plan Purpose of the Study 1. Assess the current safety and access issues for residents, business and all users – drivers, pedestrians, bicyclists, and transit. 2. Identify Potential Improvements. 3. Develop a Master Plan.
  • 5. Lexington Road Corridor Transportation Plan Vision Statement To develop a multi-modal, complete street, neighborhood friendly road that is safe and efficient for all users.
  • 6. Lexington Road Corridor Transportation Plan Study Approach – Involvement 1. Louisville Metro Lead 2. Internal Stakeholders – TARC, Parks, Public Works, Planning, EMS, Utilities, KYTC 3. External Stakeholders—Businesses, Residents, Public
  • 7. Lexington Road Corridor Transportation Plan Study Approach—Steps 1. Assess Existing Conditions 1. Talk with Businesses 2. Conduct a Safety Audit 3. Collect Traffic, Bike, and Ped Volumes, and Transit Ridership 4. Review Crash Data 5. Approved Developments 2. Identify Broad Range of Design Options – November 3. Present Recommended Concepts – December 4. Present Final Plan – January 5. Submit Draft and Final Report – February
  • 8. • Goal 1: Create an efficient transportation system serving the corridor that balances regional and local transportation needs. • Goal 2: Improve safety for all users. • Goal 3: Provide a range of convenient transportation options. • Goal 4: Enhance the quality of life along the corridor.
  • 9. Lexington Road Corridor Transportation Plan Lexington Road Complete Streets Elements Lane Redesign Bike Lanes vs. Cycle Tracks Sidewalks and Pedestrian Crossings Transit Stations Intersection Redesign Streetscapes Green Infrastructure / Drainage Issues Access to Beargrass Creek Trail Wayfinding Signage
  • 10. Bike Lanes vs. 2-Way Cycle Track What is a Cycle Track: • Physically Separated • Allows for Both Directions, but on One Side of Road • Can be Raised or Even with Road • Protected Space = Perceived Comfort and Safety • More Attractive for a Wide Range of Bicyclists at all Levels and Ages
  • 11. Lexington Road Corridor Transportation Plan Bike Lane
  • 12. Lexington Road Corridor Transportation Plan Bike Lane
  • 13. Lexington Road Corridor Transportation Plan Cycle Track
  • 14. Lexington Road Corridor Transportation Plan Cycle Track
  • 15. Lexington Road Corridor Transportation Plan Cycle Track
  • 16. Lexington Road Corridor Transportation Plan Cycle Track - Better Bike Access to Clifton and Beargrass Creek Trail - Driveway Challenges - Special Signals and Signs - Buffered where possible
  • 17. Lexington Road Corridor Transportation Plan
  • 18. Lexington Road Corridor Transportation Plan 1200 and 1300 Block ASSUMED: Permanent Parking on both Sides, N then S Two, 10-ft travel lanes No Center Turn OPTIONS: Bike Lanes: 2 Traditional 5-ft Bike Lanes Cycle Track: 1, 10- Cycle Track on North Side
  • 19. Lexington Road Corridor Transportation Plan 1200 Block Bike Lanes Cycle Track
  • 20. Lexington Road Corridor Transportation Plan 1300 Block Bike Lanes Cycle Track
  • 21. Lexington Road Corridor Transportation Plan Cycle Track
  • 22. Lexington Road Corridor Transportation Plan Bike Lanes
  • 23. Lexington Road Corridor Transportation Plan Lexington / Cooper / Liberty / Baxter
  • 24. Lexington Road Corridor Transportation Plan Lexington / Cooper / Liberty / Baxter – Lexington at Cooper – Liberty under the Viaduct – Liberty to Chestnut – Baxter to Chestnut – Lexington at Baxter
  • 25. Lexington Road Corridor Transportation Plan Lexington / Cooper / Liberty
  • 26. Lexington Road Corridor Transportation Plan Lexington / Cooper / Liberty Cycle Track
  • 27. Lexington Road Corridor Transportation Plan Lexington / Cooper / Liberty Bike Lanes
  • 28. Lexington Road Corridor Transportation Plan Liberty to Chestnut
  • 29. Lexington Road Corridor Transportation Plan Lexington: Between 1300 and Payne St.
  • 30. Lexington Road Corridor Transportation Plan Lexington: Between 1300 and Payne St. No On-Street Parking No Bike Lanes No Left-Turn Lane
  • 31. Lexington Road Corridor Transportation Plan Lexington: Between 1300 and Payne St. No On-Street Parking Uses Axis’s “Verge” = Cycle Track or Bike Lanes
  • 32. Lexington Road Corridor Transportation Plan Lexington @ Payne
  • 33. Lexington Road Corridor Transportation Plan Lexington @ Payne • Provide Left-Turn North to Clifton and re-time Signals • Reduce Crosswalk Distances • Tighten Radii • Sidewalk Replacement / Extension •Match Lane Design East and West
  • 34. Lexington Road Corridor Transportation Plan Between Payne and Spring Street
  • 35. Lexington Road Corridor Transportation Plan Between Payne and Spring Street Bike Lanes Cycle Track
  • 36. Lexington Road Corridor Transportation Plan Cave Hill Wall
  • 37. Lexington Road Corridor Transportation Plan Cave Hill Wall • Sidewalk on North side Bike Lanes • Buffer between Opposing Traffic • One lane in Each Direction • Cycle Track, or Bike Lanes Cycle Track
  • 38. Lexington Road Corridor Transportation Plan GSA to Etley Drive
  • 39. Lexington Road Corridor Transportation Plan GSA to Etley Drive • Sidewalk on North side • EB LTL and EB Thru Lane • Cycle Track, or Bike Lanes • Access to Beargrass Creek Trail Bike Lanes Cycle Track
  • 40. Lexington Road Corridor Transportation Plan Etley to Beargrass Ave. Grinstead
  • 41. Lexington Road Corridor Transportation Plan Etley to Beargrass Ave. Grinstead • Drop Bike Lanes at Eaton, and New Link to Beargrass Creek Trail •Make No Changes East – OR – • Carry Changes East of Grinstead • Drop WB Lane, Carry Cycle Track on Lexington Bike Lanes Cycle Track
  • 42. Lexington Road Corridor Transportation Plan Etley to Beargrass Ave. Grinstead • Drop Bike Lanes at Eaton, and New Link to Beargrass Creek Trail •Make No Changes East – OR – • Carry Changes East of Grinstead • Drop WB Lane, Carry Cycle Track on Lexington Bike Lanes
  • 43. Lexington Road Corridor Transportation Plan Etley to Beargrass Ave. Grinstead • Drop Bike Lanes at Eaton, and New Link to Beargrass Creek Trail •Make No Changes East – OR – • Carry Changes East of Grinstead • Drop WB Lane, Carry Cycle Track on Lexington Cycle Track
  • 44. Lexington Road Corridor Transportation Plan Public Meeting #2 November 11, 2014 Thank You for Coming Out.