RNA interference
Presented by:
C.SWORNA KUMARI
M.PHIL BIOTECHNOLOGY
Outlines
IntroductionIntroduction
RNA silencing
Definition of RNA interference
Discovery of RNAi
Mechanism of RNA interferenceMechanism of RNA interference
Applications of RNA interferenceApplications of RNA interference
Therapeutic applications
Other applications
RNA silencing
Several terms are used to described RNA silencing;
usually there are three phenotypically different but
mechanistically similar phenomena:
1. Cosuppression or post-trascriptional gene silencing
(PTGS) in plants
2. Quelling in fungi
3. RNA interference in animal kingdom
Definition
RNA interference (RNAi) is a mechanism that inhibits
gene expression at the stage of translation or by
hindering the transcription of specific genes.
RNAi targets include RNA from viruses and
transposons.
What is RNA interference (RNAi)?
“The Process by which dsRNA silences gene
expression...” Degradation of mRNA or translation
inhibition
Need for interference
Defense Mechanism
Defense against Infection by viruses, etc
As a defense mechanism to protect against transposons and
other insertional elements
Genome Wide Regulation
RNAi plays a role in regulating development and genome
maintenance.
30% of human genome regulated
Nobel prize winners in the C. elegans
field Sidney Brenner
John Sulston
Robert Horvitz
Andrew Fire
Craig Mello
RNAi was found to work in many
diverse species
Fungi
Trypanosomes
Insects
Zebrafish
Mice
Mechanism of RNAi
RNA i
( RNA Interference)
In Interference
RNA
siRNA: dsRNA 21-22 nt.
miRNA: ssRNA 19-25nt. Encoded by non protein coding
genome
RISC:
RNA induced Silencing Complex, that cleaves mRNA
Enzymes
Dicer : produces 20-21 nt cleavages that initiate RNAi
Drosha : cleaves base hairpin in to form pre miRNA; which is
later processed by Dicer
siRNAs
Small interfering RNAs that have an integral role in the
phenomenon of RNA interference (RNAi), a form of post-
transcriptional gene silencing
RNAi: 21-25 nt fragments, which bind to the complementary
portion of the target mRNA and tag it for degradation
A single base pair difference between the siRNA template
and the target mRNA is enough to block the process.
Each strand of siRNA has:
a. 5’-phosphate termini
b. 3’-hydroxyl termini
c. 2/3-nucleotide 3’ overhangs
Generation of small interference RNA
miRNA
Originate from capped & polyadenylated full length precursors
(pri-miRNA)
Hairpin precursor ~70 nt (pre-miRNA) Mature miRNA ~22 nt
(miRNA)
Illustration of miRNA processing
Difference between miRNA and siRNA
Function of both species is regulation of gene expression.
Difference is in where they originate.
siRNA originates with dsRNA.
siRNA is most commonly a response to foreign RNA (usually
viral) and is often 100% complementary to the target.
miRNA originates with ssRNA that forms a hairpin secondary
structure.
miRNA regulates post-transcriptional gene expression and is
often not 100% complementary to the target.
And also miRNA help to regulate gene expression, particularly
during induction of heterochromatin formation serves to
downregulate genes pre- transcriptionally (RNA induced
transcriptional silencing or RITSRITS)
Dicer
Loss of dicer→loss of silencing processing
in vitro
Dicer homologs exist in many organisms
including C.elegans, Drosphila, yeast and
humans (Dicer is a conserved protein)
RNase III-like dsRNA-specific ribonuclease
Enzyme involved in the initiation of RNAi.
It is able to digest dsRNA into uniformly
sized small RNAs (siRNA)
Dicer family proteins are ATP-
dependent nucleases.
Rnase III enzyme acts as a dimer
Dicer’s domains
1 4 32 2
Dicer is a ribonuclease (Rnase III family) with 4 distinct domainsDicer is a ribonuclease (Rnase III family) with 4 distinct domains:
1. Amino-terminal helicase domain
2. Dual Rnase III motifs in the carboxy terminal segment
3. dsRNA binding domain
4. PAZ domain (110-130 amino-acid domain present in protein like
Argo, Piwi..);it is thought to be important for protein-protein
interaction
RISC
RISC is a large (~500-kDa)
RNA-multiprotein complex,
which triggers mRNA
degradation in response to
siRNA
Unwinding of double-
stranded siRNA by ATP
independent helicase.
The active components of an
RISC are endonucleases
called argonaute proteins
which cleave the target
mRNA strand.
RNA i
( RNA Interference)
STEPSINVOLVED IN
RNA INTERFERENCE
RNA interference
RNA interference (RNAi) is a biological process in
which RNA molecules inhibit gene expression,
typically by causing the destruction of specific mRNA
molecules. Historically, it was known by other names,
including co-suppression, post transcriptional gene
silencing (PTGS), and quelling.
STEP 1
• dsRNA is processed
into sense and
antisense RNAs
• 21-25 nucleotides in
length
• have 2-3 nt 3’ overhanging
ends
• Done by Dicer (an RNase
III-type enzyme)
Step 2
The siRNAs
associate
with RISC (RNA-
induced silencing
complex) and
unwind
Step 3
the antisense
siRNAs act as
guides for RISC to
associate with
complimentary
single-stranded
mRNAs.
Step 4
RISC cuts the
mRNA approximately
in the middle of the
region paired with
the siRNA
The mRNA is
degraded further
What are sense and antisense
RNA?
Messenger RNA
(mRNA) is single-
stranded, called
"sense" because it
results in a gene
product (protein).
5´   C U U C A  3´     mRNA
3´   G A A G U  5´     Antisense RNA
What are sense and antisense
RNA?
Antisense
molecules
interact with
complementary
strands of
nucleic acids,
modifying
expression of
genes.
5´   C U U C A  3´     mRNA
3´   G A A G U  5´     Antisense RNA
Applicationsof RNAi
RNA i
( RNA Interference)
Therapeutic uses of RNAi
Hematology (blood)
Oncology (cancer)
Stem cell biology
Infectious diseases
Hematology (blood)
Hematologic disorders result from
Loss of gene function
Mutant gene function
Absent gene function
RNAi
May be used to create models of disease processes
Could help to develop pharmacologic and genetic therapeutic
targets
Oncology (cancer)
Targeting of oncogenes
Dominant mutant oncogenes, amplified oncogenes, viral
oncogenes
Define role of signaling molecules in tumor-creation
Improvement efficacy of chemotherapy and
radiotherapy
Tumor regression through creation of potentially new
mode of chemotherapy
Stem cell biology
Mouse research
Knock out tumor-suppression gene in mouse embryonic
stem cell
Observe tumor phenotype
Positive correlation between extent of Trp 53
(suppression gene) inhibition and severity of disease
Infectious Diseases
Virus targeting
RNAi – inhibit cellular and viral factors of disease
RNA transcriptase is RNAi target
Inhibition of replication
Main goal
Render cells resistant to infectious organisms
Hepatitis C
Infects ~200 million people worldwide
Often fatal
2002, Anton McCaffrey and Mark Kay at Stanford
University
Injected "naked" RNA strands into the tail veins of
mice
RNAi treatment controlled the virus in mice
Silencing genes in HIV
AIM:
Silence the main structural protein in the virus, p24,
and the human protein CD4.
Hit the virus where it counts by eliminating a protein it
needs to reproduce or cause infections.
Respiratory infections
RSV ( RESPIRATORY SYNCTIAL VIRUS), infects
almost every child by the age of two
Short strands of "naked" RNA
Controlled the virus in mice
Clinical trials are ongoing
Macular degeneration
Macular degeneration is the leading
cause of adult blindness
Excess VEGF which leads to
sprouting of excess blood vessels
behind the retina & obscuring vision.
The new RNAi drugs shut down
genes that produce VEGF. The drug
can be injected directly into the eye
First clinical trial: 24 patients,
launched in 2004.
Two months after being injected with
the drug, 6 of the patients had
significantly clearer vision
Other patients' vision had at least
stabilized
More extensive trials are ongoing
Huntington’s disease
Ideal candidate for RNAi therapy
Disease caused by protein, that
affects more than 30,000 people
in the U.S. alone.
We would want to shut down the
expression of the gene coding for
the abberant protein
2004, Beverly Davidson and
colleagues at the University of
Iowa
Davidson treated mice with
Huntington's
Other uses of RNAi
Testing Hypotheses of Gene Function
Target Validation
Pathway Analysis
Studying cell division
Gene Redundancy
Functional Screening
Gene Redundancy
In many cases, eliminating the expression of a single gene in
higher eukaryotes can be tolerated even if that gene product
functions in a critical pathway. This is because many critical cell
functions are accomplished by more than one gene product.
When one gene product is eliminated, the redundant gene
product compensates to allow the cell or animal to survive.
Identifying redundant genes could be achieved by co-transfecting
siRNAs and assaying for a given phenotype.
Evaluating each of the candidate genes alone to ensure that they
only cause the cell cycle defect when reduced in combination
with the target gene would help pinpoint the most likely redundant
gene
RNA interference characteristics
dsRNA needs to be directed against an exon, not an
intron in order to be effective
Homology of the dsRNA and the target gene/mRNA is
required
Targeted mRNA is lost (degraded) after RNAi
The effect is non-stoichiometric; small amounts of
dsRNA can wipe out an excess of mRNA (pointing to
an enzymatic mechanism)
ssRNA does not work as well as dsRNA
Advantage of RNAi
Downregulation of gene expression simplifies "knockout"
analysis.
Easier than use of antisense oligonucleotides. siRNA more
effective and sensitive at lower concentration.
Cost effective
High Specifity
middle region 9-14 are most sensitive
With siRNA, the researcher can simultaneously perform
experiments in any cell type of interest
Can be labelled
Ease of transfection by use of vector
Importance of RNAi
Powerful for analyzing unknown genes in sequenced genomes.
efforts are being undertaken to target every human gene via
siRNAs
Faster identification of gene function
Gene therapy: down-regulation of certain genes/ mutated alleles
Cancer treatments
knock-out of genes required for cell proliferation
knock-out of genes encoding key structural proteins
Agriculture
Thank you

Rna interfernce ppt

  • 1.
    RNA interference Presented by: C.SWORNAKUMARI M.PHIL BIOTECHNOLOGY
  • 2.
    Outlines IntroductionIntroduction RNA silencing Definition ofRNA interference Discovery of RNAi Mechanism of RNA interferenceMechanism of RNA interference Applications of RNA interferenceApplications of RNA interference Therapeutic applications Other applications
  • 3.
    RNA silencing Several termsare used to described RNA silencing; usually there are three phenotypically different but mechanistically similar phenomena: 1. Cosuppression or post-trascriptional gene silencing (PTGS) in plants 2. Quelling in fungi 3. RNA interference in animal kingdom
  • 4.
    Definition RNA interference (RNAi)is a mechanism that inhibits gene expression at the stage of translation or by hindering the transcription of specific genes. RNAi targets include RNA from viruses and transposons.
  • 5.
    What is RNAinterference (RNAi)? “The Process by which dsRNA silences gene expression...” Degradation of mRNA or translation inhibition
  • 6.
    Need for interference DefenseMechanism Defense against Infection by viruses, etc As a defense mechanism to protect against transposons and other insertional elements Genome Wide Regulation RNAi plays a role in regulating development and genome maintenance. 30% of human genome regulated
  • 7.
    Nobel prize winnersin the C. elegans field Sidney Brenner John Sulston Robert Horvitz Andrew Fire Craig Mello
  • 8.
    RNAi was foundto work in many diverse species Fungi Trypanosomes Insects Zebrafish Mice
  • 9.
    Mechanism of RNAi RNAi ( RNA Interference)
  • 10.
    In Interference RNA siRNA: dsRNA21-22 nt. miRNA: ssRNA 19-25nt. Encoded by non protein coding genome RISC: RNA induced Silencing Complex, that cleaves mRNA Enzymes Dicer : produces 20-21 nt cleavages that initiate RNAi Drosha : cleaves base hairpin in to form pre miRNA; which is later processed by Dicer
  • 11.
    siRNAs Small interfering RNAsthat have an integral role in the phenomenon of RNA interference (RNAi), a form of post- transcriptional gene silencing RNAi: 21-25 nt fragments, which bind to the complementary portion of the target mRNA and tag it for degradation A single base pair difference between the siRNA template and the target mRNA is enough to block the process. Each strand of siRNA has: a. 5’-phosphate termini b. 3’-hydroxyl termini c. 2/3-nucleotide 3’ overhangs
  • 12.
    Generation of smallinterference RNA
  • 13.
    miRNA Originate from capped& polyadenylated full length precursors (pri-miRNA) Hairpin precursor ~70 nt (pre-miRNA) Mature miRNA ~22 nt (miRNA)
  • 14.
  • 15.
    Difference between miRNAand siRNA Function of both species is regulation of gene expression. Difference is in where they originate. siRNA originates with dsRNA. siRNA is most commonly a response to foreign RNA (usually viral) and is often 100% complementary to the target. miRNA originates with ssRNA that forms a hairpin secondary structure. miRNA regulates post-transcriptional gene expression and is often not 100% complementary to the target. And also miRNA help to regulate gene expression, particularly during induction of heterochromatin formation serves to downregulate genes pre- transcriptionally (RNA induced transcriptional silencing or RITSRITS)
  • 16.
    Dicer Loss of dicer→lossof silencing processing in vitro Dicer homologs exist in many organisms including C.elegans, Drosphila, yeast and humans (Dicer is a conserved protein) RNase III-like dsRNA-specific ribonuclease Enzyme involved in the initiation of RNAi. It is able to digest dsRNA into uniformly sized small RNAs (siRNA) Dicer family proteins are ATP- dependent nucleases. Rnase III enzyme acts as a dimer
  • 17.
    Dicer’s domains 1 432 2 Dicer is a ribonuclease (Rnase III family) with 4 distinct domainsDicer is a ribonuclease (Rnase III family) with 4 distinct domains: 1. Amino-terminal helicase domain 2. Dual Rnase III motifs in the carboxy terminal segment 3. dsRNA binding domain 4. PAZ domain (110-130 amino-acid domain present in protein like Argo, Piwi..);it is thought to be important for protein-protein interaction
  • 18.
    RISC RISC is alarge (~500-kDa) RNA-multiprotein complex, which triggers mRNA degradation in response to siRNA Unwinding of double- stranded siRNA by ATP independent helicase. The active components of an RISC are endonucleases called argonaute proteins which cleave the target mRNA strand.
  • 19.
    RNA i ( RNAInterference) STEPSINVOLVED IN RNA INTERFERENCE
  • 20.
    RNA interference RNA interference(RNAi) is a biological process in which RNA molecules inhibit gene expression, typically by causing the destruction of specific mRNA molecules. Historically, it was known by other names, including co-suppression, post transcriptional gene silencing (PTGS), and quelling.
  • 21.
    STEP 1 • dsRNAis processed into sense and antisense RNAs • 21-25 nucleotides in length • have 2-3 nt 3’ overhanging ends • Done by Dicer (an RNase III-type enzyme)
  • 22.
    Step 2 The siRNAs associate withRISC (RNA- induced silencing complex) and unwind
  • 23.
    Step 3 the antisense siRNAsact as guides for RISC to associate with complimentary single-stranded mRNAs.
  • 24.
    Step 4 RISC cutsthe mRNA approximately in the middle of the region paired with the siRNA The mRNA is degraded further
  • 25.
    What are senseand antisense RNA? Messenger RNA (mRNA) is single- stranded, called "sense" because it results in a gene product (protein). 5´   C U U C A  3´     mRNA 3´   G A A G U  5´     Antisense RNA
  • 26.
    What are senseand antisense RNA? Antisense molecules interact with complementary strands of nucleic acids, modifying expression of genes. 5´   C U U C A  3´     mRNA 3´   G A A G U  5´     Antisense RNA
  • 27.
    Applicationsof RNAi RNA i (RNA Interference)
  • 28.
    Therapeutic uses ofRNAi Hematology (blood) Oncology (cancer) Stem cell biology Infectious diseases
  • 29.
    Hematology (blood) Hematologic disordersresult from Loss of gene function Mutant gene function Absent gene function RNAi May be used to create models of disease processes Could help to develop pharmacologic and genetic therapeutic targets
  • 30.
    Oncology (cancer) Targeting ofoncogenes Dominant mutant oncogenes, amplified oncogenes, viral oncogenes Define role of signaling molecules in tumor-creation Improvement efficacy of chemotherapy and radiotherapy Tumor regression through creation of potentially new mode of chemotherapy
  • 31.
    Stem cell biology Mouseresearch Knock out tumor-suppression gene in mouse embryonic stem cell Observe tumor phenotype Positive correlation between extent of Trp 53 (suppression gene) inhibition and severity of disease
  • 32.
    Infectious Diseases Virus targeting RNAi– inhibit cellular and viral factors of disease RNA transcriptase is RNAi target Inhibition of replication Main goal Render cells resistant to infectious organisms
  • 33.
    Hepatitis C Infects ~200million people worldwide Often fatal 2002, Anton McCaffrey and Mark Kay at Stanford University Injected "naked" RNA strands into the tail veins of mice RNAi treatment controlled the virus in mice
  • 34.
    Silencing genes inHIV AIM: Silence the main structural protein in the virus, p24, and the human protein CD4. Hit the virus where it counts by eliminating a protein it needs to reproduce or cause infections.
  • 35.
    Respiratory infections RSV (RESPIRATORY SYNCTIAL VIRUS), infects almost every child by the age of two Short strands of "naked" RNA Controlled the virus in mice Clinical trials are ongoing
  • 36.
    Macular degeneration Macular degenerationis the leading cause of adult blindness Excess VEGF which leads to sprouting of excess blood vessels behind the retina & obscuring vision. The new RNAi drugs shut down genes that produce VEGF. The drug can be injected directly into the eye First clinical trial: 24 patients, launched in 2004. Two months after being injected with the drug, 6 of the patients had significantly clearer vision Other patients' vision had at least stabilized More extensive trials are ongoing
  • 37.
    Huntington’s disease Ideal candidatefor RNAi therapy Disease caused by protein, that affects more than 30,000 people in the U.S. alone. We would want to shut down the expression of the gene coding for the abberant protein 2004, Beverly Davidson and colleagues at the University of Iowa Davidson treated mice with Huntington's
  • 38.
    Other uses ofRNAi Testing Hypotheses of Gene Function Target Validation Pathway Analysis Studying cell division Gene Redundancy Functional Screening
  • 39.
    Gene Redundancy In manycases, eliminating the expression of a single gene in higher eukaryotes can be tolerated even if that gene product functions in a critical pathway. This is because many critical cell functions are accomplished by more than one gene product. When one gene product is eliminated, the redundant gene product compensates to allow the cell or animal to survive. Identifying redundant genes could be achieved by co-transfecting siRNAs and assaying for a given phenotype. Evaluating each of the candidate genes alone to ensure that they only cause the cell cycle defect when reduced in combination with the target gene would help pinpoint the most likely redundant gene
  • 40.
    RNA interference characteristics dsRNAneeds to be directed against an exon, not an intron in order to be effective Homology of the dsRNA and the target gene/mRNA is required Targeted mRNA is lost (degraded) after RNAi The effect is non-stoichiometric; small amounts of dsRNA can wipe out an excess of mRNA (pointing to an enzymatic mechanism) ssRNA does not work as well as dsRNA
  • 41.
    Advantage of RNAi Downregulationof gene expression simplifies "knockout" analysis. Easier than use of antisense oligonucleotides. siRNA more effective and sensitive at lower concentration. Cost effective High Specifity middle region 9-14 are most sensitive With siRNA, the researcher can simultaneously perform experiments in any cell type of interest Can be labelled Ease of transfection by use of vector
  • 42.
    Importance of RNAi Powerfulfor analyzing unknown genes in sequenced genomes. efforts are being undertaken to target every human gene via siRNAs Faster identification of gene function Gene therapy: down-regulation of certain genes/ mutated alleles Cancer treatments knock-out of genes required for cell proliferation knock-out of genes encoding key structural proteins Agriculture
  • 43.

Editor's Notes

  • #12 siRNA (small interfering RNA)http://en.wikipedia.org/wiki/Small_interfering_RNA Small interfering RNA (siRNA), sometimes known as short interfering RNA, are a class of 20-25 nucleotide-long RNA molecules that interfere with the expression of genes. They are naturally produced as part of the RNA interference (RNAi) pathway by the enzyme Dicer. They can also be exogenously (artificially) introduced by investigators to bring about th knockdown of a particular gene. siRNA's have a well defined structure. Briefly, this is a short (usually 21-nt) double-strand of RNA (dsRNA) with 2-nt overhangs on either end, including a 5' phosphate group and a 3' hydroxy (-OH) group. Transfection of an exogenous siRNA is problematic, since it is only transient, and the dsRNA structure cannot easily be permanently maintained. One way of overcoming these problems is to modify the siRNA in such a way as to allow it to be expressed by an appropriate vector, e.g. a plasmid. This is done by the introduction of a loop between the two strands, thus producing a single transcript, which can be processed into a functional siRNA. This transcription cassette usually uses an RNA polymerase III promoter, which direct the transcription of small nuclear RNA's, such as U6 or H1. It is assumed (although not known for certain) that the resulting short hairpin RNA (shRNA) transcript is processed by Dicer. Introduction of too much siRNA can result in non-specific events due to activation of the interferon pathway. Most papers suggest that this is probably due to activation of the dsRNA sensor PKR, although retinoic acid inducible Gene I (RIG-I may also be involved One method of reducing the non-specific effects is by turning the shRNA into a micro RNA. Micro RNA's are naturally occurring, and, as such, tolerated better by the cell. By engineering an siRNA sequence into an miRNA structure, non-specific effects can potentially be eliminated.
  • #14 miRNA (micro-RNA)http://en.wikipedia.org/wiki/MiRNA A miRNA (micro-RNA) is a form of single-stranded RNA which is typically 20-25 nucleotide long. It is thought to regulate the expression of other genes. miRNAs are RNA genes which are transcribed from DNA, but are not translated into protein.The DNA sequence that codes for an miRNA gene is longer than the miRNA itself. This DNA sequence includes the miRNA sequence and an approximate reverse complement. When this DNA sequence is transcribed into a single-stranded RNA molecule, the miRNA sequence and its reverse-complement base pair to form a double stranded RNA hairpin loop; this forms a primary miRNA structure (pri-miRNA). In animals, the nuclear enzyme Drosha cleaves the base of the hairpin to form pre-miRNA. The pre-miRNA molecule is then actively transported out of the nucleus into the cytoplasm by Exportin 5, a carrier protein. The Dicer enzyme then cuts 20-25 nucleotides from the base of the hairpin to release the mature miRNA. In plants, which lack Drosha homologues, pri- and pre-miRNA processing by Dicer probably takes place in the nucleus, and mature miRNA duplexes are exported to the cytosol by Exportin 5.