AIR COMPRESSED NETWORK DESCRIPTION
1.- GENERAL DESCRPTION:
The Air Compressed Network of the U-Beam & Slabs Factory must to supply
the Air Compressed necessities for the different machines.
The Air Compressed is produced by 1 Air Compressor, Screw type, 10 m3/min.
capacity, 55 Kw. Power. The air compressed supply is not a critical factor to concrete
casting, by that, only 1 unit of compressor will be enough.
The Air Compressed requirements has been estimated as follows:
Internal concrete vibrators , maximum 3 units simultaneously, 1.200 lit/min.
consumption each unit at 6 bar pressure.
Cleaning works of the moulds; 3 supply points with flexible hoses ½ “ y
consumption of 1.500 lit/min. each at 6 bar pressure.
The total maximum consumption expected will be 8.100 lit/min. at 6 bar
pressure.
2.- SUPPLY SPECIFICATIONS:
2.1.- AIR COMPRESSEDPRODUCTION:
- 1 Air compressors, screw type with oil, soundproof at maximum
level 72 dB(A), 55 Kw. electric motor power, 400 Volt and 60 Hz.,
air supply of 10,50 m3/min. at 8 bar.
- 1 Units air filter , installed in the compressors exit to eliminate
solid materials.
- 1 Cooler-dryers, with the same capacity of the Air Compressors.
- 1 Units air filter , installed after cooler-dryers to eliminate residual
water, oil, etc…in the compressors exit to eliminate solid
materials.
- 1 Air Compressed tank, vertical type, 3.000 lit. capacity, setted at
10 bar, automatic purging device.
- Regulation control system to operate the compressor.
- Electric power and control cabinet.
- Electric assembling of air compressor. To connect it it´s provided
a hand-operated switch on-off 4 x 250 Amp.
2.2.- AIR COMPRESSED DISTRIBUTION LINES:
The main Air Compressed pipe from the Tank to distribution manifold is a 4”
diameter steel stretched pipe without weldings , unions by plate flanges every 12
mts.,DIN 2440 black PN 10, . Approximate length 40 mts. plus elbows, etc…This pipe
will be supported by brackets welded to pillars and also welded to panel walls beams.
The individual Air Com pressed distribution pipes from the manifold will be
installed along of the pillar rows ( 2 lateral rows and central row ) to both U-Beam &
Slab lines, are 3” diameter steel stretched pipe without weldings, unions by plate
flanges every 12 mts.,DIN 2440 black, PN 10. This pipe will be supported by brackets
welded to pillars and also welded to panel walls beams. Approximate length of the 3
lines will be 400 mts.
The distribution pipes must be installed with a slope of 0,5% in order to drive the
water at the purging points.
Along of theses distribution pipes and every 30 mts. will be installed several air
compressed supply points.
Every air compressed supply point must incorporate pressure regulator, gauge
and lubricator. The exit connection will be “ Quick connect Swivel plug of 1”. The supply
points must be used to drainage of the water air content.
3.- DRAWINGS:
Attached you will find a hand-made schema of the Air Compressed Network. In
the offer it must be included the drawing of the proposal installation.
4.- REVISION:
The calculations related in this document must be inspected and corrected if
necessary.
5.- ASSEMBLING AND SETTING UP:
All the elements related before, must be assembled in our factory; also, the
steam network must be started up.
In the offer must be indicated the required materials or other services
necessaries to make the Setting Up.
6.- NORMATIVE:
The Air Compressor and his accesories must be accomplish all the Safety
Standards required in the Saudi Arabian Kingdom for the Air Compressed Equipment.
7.- DELIVERY TIME AND CONDITIONS:
In the offer must be indicated the Delivery Time for the Equipment and other
elements required , specifying the estimated period to Manufacturing, Transport and
Assembly.
As well, in the offer must be indicated the considered means to supply by the
client ( auxiliary cranes, lifting machines, etc…) regarding to the Assembly and Setting
Up of the cranes.
8.- AIR COMPRESSED AND EQUIPMENT DOCUMENTS:
Together with the Air Compressor Network will be delivered the next
documents in English Language.
- Official Approval Certificate Pressure Regulation.
- Electrical Wiring Diagram ( 2 copies ).
- Manufacturer Manual Compressor, Dryer and Filters( 2 copies).
- User Manual ( 2 copies ).
9.- WARRANTY:
Two years ( estimated period to manufacture all the Beams&Slabs ); the
warranty have to covered against all manufacturing mistakes, materials bad quality or
unsuitable assembly.
As well , must be included all the Maintenance Services required by the Air
Compressor, Dryer and Filters along the referred period ( 2 years ).
10.- PAYMENT TERMS:
In the offer must be indicated the “ Payment Terms “ considered.

More Related Content

What's hot

Inertia dynamics pb400f_specsheet
Inertia dynamics pb400f_specsheetInertia dynamics pb400f_specsheet
Inertia dynamics pb400f_specsheet
Electromate
 
RBFM847v3frickcompressor
RBFM847v3frickcompressorRBFM847v3frickcompressor
RBFM847v3frickcompressor
Kelly Erwin
 
Cat 1300 Series
Cat 1300 SeriesCat 1300 Series
Cat 1300 Series
Gary Wilde
 

What's hot (15)

Inertia dynamics pb400f_specsheet
Inertia dynamics pb400f_specsheetInertia dynamics pb400f_specsheet
Inertia dynamics pb400f_specsheet
 
Super high efficiency coalescing filters for compressed air and gas
Super high efficiency coalescing filters for compressed air and gasSuper high efficiency coalescing filters for compressed air and gas
Super high efficiency coalescing filters for compressed air and gas
 
BOGE AirpowerSystem ปั๊มลม Air Compressors 1
BOGE AirpowerSystem ปั๊มลม Air Compressors 1BOGE AirpowerSystem ปั๊มลม Air Compressors 1
BOGE AirpowerSystem ปั๊มลม Air Compressors 1
 
GOODSJACK double action hydraulic deep drawing press 500 tons
GOODSJACK double action hydraulic deep drawing press 500 tonsGOODSJACK double action hydraulic deep drawing press 500 tons
GOODSJACK double action hydraulic deep drawing press 500 tons
 
Boiler MANUFACTURING STEPS
Boiler MANUFACTURING STEPSBoiler MANUFACTURING STEPS
Boiler MANUFACTURING STEPS
 
Ere ction manual bhel
Ere ction manual bhelEre ction manual bhel
Ere ction manual bhel
 
Refrigerator manufacturers in saudi arabia
Refrigerator manufacturers in saudi arabiaRefrigerator manufacturers in saudi arabia
Refrigerator manufacturers in saudi arabia
 
Air compressor in saudi arabia
Air compressor in saudi arabiaAir compressor in saudi arabia
Air compressor in saudi arabia
 
BOGE AirpowerSystem ปั๊มลม Air Compressors 4
BOGE AirpowerSystem ปั๊มลม Air Compressors 4BOGE AirpowerSystem ปั๊มลม Air Compressors 4
BOGE AirpowerSystem ปั๊มลม Air Compressors 4
 
ELGI AirpowerSystem ปั๊มลม Air Compressors 3
ELGI AirpowerSystem ปั๊มลม Air Compressors  3ELGI AirpowerSystem ปั๊มลม Air Compressors  3
ELGI AirpowerSystem ปั๊มลม Air Compressors 3
 
DAIKIN VRV PIPE SELECTION CHART
DAIKIN VRV PIPE SELECTION CHARTDAIKIN VRV PIPE SELECTION CHART
DAIKIN VRV PIPE SELECTION CHART
 
Edus391004 n vrviii installation manual 2
Edus391004 n vrviii installation manual 2Edus391004 n vrviii installation manual 2
Edus391004 n vrviii installation manual 2
 
Bitzer 2 stages condensing unit
Bitzer 2 stages condensing unitBitzer 2 stages condensing unit
Bitzer 2 stages condensing unit
 
RBFM847v3frickcompressor
RBFM847v3frickcompressorRBFM847v3frickcompressor
RBFM847v3frickcompressor
 
Cat 1300 Series
Cat 1300 SeriesCat 1300 Series
Cat 1300 Series
 

Viewers also liked

Reception Presentation2 (2)Paul
Reception Presentation2 (2)PaulReception Presentation2 (2)Paul
Reception Presentation2 (2)Paul
sgcfm
 
African american refugee student lesson civil rights presentation
African american refugee student lesson  civil rights presentationAfrican american refugee student lesson  civil rights presentation
African american refugee student lesson civil rights presentation
virgilbruce55
 
Diagramas de Kellogg (Diagramas de predominancia)
Diagramas de Kellogg (Diagramas de predominancia)Diagramas de Kellogg (Diagramas de predominancia)
Diagramas de Kellogg (Diagramas de predominancia)
costafro
 
Pumps for Ammonium Nitrate Service
Pumps for Ammonium Nitrate Service Pumps for Ammonium Nitrate Service
Pumps for Ammonium Nitrate Service
Gerard B. Hawkins
 

Viewers also liked (20)

Animalario
AnimalarioAnimalario
Animalario
 
Ch3
Ch3Ch3
Ch3
 
Animalario
AnimalarioAnimalario
Animalario
 
Central Park, NY
Central Park, NYCentral Park, NY
Central Park, NY
 
Jeu lalla laarossa (by mouad tassoufra)
Jeu lalla laarossa (by mouad tassoufra)Jeu lalla laarossa (by mouad tassoufra)
Jeu lalla laarossa (by mouad tassoufra)
 
Ch5
Ch5Ch5
Ch5
 
Ch1
Ch1Ch1
Ch1
 
Ch2
Ch2Ch2
Ch2
 
Mrkt non convenzionale
Mrkt non convenzionaleMrkt non convenzionale
Mrkt non convenzionale
 
A auga
A augaA auga
A auga
 
Reception Presentation2 (2)Paul
Reception Presentation2 (2)PaulReception Presentation2 (2)Paul
Reception Presentation2 (2)Paul
 
Letras e números
Letras e númerosLetras e números
Letras e números
 
African american refugee student lesson civil rights presentation
African american refugee student lesson  civil rights presentationAfrican american refugee student lesson  civil rights presentation
African american refugee student lesson civil rights presentation
 
Emit till power point
Emit till power pointEmit till power point
Emit till power point
 
Little rock nine power point
Little rock nine power pointLittle rock nine power point
Little rock nine power point
 
Diagramas de Kellogg (Diagramas de predominancia)
Diagramas de Kellogg (Diagramas de predominancia)Diagramas de Kellogg (Diagramas de predominancia)
Diagramas de Kellogg (Diagramas de predominancia)
 
Methanol Plant - Theory of Distillation
Methanol Plant - Theory of DistillationMethanol Plant - Theory of Distillation
Methanol Plant - Theory of Distillation
 
Pengkoon Tan Landscape Architecture Portfolio 2010
Pengkoon Tan Landscape Architecture Portfolio 2010Pengkoon Tan Landscape Architecture Portfolio 2010
Pengkoon Tan Landscape Architecture Portfolio 2010
 
METHANOL PLANT - SHALE GAS FEED PRETREATMENT
METHANOL PLANT - SHALE GAS FEED PRETREATMENTMETHANOL PLANT - SHALE GAS FEED PRETREATMENT
METHANOL PLANT - SHALE GAS FEED PRETREATMENT
 
Pumps for Ammonium Nitrate Service
Pumps for Ammonium Nitrate Service Pumps for Ammonium Nitrate Service
Pumps for Ammonium Nitrate Service
 

Similar to Rfq. air compressed network

office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final update
Aashish Soin
 
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
Juan Novillo Ramos
 

Similar to Rfq. air compressed network (20)

specif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfspecif-dust-extraction-system.pdf
specif-dust-extraction-system.pdf
 
Technical specification EEE
Technical specification EEETechnical specification EEE
Technical specification EEE
 
final presentation edit.pptx
final presentation edit.pptxfinal presentation edit.pptx
final presentation edit.pptx
 
Chemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptxChemical_Process_Equipment_2.pptx
Chemical_Process_Equipment_2.pptx
 
Auxilliary ventilation system final ppt.pptx
Auxilliary ventilation system final ppt.pptxAuxilliary ventilation system final ppt.pptx
Auxilliary ventilation system final ppt.pptx
 
Air compressor overview and basic selection guide
Air compressor overview and basic selection guideAir compressor overview and basic selection guide
Air compressor overview and basic selection guide
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Dust extrcaction system for lime stores
Dust extrcaction system for lime storesDust extrcaction system for lime stores
Dust extrcaction system for lime stores
 
3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf3D_Distribution transformer_Specification.pdf
3D_Distribution transformer_Specification.pdf
 
Design and Analysis of an Air Conditioning Duct Using Equal Friction Method
Design and Analysis of an Air Conditioning Duct Using Equal Friction MethodDesign and Analysis of an Air Conditioning Duct Using Equal Friction Method
Design and Analysis of an Air Conditioning Duct Using Equal Friction Method
 
Ac ducts
Ac ductsAc ducts
Ac ducts
 
Vortex flow meter manual
Vortex flow meter manualVortex flow meter manual
Vortex flow meter manual
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
extrusion machine
extrusion machineextrusion machine
extrusion machine
 
office final ppt [7760835] final update
office final ppt [7760835] final updateoffice final ppt [7760835] final update
office final ppt [7760835] final update
 
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA010 115-001-03 ESPECIFICACIONES DE TUBERÍA
010 115-001-03 ESPECIFICACIONES DE TUBERÍA
 
045
045045
045
 
QX1402 VDL(H) spec.
QX1402 VDL(H) spec.QX1402 VDL(H) spec.
QX1402 VDL(H) spec.
 
Toshniwal Cryogenic vacuum pumps
Toshniwal Cryogenic vacuum pumpsToshniwal Cryogenic vacuum pumps
Toshniwal Cryogenic vacuum pumps
 
Flexible Ducts
Flexible DuctsFlexible Ducts
Flexible Ducts
 

Recently uploaded

Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
Kira Dess
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
AshwaniAnuragi1
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
c3384a92eb32
 

Recently uploaded (20)

Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 

Rfq. air compressed network

  • 1. AIR COMPRESSED NETWORK DESCRIPTION 1.- GENERAL DESCRPTION: The Air Compressed Network of the U-Beam & Slabs Factory must to supply the Air Compressed necessities for the different machines. The Air Compressed is produced by 1 Air Compressor, Screw type, 10 m3/min. capacity, 55 Kw. Power. The air compressed supply is not a critical factor to concrete casting, by that, only 1 unit of compressor will be enough. The Air Compressed requirements has been estimated as follows: Internal concrete vibrators , maximum 3 units simultaneously, 1.200 lit/min. consumption each unit at 6 bar pressure. Cleaning works of the moulds; 3 supply points with flexible hoses ½ “ y consumption of 1.500 lit/min. each at 6 bar pressure. The total maximum consumption expected will be 8.100 lit/min. at 6 bar pressure. 2.- SUPPLY SPECIFICATIONS: 2.1.- AIR COMPRESSEDPRODUCTION: - 1 Air compressors, screw type with oil, soundproof at maximum level 72 dB(A), 55 Kw. electric motor power, 400 Volt and 60 Hz., air supply of 10,50 m3/min. at 8 bar. - 1 Units air filter , installed in the compressors exit to eliminate solid materials. - 1 Cooler-dryers, with the same capacity of the Air Compressors.
  • 2. - 1 Units air filter , installed after cooler-dryers to eliminate residual water, oil, etc…in the compressors exit to eliminate solid materials. - 1 Air Compressed tank, vertical type, 3.000 lit. capacity, setted at 10 bar, automatic purging device. - Regulation control system to operate the compressor. - Electric power and control cabinet. - Electric assembling of air compressor. To connect it it´s provided a hand-operated switch on-off 4 x 250 Amp. 2.2.- AIR COMPRESSED DISTRIBUTION LINES: The main Air Compressed pipe from the Tank to distribution manifold is a 4” diameter steel stretched pipe without weldings , unions by plate flanges every 12 mts.,DIN 2440 black PN 10, . Approximate length 40 mts. plus elbows, etc…This pipe will be supported by brackets welded to pillars and also welded to panel walls beams. The individual Air Com pressed distribution pipes from the manifold will be installed along of the pillar rows ( 2 lateral rows and central row ) to both U-Beam & Slab lines, are 3” diameter steel stretched pipe without weldings, unions by plate flanges every 12 mts.,DIN 2440 black, PN 10. This pipe will be supported by brackets welded to pillars and also welded to panel walls beams. Approximate length of the 3 lines will be 400 mts. The distribution pipes must be installed with a slope of 0,5% in order to drive the water at the purging points. Along of theses distribution pipes and every 30 mts. will be installed several air compressed supply points. Every air compressed supply point must incorporate pressure regulator, gauge and lubricator. The exit connection will be “ Quick connect Swivel plug of 1”. The supply points must be used to drainage of the water air content.
  • 3. 3.- DRAWINGS: Attached you will find a hand-made schema of the Air Compressed Network. In the offer it must be included the drawing of the proposal installation. 4.- REVISION: The calculations related in this document must be inspected and corrected if necessary. 5.- ASSEMBLING AND SETTING UP: All the elements related before, must be assembled in our factory; also, the steam network must be started up. In the offer must be indicated the required materials or other services necessaries to make the Setting Up. 6.- NORMATIVE: The Air Compressor and his accesories must be accomplish all the Safety Standards required in the Saudi Arabian Kingdom for the Air Compressed Equipment. 7.- DELIVERY TIME AND CONDITIONS: In the offer must be indicated the Delivery Time for the Equipment and other elements required , specifying the estimated period to Manufacturing, Transport and Assembly. As well, in the offer must be indicated the considered means to supply by the client ( auxiliary cranes, lifting machines, etc…) regarding to the Assembly and Setting Up of the cranes. 8.- AIR COMPRESSED AND EQUIPMENT DOCUMENTS: Together with the Air Compressor Network will be delivered the next documents in English Language.
  • 4. - Official Approval Certificate Pressure Regulation. - Electrical Wiring Diagram ( 2 copies ). - Manufacturer Manual Compressor, Dryer and Filters( 2 copies). - User Manual ( 2 copies ). 9.- WARRANTY: Two years ( estimated period to manufacture all the Beams&Slabs ); the warranty have to covered against all manufacturing mistakes, materials bad quality or unsuitable assembly. As well , must be included all the Maintenance Services required by the Air Compressor, Dryer and Filters along the referred period ( 2 years ). 10.- PAYMENT TERMS: In the offer must be indicated the “ Payment Terms “ considered.