I will use simple language to make you understand , earthing is Drainage system of Electrical wastage, let us
assume the system is waste water drainage system, and we are using pipes to drain the waste water.
if the drainage is not proper,that means either you have chosen wrong pipe size which is incapable to drain the
required waste, then, your water will be stored in the pipe,and the force of water will increase in the pipe, same
case is happening in earthing system,
if you do not have the required conductor to dissipate the fault then stress will be in your system, so if you will
increase the conductor size by making a mesh that means you are increasing the number of pipes to drain the
required waste water.
same thing happening in a mesh, the more soil is associated with the conductor the rate of dissipation will be
more, so it will create a low impedance path to fault current
A Systems Approach to Earthing
The ‘protective conductor’ must also provide a functional earth to the equipment operating on the system that
is, it has to provide a path for the leakage currents (at the fundamental frequency) and the high
frequency noise currents arising from, for example, switched mode power supplies via radio
frequency interference (RFI) filters as well as being a voltage reference for signal interfaces.
The magnitude of leakage currents varies around the installation. Since the earth leakage current originates
mainly from single-phase equipment on each of the three phases, balanced components of the
fundamental from each phase will tend to cancel, so that the current in the protective conductor
may increase or decrease as circuits are combined along a distribution system.
High frequency currents can be a bigger problem as far as functionality is concerned. Much of the
equipment that produces noise on the earth is also sensitive to it – but there is a difference; the equipment
produces noise currents and it is sensitive to noise voltages. If the noise currents can be transported to earth
without producing noise voltage drop, all will be well. This requires a connection to earth that has
low impedance at all frequencies. To decrease radiated noise, the earth path for the noise current should run
close to the supply conductors.
Building protective conductor arrangement
--Fault current
--Leakage current
--Signal reference plane
--Electromagnetic compatibility
‘Touch potential’ is
the voltage difference between the earthed structure and a person standing on the ground within touching
distance of the structure. ‘Step potential’ is the voltage between the feet of a person (assumed to be 1 metre
apart)standing on the ground. The maximum touch and step potentials are limited by various Standard
in here the Main Ring loop 5-10mA could be measured from MV Line crossing, throughout the PV Plant
once running in parallel all other earth conducters have 3-4 Ohm and no leakage current 0- 0,4 mA..
Main Earth Loop the UK ( British Standards ) are met / Stepvoltage ok ( so no design flaw in here)
Role of bonding
(1) Protection of equipment and personnel from the hazards of lightning discharges;
(2) Establishment of fault current return paths;
(3) Establishment of homogeneous and stable paths for signal currents;
(4) Minimization of RF potentials on enclosures and housings;
(5) Protection of personnel from shock hazards arising from accidental power ground; and
(6) Prevention of static charge accumulation.
Effects of poor bonds. With proper design and implementation, bonds minimize differences in
potential between points within the fault protection, signal reference, shielding, and lightning protection
networks of an electronic system.
Bonding is also important to the performance of other interference control
measures. For example, adequate bonding of connector shells to equipment enclosures is essential to the
maintenance of the integrity of cable shields and to the retention of the low loss transmission properties of
the cables. The careful bonding of seams and joints in EM shields is essential to the achievement of a
high degree of shielding effectiveness. Interference reduction components and devices also must be well
bonded for optimum performance.
Role of grounding
The grounding system consists of four subsystems, (1) the earth electrode subsystem,(2) the fault
protection subsystem,(3) the lightning protection subsystem,and (4) the signal reference subsystem.The
purpose of the earth electrode subsystem is to provide a path to earth for the discharge of lightning
strokes, prevent shock hazard to personnel, and assist in the control of noise.
Role of shielding
Shielding involves the use of metallic barriers to prevent the direct radiation of incident energy into the
system and internal enclosures and to minimize the coupling of energy to cables and other collectors that
may penetrate these barriers. Shielding is the basic element of any barrier design, and little EMP
protection is possible without its proper use.
PV Plant and Energy Audit e.g:
The Panel was not grounded at All.
In an IT environment and Noise generated a 16mm (thin wire) is needed.
( Was it testwise removed ?! Lot of different type of earthing datacables was surveyed)
No Grounding towards Earth Bar , no Grounding towards distribution board ( 230 VAC ) via UPS system.
There was also no plugpoint installed at the wall (outlet) cable was stripped and than fixed with
Isolationtape. The PE (Earth ) was not terminated at the Earthing Point (wire was hanging loose).
The only contact towards Earth was the metallic enclosure of the Wall from Container via 4 screws !!
PE wire visually with Isotape wrapped and not connected.
No one could tell who connected up this side of installation.
Cable towards UPS unit was done from team (previously)
Mounting of Panels (only /no wiring done) from electrician.
16mm Chassis Grounding (needed )
J- Box implementation ( best practice )
if PE ( Earh Bar ) is 0,5 mtr away from connecting up device ( surge arrestor) a V Shape connection
1x towards Earth bar existing with 4mm and a second ( back to it s source ) should be installed in here
Plus and Minuscable ( armoured shield) with 16mm
shielded dataloggingcable to prevent Noise from Inverters during switch ON OFF infiltrating the cabling ,
surges will close surge arrestors and in between 600-800mA could be measured....
if surge tries to eliminate during this time Earthloop is complete and was transferred towards the Earth Bar
from grounding Pillars and Plus Minus cabling ( surge arrestors)
Minusside coupled with Earth inside Panel closing and transferring Noise generated via Datacables.
This must be completely avoided via seperate Earthing Path quickly back to it s source.
before there was No common Earthing supplied in Panel when I visited the site Monday 20.10.2014
it was grounded in between all 3 Power supplies Negative to Negative to Negative and than towards Earth
with a 1,5mm wire which is correct, but problematic is the fact that there was no Earth connected
either towards Earth Bar or via UPS unit ( 230 V AC )
I measured with open connection of AC unit ( batterypowered ) same outcome the Noise floating backwards
from datacabling was roughly 600-800mA.
Before Energy Audit the ( shield ) was used as common and at the same time as Earth inside Datacable.
I changed the setup according emf friendly version with shield seperate and yell/green as common reference
for communication.
After Earthing Chassis a constant leakage of 800 than 600 and less towards 500mA could be measured.
( while inverters were switching Master /Slave units ON OFF during rainy / sunny weather )
Conclusions:
Following action has to be implemented ( inside Transformer/Inverters)
-Earthing Panel via db board ( bigger Path back to source ) not via 230 V AC cables
-Earthing Panel via Earth Bar
-Earthing DB Board and Earth Bar ( all with 16mm thinwire)
-Earthing J Boxes via V Shape Earthing ( sec. time using Plus/Minus armoured shield)
The investigations show similar behaviour in All 4 transformerstations I visited.
The earthing system of a building or site is a critical part of the electrical infrastructure and can
determine
the future viability of businesses operating in it. It is required to deal with short duration fault
currents of
several hundred Amperes, standing currents of a few Amperes and high frequency noise currents
returning
them to source or ground with close to zero voltage drop for noise currents and with no risk of
damage for
fault currents. At the same time, it must protect the equipment and personnel housed in
the building
during lightning strikes (fast transients in the kiloampere region) in the interconnected earthing
system.
After Remedy 5,6 mA measured.
Before 169 mA and more measured coming via Inverters and Minus /Plus Cabling DC MAIN
depending on surges is cloudy/sunny day with lots of ON OFF Master Slave units...
important V shape already incoming 4mm cabling from Pillar and second time connected via
Plus /Minus armoured shield towards same point...
Earth Bar as connection point should be avoided, longer than 0,5 mtrs away from Pillar.
Previously earthed system ( shield used – didn t work) from outside towards Panel
tested onsite with last 2 days.....working floating back to it s source
no leakage current via datalogging anymore – must be implemented as quick as possible on all J
Boxes.....
REMEDY (possible):
all 4 transformers should get same Remedy action plan as described in PV Plant Report
Munich , 28.10 2015
Andreas Iliou

More Related Content

What's hot

Earthing Arrangements
Earthing  ArrangementsEarthing  Arrangements
Earthing Arrangements
Paul Holden
 
Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems Safety
Talia Carbis
 
System neutral-earthing
System neutral-earthingSystem neutral-earthing
System neutral-earthing
azzaabo
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
Aarjun Singh Panesar
 
Neutral grounding resistor
Neutral grounding resistorNeutral grounding resistor
Neutral grounding resistor
Nithin Kumar K S
 
Lightning and Surge Protection for Potentially Explosive Atmospheres
Lightning and Surge Protection for Potentially Explosive AtmospheresLightning and Surge Protection for Potentially Explosive Atmospheres
Lightning and Surge Protection for Potentially Explosive Atmospheres
Instrument Specialties, Inc.
 
Neutral grounding project seminar
Neutral grounding project seminarNeutral grounding project seminar
Neutral grounding project seminar
Justin Rams
 
The sheath voltage_limiter
The sheath voltage_limiterThe sheath voltage_limiter
The sheath voltage_limiter
Gilberto Mejía
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
Mahesh Chandra Manav
 
Neutral grounding
Neutral groundingNeutral grounding
Neutral grounding
Asad Hussain
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
michaeljmack
 
Schneider system grounding
Schneider   system groundingSchneider   system grounding
Schneider system grounding
Manuel Giovannetti
 
Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
Practicing In Some Infra Company
 
Low voltage systems
Low voltage systemsLow voltage systems
Low voltage systems
freelay
 
Lightning protection for overhead distribution lines
Lightning protection for overhead distribution linesLightning protection for overhead distribution lines
Lightning protection for overhead distribution lines
Gilberto Mejía
 
Grounding, neutral & earthing
Grounding, neutral & earthingGrounding, neutral & earthing
Grounding, neutral & earthing
Engr Muhammad Imran
 
Neutral grounding
Neutral groundingNeutral grounding
Neutral grounding
jawaharramaya
 
Conductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arrestersConductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arresters
Gilberto Mejía
 
Electrical Grounding Practices- Part 2 of 3
Electrical Grounding Practices- Part 2 of 3Electrical Grounding Practices- Part 2 of 3
Electrical Grounding Practices- Part 2 of 3
M.S. Jacobs & Associates
 
Aterramento ground 1 - dimensionamento
Aterramento ground 1 - dimensionamento Aterramento ground 1 - dimensionamento
Aterramento ground 1 - dimensionamento
Ragamurf
 

What's hot (20)

Earthing Arrangements
Earthing  ArrangementsEarthing  Arrangements
Earthing Arrangements
 
Electrical Systems Safety
Electrical Systems SafetyElectrical Systems Safety
Electrical Systems Safety
 
System neutral-earthing
System neutral-earthingSystem neutral-earthing
System neutral-earthing
 
Electrical testing
Electrical testingElectrical testing
Electrical testing
 
Neutral grounding resistor
Neutral grounding resistorNeutral grounding resistor
Neutral grounding resistor
 
Lightning and Surge Protection for Potentially Explosive Atmospheres
Lightning and Surge Protection for Potentially Explosive AtmospheresLightning and Surge Protection for Potentially Explosive Atmospheres
Lightning and Surge Protection for Potentially Explosive Atmospheres
 
Neutral grounding project seminar
Neutral grounding project seminarNeutral grounding project seminar
Neutral grounding project seminar
 
The sheath voltage_limiter
The sheath voltage_limiterThe sheath voltage_limiter
The sheath voltage_limiter
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
 
Neutral grounding
Neutral groundingNeutral grounding
Neutral grounding
 
Generator grounding
Generator groundingGenerator grounding
Generator grounding
 
Schneider system grounding
Schneider   system groundingSchneider   system grounding
Schneider system grounding
 
Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
 
Low voltage systems
Low voltage systemsLow voltage systems
Low voltage systems
 
Lightning protection for overhead distribution lines
Lightning protection for overhead distribution linesLightning protection for overhead distribution lines
Lightning protection for overhead distribution lines
 
Grounding, neutral & earthing
Grounding, neutral & earthingGrounding, neutral & earthing
Grounding, neutral & earthing
 
Neutral grounding
Neutral groundingNeutral grounding
Neutral grounding
 
Conductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arrestersConductor size considerations_for_station_class_arresters
Conductor size considerations_for_station_class_arresters
 
Electrical Grounding Practices- Part 2 of 3
Electrical Grounding Practices- Part 2 of 3Electrical Grounding Practices- Part 2 of 3
Electrical Grounding Practices- Part 2 of 3
 
Aterramento ground 1 - dimensionamento
Aterramento ground 1 - dimensionamento Aterramento ground 1 - dimensionamento
Aterramento ground 1 - dimensionamento
 

Similar to Report earthing grounding pv with shielded, armoured dc cabling (worldwide)

Presentation jmv internal
Presentation jmv internalPresentation jmv internal
Presentation jmv internal
Mahesh Chandra Manav
 
Presentation best practice earthing and protection
Presentation   best practice earthing and protectionPresentation   best practice earthing and protection
Presentation best practice earthing and protection
Mahesh Chandra Manav
 
Multi – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptxMulti – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptx
MarlonAgustin3
 
s.pdf
s.pdfs.pdf
s.pdf
epaysokhan
 
Earthing Concepts
Earthing ConceptsEarthing Concepts
Earthing Concepts
mvrkprasad
 
GIS substation Information (Detailed Report)
GIS substation Information (Detailed Report)GIS substation Information (Detailed Report)
GIS substation Information (Detailed Report)
siddharth sharma
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.ppt
sqhuet1
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.ppt
ganesh2428364
 
EMC and HFPQ for industrial networks - Jos Knockaert, UGent and Peter Thomas...
EMC and HFPQ for industrial networks -  Jos Knockaert, UGent and Peter Thomas...EMC and HFPQ for industrial networks -  Jos Knockaert, UGent and Peter Thomas...
EMC and HFPQ for industrial networks - Jos Knockaert, UGent and Peter Thomas...
PROFIBUS and PROFINET InternationaI - PI UK
 
SUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxSUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptx
HimanshuShrivastava74
 
EMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGent
EMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGentEMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGent
EMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGent
PROFIBUS and PROFINET InternationaI - PI UK
 
Importance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docxImportance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docx
vikram desai
 
Protection Devices and the Lightning
Protection Devices and the LightningProtection Devices and the Lightning
Protection Devices and the Lightning
Ameen San
 
Technical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protectionTechnical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protection
mwashagha
 
Technical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protectionTechnical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protection
mwashagha
 
Technical guide-for-electromagnetic-disturbance-protection 2
Technical guide-for-electromagnetic-disturbance-protection 2Technical guide-for-electromagnetic-disturbance-protection 2
Technical guide-for-electromagnetic-disturbance-protection 2
mwashagha
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing Design
IOSRJEEE
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
Mahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
Mahesh Chandra Manav
 
E04523236
E04523236E04523236
E04523236
IOSR-JEN
 

Similar to Report earthing grounding pv with shielded, armoured dc cabling (worldwide) (20)

Presentation jmv internal
Presentation jmv internalPresentation jmv internal
Presentation jmv internal
 
Presentation best practice earthing and protection
Presentation   best practice earthing and protectionPresentation   best practice earthing and protection
Presentation best practice earthing and protection
 
Multi – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptxMulti – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptx
 
s.pdf
s.pdfs.pdf
s.pdf
 
Earthing Concepts
Earthing ConceptsEarthing Concepts
Earthing Concepts
 
GIS substation Information (Detailed Report)
GIS substation Information (Detailed Report)GIS substation Information (Detailed Report)
GIS substation Information (Detailed Report)
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.ppt
 
GOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.pptGOOD GROUNDING PRACTICES.ppt
GOOD GROUNDING PRACTICES.ppt
 
EMC and HFPQ for industrial networks - Jos Knockaert, UGent and Peter Thomas...
EMC and HFPQ for industrial networks -  Jos Knockaert, UGent and Peter Thomas...EMC and HFPQ for industrial networks -  Jos Knockaert, UGent and Peter Thomas...
EMC and HFPQ for industrial networks - Jos Knockaert, UGent and Peter Thomas...
 
SUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptxSUBSTATION DESIGN powerpoint presentation.pptx
SUBSTATION DESIGN powerpoint presentation.pptx
 
EMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGent
EMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGentEMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGent
EMC for Networks - Peter Thomas, Control Specialists and Jos Knockaert, UGent
 
Importance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docxImportance of Earth Mat in Substation.docx
Importance of Earth Mat in Substation.docx
 
Protection Devices and the Lightning
Protection Devices and the LightningProtection Devices and the Lightning
Protection Devices and the Lightning
 
Technical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protectionTechnical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protection
 
Technical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protectionTechnical guide-for-electromagnetic-disturbance-protection
Technical guide-for-electromagnetic-disturbance-protection
 
Technical guide-for-electromagnetic-disturbance-protection 2
Technical guide-for-electromagnetic-disturbance-protection 2Technical guide-for-electromagnetic-disturbance-protection 2
Technical guide-for-electromagnetic-disturbance-protection 2
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing Design
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
E04523236
E04523236E04523236
E04523236
 

More from Andreas ILIOU - Elektro- Solar

Uwe linder reference
Uwe linder referenceUwe linder reference
Uwe linder reference
Andreas ILIOU - Elektro- Solar
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
Andreas ILIOU - Elektro- Solar
 
Energy audit on site v02 andreas iliou
Energy audit on site v02 andreas iliouEnergy audit on site v02 andreas iliou
Energy audit on site v02 andreas iliou
Andreas ILIOU - Elektro- Solar
 
Leakage current per inverter recorded
Leakage current per inverter recordedLeakage current per inverter recorded
Leakage current per inverter recorded
Andreas ILIOU - Elektro- Solar
 
Pid-degradation of solarcells- solon in englisch
 Pid-degradation of solarcells- solon  in englisch Pid-degradation of solarcells- solon  in englisch
Pid-degradation of solarcells- solon in englisch
Andreas ILIOU - Elektro- Solar
 
Danfoss thin film and pid related topic
Danfoss thin film and pid related topicDanfoss thin film and pid related topic
Danfoss thin film and pid related topic
Andreas ILIOU - Elektro- Solar
 
Transformerless inverters with thin film technology-Danfoss thin film and pid...
Transformerless inverters with thin film technology-Danfoss thin film and pid...Transformerless inverters with thin film technology-Danfoss thin film and pid...
Transformerless inverters with thin film technology-Danfoss thin film and pid...
Andreas ILIOU - Elektro- Solar
 
Shading v02
Shading v02Shading v02
Energy Audits 2011....2018
Energy Audits 2011....2018Energy Audits 2011....2018
Energy Audits 2011....2018
Andreas ILIOU - Elektro- Solar
 
Suntech ppt 2011 new vi template.ppt1.ppt.engl
Suntech ppt 2011 new vi template.ppt1.ppt.englSuntech ppt 2011 new vi template.ppt1.ppt.engl
Suntech ppt 2011 new vi template.ppt1.ppt.engl
Andreas ILIOU - Elektro- Solar
 
Site visit as discussed
Site visit  as discussedSite visit  as discussed
Site visit as discussed
Andreas ILIOU - Elektro- Solar
 

More from Andreas ILIOU - Elektro- Solar (13)

Uwe linder reference
Uwe linder referenceUwe linder reference
Uwe linder reference
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Energy audit on site v02 andreas iliou
Energy audit on site v02 andreas iliouEnergy audit on site v02 andreas iliou
Energy audit on site v02 andreas iliou
 
Leakage current per inverter recorded
Leakage current per inverter recordedLeakage current per inverter recorded
Leakage current per inverter recorded
 
20110711 blitzschutz spezifikationen
20110711 blitzschutz spezifikationen20110711 blitzschutz spezifikationen
20110711 blitzschutz spezifikationen
 
Pid-degradation of solarcells- solon in englisch
 Pid-degradation of solarcells- solon  in englisch Pid-degradation of solarcells- solon  in englisch
Pid-degradation of solarcells- solon in englisch
 
80 MW Stringwechselrichter Lösung
80 MW Stringwechselrichter Lösung80 MW Stringwechselrichter Lösung
80 MW Stringwechselrichter Lösung
 
Danfoss thin film and pid related topic
Danfoss thin film and pid related topicDanfoss thin film and pid related topic
Danfoss thin film and pid related topic
 
Transformerless inverters with thin film technology-Danfoss thin film and pid...
Transformerless inverters with thin film technology-Danfoss thin film and pid...Transformerless inverters with thin film technology-Danfoss thin film and pid...
Transformerless inverters with thin film technology-Danfoss thin film and pid...
 
Shading v02
Shading v02Shading v02
Shading v02
 
Energy Audits 2011....2018
Energy Audits 2011....2018Energy Audits 2011....2018
Energy Audits 2011....2018
 
Suntech ppt 2011 new vi template.ppt1.ppt.engl
Suntech ppt 2011 new vi template.ppt1.ppt.englSuntech ppt 2011 new vi template.ppt1.ppt.engl
Suntech ppt 2011 new vi template.ppt1.ppt.engl
 
Site visit as discussed
Site visit  as discussedSite visit  as discussed
Site visit as discussed
 

Recently uploaded

一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
shahdabdulbaset
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 

Recently uploaded (20)

一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 

Report earthing grounding pv with shielded, armoured dc cabling (worldwide)

  • 1. Expertise Reports Address: Andreas Iliou 81739 Munich Technical Report I will use simple language to make you understand , earthing is Drainage system of Electrical wastage, let us assume the system is waste water drainage system, and we are using pipes to drain the waste water. if the drainage is not proper,that means either you have chosen wrong pipe size which is incapable to drain the required waste, then, your water will be stored in the pipe,and the force of water will increase in the pipe, same case is happening in earthing system, if you do not have the required conductor to dissipate the fault then stress will be in your system, so if you will increase the conductor size by making a mesh that means you are increasing the number of pipes to drain the required waste water. same thing happening in a mesh, the more soil is associated with the conductor the rate of dissipation will be more, so it will create a low impedance path to fault current A Systems Approach to Earthing The ‘protective conductor’ must also provide a functional earth to the equipment operating on the system that is, it has to provide a path for the leakage currents (at the fundamental frequency) and the high frequency noise currents arising from, for example, switched mode power supplies via radio frequency interference (RFI) filters as well as being a voltage reference for signal interfaces. The magnitude of leakage currents varies around the installation. Since the earth leakage current originates mainly from single-phase equipment on each of the three phases, balanced components of the fundamental from each phase will tend to cancel, so that the current in the protective conductor may increase or decrease as circuits are combined along a distribution system. High frequency currents can be a bigger problem as far as functionality is concerned. Much of the equipment that produces noise on the earth is also sensitive to it – but there is a difference; the equipment produces noise currents and it is sensitive to noise voltages. If the noise currents can be transported to earth without producing noise voltage drop, all will be well. This requires a connection to earth that has low impedance at all frequencies. To decrease radiated noise, the earth path for the noise current should run close to the supply conductors. Building protective conductor arrangement --Fault current --Leakage current --Signal reference plane --Electromagnetic compatibility
  • 2. ‘Touch potential’ is the voltage difference between the earthed structure and a person standing on the ground within touching distance of the structure. ‘Step potential’ is the voltage between the feet of a person (assumed to be 1 metre apart)standing on the ground. The maximum touch and step potentials are limited by various Standard in here the Main Ring loop 5-10mA could be measured from MV Line crossing, throughout the PV Plant once running in parallel all other earth conducters have 3-4 Ohm and no leakage current 0- 0,4 mA.. Main Earth Loop the UK ( British Standards ) are met / Stepvoltage ok ( so no design flaw in here) Role of bonding (1) Protection of equipment and personnel from the hazards of lightning discharges; (2) Establishment of fault current return paths;
  • 3. (3) Establishment of homogeneous and stable paths for signal currents; (4) Minimization of RF potentials on enclosures and housings; (5) Protection of personnel from shock hazards arising from accidental power ground; and (6) Prevention of static charge accumulation. Effects of poor bonds. With proper design and implementation, bonds minimize differences in potential between points within the fault protection, signal reference, shielding, and lightning protection networks of an electronic system. Bonding is also important to the performance of other interference control measures. For example, adequate bonding of connector shells to equipment enclosures is essential to the maintenance of the integrity of cable shields and to the retention of the low loss transmission properties of the cables. The careful bonding of seams and joints in EM shields is essential to the achievement of a high degree of shielding effectiveness. Interference reduction components and devices also must be well bonded for optimum performance. Role of grounding The grounding system consists of four subsystems, (1) the earth electrode subsystem,(2) the fault protection subsystem,(3) the lightning protection subsystem,and (4) the signal reference subsystem.The purpose of the earth electrode subsystem is to provide a path to earth for the discharge of lightning strokes, prevent shock hazard to personnel, and assist in the control of noise. Role of shielding Shielding involves the use of metallic barriers to prevent the direct radiation of incident energy into the system and internal enclosures and to minimize the coupling of energy to cables and other collectors that may penetrate these barriers. Shielding is the basic element of any barrier design, and little EMP protection is possible without its proper use. PV Plant and Energy Audit e.g: The Panel was not grounded at All. In an IT environment and Noise generated a 16mm (thin wire) is needed. ( Was it testwise removed ?! Lot of different type of earthing datacables was surveyed) No Grounding towards Earth Bar , no Grounding towards distribution board ( 230 VAC ) via UPS system. There was also no plugpoint installed at the wall (outlet) cable was stripped and than fixed with Isolationtape. The PE (Earth ) was not terminated at the Earthing Point (wire was hanging loose). The only contact towards Earth was the metallic enclosure of the Wall from Container via 4 screws !!
  • 4. PE wire visually with Isotape wrapped and not connected. No one could tell who connected up this side of installation. Cable towards UPS unit was done from team (previously) Mounting of Panels (only /no wiring done) from electrician. 16mm Chassis Grounding (needed )
  • 5. J- Box implementation ( best practice ) if PE ( Earh Bar ) is 0,5 mtr away from connecting up device ( surge arrestor) a V Shape connection 1x towards Earth bar existing with 4mm and a second ( back to it s source ) should be installed in here Plus and Minuscable ( armoured shield) with 16mm
  • 6. shielded dataloggingcable to prevent Noise from Inverters during switch ON OFF infiltrating the cabling , surges will close surge arrestors and in between 600-800mA could be measured.... if surge tries to eliminate during this time Earthloop is complete and was transferred towards the Earth Bar from grounding Pillars and Plus Minus cabling ( surge arrestors) Minusside coupled with Earth inside Panel closing and transferring Noise generated via Datacables. This must be completely avoided via seperate Earthing Path quickly back to it s source. before there was No common Earthing supplied in Panel when I visited the site Monday 20.10.2014 it was grounded in between all 3 Power supplies Negative to Negative to Negative and than towards Earth with a 1,5mm wire which is correct, but problematic is the fact that there was no Earth connected either towards Earth Bar or via UPS unit ( 230 V AC ) I measured with open connection of AC unit ( batterypowered ) same outcome the Noise floating backwards from datacabling was roughly 600-800mA. Before Energy Audit the ( shield ) was used as common and at the same time as Earth inside Datacable. I changed the setup according emf friendly version with shield seperate and yell/green as common reference for communication. After Earthing Chassis a constant leakage of 800 than 600 and less towards 500mA could be measured. ( while inverters were switching Master /Slave units ON OFF during rainy / sunny weather ) Conclusions:
  • 7. Following action has to be implemented ( inside Transformer/Inverters) -Earthing Panel via db board ( bigger Path back to source ) not via 230 V AC cables -Earthing Panel via Earth Bar -Earthing DB Board and Earth Bar ( all with 16mm thinwire) -Earthing J Boxes via V Shape Earthing ( sec. time using Plus/Minus armoured shield)
  • 8. The investigations show similar behaviour in All 4 transformerstations I visited. The earthing system of a building or site is a critical part of the electrical infrastructure and can determine the future viability of businesses operating in it. It is required to deal with short duration fault currents of several hundred Amperes, standing currents of a few Amperes and high frequency noise currents returning them to source or ground with close to zero voltage drop for noise currents and with no risk of damage for fault currents. At the same time, it must protect the equipment and personnel housed in the building during lightning strikes (fast transients in the kiloampere region) in the interconnected earthing system. After Remedy 5,6 mA measured.
  • 9. Before 169 mA and more measured coming via Inverters and Minus /Plus Cabling DC MAIN depending on surges is cloudy/sunny day with lots of ON OFF Master Slave units... important V shape already incoming 4mm cabling from Pillar and second time connected via Plus /Minus armoured shield towards same point... Earth Bar as connection point should be avoided, longer than 0,5 mtrs away from Pillar.
  • 10. Previously earthed system ( shield used – didn t work) from outside towards Panel
  • 11. tested onsite with last 2 days.....working floating back to it s source no leakage current via datalogging anymore – must be implemented as quick as possible on all J Boxes..... REMEDY (possible): all 4 transformers should get same Remedy action plan as described in PV Plant Report Munich , 28.10 2015 Andreas Iliou