Evolution of Indian Grids
Pre – Independence Period
 First Hydel Project (Darjeeling) – 1897
 First Steam Plant (1000 KW) Calcutta – 1899
 Survey of Hydro Power Potential – 1919-1921
 Generation during World War – II – 1140
 Generation at the time of Independence – 1349
MW
3
 Phenomenal expansion since Independence
 Generation : 1349 MW 162,058 MW
(in 1947) (in 2010)
 Grid :
Local grid – at the time of Independence.
State Grids – emerged in 1960s.
Regional Grids – in 1970s.
Five Regional Grids – Northern, Western, Southern,
Eastern & North-eastern
National Grid – All Five Regions Interconnected (2002)
Formation Of Central Grid by Synchronizing
North Eastern - Eastern – Western Grids (2003)
Indian Power Grid – its Evolution
4
Peculiarities of Regional Grids in India
SOUTHERN
REGION
WESTER
NREGIO
N
EASTERN
REGION
NORTHERN
REGION NORTH-
EASTERN
REGION
REGIONAL
GRIDS
Deficit Region
Snow fed – run-of –the –river hydro
Highly weather sensitive load
Adverse weather conditions: Fog &
Dust Storm
Very low load
High hydro potential
Evacuation problems
Industrial load and agricultural load
Low load
High coal reserves
Pit head base load plants
High load (40% agricultural load)
Monsoon dependent hydro
CHICKEN-NECK
5
GRID OPERATION IN THE PAST(Grid
Indiscipline )
 LOW FREQUENCY PROBLEMS
 FREQUENCY REMAINED AT 48 HZ AND BELOW FOR MOST
PART
 LOW VOLTAGE OPERATION
 VOLTAGE AT SOME SUB STATIONS DIPPED TO AS LOW AS
300 Kv!!!!
 FREQUENT GRID DISTURBANCES
 A DISTURBANCE ALMOST EVERY MONTH
 IMMENSE FINANCIAL LOSSES FOR INDUSTRY
 LOADS FREQUENTLY CUT OFF DUE TO RELAY OPERATION
 INCREASED ELECTRICAL LOSSES
 INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS
 INEFFICIENT UTILISATION OF PIT HEAD PLANTS
 GRID OPERATION FOCUSSED ON FIRE-FIGHTING RATHER THAN
OPTIMISATION AND ECONOMY
6
GRID OPERATION:
A TIGHT ROPE WALK
BLACK-OUT
VOLTAGE
COLLAPSE IN-ECONOMIC
OPERATION
INSTABILITY
POWER
SWINGS
INCREASED
LOSSES
7
AVAILABILITY BASED TARIFF
 AVAILABILITY BASED TARIFF
8
REAL TIME PRICING- NEW
TARRIFF MECHANISMS
 ABT is
 Frequency Based Tariff
 Reactive power based w.r.t voltage
tariff
APTRANSCO
9
REAL TIME PRICING- NEW
TARRIFF MECHANISMS
 Components Proposed In The ABT
1) Capacity charges based on target availability - Full
fixed charges at an availability of 80% in case of NTPC
and 72% in case of NLC
2) Energy charges for the energy scheduled
- Variable Cost
3) Unscheduled Interchange (UI) charge - 0-1000
according to variations in each time Block Ps/Unit.
of 15 mts. Scheduled energy w.r.t. frequency (UI)
4) Reactive Power Pricing
APTRANSCO
10
REAL TIME PRICING-NEW
TARRIFF MECHANISMS
 Energy Charges
 Energy Charges =Rate of Energy Charges x Schedule.Generation (Ex-
Bus)
 UnScheduled Interchange (UI)
 Variation in actual Generation / Drawal and Scheduled Generation / Drawal
shall accounted for through U.I
 UI for Generator = Actual Generation – Scheduled Generation
 UI for Beneficiaries=Total Actual drawal – Total Scheduled Drawal
 UI worked out for 15 minutes time block.
 Average Frequency of time block UI Rate (Paise per Kwh)
 Below 49.00 Hz 1000.00
 Above 50.5 Hz 0.0
APTRANSCO
11
REAL TIME PRICING-NEW
TARRIFF MECHANISMS
 Pricing for Reactive Power
 All reactive power exchanges to be compensated to avoid ISTS
lines carrying reactive power.
 Every Beneficiary
 Pays for VAR drawal when voltage at the metering point is
below 97%.
 Gets paid for VAR return when voltage is below 97%.
 Gets paid for VAR drawal when voltage is above 103%.
 Pays for VAR return when voltage is above 103%.
 Need not pay for drawal of reactive power at the Generating
Station
 Charge of 4 paise per KVARh was proposed
 Generator will not be compensated for reactive power
generated.
APTRANSCO
12
Slope of 17
paise/kWh
per 0.02 Hz
Slope of 12
paise/kWh
per 0.02 Hz
13
Changing UI Rates
0 0
3
4.8
7.35
7.35
0
1
2
3
4
5
6
7
8
9
10
49 49.1 49.2 49.3 49.4 49.5 49.6 49.7 49.8 49.9 50 50.1 50.2 50.3 50.4 50.5
Frequency (Hz)
INR/kWh
upto 31.03.2004 w.e.f. 01.04.2004 w.e.f. 01.10.2004 w.e.f. 01.04.2007
w.e.f. 07.01.2008 w.e.f 01.04.2009
14
IndIan ElEctrIcIty
MarkEt
15
CustomerCustomer
CustomerCustomer
DistributionDistributionTransmissionTransmissionGenerationGeneration
CustomerCustomer
TRADERTRADER
Debundling of Electricity by introducing IE ACT 2003
DISCOMDISCOM
DISCOMDISCOMDISCOMDISCOM
GENCOGENCO GENCOGENCO GENCOGENCO
OPEN ACCESS : Distribution
OPEN ACCESS : Transmission
TRADERTRADER
16
An Integrated Electricity Market
AVILABILITY BASED TARIFF
ENERGY SECURITY CONSTRAINTS
OPEN ACESS
•CAPACITY CHARGES
• ENEGRY CHARGES
• REACTIVE POWER CHARGES
•UI CHARGES
•CONTRAUAL OBLIGATIONS
•Long-term capacity access charge (LCC)
• Voltage,frequency,line capacity etc.
VISULIZATION OF RESTRUCTURED COMPETITIVE ELECTRICITY MARKETVISULIZATION OF RESTRUCTURED COMPETITIVE ELECTRICITY MARKET
17
Current Power Market Structure
Indian Power Market
Long Term Short Term
PPA’s
Bilateral
1 Direct
2 thru Trader
Exchange UI
1.Day Ahead
2. Same day
3. FCFS
4. Upto 3
months
5. Banking
Day Ahead
1. Intra day
2. DAC
3. Daily
4. Weekly
5. Monthly
Real
Time
18
IEGC
Feb.’2000
Ancillary
Market 2010
ABT
2002-03AND UNIFIED
SCADA SYSTEMS
Open Access
2004
PX
2008
Capacity
Market
Evolution of Power Market in IndiaEvolution of Power Market in India
19
Regional Electricity market In India
 Now it operates over the ISTS, is governed by
the frequency linked operation and commercial
settlement i.e through ABT and (UI) mechanism.
 The ABT mechanism has replaced the command and
control system employed earlier with a contractual
approach.
 The utilities have full freedom and choice to enter
into long-term and short-term bilateral contracts.
 These contracts are incorporated in the daily
interchange schedules issued by the RLDCs.
20

More Related Content

What's hot

CG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsCG (Crompton Greaves) Alternators
CG (Crompton Greaves) Alternators
Richard Schembri
 
Applimotion ho series_motors_datasheet
Applimotion ho series_motors_datasheetApplimotion ho series_motors_datasheet
Applimotion ho series_motors_datasheet
Electromate
 
Shubham chamoli 132 kv substation presenttation
Shubham  chamoli 132 kv substation presenttationShubham  chamoli 132 kv substation presenttation
Shubham chamoli 132 kv substation presenttation
shubhamchamoli
 
Turbo-Generator
Turbo-GeneratorTurbo-Generator
Turbo-Generator
Sandip Ghosh
 
DFIG BASED WIND TURBINE
DFIG BASED WIND TURBINEDFIG BASED WIND TURBINE
DFIG BASED WIND TURBINE
Logu Mani
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Stories
michaeljmack
 
Typical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load loggerTypical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load logger
Ajeesh Joseph
 
Excitation Synchronous Wind Power Generators With Maximum Power Tracking Scheme
Excitation Synchronous Wind Power Generators With Maximum Power Tracking SchemeExcitation Synchronous Wind Power Generators With Maximum Power Tracking Scheme
Excitation Synchronous Wind Power Generators With Maximum Power Tracking Scheme
Projectsatbangalore
 
Electric motors
Electric motorsElectric motors
Electric motors
michaeljmack
 
ELECTRICAL SCHMATICS AT NCP_FINAL
ELECTRICAL SCHMATICS AT NCP_FINALELECTRICAL SCHMATICS AT NCP_FINAL
ELECTRICAL SCHMATICS AT NCP_FINALFAIZ AHMAD
 
Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
MANOJ KUMAR MAHARANA
 
Galil blm n23_catalog
Galil blm n23_catalogGalil blm n23_catalog
Galil blm n23_catalog
Electromate
 
Generator basic concepts
Generator basic conceptsGenerator basic concepts
Generator basic concepts
michaeljmack
 
OLV1 (Load Flow Analysis) in Synch Mod
OLV1 (Load Flow Analysis) in Synch ModOLV1 (Load Flow Analysis) in Synch Mod
OLV1 (Load Flow Analysis) in Synch ModMuhammad Sarfraz
 
Iai rcl sa2_l_specsheet
Iai rcl sa2_l_specsheetIai rcl sa2_l_specsheet
Iai rcl sa2_l_specsheet
Electromate
 
Excitation3
Excitation3Excitation3
Excitation3
Abdu rahim Buser
 
Eb1 dcs1800 datasheet
Eb1 dcs1800 datasheetEb1 dcs1800 datasheet
Eb1 dcs1800 datasheet
staubin
 

What's hot (20)

CG (Crompton Greaves) Alternators
CG (Crompton Greaves) AlternatorsCG (Crompton Greaves) Alternators
CG (Crompton Greaves) Alternators
 
Applimotion ho series_motors_datasheet
Applimotion ho series_motors_datasheetApplimotion ho series_motors_datasheet
Applimotion ho series_motors_datasheet
 
Shubham chamoli 132 kv substation presenttation
Shubham  chamoli 132 kv substation presenttationShubham  chamoli 132 kv substation presenttation
Shubham chamoli 132 kv substation presenttation
 
Turbo-Generator
Turbo-GeneratorTurbo-Generator
Turbo-Generator
 
DFIG BASED WIND TURBINE
DFIG BASED WIND TURBINEDFIG BASED WIND TURBINE
DFIG BASED WIND TURBINE
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Stories
 
Thor power, technical summary, 1210
Thor power, technical summary, 1210Thor power, technical summary, 1210
Thor power, technical summary, 1210
 
Typical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load loggerTypical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load logger
 
Excitation Synchronous Wind Power Generators With Maximum Power Tracking Scheme
Excitation Synchronous Wind Power Generators With Maximum Power Tracking SchemeExcitation Synchronous Wind Power Generators With Maximum Power Tracking Scheme
Excitation Synchronous Wind Power Generators With Maximum Power Tracking Scheme
 
Electric motors
Electric motorsElectric motors
Electric motors
 
ELECTRICAL SCHMATICS AT NCP_FINAL
ELECTRICAL SCHMATICS AT NCP_FINALELECTRICAL SCHMATICS AT NCP_FINAL
ELECTRICAL SCHMATICS AT NCP_FINAL
 
Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
 
Galil blm n23_catalog
Galil blm n23_catalogGalil blm n23_catalog
Galil blm n23_catalog
 
Generator basic concepts
Generator basic conceptsGenerator basic concepts
Generator basic concepts
 
OLV1 (Load Flow Analysis) in Synch Mod
OLV1 (Load Flow Analysis) in Synch ModOLV1 (Load Flow Analysis) in Synch Mod
OLV1 (Load Flow Analysis) in Synch Mod
 
CSRF V1.0
CSRF V1.0CSRF V1.0
CSRF V1.0
 
Tube Data Sheet
Tube Data SheetTube Data Sheet
Tube Data Sheet
 
Iai rcl sa2_l_specsheet
Iai rcl sa2_l_specsheetIai rcl sa2_l_specsheet
Iai rcl sa2_l_specsheet
 
Excitation3
Excitation3Excitation3
Excitation3
 
Eb1 dcs1800 datasheet
Eb1 dcs1800 datasheetEb1 dcs1800 datasheet
Eb1 dcs1800 datasheet
 

Viewers also liked

Get acquainted with the new ASP.Net 5
Get acquainted with the new ASP.Net 5Get acquainted with the new ASP.Net 5
Get acquainted with the new ASP.Net 5
Suyati Technologies
 
Commercial presentation
Commercial presentationCommercial presentation
Commercial presentation
Anil Redemption
 
Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015
Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015
Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015
Ilias Koulalis
 
CaSt 28102014 Bullies & Whipping Boys Korean School Amsterdam
CaSt 28102014 Bullies & Whipping Boys Korean School AmsterdamCaSt 28102014 Bullies & Whipping Boys Korean School Amsterdam
CaSt 28102014 Bullies & Whipping Boys Korean School AmsterdamDr. Carl H.D. Steinmetz
 
Ημέρα κατά της Παχυσαρκίας 2014
Ημέρα κατά της Παχυσαρκίας 2014Ημέρα κατά της Παχυσαρκίας 2014
Ημέρα κατά της Παχυσαρκίας 2014
Ilias Koulalis
 
Slachtofferhulp: ethnisch divers?
Slachtofferhulp: ethnisch divers?Slachtofferhulp: ethnisch divers?
Slachtofferhulp: ethnisch divers?
Dr. Carl H.D. Steinmetz
 
Reporte de global de las calificaciones de todos los cursos del iv modulo i g...
Reporte de global de las calificaciones de todos los cursos del iv modulo i g...Reporte de global de las calificaciones de todos los cursos del iv modulo i g...
Reporte de global de las calificaciones de todos los cursos del iv modulo i g...Holmes Iza Sinche
 
Education POG GGZ for InHolland
Education POG GGZ for InHollandEducation POG GGZ for InHolland
Education POG GGZ for InHolland
Dr. Carl H.D. Steinmetz
 
La Salut a Barcelona 2014
La Salut a Barcelona 2014La Salut a Barcelona 2014
Jacob riis[1] (1) lol
Jacob riis[1] (1) lolJacob riis[1] (1) lol
Jacob riis[1] (1) lolmicaelalol
 
dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...
dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...
dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...
Agència de Salut Pública de Barcelona - ASPB
 
Identifying variables
Identifying variablesIdentifying variables
Identifying variablesKiefer Sison
 
Trastornos por deterioro cognitivo griselda
Trastornos por deterioro cognitivo griseldaTrastornos por deterioro cognitivo griselda
Trastornos por deterioro cognitivo griselda
Griselda Muñoz Hernandez
 
Rohit Singh(sap basis)
Rohit Singh(sap basis)Rohit Singh(sap basis)
Rohit Singh(sap basis)Rohit Singh
 
Congruence between triangles
Congruence between trianglesCongruence between triangles
Congruence between triangles
Raymundo Raymund
 
CaSt 11012016 De Nieuwe Wereld op school versie 2
CaSt 11012016 De Nieuwe Wereld op school versie 2CaSt 11012016 De Nieuwe Wereld op school versie 2
CaSt 11012016 De Nieuwe Wereld op school versie 2Dr. Carl H.D. Steinmetz
 
Graph of linear equations
Graph of linear equationsGraph of linear equations
Graph of linear equations
Raymundo Raymund
 
5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for
5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for
5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for
Dr. Carl H.D. Steinmetz
 
εργασια 1
εργασια 1εργασια 1
εργασια 1
Ilias Koulalis
 

Viewers also liked (20)

Get acquainted with the new ASP.Net 5
Get acquainted with the new ASP.Net 5Get acquainted with the new ASP.Net 5
Get acquainted with the new ASP.Net 5
 
Commercial presentation
Commercial presentationCommercial presentation
Commercial presentation
 
Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015
Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015
Παγκόσμια Ημέρα Ασφαλούς Πλοήγησης στο Διαδίκτυο 2015
 
CaSt 28102014 Bullies & Whipping Boys Korean School Amsterdam
CaSt 28102014 Bullies & Whipping Boys Korean School AmsterdamCaSt 28102014 Bullies & Whipping Boys Korean School Amsterdam
CaSt 28102014 Bullies & Whipping Boys Korean School Amsterdam
 
Ημέρα κατά της Παχυσαρκίας 2014
Ημέρα κατά της Παχυσαρκίας 2014Ημέρα κατά της Παχυσαρκίας 2014
Ημέρα κατά της Παχυσαρκίας 2014
 
Slachtofferhulp: ethnisch divers?
Slachtofferhulp: ethnisch divers?Slachtofferhulp: ethnisch divers?
Slachtofferhulp: ethnisch divers?
 
Reporte de global de las calificaciones de todos los cursos del iv modulo i g...
Reporte de global de las calificaciones de todos los cursos del iv modulo i g...Reporte de global de las calificaciones de todos los cursos del iv modulo i g...
Reporte de global de las calificaciones de todos los cursos del iv modulo i g...
 
3 g by pasha
3 g by pasha3 g by pasha
3 g by pasha
 
Education POG GGZ for InHolland
Education POG GGZ for InHollandEducation POG GGZ for InHolland
Education POG GGZ for InHolland
 
La Salut a Barcelona 2014
La Salut a Barcelona 2014La Salut a Barcelona 2014
La Salut a Barcelona 2014
 
Jacob riis[1] (1) lol
Jacob riis[1] (1) lolJacob riis[1] (1) lol
Jacob riis[1] (1) lol
 
dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...
dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...
dCOT study phase 4 Pattern of use, acceptability and perceived risk of electr...
 
Identifying variables
Identifying variablesIdentifying variables
Identifying variables
 
Trastornos por deterioro cognitivo griselda
Trastornos por deterioro cognitivo griseldaTrastornos por deterioro cognitivo griselda
Trastornos por deterioro cognitivo griselda
 
Rohit Singh(sap basis)
Rohit Singh(sap basis)Rohit Singh(sap basis)
Rohit Singh(sap basis)
 
Congruence between triangles
Congruence between trianglesCongruence between triangles
Congruence between triangles
 
CaSt 11012016 De Nieuwe Wereld op school versie 2
CaSt 11012016 De Nieuwe Wereld op school versie 2CaSt 11012016 De Nieuwe Wereld op school versie 2
CaSt 11012016 De Nieuwe Wereld op school versie 2
 
Graph of linear equations
Graph of linear equationsGraph of linear equations
Graph of linear equations
 
5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for
5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for
5 and 6 june 2013 ca st a global empathetic european consciousness’ policy for
 
εργασια 1
εργασια 1εργασια 1
εργασια 1
 

Similar to Real time power system operationunder deregulated environmnt

23PESGM4448.pdf
23PESGM4448.pdf23PESGM4448.pdf
23PESGM4448.pdf
SUBRATAMUKHOPADHYAY9
 
FATCS_DEVICES.pptx
FATCS_DEVICES.pptxFATCS_DEVICES.pptx
FATCS_DEVICES.pptx
elvandn
 
Utilization of Synchrophasors during Synchronization and Operation of Large ...
Utilization of Synchrophasors during  Synchronization and Operation of Large ...Utilization of Synchrophasors during  Synchronization and Operation of Large ...
Utilization of Synchrophasors during Synchronization and Operation of Large ...
Chandan Kumar
 
Requerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdfRequerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdf
ssuserf19e47
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case studyWaseem Hashmat
 
Enhancement of reactive power capability of doubly fed induction generator 2-3
Enhancement of reactive power capability of doubly fed induction generator 2-3Enhancement of reactive power capability of doubly fed induction generator 2-3
Enhancement of reactive power capability of doubly fed induction generator 2-3
IAEME Publication
 
IRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdfIRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdf
PowerSystemDynamicsS
 
Active power and frequency analysis of a smart grid – using matlabsimulink ap...
Active power and frequency analysis of a smart grid – using matlabsimulink ap...Active power and frequency analysis of a smart grid – using matlabsimulink ap...
Active power and frequency analysis of a smart grid – using matlabsimulink ap...
eSAT Publishing House
 
Eo34861869
Eo34861869Eo34861869
Eo34861869
IJERA Editor
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Harish Sharma
 
TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...
TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...
TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...
eeiej_journal
 
Power System Restoration
Power System RestorationPower System Restoration
Power System Restoration
Power System Operation
 
Grid integration of renewable energy-Priyabrata Patnaik
Grid integration of renewable energy-Priyabrata PatnaikGrid integration of renewable energy-Priyabrata Patnaik
Grid integration of renewable energy-Priyabrata Patnaik
Dr.Priyabrata Patnaik
 
Reactive power management in india
Reactive power  management in indiaReactive power  management in india
Reactive power management in india
Chinmaya Kumar Sahani
 
Power Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsPower Shaver Energy Saving Systems
Power Shaver Energy Saving Systems
LisaKnapp23
 
40220140507001
4022014050700140220140507001
40220140507001
IAEME Publication
 
40220140507001
4022014050700140220140507001
40220140507001
IAEME Publication
 
Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.
Bikram Prasad
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIAArun Muraleedharan
 
ppt nrel.pptx
ppt  nrel.pptxppt  nrel.pptx
ppt nrel.pptx
gulie
 

Similar to Real time power system operationunder deregulated environmnt (20)

23PESGM4448.pdf
23PESGM4448.pdf23PESGM4448.pdf
23PESGM4448.pdf
 
FATCS_DEVICES.pptx
FATCS_DEVICES.pptxFATCS_DEVICES.pptx
FATCS_DEVICES.pptx
 
Utilization of Synchrophasors during Synchronization and Operation of Large ...
Utilization of Synchrophasors during  Synchronization and Operation of Large ...Utilization of Synchrophasors during  Synchronization and Operation of Large ...
Utilization of Synchrophasors during Synchronization and Operation of Large ...
 
Requerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdfRequerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdf
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case study
 
Enhancement of reactive power capability of doubly fed induction generator 2-3
Enhancement of reactive power capability of doubly fed induction generator 2-3Enhancement of reactive power capability of doubly fed induction generator 2-3
Enhancement of reactive power capability of doubly fed induction generator 2-3
 
IRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdfIRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdf
 
Active power and frequency analysis of a smart grid – using matlabsimulink ap...
Active power and frequency analysis of a smart grid – using matlabsimulink ap...Active power and frequency analysis of a smart grid – using matlabsimulink ap...
Active power and frequency analysis of a smart grid – using matlabsimulink ap...
 
Eo34861869
Eo34861869Eo34861869
Eo34861869
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 
TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...
TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...
TCSC AND SVC OPTIMAL LOCATION TO IMPROVE THE PERFORMANCE OF POWER SYSTEM WITH...
 
Power System Restoration
Power System RestorationPower System Restoration
Power System Restoration
 
Grid integration of renewable energy-Priyabrata Patnaik
Grid integration of renewable energy-Priyabrata PatnaikGrid integration of renewable energy-Priyabrata Patnaik
Grid integration of renewable energy-Priyabrata Patnaik
 
Reactive power management in india
Reactive power  management in indiaReactive power  management in india
Reactive power management in india
 
Power Shaver Energy Saving Systems
Power Shaver Energy Saving SystemsPower Shaver Energy Saving Systems
Power Shaver Energy Saving Systems
 
40220140507001
4022014050700140220140507001
40220140507001
 
40220140507001
4022014050700140220140507001
40220140507001
 
Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.Six week Summer training report ppt on power plant.
Six week Summer training report ppt on power plant.
 
TRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIATRANSMISSION PLANNING CRITERIA
TRANSMISSION PLANNING CRITERIA
 
ppt nrel.pptx
ppt  nrel.pptxppt  nrel.pptx
ppt nrel.pptx
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 

Real time power system operationunder deregulated environmnt

  • 1. 11 REAL TIME POWER SYSTEMREAL TIME POWER SYSTEM OPERATION UNDEROPERATION UNDER DEREGULATEDDEREGULATED ENVIRONMENTENVIRONMENT P.V.SATYARAMEShP.V.SATYARAMESh
  • 2. 2 Evolution of Indian Grids Pre – Independence Period  First Hydel Project (Darjeeling) – 1897  First Steam Plant (1000 KW) Calcutta – 1899  Survey of Hydro Power Potential – 1919-1921  Generation during World War – II – 1140  Generation at the time of Independence – 1349 MW
  • 3. 3  Phenomenal expansion since Independence  Generation : 1349 MW 162,058 MW (in 1947) (in 2010)  Grid : Local grid – at the time of Independence. State Grids – emerged in 1960s. Regional Grids – in 1970s. Five Regional Grids – Northern, Western, Southern, Eastern & North-eastern National Grid – All Five Regions Interconnected (2002) Formation Of Central Grid by Synchronizing North Eastern - Eastern – Western Grids (2003) Indian Power Grid – its Evolution
  • 4. 4 Peculiarities of Regional Grids in India SOUTHERN REGION WESTER NREGIO N EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION REGIONAL GRIDS Deficit Region Snow fed – run-of –the –river hydro Highly weather sensitive load Adverse weather conditions: Fog & Dust Storm Very low load High hydro potential Evacuation problems Industrial load and agricultural load Low load High coal reserves Pit head base load plants High load (40% agricultural load) Monsoon dependent hydro CHICKEN-NECK
  • 5. 5 GRID OPERATION IN THE PAST(Grid Indiscipline )  LOW FREQUENCY PROBLEMS  FREQUENCY REMAINED AT 48 HZ AND BELOW FOR MOST PART  LOW VOLTAGE OPERATION  VOLTAGE AT SOME SUB STATIONS DIPPED TO AS LOW AS 300 Kv!!!!  FREQUENT GRID DISTURBANCES  A DISTURBANCE ALMOST EVERY MONTH  IMMENSE FINANCIAL LOSSES FOR INDUSTRY  LOADS FREQUENTLY CUT OFF DUE TO RELAY OPERATION  INCREASED ELECTRICAL LOSSES  INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS  INEFFICIENT UTILISATION OF PIT HEAD PLANTS  GRID OPERATION FOCUSSED ON FIRE-FIGHTING RATHER THAN OPTIMISATION AND ECONOMY
  • 6. 6 GRID OPERATION: A TIGHT ROPE WALK BLACK-OUT VOLTAGE COLLAPSE IN-ECONOMIC OPERATION INSTABILITY POWER SWINGS INCREASED LOSSES
  • 7. 7 AVAILABILITY BASED TARIFF  AVAILABILITY BASED TARIFF
  • 8. 8 REAL TIME PRICING- NEW TARRIFF MECHANISMS  ABT is  Frequency Based Tariff  Reactive power based w.r.t voltage tariff APTRANSCO
  • 9. 9 REAL TIME PRICING- NEW TARRIFF MECHANISMS  Components Proposed In The ABT 1) Capacity charges based on target availability - Full fixed charges at an availability of 80% in case of NTPC and 72% in case of NLC 2) Energy charges for the energy scheduled - Variable Cost 3) Unscheduled Interchange (UI) charge - 0-1000 according to variations in each time Block Ps/Unit. of 15 mts. Scheduled energy w.r.t. frequency (UI) 4) Reactive Power Pricing APTRANSCO
  • 10. 10 REAL TIME PRICING-NEW TARRIFF MECHANISMS  Energy Charges  Energy Charges =Rate of Energy Charges x Schedule.Generation (Ex- Bus)  UnScheduled Interchange (UI)  Variation in actual Generation / Drawal and Scheduled Generation / Drawal shall accounted for through U.I  UI for Generator = Actual Generation – Scheduled Generation  UI for Beneficiaries=Total Actual drawal – Total Scheduled Drawal  UI worked out for 15 minutes time block.  Average Frequency of time block UI Rate (Paise per Kwh)  Below 49.00 Hz 1000.00  Above 50.5 Hz 0.0 APTRANSCO
  • 11. 11 REAL TIME PRICING-NEW TARRIFF MECHANISMS  Pricing for Reactive Power  All reactive power exchanges to be compensated to avoid ISTS lines carrying reactive power.  Every Beneficiary  Pays for VAR drawal when voltage at the metering point is below 97%.  Gets paid for VAR return when voltage is below 97%.  Gets paid for VAR drawal when voltage is above 103%.  Pays for VAR return when voltage is above 103%.  Need not pay for drawal of reactive power at the Generating Station  Charge of 4 paise per KVARh was proposed  Generator will not be compensated for reactive power generated. APTRANSCO
  • 12. 12 Slope of 17 paise/kWh per 0.02 Hz Slope of 12 paise/kWh per 0.02 Hz
  • 13. 13 Changing UI Rates 0 0 3 4.8 7.35 7.35 0 1 2 3 4 5 6 7 8 9 10 49 49.1 49.2 49.3 49.4 49.5 49.6 49.7 49.8 49.9 50 50.1 50.2 50.3 50.4 50.5 Frequency (Hz) INR/kWh upto 31.03.2004 w.e.f. 01.04.2004 w.e.f. 01.10.2004 w.e.f. 01.04.2007 w.e.f. 07.01.2008 w.e.f 01.04.2009
  • 15. 15 CustomerCustomer CustomerCustomer DistributionDistributionTransmissionTransmissionGenerationGeneration CustomerCustomer TRADERTRADER Debundling of Electricity by introducing IE ACT 2003 DISCOMDISCOM DISCOMDISCOMDISCOMDISCOM GENCOGENCO GENCOGENCO GENCOGENCO OPEN ACCESS : Distribution OPEN ACCESS : Transmission TRADERTRADER
  • 16. 16 An Integrated Electricity Market AVILABILITY BASED TARIFF ENERGY SECURITY CONSTRAINTS OPEN ACESS •CAPACITY CHARGES • ENEGRY CHARGES • REACTIVE POWER CHARGES •UI CHARGES •CONTRAUAL OBLIGATIONS •Long-term capacity access charge (LCC) • Voltage,frequency,line capacity etc. VISULIZATION OF RESTRUCTURED COMPETITIVE ELECTRICITY MARKETVISULIZATION OF RESTRUCTURED COMPETITIVE ELECTRICITY MARKET
  • 17. 17 Current Power Market Structure Indian Power Market Long Term Short Term PPA’s Bilateral 1 Direct 2 thru Trader Exchange UI 1.Day Ahead 2. Same day 3. FCFS 4. Upto 3 months 5. Banking Day Ahead 1. Intra day 2. DAC 3. Daily 4. Weekly 5. Monthly Real Time
  • 18. 18 IEGC Feb.’2000 Ancillary Market 2010 ABT 2002-03AND UNIFIED SCADA SYSTEMS Open Access 2004 PX 2008 Capacity Market Evolution of Power Market in IndiaEvolution of Power Market in India
  • 19. 19 Regional Electricity market In India  Now it operates over the ISTS, is governed by the frequency linked operation and commercial settlement i.e through ABT and (UI) mechanism.  The ABT mechanism has replaced the command and control system employed earlier with a contractual approach.  The utilities have full freedom and choice to enter into long-term and short-term bilateral contracts.  These contracts are incorporated in the daily interchange schedules issued by the RLDCs.