PROJECT MANAGEMENT [ARC3614]
Name : Angeline Kon Kee Hooi
ID : 0302068
Tutor : Ar. Badrul Hisham
Site : Jalan Alor
Project 2 – Documentation of a Medium-sized Project
1 . 1 I N T R O D U C T I O N T O S I T E
1 .0 P ROJECT DESIGN A N A LYSIS
1 . 2 S W O T A N A L Y S I S
1 . 3 P E S T L E A N A L Y S I S
The chosen site is situated at the end of Jalan Alor, within walking
distance from Bukit Bintang LRT station. There are upgrading and
beautification plans to regularize events and market activities. MRT
Development with the Mass Rapid Transit ready in 2017, it will
enhance the transportation of locals and tourists.
WEAKNESS
• Lack of proper sidewalk
• Poor connectivity fo
neighbouring buildings
• Smell from backlane
STRENGTH
• Strategically located in city
center (commercial district,
tourist landmark)
• Interesting slope landscape
and long strip of open area
• Easily accessible by public
transport (MRT, bus)
OPPORTUNITIES
• Activate the quiet backlane
lane by extension of activity
to the green open area
• Establish urban identify to the
site (urban park)
• Collaborate with existing art
council for outdoor exhibition
THREATS
• Inactive backlanes
• Lack of public surveillance
might cause safety issues
• Lack of car park contribute to
traffic congestion
Alor food street
MRT launch
shaft
residential area
school
hospital
Urban Park
The urban park will be provided in
areas where there is a deficiency
and which are likely to be
developed as urban parks are
important in providing identity,
structure and landscape amenity to
the City as stated in government
policy.
Political
1. Green technology
Bio-filtrate system for water pond,
rainwater harvesting system and
green roof
2. Acoustic features
Options for sound absorptive materials
for acoustic features should be taken
into attention as the performance
programme’s function are crucial to
ensure optimal acoustic insulation
performance of 0.9-1.2s for sound to
decay to 60dB.
Technological
1. Tourism benefits
The film theatre annual events can
generate in economic impact
generate tourism wages, salaries
and produced 7 million in state
and local tax revenue.
2. Supporting Side Incomes
The rental of auditorium, restaurant
and retails are supporting income
to sustain the building operations.
Economical
1. Authority Building Regulations
Building setback lines and road
reserve is taken into consideration at
the preliminary stage of design.
2. Land use
The outdoor open-air cinema at the
green open space must comply with
DBKL ‘s guidelines to facilitate
pedestrian and car traffic movement.
Legal
1. Landmarks
The film theatre programme can
provide entertainment, learning
and job opportunities for school
children and community nearby
the area as well as tourist.
2. Need of Urban Park:
Open space can be used as urban
park for recreational activities and
communal space.
Sociological
1. Environmental Quality
Natural lighting and ventilation and
low embodied energy building
materials helps to reduce electrical
energy consumption. The rainwater
harvesting system help to reduce
water wastage used in flushing toilet.
2. Urban Park Strip
The open space (proposed park) shall
be well maintained to ensure
cleanliness and encourage public
surveillance and ensure safety.
Environmental
site
open space
2 .0 P ROGRA MME VIA BILITY
The proposed programme is a film theatre, tailored with hearts and minds intact: entertainment, dialogue, and education go hand in hand, showing
Malaysia, independent, foreign-language, art house and classic cinema. community cinemas, a range of participatory filmmaking programmes,.
2 . 1 P R O P O S E D P R O G R A M M E
The proposed offers recreation, fitness and social opportunities for all
ages. Theatre, restaurants, cafés and bars can be found throughout the
building, most with al-fresco concept overlooking the vibrant street.
2 . 3 S T A K E H O L D E R S
1. THEATRE
The 90 seats film theatre and 80 studio theatre are is the
main source of income to sustain the building.
2. WORKSHOPS
The workshops provides facilities which can be rented
to run groups that arrange to manage film events and
workshops, featuring props and scenery. ground-
breaking public education and civic engagement
initiative and organizations to learn, discuss and get
involved in today’s critical social issues. Underpinning
these productions, workshops are a dependable source
of creative activity in lives where everything else can be
changing.
3. COMMUNITY CAFE
The café is a social enterprise which can generates
incomes and provides vocational training to the urban
poor, helping homeless and socially excluded people
reconnect with society.
4. ACCOMODATION
The semi-public urban spaces with residential building
blocks complement the public space offering, The
accommodation is designed for artists or individuals
accommodate roof terrace and meeting points.
5. URBAN PARK
The outdoor park featuring weekly outdoor film
screenings and incorporate sidewalks. Through weekly
film programmes in the film park and exhibition venues
by staging critically-acclaimed film productions starring
performer, it brings together community members.
ii) Ministry of Tourism and Culture Malaysia
The proposed building has potential to contribute to the tourism industry
and benefited from the financial assistance for Kuala Lumpur city
planners, this is to be a cultural magnet and a focal point for the mixed-
use development ever in Kuala Lumpur’s inner city, the massive
rejuvenation plan for Jalan Alor, KL.
B) Targeted User
i) Residents, Tourists and Neighbours
The proposed film theatre offers movie screenings and film educational
learning including film appreciation workshops and seminars. Besides, the
proposed building with outdoor cinema is extended to provide urban
park strip for outdoor exhibition which is parallel to Alor food street.
ii) Public (Artists, Organizations)
The proposed building has potential to host film festivals and special
retrospective programmes. It acts as a referral point for local and foreign
organizations seeking information and contacts on films and cinema
generally and in relation to Malaysia.
A) Client
i) Malaysia Film Club (Kelab Seni Filem Malaysia)
The proposed film theatre will provide strong support to local filmmakers,
especially the independent filmmakers, through showcasing their work and
promoting it at international film festivals which in line with Malaysia Film
Club which is involved in screening a year-round programme of
international cinema.
2 . 2 S P A C E S F O R P R O G R A M M E
Live- Accommodation block to cater artists, individual or families in need of support.
Work- Job opportunities offered in film theatre, cafes, and restaurants for people in need of financial support.
Play- entertainment facilities which includes indoor theatre, integrated park ‘strip’ with outdoor theatre, outdoor exhibition and recreational activities.
1. Orientation
The orientation of the
building within the
plot allows visual
connection with the
green strip,
2. Sun Control
Passive thermal
comfort by providing
shade during the day
and reduce solar
gains. Louvers
functioning as a filter
to the outside, a
mediation zone
between private and
public space that will
reflect in time the
diversity of the
inhabitants.
3 . 1 D E S I G N S T R A T E G Y
PRIVATE
ACCOMODATION BLOCK
- Located at eastside
and second floor to
provide more privacy.
SEMI-PUBLIC
Theatre café, studio
theatre and workshop
studios located at the first
floor and second floor to
overlook the central space
of the building.
3 .0 DESIGN SUITA BILITY
3 . 2 D E S I G N F E A T U R E S
Greenary ViewPermeability
Urban Park
The massing of the building is divided in two modules with interlocking series of volumes. Surrounding
of the film theatre is a strip of urban park. adjustable to the slope topography. The space in between
forms a pedestrian network of stepped streets.
Solid and Void
3 . 2 S P A T I A L P L A N N I N G
G r o u n d F l o o r P l a n
N T S
F i r s t F l o o r P l a n
N T S
S e c o n d F l o o r P l a n
N T S
PUBLIC
GATHERING SPACE
Activated by retails and kiosks at upper ground and restaurant,
café at lower ground to continuity the street activity and
create opportunities for community activities and social
gathering. Outdoor cinema and exhibition park for
recreational and communal activities.
RESIDENCE
RETAILS
WORKSHOPS
GALLERY
EVENT
SPACE
LOWER GROUND
UPPER GROUND
1ST FLOOR
TICKETING
CAFE
2ND FLOOR
ROOF LEVEL
ROOF
GARDEN
3. Natural Ventilation
- Cross ventilation
and stack effect
ventilation at the
FILM THEATRE block
and
workshop/acomod
ation block.
4. Greenery/ Nature
Roof garden provide
breathing space and
enhance the view
4 .0 MA IN TENANCE STRA TEGY
The Film Theatre is providing an
extensive range of public open space,
performing space, supporting
programmes and accommodation. To
deliver a quality services and ensure
smooth operational flow of the
building and building sustainability, a
comprehensive maintenance strategy
is essential.
There are two types of maintenance
strategy which are as follows:-
i) Preventive Maintenance
Routine check and professional
service by personnel for the purpose of
maintaining equipment and facilities in
a good operation condition by
providing systematic inspection,
detection and correction to prevent
problem from occurring and mitigate
the consequences of the failure of the
equipment.
i) Corrective Maintenance
Maintenance task has to be carried
out to identify, isolate and rectify the
fault so that the failed equipment or
system can be restored to operable
condition within the tolerance
established for in-service operation.
4 . 1 I N T E R N A L M A I N T E N A N C E
ITEM MAINTENANCE OBJECTIVE RISK
METHOD FREQUENCY
Electrical Services
i) Power outlets
ii) Switches
Check/ repair Daily-weekly Smooth building operation Electrical leakage or failure
may lead to electric shock
Water Services
i) Water fixtures
ii) Sanitary fittings
iii) Plumbing & piping
Check/
clean/ repair
Weekly Ensure clean water supply and no
water leakage
Water leakage may lead to
wastage and damage of
equipment
Vertical Transportation
i) Fire staircase
ii) Lift
Check/
repair
Daily &
When necessary Ensure smooth flow of circulation
Ensure clearance of escape route
Obstruction of escape
route may lead to safety
issues
Facilities
i) Audio-visual equipment
ii) Furniture
Check/
repair/
replace
Daily &
When necessary Ensure sufficient amount are
provided
Discomfort and give bad
impression to users
Fenestration
i) Doors & Windows
Check/
repair
Monthly Ensure doors and windows are
functioning for safety and
accessibility
Can cause privacy issues or
life-threatening during fire
escape
Programme
i) Theatre
ii) Workshop Studio
iii) Resource Library
Advertise Monthly Sustain the film theatre and ensure
great experience for visitors
Lack of the lack of
availability of the film’s ,
workshop or events will
discourage visitors
4 . 2 E X T E R N A L M A I N T E N A N C E
ITEM MAINTENANCE OBJECTIVE RISK
METHOD FREQUENCY
Greenery & Landscape
i) Plantation
ii) Outdoor facilities
Watering/
trimming
Daily-weekly Ensure plantations grow well
Ensure clean outdoor space
Bad impression for users
Rainwater Harvesting System
i) Water collection tank
ii) Ducts and piping
Check/
clean/
repair
Monthly Collect rainwater for toilet flushing
and plant irrigation
Contamination of rainwater
Clogging of ducts and
pipes due to dust
accumulation.
Shading Devices
i) Louvers
ii) Façade shading
Clean Monthly
When necessary
To minimize direct sun exposure from
exterior
Accumulation of dirt and
bad impression for visitors
Exterior wall
i) Glass curtain wall
ii) Concrete wall
Clean Annually Allowing sunlight penetration and
prevent the growth of fungus
Hygiene problem and give
bad impression to users
Service Area
i) M&E Room
ii) Telecommunication
Room
iii) Refuse Chamber
Check/
repair
Ensure services are in good
condition in case of emergency
Faulty services and
disruption of activities
5 . 1 S U C C E S S C R I T E R I A
5 .0 RISK A N ALYSIS
1. Time
Estimated completion time for the project is
1 year. The date of completion will be on
November 15 2016. Each task are to ensure
following the Gantt Chart to prevent delay
of completion time. Certificate of
Completion and Compliance will be issued
and received not later than February 2017.
2. Cost
Estimated budget is to be RM 7 Million. The
proposed programmed is supported by
Malaysian Film Club and Ministry of Tourism
and Culture Malaysia which encourage the
collaboration with foreign filmmakers to
exchange ideas and promote cultural
interest.
3. Quality
The project quality relies on Green Building
Index assessment criteria to be categorized
in the range of at least 66 points to achieve
Silver rated GBI. Low embodied energy
materials are used including certified wood,
recycled and regional materials.
Sustainable features such as rainwater
harvesting system.
Workmanship to be monitored during
construction to achieve good quality
performance in indoor air quality, acoustics,
visual and thermal comfort, provide good
service and customer satisfaction.
5 . 2 R I S K A N A L Y S I S A N D M I T I G A T I O N S T R A T E G Y
Risk Likelihood Severity Impact Mitigation Strategy Contingency Plan
PRECONSTRUCTION PHASE
Disapproval of
Design by
Client
Medium High Disapproval
of project
Clarify client’s
requirement
Comply with design
Miscommunic
ation between
consultants
and architects
Low Low Delay of work Documentation of
project, internal
meeting and refer
meeting minutes
Clear and complete drawing
convention
Disapproval
from authority
Medium Medium Delay of
project
Follow Authority
guidelines
Fulfill Authority guidelines and
submit requirements to get
approval
CONTRUCTION PHASE
Site accident
and climate
change
Low High Delay of
construction
Apply permit for
extension of time
Reschedule project
completion date and provide
insurance for workers
Increase of
Cost due to
transportation
fees
Medium Medium Affect the
estimated
budget
Fix contract
agreement with
dealers for constant
price rate
Increase the budget to
comply with the increasing
cost
BUILDING OPERATIONAL AND MAINTENANCE PHASE
Insufficient
investment
from
stakeholders
Low High Insufficient to
sustain
operation
fees
Proper planning of
programmes and
prepare marketing
proposal to convince
stakeholders
Financial funding and bank
loan application
Lack of
tenants for
programme
spaces
Medium High Insufficient to
sustain the
programme
Advertise and
marketing proposal
to attract tenants
Introduce free programmes
and events for the public
Lack of Public
Surveillance in
open spaces
Medium Medium Emergence
of safety
issues and
security issues
Install safety doors
and CCTV
Hire security guard services to
ensure the safety and security
of the premise
Quality/ Scope
CostTime
Project
Management
Goal
6.0 GANTT CHART
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W5 W6 W7 W8
1.0 General Conditions 2-Nov-15 2-Nov-15 0
1.1 Apply for Permits 2-Nov-15 2-Nov-15 0
2.0 Site Grading & Utilities 2-Nov-15 15-Nov-15 14
2.1 Mobilization & Site Survey 16-Nov-15 20-Nov-15 5
2.2 Site Cleaning 21/17/2015 27/18/2015 7
2.3 Installation of Temporary Power Service 28-Nov-15 28-Nov-15 1
2.4 Installation of Underground Utilities 29-Nov-15 29-Nov-15 1
3.0 Substructure Works 30-Nov-15 13-Jan-16 44
3.1 Soil Investigation & Analysis 30-Nov-15 2-Dec-15 3
3.2 Excavation for Foundation 3-Dec-15 21-Dec-15 19
3.3 Piling Foundation 22-Dec-15 13-Jan-16 22
4.0 Structural Work 14-Jan-16 3-Jan-16 71
4.1 Basement Floor Slab 14-Jan-16 30-Jan-16 16
4.2 Lower Ground Floor Slab 1-Feb-16 13-Feb-16 13
4.3 Upper Ground Floor Slab 15-Feb-16 18-Feb-16 12
4.4 First Floor Slab & Structure 23-Feb-16 26-Mar-16 12
4.5 Second Floor Slab & Structure 27-Feb-16 9-Mar-16 12
4.6 Roof Slab 10-Mar-16 14-Mar-16 5
5.0 Roof 15-Mar-16 19-Mar-16 5
5.1 Metal Truss & Framing 15-Mar-16 19-Mar-16 5
6.0 Wall & Opening 21-Mar-16 5-Apr-16 63
6.1 Basement Floor Wall 6-Apr-16 21-Apr-16 16
6.2 Lower Ground Floor Wall & Opening 22-Apr-16 5-May-16 14
6.3 Upper Ground Floor Wall & Opening 6-May-16 2-Jun-16 14
6.4 First Floor Wall & Opening 3-Jun-16 16-Jun-16 14
7.4 Second Floor Wall & Opening 17-Jun-16 21-Mar-16 6
7.0 Services 22-Jun-16 15-Mar-16 29
7.1 Electrical & Lightung 22-Jun-16 28-Jun-16 7
7.2 Plumbing & Sanitary 29-Jun-16 6-Jul-16 8
7.3 Mechanical Ventilation System 7-Jul-16 11-Jul-16 5
7.4 Fire Protection Syatem 12-Jul-16 16-Jul-16 5
7.5 Lift Car System 18-Jul-16 22-Jul-16 5
8.0 Fitting & Finishes 23-Jul-16 6-Sep-16 50
8.1 Plastering & Painting 23-Mar-16 11-Aug-16 20
8.2 Door & Window Installation 12-Aug-16 15-Aug-16 4
8.3 Sanitary Fitting 16-Aug-16 15-Aug-16 2
8.4 Tiling work 16-Aug-16 25-Aug-16 10
8.5 Staircase Finishes & Handrail 26-Aug-16 30-Aug-16 5
8.6 Ceiling Finshes 1-Sep-16 5-Sep-16 5
8.7 Interior Work Inspection & Completion 6-Sep-16 6-Sep-16 1
9.0 Exterior Infrastructure 7-Sep-16 15-Mar-16 42
9.1 Outdoor Theatre 7-Sep-16 18-Sep-16 5
9.2 Drain Sewage and Piping 19-Sep-16 3-Oct-16 12
9.3 Road & Pavements 4-Oct-16 21-Oct-16 15
9.4 Landscape 22-Oct-16 31-Oct-16 10
10.0 Final Acceptance 1-Nov-16 15-Nov-16 22
10.1 Testing & Comissioning 16-Nov-16 29-Nov-16 14
10.2 Site Cleaning 30-Nov-16 6-Dec-16 7
10.3 Inspection & Handover 7-Dec-16 7-Dec-16 1
Critical Path
BIM Strategy
Milestone
Mar-16
ITEM
Nov-16Oct-16
DESCRIPTION
START
DATE
COMPLETION
DATE
DURATION
(Days)
Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16Nov-15 Dec-15 Jan-16 Feb-16
End of substructure work
Prefabrication steel strcture as am alternative materials for
faster construction
Precast concrete as an alternative material
for faster construction
IBS toilet as an alternative fittings
for faster construction
End of Internal Work

More Related Content

What's hot

Group 6 ar.alina
Group 6 ar.alinaGroup 6 ar.alina
Group 6 ar.alina
aarenneoone
 
Nikola Dakic - Portfolio
Nikola Dakic - PortfolioNikola Dakic - Portfolio
Nikola Dakic - Portfolio
nikoladakic
 
Suburban Centralities- An agro vision for Lainate
Suburban Centralities- An agro vision for LainateSuburban Centralities- An agro vision for Lainate
Suburban Centralities- An agro vision for Lainate
Mansi Shah
 
Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012
Marcelo Figueira, MEDes, RPP, MCIP
 
Stitching archipelagos, Luxembourg
Stitching archipelagos, LuxembourgStitching archipelagos, Luxembourg
Stitching archipelagos, Luxembourg
Mansi Shah
 
Nikola Dakic - Portfolio
Nikola Dakic - PortfolioNikola Dakic - Portfolio
Nikola Dakic - Portfolio
nikoladakic
 
Nikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural PortfolioNikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural Portfolio
nikoladakic
 
Project management
Project management Project management
Project management
Jing Fan Koh
 
Marina bay sands,singapore
Marina bay sands,singaporeMarina bay sands,singapore
Marina bay sands,singapore
Sandeep Gupta
 
Earth iconic gurgaon
Earth iconic gurgaonEarth iconic gurgaon
Earth iconic gurgaon
Earthsky Gate
 
Safiya Yahaya- Design Portfolio
Safiya Yahaya- Design PortfolioSafiya Yahaya- Design Portfolio
Safiya Yahaya- Design Portfolio
Safiya Yahaya
 
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTTHESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
Mokshika Balana
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
zerospaces_
 
Amanora housing
Amanora housingAmanora housing
Amanora housing
Simran Aggarwal
 
Nikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural PortfolioNikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural Portfolio
nikoladakic
 
Final ADP Report
Final ADP ReportFinal ADP Report
Final ADP Report
Ho Yen Liang
 

What's hot (18)

Group 6 ar.alina
Group 6 ar.alinaGroup 6 ar.alina
Group 6 ar.alina
 
Nikola Dakic - Portfolio
Nikola Dakic - PortfolioNikola Dakic - Portfolio
Nikola Dakic - Portfolio
 
Suburban Centralities- An agro vision for Lainate
Suburban Centralities- An agro vision for LainateSuburban Centralities- An agro vision for Lainate
Suburban Centralities- An agro vision for Lainate
 
Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012Tod appi conference 2011 & evds 2012
Tod appi conference 2011 & evds 2012
 
Stitching archipelagos, Luxembourg
Stitching archipelagos, LuxembourgStitching archipelagos, Luxembourg
Stitching archipelagos, Luxembourg
 
Nikola Dakic - Portfolio
Nikola Dakic - PortfolioNikola Dakic - Portfolio
Nikola Dakic - Portfolio
 
Nikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural PortfolioNikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural Portfolio
 
Project management
Project management Project management
Project management
 
Marina bay sands,singapore
Marina bay sands,singaporeMarina bay sands,singapore
Marina bay sands,singapore
 
Earth iconic gurgaon
Earth iconic gurgaonEarth iconic gurgaon
Earth iconic gurgaon
 
Safiya Yahaya- Design Portfolio
Safiya Yahaya- Design PortfolioSafiya Yahaya- Design Portfolio
Safiya Yahaya- Design Portfolio
 
2015_Mapp_Road
2015_Mapp_Road2015_Mapp_Road
2015_Mapp_Road
 
DDG shopping malls
DDG shopping mallsDDG shopping malls
DDG shopping malls
 
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICTTHESIS REPORT ON CENTRAL BUSINESS DISRTICT
THESIS REPORT ON CENTRAL BUSINESS DISRTICT
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
Amanora housing
Amanora housingAmanora housing
Amanora housing
 
Nikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural PortfolioNikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural Portfolio
 
Final ADP Report
Final ADP ReportFinal ADP Report
Final ADP Report
 

Viewers also liked

BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
Angeline KH
 
CCTV INSTALLATIONS CHICAGO
CCTV INSTALLATIONS CHICAGOCCTV INSTALLATIONS CHICAGO
CCTV INSTALLATIONS CHICAGO
Ramesh Garg
 
Part 1
Part 1Part 1
Part 2
Part 2Part 2
Bridge project
Bridge projectBridge project
Bridge projectVivek John
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
Jill Reeves
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
Jannah Jailani
 
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting PlansBUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
Angeline KH
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
Angeline KH
 
A3-Lighting and Acoustic Research
A3-Lighting and Acoustic ResearchA3-Lighting and Acoustic Research
A3-Lighting and Acoustic Research
Angeline KH
 
Gnatt chart outlining project
Gnatt chart outlining projectGnatt chart outlining project
Gnatt chart outlining projectms72527
 
Project Planning and Management of Millau Viaduct Bridge, France
Project Planning and Management of Millau Viaduct Bridge, FranceProject Planning and Management of Millau Viaduct Bridge, France
Project Planning and Management of Millau Viaduct Bridge, France
Rakibul Hasan,MEng,EIT
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
history of modern architecture - lecture 01
history of modern architecture - lecture 01history of modern architecture - lecture 01
history of modern architecture - lecture 01Shahril Khairi
 
Project management
Project managementProject management
Project management
Satish Yadavalli
 

Viewers also liked (15)

BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
CCTV INSTALLATIONS CHICAGO
CCTV INSTALLATIONS CHICAGOCCTV INSTALLATIONS CHICAGO
CCTV INSTALLATIONS CHICAGO
 
Part 1
Part 1Part 1
Part 1
 
Part 2
Part 2Part 2
Part 2
 
Bridge project
Bridge projectBridge project
Bridge project
 
Kearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge ProjectKearney Precast Concrete Deck Panel Bridge Project
Kearney Precast Concrete Deck Panel Bridge Project
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting PlansBUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
A3-Lighting and Acoustic Research
A3-Lighting and Acoustic ResearchA3-Lighting and Acoustic Research
A3-Lighting and Acoustic Research
 
Gnatt chart outlining project
Gnatt chart outlining projectGnatt chart outlining project
Gnatt chart outlining project
 
Project Planning and Management of Millau Viaduct Bridge, France
Project Planning and Management of Millau Viaduct Bridge, FranceProject Planning and Management of Millau Viaduct Bridge, France
Project Planning and Management of Millau Viaduct Bridge, France
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
history of modern architecture - lecture 01
history of modern architecture - lecture 01history of modern architecture - lecture 01
history of modern architecture - lecture 01
 
Project management
Project managementProject management
Project management
 

Similar to PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PROJECT

Pm final
Pm finalPm final
Pm final
aarenneoone
 
Final report ADP 2017
Final report ADP 2017Final report ADP 2017
Final report ADP 2017
Clement Seong
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
Carmen Chan
 
Project management (3)
Project management (3)Project management (3)
Project management (3)
Benjamin Tan
 
Architectural Comprehensive Design Report
Architectural Comprehensive Design ReportArchitectural Comprehensive Design Report
Architectural Comprehensive Design Report
LimSiewNi
 
Project management final - KSHV SZ
Project management final - KSHV SZProject management final - KSHV SZ
Project management final - KSHV SZ
Keshav Seewraz
 
SY_Yao_Portfolio0615
SY_Yao_Portfolio0615SY_Yao_Portfolio0615
SY_Yao_Portfolio0615Yao Shi-Yuan
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
Ho Yen Liang
 
Final report
Final reportFinal report
Final report
alianisaraflly
 
Project Management (Individual)
Project Management (Individual)Project Management (Individual)
Project Management (Individual)
FabienFoo
 
Ici final project
Ici final projectIci final project
Ici final project
Lee Fong Yen
 
Ici final project
Ici final projectIci final project
Ici final project
Lee Fong Yen
 
Adp report
Adp reportAdp report
Adp report
Nicky Wong
 
Project management final
Project management finalProject management final
Project management final
Aidiel Azhar
 
Project 2 report
Project 2 reportProject 2 report
Project 2 report
ChengWei Chia
 
Public and semi public spa ce
Public and semi public spa cePublic and semi public spa ce
Public and semi public spa ce
tivar rose
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
Chong Chin Pin
 
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANYThe India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
Insiya Ratlamwala
 
CPS Retail EOI 2015 Mar
CPS Retail EOI 2015 MarCPS Retail EOI 2015 Mar
CPS Retail EOI 2015 MarJohnny Hanson
 

Similar to PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PROJECT (20)

Pm final
Pm finalPm final
Pm final
 
Final report ADP 2017
Final report ADP 2017Final report ADP 2017
Final report ADP 2017
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
Project management (3)
Project management (3)Project management (3)
Project management (3)
 
Architectural Comprehensive Design Report
Architectural Comprehensive Design ReportArchitectural Comprehensive Design Report
Architectural Comprehensive Design Report
 
Project management final - KSHV SZ
Project management final - KSHV SZProject management final - KSHV SZ
Project management final - KSHV SZ
 
SY_Yao_Portfolio0615
SY_Yao_Portfolio0615SY_Yao_Portfolio0615
SY_Yao_Portfolio0615
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
Final report
Final reportFinal report
Final report
 
Project Management (Individual)
Project Management (Individual)Project Management (Individual)
Project Management (Individual)
 
Ici final project
Ici final projectIci final project
Ici final project
 
Ici final project
Ici final projectIci final project
Ici final project
 
Adp report
Adp reportAdp report
Adp report
 
Project management final
Project management finalProject management final
Project management final
 
WorkSamples
WorkSamplesWorkSamples
WorkSamples
 
Project 2 report
Project 2 reportProject 2 report
Project 2 report
 
Public and semi public spa ce
Public and semi public spa cePublic and semi public spa ce
Public and semi public spa ce
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
 
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANYThe India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANY
 
CPS Retail EOI 2015 Mar
CPS Retail EOI 2015 MarCPS Retail EOI 2015 Mar
CPS Retail EOI 2015 Mar
 

More from Angeline KH

B sc a2 lighting proposal
B sc a2  lighting proposalB sc a2  lighting proposal
B sc a2 lighting proposalAngeline KH
 
Angeline-BSc2- Integration with Design Studio 5
Angeline-BSc2- Integration with Design Studio 5Angeline-BSc2- Integration with Design Studio 5
Angeline-BSc2- Integration with Design Studio 5Angeline KH
 
Project 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and DesignProject 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and DesignAngeline KH
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline KH
 
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
Angeline KH
 
ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068
ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068
ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068Angeline KH
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...Angeline KH
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...Angeline KH
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...Angeline KH
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...Angeline KH
 
ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...
ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...
ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...Angeline KH
 
Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal
Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal
Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal Angeline KH
 
Asian Architecture [ARC2234]- Project 1: Case Study Paper Presentation
Asian Architecture [ARC2234]- Project 1:  Case Study Paper PresentationAsian Architecture [ARC2234]- Project 1:  Case Study Paper Presentation
Asian Architecture [ARC2234]- Project 1: Case Study Paper PresentationAngeline KH
 
[ARC 1215] Methods of documentation and Measured Drawings
[ARC 1215] Methods of documentation and Measured Drawings[ARC 1215] Methods of documentation and Measured Drawings
[ARC 1215] Methods of documentation and Measured Drawings
Angeline KH
 
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...
Angeline KH
 
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the interventionAngeline KH
 

More from Angeline KH (16)

B sc a2 lighting proposal
B sc a2  lighting proposalB sc a2  lighting proposal
B sc a2 lighting proposal
 
Angeline-BSc2- Integration with Design Studio 5
Angeline-BSc2- Integration with Design Studio 5Angeline-BSc2- Integration with Design Studio 5
Angeline-BSc2- Integration with Design Studio 5
 
Project 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and DesignProject 1-Lighting & Acoustic Performance Evaluation and Design
Project 1-Lighting & Acoustic Performance Evaluation and Design
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
 
ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068
ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068
ARC2615 LOG SHEETS FILE_AngelineKonKeeHooi0302068
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Synopsis: Interpret...
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]- Project Part 2 Anal...
 
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...
THEORIES OF ARCHITECTURE & URBANISM [ARC61303] [ARC2224]-Project 1A: Ar. Lum ...
 
ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...
ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...
ASIAN ARCHITECTURE [ARC 2234]- Project 1: Case Study Paper: Openings as a Met...
 
Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal
Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal
Asian Architecture [ARC2234]- Project 1: Topic & Issue Proposal
 
Asian Architecture [ARC2234]- Project 1: Case Study Paper Presentation
Asian Architecture [ARC2234]- Project 1:  Case Study Paper PresentationAsian Architecture [ARC2234]- Project 1:  Case Study Paper Presentation
Asian Architecture [ARC2234]- Project 1: Case Study Paper Presentation
 
[ARC 1215] Methods of documentation and Measured Drawings
[ARC 1215] Methods of documentation and Measured Drawings[ARC 1215] Methods of documentation and Measured Drawings
[ARC 1215] Methods of documentation and Measured Drawings
 
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...
 
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
 

Recently uploaded

Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
CarlosHernanMontoyab2
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
SACHIN R KONDAGURI
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 

Recently uploaded (20)

Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf678020731-Sumas-y-Restas-Para-Colorear.pdf
678020731-Sumas-y-Restas-Para-Colorear.pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
"Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe..."Protectable subject matters, Protection in biotechnology, Protection of othe...
"Protectable subject matters, Protection in biotechnology, Protection of othe...
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 

PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PROJECT

  • 1. PROJECT MANAGEMENT [ARC3614] Name : Angeline Kon Kee Hooi ID : 0302068 Tutor : Ar. Badrul Hisham Site : Jalan Alor Project 2 – Documentation of a Medium-sized Project
  • 2. 1 . 1 I N T R O D U C T I O N T O S I T E 1 .0 P ROJECT DESIGN A N A LYSIS 1 . 2 S W O T A N A L Y S I S 1 . 3 P E S T L E A N A L Y S I S The chosen site is situated at the end of Jalan Alor, within walking distance from Bukit Bintang LRT station. There are upgrading and beautification plans to regularize events and market activities. MRT Development with the Mass Rapid Transit ready in 2017, it will enhance the transportation of locals and tourists. WEAKNESS • Lack of proper sidewalk • Poor connectivity fo neighbouring buildings • Smell from backlane STRENGTH • Strategically located in city center (commercial district, tourist landmark) • Interesting slope landscape and long strip of open area • Easily accessible by public transport (MRT, bus) OPPORTUNITIES • Activate the quiet backlane lane by extension of activity to the green open area • Establish urban identify to the site (urban park) • Collaborate with existing art council for outdoor exhibition THREATS • Inactive backlanes • Lack of public surveillance might cause safety issues • Lack of car park contribute to traffic congestion Alor food street MRT launch shaft residential area school hospital Urban Park The urban park will be provided in areas where there is a deficiency and which are likely to be developed as urban parks are important in providing identity, structure and landscape amenity to the City as stated in government policy. Political 1. Green technology Bio-filtrate system for water pond, rainwater harvesting system and green roof 2. Acoustic features Options for sound absorptive materials for acoustic features should be taken into attention as the performance programme’s function are crucial to ensure optimal acoustic insulation performance of 0.9-1.2s for sound to decay to 60dB. Technological 1. Tourism benefits The film theatre annual events can generate in economic impact generate tourism wages, salaries and produced 7 million in state and local tax revenue. 2. Supporting Side Incomes The rental of auditorium, restaurant and retails are supporting income to sustain the building operations. Economical 1. Authority Building Regulations Building setback lines and road reserve is taken into consideration at the preliminary stage of design. 2. Land use The outdoor open-air cinema at the green open space must comply with DBKL ‘s guidelines to facilitate pedestrian and car traffic movement. Legal 1. Landmarks The film theatre programme can provide entertainment, learning and job opportunities for school children and community nearby the area as well as tourist. 2. Need of Urban Park: Open space can be used as urban park for recreational activities and communal space. Sociological 1. Environmental Quality Natural lighting and ventilation and low embodied energy building materials helps to reduce electrical energy consumption. The rainwater harvesting system help to reduce water wastage used in flushing toilet. 2. Urban Park Strip The open space (proposed park) shall be well maintained to ensure cleanliness and encourage public surveillance and ensure safety. Environmental site open space
  • 3. 2 .0 P ROGRA MME VIA BILITY The proposed programme is a film theatre, tailored with hearts and minds intact: entertainment, dialogue, and education go hand in hand, showing Malaysia, independent, foreign-language, art house and classic cinema. community cinemas, a range of participatory filmmaking programmes,. 2 . 1 P R O P O S E D P R O G R A M M E The proposed offers recreation, fitness and social opportunities for all ages. Theatre, restaurants, cafés and bars can be found throughout the building, most with al-fresco concept overlooking the vibrant street. 2 . 3 S T A K E H O L D E R S 1. THEATRE The 90 seats film theatre and 80 studio theatre are is the main source of income to sustain the building. 2. WORKSHOPS The workshops provides facilities which can be rented to run groups that arrange to manage film events and workshops, featuring props and scenery. ground- breaking public education and civic engagement initiative and organizations to learn, discuss and get involved in today’s critical social issues. Underpinning these productions, workshops are a dependable source of creative activity in lives where everything else can be changing. 3. COMMUNITY CAFE The café is a social enterprise which can generates incomes and provides vocational training to the urban poor, helping homeless and socially excluded people reconnect with society. 4. ACCOMODATION The semi-public urban spaces with residential building blocks complement the public space offering, The accommodation is designed for artists or individuals accommodate roof terrace and meeting points. 5. URBAN PARK The outdoor park featuring weekly outdoor film screenings and incorporate sidewalks. Through weekly film programmes in the film park and exhibition venues by staging critically-acclaimed film productions starring performer, it brings together community members. ii) Ministry of Tourism and Culture Malaysia The proposed building has potential to contribute to the tourism industry and benefited from the financial assistance for Kuala Lumpur city planners, this is to be a cultural magnet and a focal point for the mixed- use development ever in Kuala Lumpur’s inner city, the massive rejuvenation plan for Jalan Alor, KL. B) Targeted User i) Residents, Tourists and Neighbours The proposed film theatre offers movie screenings and film educational learning including film appreciation workshops and seminars. Besides, the proposed building with outdoor cinema is extended to provide urban park strip for outdoor exhibition which is parallel to Alor food street. ii) Public (Artists, Organizations) The proposed building has potential to host film festivals and special retrospective programmes. It acts as a referral point for local and foreign organizations seeking information and contacts on films and cinema generally and in relation to Malaysia. A) Client i) Malaysia Film Club (Kelab Seni Filem Malaysia) The proposed film theatre will provide strong support to local filmmakers, especially the independent filmmakers, through showcasing their work and promoting it at international film festivals which in line with Malaysia Film Club which is involved in screening a year-round programme of international cinema. 2 . 2 S P A C E S F O R P R O G R A M M E Live- Accommodation block to cater artists, individual or families in need of support. Work- Job opportunities offered in film theatre, cafes, and restaurants for people in need of financial support. Play- entertainment facilities which includes indoor theatre, integrated park ‘strip’ with outdoor theatre, outdoor exhibition and recreational activities.
  • 4. 1. Orientation The orientation of the building within the plot allows visual connection with the green strip, 2. Sun Control Passive thermal comfort by providing shade during the day and reduce solar gains. Louvers functioning as a filter to the outside, a mediation zone between private and public space that will reflect in time the diversity of the inhabitants. 3 . 1 D E S I G N S T R A T E G Y PRIVATE ACCOMODATION BLOCK - Located at eastside and second floor to provide more privacy. SEMI-PUBLIC Theatre café, studio theatre and workshop studios located at the first floor and second floor to overlook the central space of the building. 3 .0 DESIGN SUITA BILITY 3 . 2 D E S I G N F E A T U R E S Greenary ViewPermeability Urban Park The massing of the building is divided in two modules with interlocking series of volumes. Surrounding of the film theatre is a strip of urban park. adjustable to the slope topography. The space in between forms a pedestrian network of stepped streets. Solid and Void 3 . 2 S P A T I A L P L A N N I N G G r o u n d F l o o r P l a n N T S F i r s t F l o o r P l a n N T S S e c o n d F l o o r P l a n N T S PUBLIC GATHERING SPACE Activated by retails and kiosks at upper ground and restaurant, café at lower ground to continuity the street activity and create opportunities for community activities and social gathering. Outdoor cinema and exhibition park for recreational and communal activities. RESIDENCE RETAILS WORKSHOPS GALLERY EVENT SPACE LOWER GROUND UPPER GROUND 1ST FLOOR TICKETING CAFE 2ND FLOOR ROOF LEVEL ROOF GARDEN 3. Natural Ventilation - Cross ventilation and stack effect ventilation at the FILM THEATRE block and workshop/acomod ation block. 4. Greenery/ Nature Roof garden provide breathing space and enhance the view
  • 5. 4 .0 MA IN TENANCE STRA TEGY The Film Theatre is providing an extensive range of public open space, performing space, supporting programmes and accommodation. To deliver a quality services and ensure smooth operational flow of the building and building sustainability, a comprehensive maintenance strategy is essential. There are two types of maintenance strategy which are as follows:- i) Preventive Maintenance Routine check and professional service by personnel for the purpose of maintaining equipment and facilities in a good operation condition by providing systematic inspection, detection and correction to prevent problem from occurring and mitigate the consequences of the failure of the equipment. i) Corrective Maintenance Maintenance task has to be carried out to identify, isolate and rectify the fault so that the failed equipment or system can be restored to operable condition within the tolerance established for in-service operation. 4 . 1 I N T E R N A L M A I N T E N A N C E ITEM MAINTENANCE OBJECTIVE RISK METHOD FREQUENCY Electrical Services i) Power outlets ii) Switches Check/ repair Daily-weekly Smooth building operation Electrical leakage or failure may lead to electric shock Water Services i) Water fixtures ii) Sanitary fittings iii) Plumbing & piping Check/ clean/ repair Weekly Ensure clean water supply and no water leakage Water leakage may lead to wastage and damage of equipment Vertical Transportation i) Fire staircase ii) Lift Check/ repair Daily & When necessary Ensure smooth flow of circulation Ensure clearance of escape route Obstruction of escape route may lead to safety issues Facilities i) Audio-visual equipment ii) Furniture Check/ repair/ replace Daily & When necessary Ensure sufficient amount are provided Discomfort and give bad impression to users Fenestration i) Doors & Windows Check/ repair Monthly Ensure doors and windows are functioning for safety and accessibility Can cause privacy issues or life-threatening during fire escape Programme i) Theatre ii) Workshop Studio iii) Resource Library Advertise Monthly Sustain the film theatre and ensure great experience for visitors Lack of the lack of availability of the film’s , workshop or events will discourage visitors 4 . 2 E X T E R N A L M A I N T E N A N C E ITEM MAINTENANCE OBJECTIVE RISK METHOD FREQUENCY Greenery & Landscape i) Plantation ii) Outdoor facilities Watering/ trimming Daily-weekly Ensure plantations grow well Ensure clean outdoor space Bad impression for users Rainwater Harvesting System i) Water collection tank ii) Ducts and piping Check/ clean/ repair Monthly Collect rainwater for toilet flushing and plant irrigation Contamination of rainwater Clogging of ducts and pipes due to dust accumulation. Shading Devices i) Louvers ii) Façade shading Clean Monthly When necessary To minimize direct sun exposure from exterior Accumulation of dirt and bad impression for visitors Exterior wall i) Glass curtain wall ii) Concrete wall Clean Annually Allowing sunlight penetration and prevent the growth of fungus Hygiene problem and give bad impression to users Service Area i) M&E Room ii) Telecommunication Room iii) Refuse Chamber Check/ repair Ensure services are in good condition in case of emergency Faulty services and disruption of activities
  • 6. 5 . 1 S U C C E S S C R I T E R I A 5 .0 RISK A N ALYSIS 1. Time Estimated completion time for the project is 1 year. The date of completion will be on November 15 2016. Each task are to ensure following the Gantt Chart to prevent delay of completion time. Certificate of Completion and Compliance will be issued and received not later than February 2017. 2. Cost Estimated budget is to be RM 7 Million. The proposed programmed is supported by Malaysian Film Club and Ministry of Tourism and Culture Malaysia which encourage the collaboration with foreign filmmakers to exchange ideas and promote cultural interest. 3. Quality The project quality relies on Green Building Index assessment criteria to be categorized in the range of at least 66 points to achieve Silver rated GBI. Low embodied energy materials are used including certified wood, recycled and regional materials. Sustainable features such as rainwater harvesting system. Workmanship to be monitored during construction to achieve good quality performance in indoor air quality, acoustics, visual and thermal comfort, provide good service and customer satisfaction. 5 . 2 R I S K A N A L Y S I S A N D M I T I G A T I O N S T R A T E G Y Risk Likelihood Severity Impact Mitigation Strategy Contingency Plan PRECONSTRUCTION PHASE Disapproval of Design by Client Medium High Disapproval of project Clarify client’s requirement Comply with design Miscommunic ation between consultants and architects Low Low Delay of work Documentation of project, internal meeting and refer meeting minutes Clear and complete drawing convention Disapproval from authority Medium Medium Delay of project Follow Authority guidelines Fulfill Authority guidelines and submit requirements to get approval CONTRUCTION PHASE Site accident and climate change Low High Delay of construction Apply permit for extension of time Reschedule project completion date and provide insurance for workers Increase of Cost due to transportation fees Medium Medium Affect the estimated budget Fix contract agreement with dealers for constant price rate Increase the budget to comply with the increasing cost BUILDING OPERATIONAL AND MAINTENANCE PHASE Insufficient investment from stakeholders Low High Insufficient to sustain operation fees Proper planning of programmes and prepare marketing proposal to convince stakeholders Financial funding and bank loan application Lack of tenants for programme spaces Medium High Insufficient to sustain the programme Advertise and marketing proposal to attract tenants Introduce free programmes and events for the public Lack of Public Surveillance in open spaces Medium Medium Emergence of safety issues and security issues Install safety doors and CCTV Hire security guard services to ensure the safety and security of the premise Quality/ Scope CostTime Project Management Goal
  • 7. 6.0 GANTT CHART W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W5 W6 W7 W8 1.0 General Conditions 2-Nov-15 2-Nov-15 0 1.1 Apply for Permits 2-Nov-15 2-Nov-15 0 2.0 Site Grading & Utilities 2-Nov-15 15-Nov-15 14 2.1 Mobilization & Site Survey 16-Nov-15 20-Nov-15 5 2.2 Site Cleaning 21/17/2015 27/18/2015 7 2.3 Installation of Temporary Power Service 28-Nov-15 28-Nov-15 1 2.4 Installation of Underground Utilities 29-Nov-15 29-Nov-15 1 3.0 Substructure Works 30-Nov-15 13-Jan-16 44 3.1 Soil Investigation & Analysis 30-Nov-15 2-Dec-15 3 3.2 Excavation for Foundation 3-Dec-15 21-Dec-15 19 3.3 Piling Foundation 22-Dec-15 13-Jan-16 22 4.0 Structural Work 14-Jan-16 3-Jan-16 71 4.1 Basement Floor Slab 14-Jan-16 30-Jan-16 16 4.2 Lower Ground Floor Slab 1-Feb-16 13-Feb-16 13 4.3 Upper Ground Floor Slab 15-Feb-16 18-Feb-16 12 4.4 First Floor Slab & Structure 23-Feb-16 26-Mar-16 12 4.5 Second Floor Slab & Structure 27-Feb-16 9-Mar-16 12 4.6 Roof Slab 10-Mar-16 14-Mar-16 5 5.0 Roof 15-Mar-16 19-Mar-16 5 5.1 Metal Truss & Framing 15-Mar-16 19-Mar-16 5 6.0 Wall & Opening 21-Mar-16 5-Apr-16 63 6.1 Basement Floor Wall 6-Apr-16 21-Apr-16 16 6.2 Lower Ground Floor Wall & Opening 22-Apr-16 5-May-16 14 6.3 Upper Ground Floor Wall & Opening 6-May-16 2-Jun-16 14 6.4 First Floor Wall & Opening 3-Jun-16 16-Jun-16 14 7.4 Second Floor Wall & Opening 17-Jun-16 21-Mar-16 6 7.0 Services 22-Jun-16 15-Mar-16 29 7.1 Electrical & Lightung 22-Jun-16 28-Jun-16 7 7.2 Plumbing & Sanitary 29-Jun-16 6-Jul-16 8 7.3 Mechanical Ventilation System 7-Jul-16 11-Jul-16 5 7.4 Fire Protection Syatem 12-Jul-16 16-Jul-16 5 7.5 Lift Car System 18-Jul-16 22-Jul-16 5 8.0 Fitting & Finishes 23-Jul-16 6-Sep-16 50 8.1 Plastering & Painting 23-Mar-16 11-Aug-16 20 8.2 Door & Window Installation 12-Aug-16 15-Aug-16 4 8.3 Sanitary Fitting 16-Aug-16 15-Aug-16 2 8.4 Tiling work 16-Aug-16 25-Aug-16 10 8.5 Staircase Finishes & Handrail 26-Aug-16 30-Aug-16 5 8.6 Ceiling Finshes 1-Sep-16 5-Sep-16 5 8.7 Interior Work Inspection & Completion 6-Sep-16 6-Sep-16 1 9.0 Exterior Infrastructure 7-Sep-16 15-Mar-16 42 9.1 Outdoor Theatre 7-Sep-16 18-Sep-16 5 9.2 Drain Sewage and Piping 19-Sep-16 3-Oct-16 12 9.3 Road & Pavements 4-Oct-16 21-Oct-16 15 9.4 Landscape 22-Oct-16 31-Oct-16 10 10.0 Final Acceptance 1-Nov-16 15-Nov-16 22 10.1 Testing & Comissioning 16-Nov-16 29-Nov-16 14 10.2 Site Cleaning 30-Nov-16 6-Dec-16 7 10.3 Inspection & Handover 7-Dec-16 7-Dec-16 1 Critical Path BIM Strategy Milestone Mar-16 ITEM Nov-16Oct-16 DESCRIPTION START DATE COMPLETION DATE DURATION (Days) Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16Nov-15 Dec-15 Jan-16 Feb-16 End of substructure work Prefabrication steel strcture as am alternative materials for faster construction Precast concrete as an alternative material for faster construction IBS toilet as an alternative fittings for faster construction End of Internal Work