‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬
Project Work Performance Data, Informational and Reports
Abdelrahman Elsheikh Seedahmed , M.sc, PMOC,CBAP, PMP, RMP, ACP, PMI-SP,
KPI-A, EVM,CPRE, MCITP, MCTS, OCP, OCA, ITIL v3, CTFL, ISO20000, ISO27002
Abdelrahman Elsheikh Bio
 14 experience as Strategic PMO Director, Strategy Execution Consultant,
PMO Consultant, Project Manager, Business Analyst and Software
Engineer.
• Master Degree in Software Engineering.
• Project Management Office Certification (PMOC).
• Certified Project Management Professional (PMP).
• Agile Certified Practitioner (PMI-ACP).
• Risk Management Professional (PMI-RMP).
• Schedule Professional (PMI-SP).
• Certified Business Analyst Professional (CBAP).
• Microsoft Certified IT Professional (MCITP).
• Key Performance Indicator Associate (KPI-A).
• OCP and OCA.
• Certified Professional for Requirement Engineer (CPRE).
• Certified Tester Foundation Level (CTFL).
• Earned Value Project Management (EVM).
• ISO/IEC 20000 Foundation.
• ISO/IEC 27002 Foundation.
• Certified ITIL Foundation Level.
‫وإدارة‬ ‫توجيه‬
‫المشروع‬ ‫أعمال‬
•Manage and Direct
Project Work
•Work Performance
Data
‫التحكم‬ ‫عمليات‬
‫المشروع‬ ‫في‬
•All Control Process
•Work Performance
Information
‫والتح‬ ‫المتابعة‬‫كم‬
‫أعمال‬ ‫في‬
‫المشروع‬
•Monitor and Control Project Work
•Work Performance Reports
‫التواصل‬ ‫إدارة‬ •Manage Communications
•Project
Communications
•Project
Documents
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬
Monitoring and
Control Processes
‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬
Project Work Performance Data, Informational and Reports
‫وإدارة‬ ‫توجيه‬
‫المشروع‬ ‫أعمال‬
•Manage and Direct
Project Work
•Work Performance
Data
‫التحكم‬ ‫عمليات‬
‫المشروع‬ ‫في‬
•All Control Process
•Work Performance
Information
‫والتح‬ ‫المتابعة‬‫كم‬
‫أعمال‬ ‫في‬
‫المشروع‬
•Monitor and Control Project Work
•Work Performance Reports
‫التواصل‬ ‫إدارة‬ •Manage Communications
•Project
Communications
•Project
Documents
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬
Monitoring and
Control Processes
‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬
Project Work Performance Data, Informational and Reports
‫المشروع‬ ‫أعمال‬ ‫وإدارة‬ ‫توجيه‬
Manage and Direct Project Work
•‫التغي‬ ‫وتطبيق‬ ‫المشروع‬ ‫إدارة‬ ‫خطة‬ ‫في‬ ‫المحدد‬ ‫العمل‬ ‫وقيادة‬ ‫إنجاز‬ ‫عملية‬ ‫هي‬‫يرات‬
‫المشروع‬ ‫أهداف‬ ‫لتحقيق‬ ‫المعتمدة‬.
•‫ن‬ ‫احتمال‬ ‫من‬ ‫يحسن‬ ‫مما‬ ‫المشروع‬ ‫في‬ ‫والتسليمات‬ ‫للعمل‬ ‫شاملة‬ ‫إدارة‬ ‫توفر‬‫جاح‬
‫المشروع‬.
•‫المشروع‬ ‫مدار‬ ‫على‬ ‫العملية‬ ‫هذه‬ ‫تنفذ‬.
‫المشروع‬ ‫أعمال‬ ‫وإدارة‬ ‫توجيه‬
Manage and Direct Project Work
‫األنشطة‬‫المتوقعة‬
‫المشروع‬ ‫مخرجات‬ ‫توليد‬ ‫تنفيذ‬‫ال‬ ‫متطلبات‬ ‫إلكمال‬ ‫األنشطة‬‫مشروع‬
‫واستخدام‬ ‫إدارة‬‫المشروع‬ ‫موارد‬ ‫توفير‬‫ألعمال‬ ‫المناسب‬ ‫العمل‬ ‫فريق‬
‫المشروع‬‫الع‬ ‫فريق‬ ‫وإدارة‬ ‫والتدريب‬‫مل‬
‫التواصل‬ ‫قنوات‬ ‫وإدارة‬ ‫تأسيس‬ ‫المعايير‬ ‫تنفيذ‬
‫إصدار‬‫التغيير‬ ‫أوامر‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫توليد‬
‫الخدمات‬ ‫ومزودين‬ ‫الموردين‬ ‫إدارة‬ ‫المخاطر‬ ‫إدارة‬‫استراتيجيات‬ ‫وتنفيذ‬
‫المخاطر‬
‫المشروع‬ ‫في‬ ‫المعرفة‬ ‫إدارة‬ ‫العالقة‬ ‫أصحاب‬ ‫إدارة‬
‫العمل‬ ‫أداء‬ ‫بيانات‬Work Performance Data
•‫ل‬ ‫باألنشطة‬ ‫القيام‬ ‫أثناء‬ ‫ِّدت‬‫د‬ُ‫ح‬ ‫التي‬ ‫األولية‬ ‫والقياسات‬ ‫المالحظات‬ ‫هي‬‫أعمال‬ ‫تنفيذ‬
‫المشروع‬.
•‫العمل‬ ‫منه‬ ‫تشتق‬ ‫التفصيل‬ ‫من‬ ‫مستوي‬ ‫أدنى‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫وتعتبر‬‫األخرى‬ ‫يات‬
‫المعلومات‬Raw Data.
•‫هذه‬ ‫جمع‬ُ‫ت‬‫العمل‬ ‫أداء‬ ‫بيانات‬‫ع‬ ‫إلى‬ ‫مرر‬ُ‫ت‬‫و‬ ‫المشروع‬ ‫أعمال‬ ‫تنفيذ‬ ‫خالل‬ ‫من‬‫مليات‬
‫لتحليلها‬ ‫التحكم‬.
‫العمل‬ ‫أداء‬ ‫بيانات‬Work Performance Data
•‫مرحلة‬ ‫في‬ ‫عمله‬ ‫وفريق‬ ‫المشروع‬ ‫مدير‬ ‫يقوم‬‫المش‬ ‫تنفيذ‬ ‫وقبل‬ ‫التخطيط‬‫روع‬(‫عمل‬
‫المشروع‬ ‫أساس‬ ‫خط‬)‫االتي‬:
–‫كيف‬‫جمع‬ُ‫ت‬‫س‬‫أداء‬ ‫بيانات‬‫العمل‬.
–‫ستقاس‬ ‫متى‬(‫التردد‬)‫العمل‬ ‫أداء‬ ‫بيانات‬.
–‫التنفيذ‬ ‫فترة‬ ‫خالل‬ ‫منها‬ ‫التوقع‬ ‫او‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫قيم‬.
•‫مثل‬ ‫للمشروع‬ ‫األساس‬ ‫خط‬ ‫عمل‬ ‫مع‬ ‫تحدد‬ ‫بيانات‬ ‫هناك‬:
–‫االكتمال‬ ‫عند‬ ‫الموازنة‬BAC.
–‫لها‬ ‫المخطط‬ ‫القيمة‬PV.
‫العمل‬ ‫أداء‬ ‫بيانات‬Work Performance Data
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫للمتطلبات‬ ‫االمتثال‬ ‫درجة‬.
•‫التوافق‬ ‫حاالت‬ ‫عدد‬.
•‫فترة‬ ‫خالل‬ ‫التحقق‬ ‫دورات‬ ‫عدد‬
‫محددة‬ ‫زمنية‬.
•‫التسليم‬ ‫اجتماعات‬ ‫عدد‬.
•‫المنفذة‬ ‫المشروع‬ ‫مخرجات‬ ‫عدد‬.
•‫المستلمة‬ ‫التغيير‬ ‫طلبات‬ ‫عدد‬.
•‫المقبولة‬ ‫التغيير‬ ‫طلبات‬ ‫عدد‬
‫والمرفوضة‬.
•‫التغيير‬ ‫طلبات‬ ‫رفض‬ ‫أسباب‬.
•‫المنفذة‬ ‫المشروع‬ ‫مخرجات‬ ‫عدد‬.
‫العمل‬ ‫نطاق‬
•‫األنشطة‬‫انتهت‬ ‫والتي‬ ‫بدأت‬ ‫التي‬.
•‫لألنشطة‬ ‫الفعلية‬ ‫المدة‬.
•‫األنشطة‬ ‫إلكمال‬ ‫المتبقية‬ ‫المدة‬.
•‫المنفذة‬ ‫لألعمال‬ ‫المئوية‬ ‫النسبة‬.
•‫المكتسبة‬ ‫القيمة‬EV.
‫الزمني‬ ‫الجدول‬
‫العمل‬ ‫أداء‬ ‫بيانات‬Work Performance Data
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫الفعلية‬ ‫التكاليف‬AC.
•‫المالية‬ ‫المطالبات‬ ‫وقيمة‬ ‫عدد‬
(‫المستخلصات‬.)
‫التكلفة‬
•‫بيانات‬‫المنت‬ ‫حالة‬ ‫عن‬ ‫مالحظات‬ ‫او‬‫ج‬
‫المشروع‬ ‫مخرجات‬ ‫او‬ ‫الخدمة‬ ‫او‬.
•‫الجودة‬ ‫مقاييس‬.
•‫الفني‬ ‫باألداء‬ ‫الخاصة‬ ‫المقاييس‬.
•‫أداء‬ ‫بشأن‬ ‫المشروع‬ ‫جودة‬ ‫معلومات‬
‫التكلفة‬ ‫وأداء‬ ‫الزمني‬ ‫الجدول‬.
•‫التسليمات‬ ‫في‬ ‫األخطاء‬ ‫عدد‬.
‫الجودة‬
‫العمل‬ ‫أداء‬ ‫بيانات‬Work Performance Data
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫استخدمت‬ ‫التي‬ ‫الموارد‬ ‫عدد‬.
•‫استخدمت‬ ‫التي‬ ‫الموارد‬ ‫نوع‬.
‫الموارد‬
•‫نوع‬‫ج‬ُ‫أ‬ ‫التي‬ ‫االتصاالت‬ ‫وكمية‬‫ري‬
‫توزيعها‬.
•‫العالقة‬ ‫والمواضيع‬ ‫المشاكل‬ ‫عدد‬.
‫التواصل‬
•‫المخاطر‬ ‫استجابات‬‫تطب‬ ‫تم‬ ‫التي‬‫يقها‬.
•‫وقعت‬ ‫التي‬ ‫المخاطر‬.
•‫النشطة‬ ‫المخاطر‬.
•‫إغالقها‬ ‫تم‬ ‫التي‬ ‫المخاطر‬.
‫المخاطر‬
‫العمل‬ ‫أداء‬ ‫بيانات‬Work Performance Data
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫بيانات‬‫بش‬ ‫والموردين‬ ‫المقاولين‬‫أن‬
‫المشروع‬ ‫حالة‬.
•‫والموردي‬ ‫للمقاولين‬ ‫الفني‬ ‫األداء‬‫ن‬.
•‫ا‬ ‫قيد‬ ‫والتي‬ ‫بدأت‬ ‫التي‬ ‫األنشطة‬‫لتنفيذ‬
‫بالمقاولين‬ ‫الخاصة‬ ‫والمنتهية‬
‫والموردين‬.
•‫اال‬ ‫او‬ ‫تحملها‬ ‫تم‬ ‫التي‬ ‫التكاليف‬‫لتزام‬
‫بها‬.
•‫والموردين‬ ‫المقاولين‬ ‫فواتير‬
‫المسددة‬.
‫المشتريات‬
•‫للمشرو‬ ‫مساند‬ ‫العالقة‬ ‫أصحاب‬ ‫أي‬‫ع‬
‫هو‬ ‫ومن‬ ‫المشروع‬ ‫ضد‬ ‫هو‬ ‫ومن‬
‫محايد‬.
•‫مشاركة‬ ‫ونوع‬ ‫مستوى‬‫أصحاب‬
‫العالقة‬‫في‬‫المشروع‬.
‫أصحاب‬‫والمصلحة‬ ‫العالقة‬
‫وإدارة‬ ‫توجيه‬
‫المشروع‬ ‫أعمال‬
•Manage and Direct
Project Work
•Work Performance
Data
‫التحكم‬ ‫عمليات‬
‫المشروع‬ ‫في‬
•All Control Process
•Work Performance
Information
‫والتح‬ ‫المتابعة‬‫كم‬
‫أعمال‬ ‫في‬
‫المشروع‬
•Monitor and Control Project Work
•Work Performance Reports
‫التواصل‬ ‫إدارة‬ •Manage Communications
•Project
Communications
•Project
Documents
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬
Monitoring and
Control Processes
‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬
Project Work Performance Data, Informational and Reports
‫المشروع‬ ‫في‬ ‫التحكم‬ ‫عمليات‬
•‫عمل‬ ‫سير‬ ‫في‬ ‫والتحكم‬ ‫وضبط‬ ‫ومراجعة‬ ‫بمتابعة‬ ‫تقوم‬ ‫التي‬ ‫العمليات‬ ‫هي‬‫وأداء‬
‫المشروع‬.
•‫قياس‬ ‫تم‬ ‫التي‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫من‬ ‫يناسبها‬ ‫ما‬ ‫تحكم‬ ‫عملية‬ ‫كل‬ ‫تستخدم‬‫عملية‬ ‫في‬ ‫ها‬
‫أعمال‬ ‫وإدارة‬ ‫توجيه‬‫المشروع‬.
‫المشروع‬ ‫في‬ ‫التحكم‬ ‫عمليات‬
•‫المشر‬ ‫جوانب‬ ‫كل‬ ‫في‬ ‫له‬ ‫بالمخطط‬ ‫الحالي‬ ‫األداء‬ ‫بمقارنة‬ ‫العمليات‬ ‫هذه‬ ‫تقوم‬‫وع‬.
•‫تصحيح‬ ‫كانت‬ ‫سواء‬ ‫المناسبة‬ ‫اإلجراءات‬ ‫بوضع‬ ‫تقوم‬ ‫المقارنة‬ ‫على‬ ‫وبناء‬‫او‬ ‫ية‬
‫أحيانا‬ ‫تغيير‬ ‫طلبات‬ ‫يتطلب‬ ‫قد‬ ‫الذي‬ ‫األمر‬ ‫عالجية‬ ‫أو‬ ‫وقائية‬.
‫المشروع‬ ‫في‬ ‫التحكم‬ ‫عمليات‬
‫األنشطة‬‫المتوقعة‬
‫معلومات‬ ‫توليد‬‫العمل‬ ‫أداء‬Work
Performance Information.
‫عمل‬ ‫سير‬ ‫وضبط‬ ‫ومتابعة‬ ‫مراجعة‬
‫المشروع‬.
‫باإلجراءات‬ ‫التوصية‬‫التصحيحية‬
‫األمر‬ ‫تطلب‬ ‫اذا‬ ‫والوقائية‬ ‫والعالجية‬.
‫إصدار‬‫التغيير‬ ‫طلبات‬.
‫الزمني‬ ‫والجدول‬ ‫العمل‬ ‫نطاق‬ ‫ضبط‬
‫والتواص‬ ‫والموارد‬ ‫والجودة‬ ‫والتكاليف‬‫ل‬
‫والمخاطر‬‫وأصحاب‬ ‫والمشتريات‬
‫للمشروع‬ ‫العالقة‬.
‫ووثائقه‬ ‫المشروع‬ ‫تغييرات‬ ‫ضبط‬.
‫تقاري‬ ‫كانت‬ ‫سواء‬ ‫التقارير‬ ‫تجهيز‬‫سير‬ ‫ر‬
‫تنبؤ‬ ‫او‬ ‫حالة‬ ‫او‬ ‫عمل‬‫للمعنيين‬.
‫المشروع‬ ‫مخرجات‬ ‫استالم‬.
‫المشروع‬ ‫في‬ ‫التحكم‬ ‫عمليات‬
•‫م‬ ‫حسب‬ ‫موزعة‬ ‫أجندة‬ ‫به‬ ‫دوري‬ ‫اجتماع‬ ‫بشكل‬ ‫التحكم‬ ‫عمليات‬ ‫تشبيه‬ ‫يمكن‬‫جاالت‬
‫المشروع‬ ‫في‬ ‫المعرفة‬.
‫العمل‬ ‫أداء‬ ‫معلومات‬Work Performance Information
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫والمرفوض‬ ‫المقبولة‬ ‫التسليمات‬‫ة‬.
•‫التسليمات‬ ‫رفض‬ ‫أسباب‬.
•‫االستالم‬ ‫محاضر‬‫والن‬ ‫االبتدائية‬‫هائية‬.
•‫المشروع‬ ‫مخرجات‬ ‫بين‬ ‫مقارنة‬
‫لها‬ ‫المخطط‬ ‫والمخرجات‬.
•‫وم‬ ‫وأسبابها‬ ‫النطاق‬ ‫تباين‬ ‫حاالت‬‫دى‬
‫الزمني‬ ‫الجدول‬ ‫على‬ ‫ذلك‬ ‫تأثير‬
‫والجودة‬ ‫والتكلفة‬.
•‫النطاق‬ ‫أداء‬ ‫توقع‬.
‫العمل‬ ‫نطاق‬
•‫مقارنة‬‫الفعلي‬ ‫األنشطة‬ ‫زمن‬ ‫بين‬
‫األساس‬ ‫خط‬ ‫حسب‬ ‫زمنها‬ ‫وبين‬.
•‫المسار‬‫الحرج‬
•‫الزمني‬ ‫الجدول‬ ‫تباين‬SV.
•‫الزمني‬ ‫الجدول‬ ‫أداء‬ ‫مؤشر‬SPI.
•‫االكتمال‬ ‫حتى‬ ‫التقدير‬(‫الزمن‬)EAC
‫الزمني‬ ‫الجدول‬
‫العمل‬ ‫أداء‬ ‫معلومات‬Work Performance Information
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫مقارنة‬‫الف‬ ‫األنشطة‬ ‫تكلفة‬ ‫بين‬‫علي‬
‫األساس‬ ‫خط‬ ‫حسب‬ ‫تكلفتها‬ ‫وبين‬.
•‫التكلفة‬ ‫تباين‬CV.
•‫التكلفة‬ ‫أداء‬ ‫مؤشر‬CPI.
•‫االكتمال‬ ‫عند‬ ‫التقدير‬EAC.
•‫االكتمال‬ ‫حتى‬ ‫التقدير‬ETC.
•‫االكتمال‬ ‫عند‬ ‫التباين‬VAC.
•‫مؤشر‬‫االكتمال‬ ‫حتى‬ ‫األداء‬TCPI.
‫التكلفة‬
•‫متطلبات‬ ‫تلبية‬ ‫عن‬ ‫معلومات‬
‫المشروع‬.
•‫وجدت‬ ‫إن‬ ‫الرفض‬ ‫أسباب‬.
•‫المرفوض‬ ‫العمل‬ ‫تنفيذ‬ ‫إعادة‬.
•‫لإلجراءات‬ ‫توصيات‬‫التصحيحي‬‫ة‬.
•‫منها‬ ‫المتحقق‬ ‫التسليمات‬ ‫قوائم‬.
•‫الجودة‬ ‫مقاييس‬ ‫حالة‬.
•‫تعديل‬ ‫إلى‬ ‫بالحاجة‬ ‫التوصية‬
‫العمليات‬.
‫الجودة‬
‫العمل‬ ‫أداء‬ ‫معلومات‬Work Performance Information
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫الموارد‬ ‫متطلبات‬ ‫بين‬ ‫مقارنة‬
‫واالستعمال‬ ‫الموارد‬ ‫ومخصصات‬
‫للموارد‬ ‫الفعلي‬.
•‫الموارد‬ ‫في‬ ‫الثغرات‬‫و‬‫تحت‬ ‫التي‬‫اج‬
‫لمتابعة‬‫عالج‬ ‫او‬.
•‫المخص‬ ‫بين‬ ‫مقارنة‬ ‫الموارد‬ ‫توفر‬‫ص‬
‫األساس‬ ‫خط‬ ‫في‬ ‫لها‬.
‫الموارد‬
•‫مقارنة‬‫جريت‬ُ‫أ‬ ‫التي‬ ‫االتصاالت‬
‫لها‬ ‫بالمخطط‬.
•‫فعالي‬ ‫حول‬ ‫االستقصاءات‬ ‫نتائج‬‫ة‬
‫االتصاالت‬.
‫التواصل‬
•‫مقارنة‬‫مع‬ ‫حدثت‬ ‫التي‬ ‫المخاطر‬
‫حدوثها‬ ‫كيفية‬ ‫توقع‬.
•‫االستجاب‬ ‫تخطيط‬ ‫عملية‬ ‫فعالية‬‫ة‬
‫للمخاطر‬.
•‫االستجاب‬ ‫تطبيق‬ ‫عملية‬ ‫فعالية‬‫ة‬
‫للمخاطر‬.
‫المخاطر‬
‫العمل‬ ‫أداء‬ ‫معلومات‬Work Performance Information
‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬
•‫أداء‬ ‫تقييم‬‫والموردين‬ ‫المقاولين‬.
•‫مع‬ ‫المستلمة‬ ‫التسليمات‬ ‫مقارنة‬
‫الع‬ ‫حسب‬ ‫المفترضة‬ ‫التسليمات‬‫قد‬.
•‫مع‬ ‫المحقق‬ ‫الفني‬ ‫األداء‬ ‫مقارنة‬
‫له‬ ‫المخطط‬ ‫األداء‬.
•‫تكب‬ ‫تم‬ ‫التي‬ ‫التكاليف‬ ‫مقارنة‬‫مع‬ ‫دها‬
‫المخصصة‬ ‫المفترضة‬ ‫الموازنة‬
‫للعمل‬.
‫المشتريات‬
•‫للمشروع‬ ‫الحالي‬ ‫الدعم‬ ‫مستوى‬
‫من‬ ‫المرجو‬ ‫بالمستوى‬ ‫ومقارنته‬
‫له‬ ‫والمخطط‬ ‫المشاركة‬.
‫أصحاب‬‫والمصلحة‬ ‫العالقة‬
‫وإدارة‬ ‫توجيه‬
‫المشروع‬ ‫أعمال‬
•Manage and Direct
Project Work
•Work Performance
Data
‫التحكم‬ ‫عمليات‬
‫المشروع‬ ‫في‬
•All Control Process
•Work Performance
Information
‫والتح‬ ‫المتابعة‬‫كم‬
‫أعمال‬ ‫في‬
‫المشروع‬
•Monitor and Control Project Work
•Work Performance Reports
‫التواصل‬ ‫إدارة‬ •Manage Communications
•Project
Communications
•Project
Documents
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬
Monitoring and
Control Processes
‫تقارير‬ ‫عمل‬ ‫دورة‬‫المشروع‬
Project Reports Workflow
‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬
Project Work Performance Data, Informational and Reports
‫المشروع‬ ‫عمل‬ ‫في‬ ‫والتحكم‬ ‫المتابعة‬
Manage and Control Project Work
•‫عملية‬ ‫هي‬‫تحقيق‬ ‫نحو‬ ‫كلي‬ ‫تقدم‬ ‫من‬ ‫يحرز‬ ‫ما‬ ‫تقرير‬ ‫وإعداد‬ ‫ومراجعة‬ ‫متابعة‬
‫المشروع‬ ‫خطة‬ ‫في‬ ‫المحددة‬ ‫األداء‬ ‫أهداف‬.
•‫بالمشروع‬ ‫العالقة‬ ‫ألصحاب‬ ‫العملية‬ ‫هذه‬ ‫تتيح‬:
–‫تت‬ ‫إشكاالت‬ ‫أي‬ ‫لمعالجة‬ ‫اتخذت‬ ‫التي‬ ‫اإلجراءات‬ ‫على‬ ‫والتعرف‬ ‫له‬ ‫الحالية‬ ‫الحالة‬ ‫فهم‬‫علق‬
‫باألداء‬.
–‫المستقبلية‬ ‫المشروع‬ ‫حالة‬ ‫حول‬ ‫الرؤية‬ ‫امتالك‬.
–‫الزمني‬ ‫والجدول‬ ‫التكلفة‬ ‫توقعات‬.
•‫المشروع‬ ‫مدار‬ ‫على‬ ‫العملية‬ ‫هذه‬ ‫تنفذ‬.
‫في‬ ‫والتحكم‬ ‫المتابعة‬‫المشروع‬ ‫عمل‬
Manage and Control Project Work
‫األنشطة‬‫المتوقعة‬
‫توليد‬‫أداء‬ ‫تقارير‬‫العمل‬Work
Performance Report.
‫خطة‬ ‫مع‬ ‫للمشروع‬ ‫الحالي‬ ‫األداء‬ ‫مقارنة‬
‫المشروع‬ ‫إدارة‬.
‫المشروع‬ ‫عن‬ ‫محدثة‬ ‫معلومات‬ ‫توفير‬
‫لدعم‬‫وتق‬ ‫المشروع‬ ‫حالة‬ ‫تقرير‬ ‫رفع‬‫رير‬
‫المشروع‬ ‫عمل‬ ‫سير‬.
‫اإلجراءات‬ ‫هي‬ ‫ما‬ ‫لمعرفة‬ ‫األداء‬ ‫تقييم‬
‫م‬ ‫المطلوبة‬ ‫الوقائية‬ ‫او‬ ‫التصحيحية‬‫ع‬
‫منهما‬ ‫يلزم‬ ‫بما‬ ‫التوصية‬.
‫ور‬ ‫المعتمدة‬ ‫التغيير‬ ‫طلبات‬ ‫متابعة‬‫فع‬
‫تنفيذها‬ ‫عن‬ ‫تقرير‬.
‫التعرف‬‫وتحليلها‬ ‫جديدة‬ ‫مخاطر‬ ‫على‬
‫لها‬ ‫استجابة‬ ‫طرق‬ ‫واقتراح‬.‫وأيضا‬
‫ورف‬ ‫القائمة‬ ‫المخاطر‬ ‫ومتابعة‬ ‫مراقبة‬‫ع‬
‫حالتها‬ ‫عن‬ ‫التقارير‬.
‫المشروع‬ ‫توافق‬ ‫استمرار‬ ‫من‬ ‫التأكد‬‫م‬‫ع‬
‫االعمال‬ ‫احتياجات‬.
‫المستقبلية‬ ‫التوقعات‬ ‫كل‬ ‫توفير‬‫للمشروع‬
‫وجدول‬ ‫تكلفة‬ ‫من‬‫نقدي‬ ‫وتدفق‬ ‫زمني‬.
‫المشروع‬ ‫عمل‬ ‫في‬ ‫والتحكم‬ ‫المتابعة‬
Manage and Control Project Work
•‫وذل‬ ‫إلكترونية‬ ‫او‬ ‫مادية‬ ‫صورة‬ ‫في‬ ‫وتوزع‬ ‫وتسجل‬ ‫العمل‬ ‫أداء‬ ‫معلومات‬ ‫تدمج‬‫ك‬
‫التخاذ‬‫الوعي‬ ‫وخلق‬ ‫إجراءات‬ ‫او‬ ‫قرارات‬ ‫من‬ ‫يلزم‬ ‫ما‬.
•‫واال‬ ‫والتحكم‬ ‫المتابعة‬ ‫عمليات‬ ‫بقية‬ ‫من‬ ‫العمل‬ ‫أداء‬ ‫معلومات‬ ‫كل‬ ‫تجميع‬ ‫يتم‬‫ستفادة‬
‫إدارة‬ ‫خطة‬ ‫حسب‬ ‫له‬ ‫والمخطط‬ ‫الحالي‬ ‫المشروع‬ ‫أداء‬ ‫بين‬ ‫المقارنات‬ ‫بعمل‬ ‫منها‬
‫األ‬ ‫تطلب‬ ‫ان‬ ‫الصحيح‬ ‫لمساره‬ ‫المشروع‬ ‫لعودة‬ ‫يلزم‬ ‫ما‬ ‫التخاذ‬ ‫وذلك‬ ‫المشروع‬‫مر‬.
‫المشروع‬ ‫عمل‬ ‫في‬ ‫والتحكم‬ ‫المتابعة‬
Manage and Control Project Work
•‫الزمني‬ ‫بالجدول‬ ‫الخاصة‬ ‫العمل‬ ‫أداء‬ ‫معلومات‬ ‫من‬ ‫االستفادة‬ ‫مثال‬ ‫يمكن‬ ‫حيث‬‫مع‬
‫ال‬ ‫ناحية‬ ‫من‬ ‫المشروع‬ ‫حالة‬ ‫لمعرفة‬ ‫بالتكلفة‬ ‫الخاصة‬ ‫العمل‬ ‫األداء‬ ‫معلومات‬‫زمن‬
‫والتكلفة‬‫معا‬‫والجودة‬ ‫العمل‬ ‫بنطاق‬ ‫المخاطر‬ ‫مقارنة‬ ‫تأثير‬ ‫أو‬.
‫العمل‬ ‫أداء‬ ‫تقارير‬Work Performance Reports
•‫ج‬ ‫التي‬ ‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫إلكتروني‬ ‫او‬ ‫مادي‬ ‫تمثيل‬ ‫هي‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬‫معت‬
‫التوعية‬ ‫أو‬ ‫اإلجراءات‬ ‫أو‬ ‫القرارات‬ ‫إصدار‬ ‫بهدف‬.
•‫االت‬ ‫عمليات‬ ‫خالل‬ ‫من‬ ‫بالمشروع‬ ‫العالقة‬ ‫وأصحاب‬ ‫للمعنيين‬ ‫إتاحتها‬ ‫يتم‬‫صال‬
‫المشروع‬ ‫اتصاالت‬ ‫إدارة‬ ‫خطة‬ ‫في‬ ‫المحددة‬.
‫العمل‬ ‫أداء‬ ‫تقارير‬Work Performance Reports
•‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تشمل‬:
–‫الحالة‬ ‫تقارير‬Status Report.
–‫العمل‬ ‫سير‬ ‫تقارير‬Progress Report.
‫العمل‬ ‫أداء‬ ‫تقارير‬Work Performance Reports
•‫على‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تحتوي‬ ‫أن‬ ‫يمكن‬:
–‫المكتسبة‬ ‫القيمة‬ ‫ومعلومات‬ ‫مخططات‬Earned Value.
•‫للمشروع‬ ‫األساس‬ ‫خط‬ ‫بيانات‬(BAC - PV.)
•‫العمل‬ ‫أداء‬ ‫بيانات‬(EV - AC)
•‫الحالي‬ ‫األداء‬ ‫مؤشرات‬(SPI - CPI.)
•‫الحالي‬ ‫األداء‬ ‫في‬ ‫التباين‬ ‫مؤشرات‬(SV – CV.)
•‫للمشروع‬ ‫المستقبلي‬ ‫التوقع‬ ‫مؤشرات‬(ETC – EAC – VAC - TCPI.)
–‫للعيوب‬ ‫توزيعية‬ ‫بيانية‬ ‫رسوم‬Defects.
–‫العقود‬ ‫أداء‬ ‫معلومات‬.
–‫والمشاكل‬ ‫المخاطر‬ ‫ملخصات‬.
–‫الوقائية‬ ‫او‬ ‫التصحيحية‬ ‫باإلجراءات‬ ‫توصيات‬.
–‫والجودة‬ ‫األداء‬ ‫في‬ ‫التباين‬ ‫أسباب‬.
‫العمل‬ ‫أداء‬ ‫تقارير‬Work Performance Reports
•‫شكل‬ ‫في‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تعرض‬ ‫أن‬ ‫يمكن‬:
–‫القياس‬ ‫لوحات‬Dash Boards.
–‫الحراري‬ ‫التمثيل‬ ‫تقارير‬Heat Reports.
–‫المرورية‬ ‫اإلشارة‬ ‫مخططات‬Stop Light Charts.
–‫أخرى‬ ‫توضيحية‬ ‫مخططات‬ ‫أي‬ ‫او‬.
‫العمل‬ ‫أداء‬ ‫تقارير‬Work Performance Reports
•‫وهي‬ ‫عمليات‬ ‫أربعة‬ ‫إلى‬ ‫كمدخل‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تدخل‬:
–‫التغييرات‬ ‫في‬ ‫المتكامل‬ ‫التحكم‬ ‫إجراء‬.
–‫المخاطر‬ ‫متابعة‬.
–‫إدارة‬‫العمل‬ ‫فريق‬.
–‫إدارة‬‫التواصل‬.
‫وإدارة‬ ‫توجيه‬
‫المشروع‬ ‫أعمال‬
•Manage and Direct
Project Work
•Work Performance
Data
‫التحكم‬ ‫عمليات‬
‫المشروع‬ ‫في‬
•All Control Process
•Work Performance
Information
‫والتح‬ ‫المتابعة‬‫كم‬
‫أعمال‬ ‫في‬
‫المشروع‬
•Monitor and Control Project Work
•Work Performance Reports
‫التواصل‬ ‫إدارة‬ •Manage Communications
•Project
Communications
•Project
Documents
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬
Monitoring and
Control Processes
‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬
Project Work Performance Data, Informational and Reports
‫التواصل‬ ‫إدارة‬Manage Communications
•‫وتخز‬ ‫وتوزيعها‬ ‫وتكوينها‬ ‫المشروع‬ ‫معلومات‬ ‫بجمع‬ ‫القيام‬ ‫ضمان‬ ‫عملية‬ ‫هي‬‫ينها‬
‫و‬ ‫المالئم‬ ‫الوقت‬ ‫في‬ ‫فيها‬ ‫النهائي‬ ‫التصرف‬ ‫ومراقبة‬ ‫وإدارتها‬ ‫واسترجاعها‬‫بالصورة‬
‫حسب‬ ‫المناسبة‬‫التواصل‬ ‫إدارة‬ ‫خطة‬.
•‫ا‬ ‫وأصحاب‬ ‫المشروع‬ ‫فريق‬ ‫بين‬ ‫وفعالية‬ ‫بكفاءة‬ ‫المعلومات‬ ‫تدفق‬ ‫تتيح‬‫لعالقة‬
‫المشروع‬ ‫في‬ ‫والمعنيين‬.
•‫المشروع‬ ‫مدار‬ ‫على‬ ‫العملية‬ ‫هذه‬ ‫تنفذ‬.
‫بالمشروع‬ ‫التواصل‬Project Communications
•‫المثال‬ ‫سبيل‬ ‫على‬ ‫بالمشروع‬ ‫التواصل‬ ‫منتجات‬ ‫يتضمن‬ ‫ان‬ ‫يمكن‬:
–‫األداء‬ ‫تقارير‬.
–‫التسليمات‬ ‫حالة‬.
–‫الزمني‬ ‫الجدول‬ ‫سير‬.
–‫المتحملة‬ ‫التكلفة‬.
–‫التقديمية‬ ‫العروض‬.
–‫بالمشروع‬ ‫المعنيين‬ ‫او‬ ‫العالقة‬ ‫أصحاب‬ ‫يطلبها‬ ‫التي‬ ‫المعلومات‬.
•‫الحاج‬ ‫وقت‬ ‫إليها‬ ‫الرجوع‬ ‫يتم‬ ‫للمشروع‬ ‫كوثائق‬ ‫التواصل‬ ‫منتجات‬ ‫تحفظ‬‫ة‬.
‫بالمشروع‬ ‫التواصل‬Project Communications
•‫بالمشروع‬ ‫التواصل‬ ‫على‬ ‫تؤثر‬ ‫ان‬ ‫يمكن‬ ‫التي‬ ‫العوامل‬:
–‫التسليم‬ ‫طريقة‬.
–‫السرية‬ ‫مستوي‬.
–‫التواصل‬ ‫سرعة‬.
–‫التواصل‬ ‫تأثير‬.
‫وإدارة‬ ‫توجيه‬
‫المشروع‬ ‫أعمال‬
•Manage and Direct
Project Work
•Work Performance
Data
‫التحكم‬ ‫عمليات‬
‫المشروع‬ ‫في‬
•All Control Process
•Work Performance
Information
‫والتح‬ ‫المتابعة‬‫كم‬
‫أعمال‬ ‫في‬
‫المشروع‬
•Monitor and Control Project Work
•Work Performance Reports
‫التواصل‬ ‫إدارة‬ •Manage Communications
•Project
Communications
•Project
Documents
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫التنف‬ ‫عمليات‬‫يذ‬
Execution
Processes
‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬
Monitoring and
Control Processes
‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬
Project Work Performance Data, Informational and Reports
https://www.facebook.com/abdelrahmansida/
https://www.youtube.com/c/abdelrahmanelsheikh
https://www.linkedin.com/in/abdelrahmanelsheikh/
https://twitter.com/AbdelrahmanSida
https://www.slideshare.net/abdelrahmanelsheikh1
بيانات ومعلومات وتقارير أداء عمل المشروع  Project Work Performance Data, Informational and Reports

بيانات ومعلومات وتقارير أداء عمل المشروع Project Work Performance Data, Informational and Reports

  • 1.
    ‫المشروع‬ ‫عمل‬ ‫أداء‬‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬ Project Work Performance Data, Informational and Reports Abdelrahman Elsheikh Seedahmed , M.sc, PMOC,CBAP, PMP, RMP, ACP, PMI-SP, KPI-A, EVM,CPRE, MCITP, MCTS, OCP, OCA, ITIL v3, CTFL, ISO20000, ISO27002
  • 2.
    Abdelrahman Elsheikh Bio 14 experience as Strategic PMO Director, Strategy Execution Consultant, PMO Consultant, Project Manager, Business Analyst and Software Engineer. • Master Degree in Software Engineering. • Project Management Office Certification (PMOC). • Certified Project Management Professional (PMP). • Agile Certified Practitioner (PMI-ACP). • Risk Management Professional (PMI-RMP). • Schedule Professional (PMI-SP). • Certified Business Analyst Professional (CBAP). • Microsoft Certified IT Professional (MCITP). • Key Performance Indicator Associate (KPI-A). • OCP and OCA. • Certified Professional for Requirement Engineer (CPRE). • Certified Tester Foundation Level (CTFL). • Earned Value Project Management (EVM). • ISO/IEC 20000 Foundation. • ISO/IEC 27002 Foundation. • Certified ITIL Foundation Level.
  • 3.
    ‫وإدارة‬ ‫توجيه‬ ‫المشروع‬ ‫أعمال‬ •Manageand Direct Project Work •Work Performance Data ‫التحكم‬ ‫عمليات‬ ‫المشروع‬ ‫في‬ •All Control Process •Work Performance Information ‫والتح‬ ‫المتابعة‬‫كم‬ ‫أعمال‬ ‫في‬ ‫المشروع‬ •Monitor and Control Project Work •Work Performance Reports ‫التواصل‬ ‫إدارة‬ •Manage Communications •Project Communications •Project Documents ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬ Monitoring and Control Processes ‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬ Project Work Performance Data, Informational and Reports
  • 4.
    ‫وإدارة‬ ‫توجيه‬ ‫المشروع‬ ‫أعمال‬ •Manageand Direct Project Work •Work Performance Data ‫التحكم‬ ‫عمليات‬ ‫المشروع‬ ‫في‬ •All Control Process •Work Performance Information ‫والتح‬ ‫المتابعة‬‫كم‬ ‫أعمال‬ ‫في‬ ‫المشروع‬ •Monitor and Control Project Work •Work Performance Reports ‫التواصل‬ ‫إدارة‬ •Manage Communications •Project Communications •Project Documents ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬ Monitoring and Control Processes ‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬ Project Work Performance Data, Informational and Reports
  • 5.
    ‫المشروع‬ ‫أعمال‬ ‫وإدارة‬‫توجيه‬ Manage and Direct Project Work •‫التغي‬ ‫وتطبيق‬ ‫المشروع‬ ‫إدارة‬ ‫خطة‬ ‫في‬ ‫المحدد‬ ‫العمل‬ ‫وقيادة‬ ‫إنجاز‬ ‫عملية‬ ‫هي‬‫يرات‬ ‫المشروع‬ ‫أهداف‬ ‫لتحقيق‬ ‫المعتمدة‬. •‫ن‬ ‫احتمال‬ ‫من‬ ‫يحسن‬ ‫مما‬ ‫المشروع‬ ‫في‬ ‫والتسليمات‬ ‫للعمل‬ ‫شاملة‬ ‫إدارة‬ ‫توفر‬‫جاح‬ ‫المشروع‬. •‫المشروع‬ ‫مدار‬ ‫على‬ ‫العملية‬ ‫هذه‬ ‫تنفذ‬.
  • 6.
    ‫المشروع‬ ‫أعمال‬ ‫وإدارة‬‫توجيه‬ Manage and Direct Project Work ‫األنشطة‬‫المتوقعة‬ ‫المشروع‬ ‫مخرجات‬ ‫توليد‬ ‫تنفيذ‬‫ال‬ ‫متطلبات‬ ‫إلكمال‬ ‫األنشطة‬‫مشروع‬ ‫واستخدام‬ ‫إدارة‬‫المشروع‬ ‫موارد‬ ‫توفير‬‫ألعمال‬ ‫المناسب‬ ‫العمل‬ ‫فريق‬ ‫المشروع‬‫الع‬ ‫فريق‬ ‫وإدارة‬ ‫والتدريب‬‫مل‬ ‫التواصل‬ ‫قنوات‬ ‫وإدارة‬ ‫تأسيس‬ ‫المعايير‬ ‫تنفيذ‬ ‫إصدار‬‫التغيير‬ ‫أوامر‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫توليد‬ ‫الخدمات‬ ‫ومزودين‬ ‫الموردين‬ ‫إدارة‬ ‫المخاطر‬ ‫إدارة‬‫استراتيجيات‬ ‫وتنفيذ‬ ‫المخاطر‬ ‫المشروع‬ ‫في‬ ‫المعرفة‬ ‫إدارة‬ ‫العالقة‬ ‫أصحاب‬ ‫إدارة‬
  • 7.
    ‫العمل‬ ‫أداء‬ ‫بيانات‬WorkPerformance Data •‫ل‬ ‫باألنشطة‬ ‫القيام‬ ‫أثناء‬ ‫ِّدت‬‫د‬ُ‫ح‬ ‫التي‬ ‫األولية‬ ‫والقياسات‬ ‫المالحظات‬ ‫هي‬‫أعمال‬ ‫تنفيذ‬ ‫المشروع‬. •‫العمل‬ ‫منه‬ ‫تشتق‬ ‫التفصيل‬ ‫من‬ ‫مستوي‬ ‫أدنى‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫وتعتبر‬‫األخرى‬ ‫يات‬ ‫المعلومات‬Raw Data. •‫هذه‬ ‫جمع‬ُ‫ت‬‫العمل‬ ‫أداء‬ ‫بيانات‬‫ع‬ ‫إلى‬ ‫مرر‬ُ‫ت‬‫و‬ ‫المشروع‬ ‫أعمال‬ ‫تنفيذ‬ ‫خالل‬ ‫من‬‫مليات‬ ‫لتحليلها‬ ‫التحكم‬.
  • 8.
    ‫العمل‬ ‫أداء‬ ‫بيانات‬WorkPerformance Data •‫مرحلة‬ ‫في‬ ‫عمله‬ ‫وفريق‬ ‫المشروع‬ ‫مدير‬ ‫يقوم‬‫المش‬ ‫تنفيذ‬ ‫وقبل‬ ‫التخطيط‬‫روع‬(‫عمل‬ ‫المشروع‬ ‫أساس‬ ‫خط‬)‫االتي‬: –‫كيف‬‫جمع‬ُ‫ت‬‫س‬‫أداء‬ ‫بيانات‬‫العمل‬. –‫ستقاس‬ ‫متى‬(‫التردد‬)‫العمل‬ ‫أداء‬ ‫بيانات‬. –‫التنفيذ‬ ‫فترة‬ ‫خالل‬ ‫منها‬ ‫التوقع‬ ‫او‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫قيم‬. •‫مثل‬ ‫للمشروع‬ ‫األساس‬ ‫خط‬ ‫عمل‬ ‫مع‬ ‫تحدد‬ ‫بيانات‬ ‫هناك‬: –‫االكتمال‬ ‫عند‬ ‫الموازنة‬BAC. –‫لها‬ ‫المخطط‬ ‫القيمة‬PV.
  • 9.
    ‫العمل‬ ‫أداء‬ ‫بيانات‬WorkPerformance Data ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫للمتطلبات‬ ‫االمتثال‬ ‫درجة‬. •‫التوافق‬ ‫حاالت‬ ‫عدد‬. •‫فترة‬ ‫خالل‬ ‫التحقق‬ ‫دورات‬ ‫عدد‬ ‫محددة‬ ‫زمنية‬. •‫التسليم‬ ‫اجتماعات‬ ‫عدد‬. •‫المنفذة‬ ‫المشروع‬ ‫مخرجات‬ ‫عدد‬. •‫المستلمة‬ ‫التغيير‬ ‫طلبات‬ ‫عدد‬. •‫المقبولة‬ ‫التغيير‬ ‫طلبات‬ ‫عدد‬ ‫والمرفوضة‬. •‫التغيير‬ ‫طلبات‬ ‫رفض‬ ‫أسباب‬. •‫المنفذة‬ ‫المشروع‬ ‫مخرجات‬ ‫عدد‬. ‫العمل‬ ‫نطاق‬ •‫األنشطة‬‫انتهت‬ ‫والتي‬ ‫بدأت‬ ‫التي‬. •‫لألنشطة‬ ‫الفعلية‬ ‫المدة‬. •‫األنشطة‬ ‫إلكمال‬ ‫المتبقية‬ ‫المدة‬. •‫المنفذة‬ ‫لألعمال‬ ‫المئوية‬ ‫النسبة‬. •‫المكتسبة‬ ‫القيمة‬EV. ‫الزمني‬ ‫الجدول‬
  • 10.
    ‫العمل‬ ‫أداء‬ ‫بيانات‬WorkPerformance Data ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫الفعلية‬ ‫التكاليف‬AC. •‫المالية‬ ‫المطالبات‬ ‫وقيمة‬ ‫عدد‬ (‫المستخلصات‬.) ‫التكلفة‬ •‫بيانات‬‫المنت‬ ‫حالة‬ ‫عن‬ ‫مالحظات‬ ‫او‬‫ج‬ ‫المشروع‬ ‫مخرجات‬ ‫او‬ ‫الخدمة‬ ‫او‬. •‫الجودة‬ ‫مقاييس‬. •‫الفني‬ ‫باألداء‬ ‫الخاصة‬ ‫المقاييس‬. •‫أداء‬ ‫بشأن‬ ‫المشروع‬ ‫جودة‬ ‫معلومات‬ ‫التكلفة‬ ‫وأداء‬ ‫الزمني‬ ‫الجدول‬. •‫التسليمات‬ ‫في‬ ‫األخطاء‬ ‫عدد‬. ‫الجودة‬
  • 11.
    ‫العمل‬ ‫أداء‬ ‫بيانات‬WorkPerformance Data ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫استخدمت‬ ‫التي‬ ‫الموارد‬ ‫عدد‬. •‫استخدمت‬ ‫التي‬ ‫الموارد‬ ‫نوع‬. ‫الموارد‬ •‫نوع‬‫ج‬ُ‫أ‬ ‫التي‬ ‫االتصاالت‬ ‫وكمية‬‫ري‬ ‫توزيعها‬. •‫العالقة‬ ‫والمواضيع‬ ‫المشاكل‬ ‫عدد‬. ‫التواصل‬ •‫المخاطر‬ ‫استجابات‬‫تطب‬ ‫تم‬ ‫التي‬‫يقها‬. •‫وقعت‬ ‫التي‬ ‫المخاطر‬. •‫النشطة‬ ‫المخاطر‬. •‫إغالقها‬ ‫تم‬ ‫التي‬ ‫المخاطر‬. ‫المخاطر‬
  • 12.
    ‫العمل‬ ‫أداء‬ ‫بيانات‬WorkPerformance Data ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لبيانات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫بيانات‬‫بش‬ ‫والموردين‬ ‫المقاولين‬‫أن‬ ‫المشروع‬ ‫حالة‬. •‫والموردي‬ ‫للمقاولين‬ ‫الفني‬ ‫األداء‬‫ن‬. •‫ا‬ ‫قيد‬ ‫والتي‬ ‫بدأت‬ ‫التي‬ ‫األنشطة‬‫لتنفيذ‬ ‫بالمقاولين‬ ‫الخاصة‬ ‫والمنتهية‬ ‫والموردين‬. •‫اال‬ ‫او‬ ‫تحملها‬ ‫تم‬ ‫التي‬ ‫التكاليف‬‫لتزام‬ ‫بها‬. •‫والموردين‬ ‫المقاولين‬ ‫فواتير‬ ‫المسددة‬. ‫المشتريات‬ •‫للمشرو‬ ‫مساند‬ ‫العالقة‬ ‫أصحاب‬ ‫أي‬‫ع‬ ‫هو‬ ‫ومن‬ ‫المشروع‬ ‫ضد‬ ‫هو‬ ‫ومن‬ ‫محايد‬. •‫مشاركة‬ ‫ونوع‬ ‫مستوى‬‫أصحاب‬ ‫العالقة‬‫في‬‫المشروع‬. ‫أصحاب‬‫والمصلحة‬ ‫العالقة‬
  • 13.
    ‫وإدارة‬ ‫توجيه‬ ‫المشروع‬ ‫أعمال‬ •Manageand Direct Project Work •Work Performance Data ‫التحكم‬ ‫عمليات‬ ‫المشروع‬ ‫في‬ •All Control Process •Work Performance Information ‫والتح‬ ‫المتابعة‬‫كم‬ ‫أعمال‬ ‫في‬ ‫المشروع‬ •Monitor and Control Project Work •Work Performance Reports ‫التواصل‬ ‫إدارة‬ •Manage Communications •Project Communications •Project Documents ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬ Monitoring and Control Processes ‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬ Project Work Performance Data, Informational and Reports
  • 14.
    ‫المشروع‬ ‫في‬ ‫التحكم‬‫عمليات‬ •‫عمل‬ ‫سير‬ ‫في‬ ‫والتحكم‬ ‫وضبط‬ ‫ومراجعة‬ ‫بمتابعة‬ ‫تقوم‬ ‫التي‬ ‫العمليات‬ ‫هي‬‫وأداء‬ ‫المشروع‬. •‫قياس‬ ‫تم‬ ‫التي‬ ‫العمل‬ ‫أداء‬ ‫بيانات‬ ‫من‬ ‫يناسبها‬ ‫ما‬ ‫تحكم‬ ‫عملية‬ ‫كل‬ ‫تستخدم‬‫عملية‬ ‫في‬ ‫ها‬ ‫أعمال‬ ‫وإدارة‬ ‫توجيه‬‫المشروع‬.
  • 15.
    ‫المشروع‬ ‫في‬ ‫التحكم‬‫عمليات‬ •‫المشر‬ ‫جوانب‬ ‫كل‬ ‫في‬ ‫له‬ ‫بالمخطط‬ ‫الحالي‬ ‫األداء‬ ‫بمقارنة‬ ‫العمليات‬ ‫هذه‬ ‫تقوم‬‫وع‬. •‫تصحيح‬ ‫كانت‬ ‫سواء‬ ‫المناسبة‬ ‫اإلجراءات‬ ‫بوضع‬ ‫تقوم‬ ‫المقارنة‬ ‫على‬ ‫وبناء‬‫او‬ ‫ية‬ ‫أحيانا‬ ‫تغيير‬ ‫طلبات‬ ‫يتطلب‬ ‫قد‬ ‫الذي‬ ‫األمر‬ ‫عالجية‬ ‫أو‬ ‫وقائية‬.
  • 16.
    ‫المشروع‬ ‫في‬ ‫التحكم‬‫عمليات‬ ‫األنشطة‬‫المتوقعة‬ ‫معلومات‬ ‫توليد‬‫العمل‬ ‫أداء‬Work Performance Information. ‫عمل‬ ‫سير‬ ‫وضبط‬ ‫ومتابعة‬ ‫مراجعة‬ ‫المشروع‬. ‫باإلجراءات‬ ‫التوصية‬‫التصحيحية‬ ‫األمر‬ ‫تطلب‬ ‫اذا‬ ‫والوقائية‬ ‫والعالجية‬. ‫إصدار‬‫التغيير‬ ‫طلبات‬. ‫الزمني‬ ‫والجدول‬ ‫العمل‬ ‫نطاق‬ ‫ضبط‬ ‫والتواص‬ ‫والموارد‬ ‫والجودة‬ ‫والتكاليف‬‫ل‬ ‫والمخاطر‬‫وأصحاب‬ ‫والمشتريات‬ ‫للمشروع‬ ‫العالقة‬. ‫ووثائقه‬ ‫المشروع‬ ‫تغييرات‬ ‫ضبط‬. ‫تقاري‬ ‫كانت‬ ‫سواء‬ ‫التقارير‬ ‫تجهيز‬‫سير‬ ‫ر‬ ‫تنبؤ‬ ‫او‬ ‫حالة‬ ‫او‬ ‫عمل‬‫للمعنيين‬. ‫المشروع‬ ‫مخرجات‬ ‫استالم‬.
  • 17.
    ‫المشروع‬ ‫في‬ ‫التحكم‬‫عمليات‬ •‫م‬ ‫حسب‬ ‫موزعة‬ ‫أجندة‬ ‫به‬ ‫دوري‬ ‫اجتماع‬ ‫بشكل‬ ‫التحكم‬ ‫عمليات‬ ‫تشبيه‬ ‫يمكن‬‫جاالت‬ ‫المشروع‬ ‫في‬ ‫المعرفة‬.
  • 18.
    ‫العمل‬ ‫أداء‬ ‫معلومات‬WorkPerformance Information ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫والمرفوض‬ ‫المقبولة‬ ‫التسليمات‬‫ة‬. •‫التسليمات‬ ‫رفض‬ ‫أسباب‬. •‫االستالم‬ ‫محاضر‬‫والن‬ ‫االبتدائية‬‫هائية‬. •‫المشروع‬ ‫مخرجات‬ ‫بين‬ ‫مقارنة‬ ‫لها‬ ‫المخطط‬ ‫والمخرجات‬. •‫وم‬ ‫وأسبابها‬ ‫النطاق‬ ‫تباين‬ ‫حاالت‬‫دى‬ ‫الزمني‬ ‫الجدول‬ ‫على‬ ‫ذلك‬ ‫تأثير‬ ‫والجودة‬ ‫والتكلفة‬. •‫النطاق‬ ‫أداء‬ ‫توقع‬. ‫العمل‬ ‫نطاق‬ •‫مقارنة‬‫الفعلي‬ ‫األنشطة‬ ‫زمن‬ ‫بين‬ ‫األساس‬ ‫خط‬ ‫حسب‬ ‫زمنها‬ ‫وبين‬. •‫المسار‬‫الحرج‬ •‫الزمني‬ ‫الجدول‬ ‫تباين‬SV. •‫الزمني‬ ‫الجدول‬ ‫أداء‬ ‫مؤشر‬SPI. •‫االكتمال‬ ‫حتى‬ ‫التقدير‬(‫الزمن‬)EAC ‫الزمني‬ ‫الجدول‬
  • 19.
    ‫العمل‬ ‫أداء‬ ‫معلومات‬WorkPerformance Information ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫مقارنة‬‫الف‬ ‫األنشطة‬ ‫تكلفة‬ ‫بين‬‫علي‬ ‫األساس‬ ‫خط‬ ‫حسب‬ ‫تكلفتها‬ ‫وبين‬. •‫التكلفة‬ ‫تباين‬CV. •‫التكلفة‬ ‫أداء‬ ‫مؤشر‬CPI. •‫االكتمال‬ ‫عند‬ ‫التقدير‬EAC. •‫االكتمال‬ ‫حتى‬ ‫التقدير‬ETC. •‫االكتمال‬ ‫عند‬ ‫التباين‬VAC. •‫مؤشر‬‫االكتمال‬ ‫حتى‬ ‫األداء‬TCPI. ‫التكلفة‬ •‫متطلبات‬ ‫تلبية‬ ‫عن‬ ‫معلومات‬ ‫المشروع‬. •‫وجدت‬ ‫إن‬ ‫الرفض‬ ‫أسباب‬. •‫المرفوض‬ ‫العمل‬ ‫تنفيذ‬ ‫إعادة‬. •‫لإلجراءات‬ ‫توصيات‬‫التصحيحي‬‫ة‬. •‫منها‬ ‫المتحقق‬ ‫التسليمات‬ ‫قوائم‬. •‫الجودة‬ ‫مقاييس‬ ‫حالة‬. •‫تعديل‬ ‫إلى‬ ‫بالحاجة‬ ‫التوصية‬ ‫العمليات‬. ‫الجودة‬
  • 20.
    ‫العمل‬ ‫أداء‬ ‫معلومات‬WorkPerformance Information ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫الموارد‬ ‫متطلبات‬ ‫بين‬ ‫مقارنة‬ ‫واالستعمال‬ ‫الموارد‬ ‫ومخصصات‬ ‫للموارد‬ ‫الفعلي‬. •‫الموارد‬ ‫في‬ ‫الثغرات‬‫و‬‫تحت‬ ‫التي‬‫اج‬ ‫لمتابعة‬‫عالج‬ ‫او‬. •‫المخص‬ ‫بين‬ ‫مقارنة‬ ‫الموارد‬ ‫توفر‬‫ص‬ ‫األساس‬ ‫خط‬ ‫في‬ ‫لها‬. ‫الموارد‬ •‫مقارنة‬‫جريت‬ُ‫أ‬ ‫التي‬ ‫االتصاالت‬ ‫لها‬ ‫بالمخطط‬. •‫فعالي‬ ‫حول‬ ‫االستقصاءات‬ ‫نتائج‬‫ة‬ ‫االتصاالت‬. ‫التواصل‬ •‫مقارنة‬‫مع‬ ‫حدثت‬ ‫التي‬ ‫المخاطر‬ ‫حدوثها‬ ‫كيفية‬ ‫توقع‬. •‫االستجاب‬ ‫تخطيط‬ ‫عملية‬ ‫فعالية‬‫ة‬ ‫للمخاطر‬. •‫االستجاب‬ ‫تطبيق‬ ‫عملية‬ ‫فعالية‬‫ة‬ ‫للمخاطر‬. ‫المخاطر‬
  • 21.
    ‫العمل‬ ‫أداء‬ ‫معلومات‬WorkPerformance Information ‫أمثلة‬‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫محتملة‬ ‫المشروع‬ ‫في‬ ‫المعرفية‬ ‫المجاالت‬ •‫أداء‬ ‫تقييم‬‫والموردين‬ ‫المقاولين‬. •‫مع‬ ‫المستلمة‬ ‫التسليمات‬ ‫مقارنة‬ ‫الع‬ ‫حسب‬ ‫المفترضة‬ ‫التسليمات‬‫قد‬. •‫مع‬ ‫المحقق‬ ‫الفني‬ ‫األداء‬ ‫مقارنة‬ ‫له‬ ‫المخطط‬ ‫األداء‬. •‫تكب‬ ‫تم‬ ‫التي‬ ‫التكاليف‬ ‫مقارنة‬‫مع‬ ‫دها‬ ‫المخصصة‬ ‫المفترضة‬ ‫الموازنة‬ ‫للعمل‬. ‫المشتريات‬ •‫للمشروع‬ ‫الحالي‬ ‫الدعم‬ ‫مستوى‬ ‫من‬ ‫المرجو‬ ‫بالمستوى‬ ‫ومقارنته‬ ‫له‬ ‫والمخطط‬ ‫المشاركة‬. ‫أصحاب‬‫والمصلحة‬ ‫العالقة‬
  • 22.
    ‫وإدارة‬ ‫توجيه‬ ‫المشروع‬ ‫أعمال‬ •Manageand Direct Project Work •Work Performance Data ‫التحكم‬ ‫عمليات‬ ‫المشروع‬ ‫في‬ •All Control Process •Work Performance Information ‫والتح‬ ‫المتابعة‬‫كم‬ ‫أعمال‬ ‫في‬ ‫المشروع‬ •Monitor and Control Project Work •Work Performance Reports ‫التواصل‬ ‫إدارة‬ •Manage Communications •Project Communications •Project Documents ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬ Monitoring and Control Processes ‫تقارير‬ ‫عمل‬ ‫دورة‬‫المشروع‬ Project Reports Workflow ‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬ Project Work Performance Data, Informational and Reports
  • 23.
    ‫المشروع‬ ‫عمل‬ ‫في‬‫والتحكم‬ ‫المتابعة‬ Manage and Control Project Work •‫عملية‬ ‫هي‬‫تحقيق‬ ‫نحو‬ ‫كلي‬ ‫تقدم‬ ‫من‬ ‫يحرز‬ ‫ما‬ ‫تقرير‬ ‫وإعداد‬ ‫ومراجعة‬ ‫متابعة‬ ‫المشروع‬ ‫خطة‬ ‫في‬ ‫المحددة‬ ‫األداء‬ ‫أهداف‬. •‫بالمشروع‬ ‫العالقة‬ ‫ألصحاب‬ ‫العملية‬ ‫هذه‬ ‫تتيح‬: –‫تت‬ ‫إشكاالت‬ ‫أي‬ ‫لمعالجة‬ ‫اتخذت‬ ‫التي‬ ‫اإلجراءات‬ ‫على‬ ‫والتعرف‬ ‫له‬ ‫الحالية‬ ‫الحالة‬ ‫فهم‬‫علق‬ ‫باألداء‬. –‫المستقبلية‬ ‫المشروع‬ ‫حالة‬ ‫حول‬ ‫الرؤية‬ ‫امتالك‬. –‫الزمني‬ ‫والجدول‬ ‫التكلفة‬ ‫توقعات‬. •‫المشروع‬ ‫مدار‬ ‫على‬ ‫العملية‬ ‫هذه‬ ‫تنفذ‬.
  • 24.
    ‫في‬ ‫والتحكم‬ ‫المتابعة‬‫المشروع‬‫عمل‬ Manage and Control Project Work ‫األنشطة‬‫المتوقعة‬ ‫توليد‬‫أداء‬ ‫تقارير‬‫العمل‬Work Performance Report. ‫خطة‬ ‫مع‬ ‫للمشروع‬ ‫الحالي‬ ‫األداء‬ ‫مقارنة‬ ‫المشروع‬ ‫إدارة‬. ‫المشروع‬ ‫عن‬ ‫محدثة‬ ‫معلومات‬ ‫توفير‬ ‫لدعم‬‫وتق‬ ‫المشروع‬ ‫حالة‬ ‫تقرير‬ ‫رفع‬‫رير‬ ‫المشروع‬ ‫عمل‬ ‫سير‬. ‫اإلجراءات‬ ‫هي‬ ‫ما‬ ‫لمعرفة‬ ‫األداء‬ ‫تقييم‬ ‫م‬ ‫المطلوبة‬ ‫الوقائية‬ ‫او‬ ‫التصحيحية‬‫ع‬ ‫منهما‬ ‫يلزم‬ ‫بما‬ ‫التوصية‬. ‫ور‬ ‫المعتمدة‬ ‫التغيير‬ ‫طلبات‬ ‫متابعة‬‫فع‬ ‫تنفيذها‬ ‫عن‬ ‫تقرير‬. ‫التعرف‬‫وتحليلها‬ ‫جديدة‬ ‫مخاطر‬ ‫على‬ ‫لها‬ ‫استجابة‬ ‫طرق‬ ‫واقتراح‬.‫وأيضا‬ ‫ورف‬ ‫القائمة‬ ‫المخاطر‬ ‫ومتابعة‬ ‫مراقبة‬‫ع‬ ‫حالتها‬ ‫عن‬ ‫التقارير‬. ‫المشروع‬ ‫توافق‬ ‫استمرار‬ ‫من‬ ‫التأكد‬‫م‬‫ع‬ ‫االعمال‬ ‫احتياجات‬. ‫المستقبلية‬ ‫التوقعات‬ ‫كل‬ ‫توفير‬‫للمشروع‬ ‫وجدول‬ ‫تكلفة‬ ‫من‬‫نقدي‬ ‫وتدفق‬ ‫زمني‬.
  • 25.
    ‫المشروع‬ ‫عمل‬ ‫في‬‫والتحكم‬ ‫المتابعة‬ Manage and Control Project Work •‫وذل‬ ‫إلكترونية‬ ‫او‬ ‫مادية‬ ‫صورة‬ ‫في‬ ‫وتوزع‬ ‫وتسجل‬ ‫العمل‬ ‫أداء‬ ‫معلومات‬ ‫تدمج‬‫ك‬ ‫التخاذ‬‫الوعي‬ ‫وخلق‬ ‫إجراءات‬ ‫او‬ ‫قرارات‬ ‫من‬ ‫يلزم‬ ‫ما‬. •‫واال‬ ‫والتحكم‬ ‫المتابعة‬ ‫عمليات‬ ‫بقية‬ ‫من‬ ‫العمل‬ ‫أداء‬ ‫معلومات‬ ‫كل‬ ‫تجميع‬ ‫يتم‬‫ستفادة‬ ‫إدارة‬ ‫خطة‬ ‫حسب‬ ‫له‬ ‫والمخطط‬ ‫الحالي‬ ‫المشروع‬ ‫أداء‬ ‫بين‬ ‫المقارنات‬ ‫بعمل‬ ‫منها‬ ‫األ‬ ‫تطلب‬ ‫ان‬ ‫الصحيح‬ ‫لمساره‬ ‫المشروع‬ ‫لعودة‬ ‫يلزم‬ ‫ما‬ ‫التخاذ‬ ‫وذلك‬ ‫المشروع‬‫مر‬.
  • 26.
    ‫المشروع‬ ‫عمل‬ ‫في‬‫والتحكم‬ ‫المتابعة‬ Manage and Control Project Work •‫الزمني‬ ‫بالجدول‬ ‫الخاصة‬ ‫العمل‬ ‫أداء‬ ‫معلومات‬ ‫من‬ ‫االستفادة‬ ‫مثال‬ ‫يمكن‬ ‫حيث‬‫مع‬ ‫ال‬ ‫ناحية‬ ‫من‬ ‫المشروع‬ ‫حالة‬ ‫لمعرفة‬ ‫بالتكلفة‬ ‫الخاصة‬ ‫العمل‬ ‫األداء‬ ‫معلومات‬‫زمن‬ ‫والتكلفة‬‫معا‬‫والجودة‬ ‫العمل‬ ‫بنطاق‬ ‫المخاطر‬ ‫مقارنة‬ ‫تأثير‬ ‫أو‬.
  • 27.
    ‫العمل‬ ‫أداء‬ ‫تقارير‬WorkPerformance Reports •‫ج‬ ‫التي‬ ‫العمل‬ ‫أداء‬ ‫لمعلومات‬ ‫إلكتروني‬ ‫او‬ ‫مادي‬ ‫تمثيل‬ ‫هي‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬‫معت‬ ‫التوعية‬ ‫أو‬ ‫اإلجراءات‬ ‫أو‬ ‫القرارات‬ ‫إصدار‬ ‫بهدف‬. •‫االت‬ ‫عمليات‬ ‫خالل‬ ‫من‬ ‫بالمشروع‬ ‫العالقة‬ ‫وأصحاب‬ ‫للمعنيين‬ ‫إتاحتها‬ ‫يتم‬‫صال‬ ‫المشروع‬ ‫اتصاالت‬ ‫إدارة‬ ‫خطة‬ ‫في‬ ‫المحددة‬.
  • 28.
    ‫العمل‬ ‫أداء‬ ‫تقارير‬WorkPerformance Reports •‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تشمل‬: –‫الحالة‬ ‫تقارير‬Status Report. –‫العمل‬ ‫سير‬ ‫تقارير‬Progress Report.
  • 29.
    ‫العمل‬ ‫أداء‬ ‫تقارير‬WorkPerformance Reports •‫على‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تحتوي‬ ‫أن‬ ‫يمكن‬: –‫المكتسبة‬ ‫القيمة‬ ‫ومعلومات‬ ‫مخططات‬Earned Value. •‫للمشروع‬ ‫األساس‬ ‫خط‬ ‫بيانات‬(BAC - PV.) •‫العمل‬ ‫أداء‬ ‫بيانات‬(EV - AC) •‫الحالي‬ ‫األداء‬ ‫مؤشرات‬(SPI - CPI.) •‫الحالي‬ ‫األداء‬ ‫في‬ ‫التباين‬ ‫مؤشرات‬(SV – CV.) •‫للمشروع‬ ‫المستقبلي‬ ‫التوقع‬ ‫مؤشرات‬(ETC – EAC – VAC - TCPI.) –‫للعيوب‬ ‫توزيعية‬ ‫بيانية‬ ‫رسوم‬Defects. –‫العقود‬ ‫أداء‬ ‫معلومات‬. –‫والمشاكل‬ ‫المخاطر‬ ‫ملخصات‬. –‫الوقائية‬ ‫او‬ ‫التصحيحية‬ ‫باإلجراءات‬ ‫توصيات‬. –‫والجودة‬ ‫األداء‬ ‫في‬ ‫التباين‬ ‫أسباب‬.
  • 30.
    ‫العمل‬ ‫أداء‬ ‫تقارير‬WorkPerformance Reports •‫شكل‬ ‫في‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تعرض‬ ‫أن‬ ‫يمكن‬: –‫القياس‬ ‫لوحات‬Dash Boards. –‫الحراري‬ ‫التمثيل‬ ‫تقارير‬Heat Reports. –‫المرورية‬ ‫اإلشارة‬ ‫مخططات‬Stop Light Charts. –‫أخرى‬ ‫توضيحية‬ ‫مخططات‬ ‫أي‬ ‫او‬.
  • 31.
    ‫العمل‬ ‫أداء‬ ‫تقارير‬WorkPerformance Reports •‫وهي‬ ‫عمليات‬ ‫أربعة‬ ‫إلى‬ ‫كمدخل‬ ‫العمل‬ ‫أداء‬ ‫تقارير‬ ‫تدخل‬: –‫التغييرات‬ ‫في‬ ‫المتكامل‬ ‫التحكم‬ ‫إجراء‬. –‫المخاطر‬ ‫متابعة‬. –‫إدارة‬‫العمل‬ ‫فريق‬. –‫إدارة‬‫التواصل‬.
  • 32.
    ‫وإدارة‬ ‫توجيه‬ ‫المشروع‬ ‫أعمال‬ •Manageand Direct Project Work •Work Performance Data ‫التحكم‬ ‫عمليات‬ ‫المشروع‬ ‫في‬ •All Control Process •Work Performance Information ‫والتح‬ ‫المتابعة‬‫كم‬ ‫أعمال‬ ‫في‬ ‫المشروع‬ •Monitor and Control Project Work •Work Performance Reports ‫التواصل‬ ‫إدارة‬ •Manage Communications •Project Communications •Project Documents ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬ Monitoring and Control Processes ‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬ Project Work Performance Data, Informational and Reports
  • 33.
    ‫التواصل‬ ‫إدارة‬Manage Communications •‫وتخز‬‫وتوزيعها‬ ‫وتكوينها‬ ‫المشروع‬ ‫معلومات‬ ‫بجمع‬ ‫القيام‬ ‫ضمان‬ ‫عملية‬ ‫هي‬‫ينها‬ ‫و‬ ‫المالئم‬ ‫الوقت‬ ‫في‬ ‫فيها‬ ‫النهائي‬ ‫التصرف‬ ‫ومراقبة‬ ‫وإدارتها‬ ‫واسترجاعها‬‫بالصورة‬ ‫حسب‬ ‫المناسبة‬‫التواصل‬ ‫إدارة‬ ‫خطة‬. •‫ا‬ ‫وأصحاب‬ ‫المشروع‬ ‫فريق‬ ‫بين‬ ‫وفعالية‬ ‫بكفاءة‬ ‫المعلومات‬ ‫تدفق‬ ‫تتيح‬‫لعالقة‬ ‫المشروع‬ ‫في‬ ‫والمعنيين‬. •‫المشروع‬ ‫مدار‬ ‫على‬ ‫العملية‬ ‫هذه‬ ‫تنفذ‬.
  • 34.
    ‫بالمشروع‬ ‫التواصل‬Project Communications •‫المثال‬‫سبيل‬ ‫على‬ ‫بالمشروع‬ ‫التواصل‬ ‫منتجات‬ ‫يتضمن‬ ‫ان‬ ‫يمكن‬: –‫األداء‬ ‫تقارير‬. –‫التسليمات‬ ‫حالة‬. –‫الزمني‬ ‫الجدول‬ ‫سير‬. –‫المتحملة‬ ‫التكلفة‬. –‫التقديمية‬ ‫العروض‬. –‫بالمشروع‬ ‫المعنيين‬ ‫او‬ ‫العالقة‬ ‫أصحاب‬ ‫يطلبها‬ ‫التي‬ ‫المعلومات‬. •‫الحاج‬ ‫وقت‬ ‫إليها‬ ‫الرجوع‬ ‫يتم‬ ‫للمشروع‬ ‫كوثائق‬ ‫التواصل‬ ‫منتجات‬ ‫تحفظ‬‫ة‬.
  • 35.
    ‫بالمشروع‬ ‫التواصل‬Project Communications •‫بالمشروع‬‫التواصل‬ ‫على‬ ‫تؤثر‬ ‫ان‬ ‫يمكن‬ ‫التي‬ ‫العوامل‬: –‫التسليم‬ ‫طريقة‬. –‫السرية‬ ‫مستوي‬. –‫التواصل‬ ‫سرعة‬. –‫التواصل‬ ‫تأثير‬.
  • 36.
    ‫وإدارة‬ ‫توجيه‬ ‫المشروع‬ ‫أعمال‬ •Manageand Direct Project Work •Work Performance Data ‫التحكم‬ ‫عمليات‬ ‫المشروع‬ ‫في‬ •All Control Process •Work Performance Information ‫والتح‬ ‫المتابعة‬‫كم‬ ‫أعمال‬ ‫في‬ ‫المشروع‬ •Monitor and Control Project Work •Work Performance Reports ‫التواصل‬ ‫إدارة‬ •Manage Communications •Project Communications •Project Documents ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫التنف‬ ‫عمليات‬‫يذ‬ Execution Processes ‫والمراقبة‬ ‫التحكم‬ ‫عمليات‬ Monitoring and Control Processes ‫المشروع‬ ‫عمل‬ ‫أداء‬ ‫وتقارير‬ ‫ومعلومات‬ ‫بيانات‬ Project Work Performance Data, Informational and Reports
  • 37.