This document provides documentation for a medium-sized project located on Jalan Alor in Kuala Lumpur, Malaysia. It includes an analysis of the site and surrounding area, as well as proposed designs and programming for a new film theatre building. Key elements include a SWOT analysis of the site, proposed programming such as a theatre, workshops, and urban park, and design strategies focusing on natural ventilation, greenery, and permeability. A Gantt chart outlines the project schedule from November 2015 to February 2017.
Earth Iconic is a Gurgaon based commercial office space with a concept of live, work and play. It offers shopping center, studio apartments and office spaces under one roof.
Earth Iconic is a Gurgaon based commercial office space with a concept of live, work and play. It offers shopping center, studio apartments and office spaces under one roof.
Earth Iconic is a Gurgaon based commercial office space with a concept of live, work and play. It offers shopping center, studio apartments and office spaces under one roof.
Earth Iconic is a Gurgaon based commercial office space with a concept of live, work and play. It offers shopping center, studio apartments and office spaces under one roof.
Suburban Centralities- An agro vision for LainateMansi Shah
The thesis investigates the possibility of community agriculture as a way to achieve compactness in spatial morphology and a more humane sustainable suburbia.
Every Transit-oriented Development (TOD) is unique in its response to surrounding context and city-wide goals and needs. Planning TOD must consider designing inclusive communities that meet the needs of a range of age and income groups as socio-, cultural-, economic and ecological concerns are integrated with principles of sustainable planning and design. In this presentation, Marcelo shared his expertise and experience on designing previously successful transit-oriented developments in Edmonton while providing insightful direction and foresight on the working model for TOD in Edmonton, and how it can be successfully implemented and improved in the future.
Filament city is a type of urban development that is rejected from the outset, as it is cited responsible for disorder and fragmentation of the territory. But, it is the lack of business concentration, the low density of the under populated centers and services that’s leads to dispersion in the territory and consumption of terrain.
The goal was to increase and consolidate the trans-frontier relationships and physically strengthening the existing filaments and to redesign the local settlement typology keeping the basic morphological features but adapting the new needs.
Founded on Earth Day April 22nd 2010 with a vision to become the most innovative and trusted brand in real estate sector by adopting state-of-the-art technologies, global trends and continuous innovation with a dedicated focus to deliver at par with best trends around the globe.
Earth Group of Companies today stands tall as one of the fastest emerging key players in the Indian real estate landscape with 50+ offices across the country, 1500+ employees, 15000+ satisfied customers, and 20 million+ sq. ft. space under construction.
Chicago is a city that has seen its fair share of crime. The city currently experiences a higher murder rate than larger cities, such as New York City and Los Angeles. Only 60 percent of murders in the Chicago area are solved. In general, Chicago has a higher than normal crime rate. Approximately 300,000 crimes are committed annually in Chicago with nearly 1 in every 30 residents becoming a victim. The security needs of homeowners in the Chicago area are going to be somewhat different than elsewhere. Residents of Chicago are more likely to be victims of burglary and theft than people in other cities. An alarm system can have a dramatic impact on the security of a home. A home with a security system is three times less likely to be burglarized.
Stealth's home security solutions ensures Chicagoland security systems are installed properly so you maximize your return on all your security system investments. Wherever you work in and around Chicago, IL,Stealth's home security solutions will install your security system to manufacturer specifications and your personal satisfaction.
For a security system you can rely on, call Stealth's home security solutions at (866) 424-3521 today.security systems chicago security cameras chicago cctv installations chicago home theater
Suburban Centralities- An agro vision for LainateMansi Shah
The thesis investigates the possibility of community agriculture as a way to achieve compactness in spatial morphology and a more humane sustainable suburbia.
Every Transit-oriented Development (TOD) is unique in its response to surrounding context and city-wide goals and needs. Planning TOD must consider designing inclusive communities that meet the needs of a range of age and income groups as socio-, cultural-, economic and ecological concerns are integrated with principles of sustainable planning and design. In this presentation, Marcelo shared his expertise and experience on designing previously successful transit-oriented developments in Edmonton while providing insightful direction and foresight on the working model for TOD in Edmonton, and how it can be successfully implemented and improved in the future.
Filament city is a type of urban development that is rejected from the outset, as it is cited responsible for disorder and fragmentation of the territory. But, it is the lack of business concentration, the low density of the under populated centers and services that’s leads to dispersion in the territory and consumption of terrain.
The goal was to increase and consolidate the trans-frontier relationships and physically strengthening the existing filaments and to redesign the local settlement typology keeping the basic morphological features but adapting the new needs.
Founded on Earth Day April 22nd 2010 with a vision to become the most innovative and trusted brand in real estate sector by adopting state-of-the-art technologies, global trends and continuous innovation with a dedicated focus to deliver at par with best trends around the globe.
Earth Group of Companies today stands tall as one of the fastest emerging key players in the Indian real estate landscape with 50+ offices across the country, 1500+ employees, 15000+ satisfied customers, and 20 million+ sq. ft. space under construction.
Chicago is a city that has seen its fair share of crime. The city currently experiences a higher murder rate than larger cities, such as New York City and Los Angeles. Only 60 percent of murders in the Chicago area are solved. In general, Chicago has a higher than normal crime rate. Approximately 300,000 crimes are committed annually in Chicago with nearly 1 in every 30 residents becoming a victim. The security needs of homeowners in the Chicago area are going to be somewhat different than elsewhere. Residents of Chicago are more likely to be victims of burglary and theft than people in other cities. An alarm system can have a dramatic impact on the security of a home. A home with a security system is three times less likely to be burglarized.
Stealth's home security solutions ensures Chicagoland security systems are installed properly so you maximize your return on all your security system investments. Wherever you work in and around Chicago, IL,Stealth's home security solutions will install your security system to manufacturer specifications and your personal satisfaction.
For a security system you can rely on, call Stealth's home security solutions at (866) 424-3521 today.security systems chicago security cameras chicago cctv installations chicago home theater
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting PlansAngeline KH
a. Site Plan, Key Plan and Location Plan
b. Full set of Building Plans including Roof Plan
c. Sections and Elevations
d. Staircase and toilet details
e. Cold water supply and sewerage layout diagram
f. Door and window schedules
The report shall incorporate application of the knowledge acquired from module co-requisite and pre-requisites into their design. The report is an evidence and documentation of the student’s 15-week design process
The India Habitat Centre and HANNOVER EXHIBITION CENTER, GERMANYInsiya Ratlamwala
The India Habitat Centre was started in 1993.
The public agency for Housing and Urban Development Corporation Ltd (HUDCO) wanted an office building for its workers and made the unprecedented decision to invite chosen non-profit organizations that shared their concern with habitat to share that work space.
.
.
Hannover, English Hanover, city, capital of Lower Saxony Land (state), northwestern Germany. It lies on the Leine River and the Mittelland Canal, where the spurs of the Harz Mountains meet the wide North German Plain.
The area of the fairground originally was an aircraft works. After World War II, the British military government in Allied-occupied Germany wanted to hold a trade fair and sought for a good place, since Leipzig, the traditional fairground of Germany, was unavailable, being in the Soviet occupation zone. The hangars in Laatzen, south of Hanover, were deemed suitable for this purpose, and so the Hanover Fair, then named Exportmesse 1947 was first held in 1947 to promote the economic recovery in the Bizone. The concept proved to be successful, and so a permanent fairground was established, growing over the years.
[ARC 1215] Methods of Documentation & Measured Drawing: Lot 40-42, Jalan Laks...Angeline KH
Measuring these shop houses for conservation purposes the condition of the shop houses as well as their architectural development are analyzed and recorded.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
Francesca Gottschalk - How can education support child empowerment.pptxEduSkills OECD
Francesca Gottschalk from the OECD’s Centre for Educational Research and Innovation presents at the Ask an Expert Webinar: How can education support child empowerment?
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Thesis Statement for students diagnonsed withADHD.ppt
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PROJECT
1. PROJECT MANAGEMENT [ARC3614]
Name : Angeline Kon Kee Hooi
ID : 0302068
Tutor : Ar. Badrul Hisham
Site : Jalan Alor
Project 2 – Documentation of a Medium-sized Project
2. 1 . 1 I N T R O D U C T I O N T O S I T E
1 .0 P ROJECT DESIGN A N A LYSIS
1 . 2 S W O T A N A L Y S I S
1 . 3 P E S T L E A N A L Y S I S
The chosen site is situated at the end of Jalan Alor, within walking
distance from Bukit Bintang LRT station. There are upgrading and
beautification plans to regularize events and market activities. MRT
Development with the Mass Rapid Transit ready in 2017, it will
enhance the transportation of locals and tourists.
WEAKNESS
• Lack of proper sidewalk
• Poor connectivity fo
neighbouring buildings
• Smell from backlane
STRENGTH
• Strategically located in city
center (commercial district,
tourist landmark)
• Interesting slope landscape
and long strip of open area
• Easily accessible by public
transport (MRT, bus)
OPPORTUNITIES
• Activate the quiet backlane
lane by extension of activity
to the green open area
• Establish urban identify to the
site (urban park)
• Collaborate with existing art
council for outdoor exhibition
THREATS
• Inactive backlanes
• Lack of public surveillance
might cause safety issues
• Lack of car park contribute to
traffic congestion
Alor food street
MRT launch
shaft
residential area
school
hospital
Urban Park
The urban park will be provided in
areas where there is a deficiency
and which are likely to be
developed as urban parks are
important in providing identity,
structure and landscape amenity to
the City as stated in government
policy.
Political
1. Green technology
Bio-filtrate system for water pond,
rainwater harvesting system and
green roof
2. Acoustic features
Options for sound absorptive materials
for acoustic features should be taken
into attention as the performance
programme’s function are crucial to
ensure optimal acoustic insulation
performance of 0.9-1.2s for sound to
decay to 60dB.
Technological
1. Tourism benefits
The film theatre annual events can
generate in economic impact
generate tourism wages, salaries
and produced 7 million in state
and local tax revenue.
2. Supporting Side Incomes
The rental of auditorium, restaurant
and retails are supporting income
to sustain the building operations.
Economical
1. Authority Building Regulations
Building setback lines and road
reserve is taken into consideration at
the preliminary stage of design.
2. Land use
The outdoor open-air cinema at the
green open space must comply with
DBKL ‘s guidelines to facilitate
pedestrian and car traffic movement.
Legal
1. Landmarks
The film theatre programme can
provide entertainment, learning
and job opportunities for school
children and community nearby
the area as well as tourist.
2. Need of Urban Park:
Open space can be used as urban
park for recreational activities and
communal space.
Sociological
1. Environmental Quality
Natural lighting and ventilation and
low embodied energy building
materials helps to reduce electrical
energy consumption. The rainwater
harvesting system help to reduce
water wastage used in flushing toilet.
2. Urban Park Strip
The open space (proposed park) shall
be well maintained to ensure
cleanliness and encourage public
surveillance and ensure safety.
Environmental
site
open space
3. 2 .0 P ROGRA MME VIA BILITY
The proposed programme is a film theatre, tailored with hearts and minds intact: entertainment, dialogue, and education go hand in hand, showing
Malaysia, independent, foreign-language, art house and classic cinema. community cinemas, a range of participatory filmmaking programmes,.
2 . 1 P R O P O S E D P R O G R A M M E
The proposed offers recreation, fitness and social opportunities for all
ages. Theatre, restaurants, cafés and bars can be found throughout the
building, most with al-fresco concept overlooking the vibrant street.
2 . 3 S T A K E H O L D E R S
1. THEATRE
The 90 seats film theatre and 80 studio theatre are is the
main source of income to sustain the building.
2. WORKSHOPS
The workshops provides facilities which can be rented
to run groups that arrange to manage film events and
workshops, featuring props and scenery. ground-
breaking public education and civic engagement
initiative and organizations to learn, discuss and get
involved in today’s critical social issues. Underpinning
these productions, workshops are a dependable source
of creative activity in lives where everything else can be
changing.
3. COMMUNITY CAFE
The café is a social enterprise which can generates
incomes and provides vocational training to the urban
poor, helping homeless and socially excluded people
reconnect with society.
4. ACCOMODATION
The semi-public urban spaces with residential building
blocks complement the public space offering, The
accommodation is designed for artists or individuals
accommodate roof terrace and meeting points.
5. URBAN PARK
The outdoor park featuring weekly outdoor film
screenings and incorporate sidewalks. Through weekly
film programmes in the film park and exhibition venues
by staging critically-acclaimed film productions starring
performer, it brings together community members.
ii) Ministry of Tourism and Culture Malaysia
The proposed building has potential to contribute to the tourism industry
and benefited from the financial assistance for Kuala Lumpur city
planners, this is to be a cultural magnet and a focal point for the mixed-
use development ever in Kuala Lumpur’s inner city, the massive
rejuvenation plan for Jalan Alor, KL.
B) Targeted User
i) Residents, Tourists and Neighbours
The proposed film theatre offers movie screenings and film educational
learning including film appreciation workshops and seminars. Besides, the
proposed building with outdoor cinema is extended to provide urban
park strip for outdoor exhibition which is parallel to Alor food street.
ii) Public (Artists, Organizations)
The proposed building has potential to host film festivals and special
retrospective programmes. It acts as a referral point for local and foreign
organizations seeking information and contacts on films and cinema
generally and in relation to Malaysia.
A) Client
i) Malaysia Film Club (Kelab Seni Filem Malaysia)
The proposed film theatre will provide strong support to local filmmakers,
especially the independent filmmakers, through showcasing their work and
promoting it at international film festivals which in line with Malaysia Film
Club which is involved in screening a year-round programme of
international cinema.
2 . 2 S P A C E S F O R P R O G R A M M E
Live- Accommodation block to cater artists, individual or families in need of support.
Work- Job opportunities offered in film theatre, cafes, and restaurants for people in need of financial support.
Play- entertainment facilities which includes indoor theatre, integrated park ‘strip’ with outdoor theatre, outdoor exhibition and recreational activities.
4. 1. Orientation
The orientation of the
building within the
plot allows visual
connection with the
green strip,
2. Sun Control
Passive thermal
comfort by providing
shade during the day
and reduce solar
gains. Louvers
functioning as a filter
to the outside, a
mediation zone
between private and
public space that will
reflect in time the
diversity of the
inhabitants.
3 . 1 D E S I G N S T R A T E G Y
PRIVATE
ACCOMODATION BLOCK
- Located at eastside
and second floor to
provide more privacy.
SEMI-PUBLIC
Theatre café, studio
theatre and workshop
studios located at the first
floor and second floor to
overlook the central space
of the building.
3 .0 DESIGN SUITA BILITY
3 . 2 D E S I G N F E A T U R E S
Greenary ViewPermeability
Urban Park
The massing of the building is divided in two modules with interlocking series of volumes. Surrounding
of the film theatre is a strip of urban park. adjustable to the slope topography. The space in between
forms a pedestrian network of stepped streets.
Solid and Void
3 . 2 S P A T I A L P L A N N I N G
G r o u n d F l o o r P l a n
N T S
F i r s t F l o o r P l a n
N T S
S e c o n d F l o o r P l a n
N T S
PUBLIC
GATHERING SPACE
Activated by retails and kiosks at upper ground and restaurant,
café at lower ground to continuity the street activity and
create opportunities for community activities and social
gathering. Outdoor cinema and exhibition park for
recreational and communal activities.
RESIDENCE
RETAILS
WORKSHOPS
GALLERY
EVENT
SPACE
LOWER GROUND
UPPER GROUND
1ST FLOOR
TICKETING
CAFE
2ND FLOOR
ROOF LEVEL
ROOF
GARDEN
3. Natural Ventilation
- Cross ventilation
and stack effect
ventilation at the
FILM THEATRE block
and
workshop/acomod
ation block.
4. Greenery/ Nature
Roof garden provide
breathing space and
enhance the view
5. 4 .0 MA IN TENANCE STRA TEGY
The Film Theatre is providing an
extensive range of public open space,
performing space, supporting
programmes and accommodation. To
deliver a quality services and ensure
smooth operational flow of the
building and building sustainability, a
comprehensive maintenance strategy
is essential.
There are two types of maintenance
strategy which are as follows:-
i) Preventive Maintenance
Routine check and professional
service by personnel for the purpose of
maintaining equipment and facilities in
a good operation condition by
providing systematic inspection,
detection and correction to prevent
problem from occurring and mitigate
the consequences of the failure of the
equipment.
i) Corrective Maintenance
Maintenance task has to be carried
out to identify, isolate and rectify the
fault so that the failed equipment or
system can be restored to operable
condition within the tolerance
established for in-service operation.
4 . 1 I N T E R N A L M A I N T E N A N C E
ITEM MAINTENANCE OBJECTIVE RISK
METHOD FREQUENCY
Electrical Services
i) Power outlets
ii) Switches
Check/ repair Daily-weekly Smooth building operation Electrical leakage or failure
may lead to electric shock
Water Services
i) Water fixtures
ii) Sanitary fittings
iii) Plumbing & piping
Check/
clean/ repair
Weekly Ensure clean water supply and no
water leakage
Water leakage may lead to
wastage and damage of
equipment
Vertical Transportation
i) Fire staircase
ii) Lift
Check/
repair
Daily &
When necessary Ensure smooth flow of circulation
Ensure clearance of escape route
Obstruction of escape
route may lead to safety
issues
Facilities
i) Audio-visual equipment
ii) Furniture
Check/
repair/
replace
Daily &
When necessary Ensure sufficient amount are
provided
Discomfort and give bad
impression to users
Fenestration
i) Doors & Windows
Check/
repair
Monthly Ensure doors and windows are
functioning for safety and
accessibility
Can cause privacy issues or
life-threatening during fire
escape
Programme
i) Theatre
ii) Workshop Studio
iii) Resource Library
Advertise Monthly Sustain the film theatre and ensure
great experience for visitors
Lack of the lack of
availability of the film’s ,
workshop or events will
discourage visitors
4 . 2 E X T E R N A L M A I N T E N A N C E
ITEM MAINTENANCE OBJECTIVE RISK
METHOD FREQUENCY
Greenery & Landscape
i) Plantation
ii) Outdoor facilities
Watering/
trimming
Daily-weekly Ensure plantations grow well
Ensure clean outdoor space
Bad impression for users
Rainwater Harvesting System
i) Water collection tank
ii) Ducts and piping
Check/
clean/
repair
Monthly Collect rainwater for toilet flushing
and plant irrigation
Contamination of rainwater
Clogging of ducts and
pipes due to dust
accumulation.
Shading Devices
i) Louvers
ii) Façade shading
Clean Monthly
When necessary
To minimize direct sun exposure from
exterior
Accumulation of dirt and
bad impression for visitors
Exterior wall
i) Glass curtain wall
ii) Concrete wall
Clean Annually Allowing sunlight penetration and
prevent the growth of fungus
Hygiene problem and give
bad impression to users
Service Area
i) M&E Room
ii) Telecommunication
Room
iii) Refuse Chamber
Check/
repair
Ensure services are in good
condition in case of emergency
Faulty services and
disruption of activities
6. 5 . 1 S U C C E S S C R I T E R I A
5 .0 RISK A N ALYSIS
1. Time
Estimated completion time for the project is
1 year. The date of completion will be on
November 15 2016. Each task are to ensure
following the Gantt Chart to prevent delay
of completion time. Certificate of
Completion and Compliance will be issued
and received not later than February 2017.
2. Cost
Estimated budget is to be RM 7 Million. The
proposed programmed is supported by
Malaysian Film Club and Ministry of Tourism
and Culture Malaysia which encourage the
collaboration with foreign filmmakers to
exchange ideas and promote cultural
interest.
3. Quality
The project quality relies on Green Building
Index assessment criteria to be categorized
in the range of at least 66 points to achieve
Silver rated GBI. Low embodied energy
materials are used including certified wood,
recycled and regional materials.
Sustainable features such as rainwater
harvesting system.
Workmanship to be monitored during
construction to achieve good quality
performance in indoor air quality, acoustics,
visual and thermal comfort, provide good
service and customer satisfaction.
5 . 2 R I S K A N A L Y S I S A N D M I T I G A T I O N S T R A T E G Y
Risk Likelihood Severity Impact Mitigation Strategy Contingency Plan
PRECONSTRUCTION PHASE
Disapproval of
Design by
Client
Medium High Disapproval
of project
Clarify client’s
requirement
Comply with design
Miscommunic
ation between
consultants
and architects
Low Low Delay of work Documentation of
project, internal
meeting and refer
meeting minutes
Clear and complete drawing
convention
Disapproval
from authority
Medium Medium Delay of
project
Follow Authority
guidelines
Fulfill Authority guidelines and
submit requirements to get
approval
CONTRUCTION PHASE
Site accident
and climate
change
Low High Delay of
construction
Apply permit for
extension of time
Reschedule project
completion date and provide
insurance for workers
Increase of
Cost due to
transportation
fees
Medium Medium Affect the
estimated
budget
Fix contract
agreement with
dealers for constant
price rate
Increase the budget to
comply with the increasing
cost
BUILDING OPERATIONAL AND MAINTENANCE PHASE
Insufficient
investment
from
stakeholders
Low High Insufficient to
sustain
operation
fees
Proper planning of
programmes and
prepare marketing
proposal to convince
stakeholders
Financial funding and bank
loan application
Lack of
tenants for
programme
spaces
Medium High Insufficient to
sustain the
programme
Advertise and
marketing proposal
to attract tenants
Introduce free programmes
and events for the public
Lack of Public
Surveillance in
open spaces
Medium Medium Emergence
of safety
issues and
security issues
Install safety doors
and CCTV
Hire security guard services to
ensure the safety and security
of the premise
Quality/ Scope
CostTime
Project
Management
Goal
7. 6.0 GANTT CHART
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W5 W6 W7 W8
1.0 General Conditions 2-Nov-15 2-Nov-15 0
1.1 Apply for Permits 2-Nov-15 2-Nov-15 0
2.0 Site Grading & Utilities 2-Nov-15 15-Nov-15 14
2.1 Mobilization & Site Survey 16-Nov-15 20-Nov-15 5
2.2 Site Cleaning 21/17/2015 27/18/2015 7
2.3 Installation of Temporary Power Service 28-Nov-15 28-Nov-15 1
2.4 Installation of Underground Utilities 29-Nov-15 29-Nov-15 1
3.0 Substructure Works 30-Nov-15 13-Jan-16 44
3.1 Soil Investigation & Analysis 30-Nov-15 2-Dec-15 3
3.2 Excavation for Foundation 3-Dec-15 21-Dec-15 19
3.3 Piling Foundation 22-Dec-15 13-Jan-16 22
4.0 Structural Work 14-Jan-16 3-Jan-16 71
4.1 Basement Floor Slab 14-Jan-16 30-Jan-16 16
4.2 Lower Ground Floor Slab 1-Feb-16 13-Feb-16 13
4.3 Upper Ground Floor Slab 15-Feb-16 18-Feb-16 12
4.4 First Floor Slab & Structure 23-Feb-16 26-Mar-16 12
4.5 Second Floor Slab & Structure 27-Feb-16 9-Mar-16 12
4.6 Roof Slab 10-Mar-16 14-Mar-16 5
5.0 Roof 15-Mar-16 19-Mar-16 5
5.1 Metal Truss & Framing 15-Mar-16 19-Mar-16 5
6.0 Wall & Opening 21-Mar-16 5-Apr-16 63
6.1 Basement Floor Wall 6-Apr-16 21-Apr-16 16
6.2 Lower Ground Floor Wall & Opening 22-Apr-16 5-May-16 14
6.3 Upper Ground Floor Wall & Opening 6-May-16 2-Jun-16 14
6.4 First Floor Wall & Opening 3-Jun-16 16-Jun-16 14
7.4 Second Floor Wall & Opening 17-Jun-16 21-Mar-16 6
7.0 Services 22-Jun-16 15-Mar-16 29
7.1 Electrical & Lightung 22-Jun-16 28-Jun-16 7
7.2 Plumbing & Sanitary 29-Jun-16 6-Jul-16 8
7.3 Mechanical Ventilation System 7-Jul-16 11-Jul-16 5
7.4 Fire Protection Syatem 12-Jul-16 16-Jul-16 5
7.5 Lift Car System 18-Jul-16 22-Jul-16 5
8.0 Fitting & Finishes 23-Jul-16 6-Sep-16 50
8.1 Plastering & Painting 23-Mar-16 11-Aug-16 20
8.2 Door & Window Installation 12-Aug-16 15-Aug-16 4
8.3 Sanitary Fitting 16-Aug-16 15-Aug-16 2
8.4 Tiling work 16-Aug-16 25-Aug-16 10
8.5 Staircase Finishes & Handrail 26-Aug-16 30-Aug-16 5
8.6 Ceiling Finshes 1-Sep-16 5-Sep-16 5
8.7 Interior Work Inspection & Completion 6-Sep-16 6-Sep-16 1
9.0 Exterior Infrastructure 7-Sep-16 15-Mar-16 42
9.1 Outdoor Theatre 7-Sep-16 18-Sep-16 5
9.2 Drain Sewage and Piping 19-Sep-16 3-Oct-16 12
9.3 Road & Pavements 4-Oct-16 21-Oct-16 15
9.4 Landscape 22-Oct-16 31-Oct-16 10
10.0 Final Acceptance 1-Nov-16 15-Nov-16 22
10.1 Testing & Comissioning 16-Nov-16 29-Nov-16 14
10.2 Site Cleaning 30-Nov-16 6-Dec-16 7
10.3 Inspection & Handover 7-Dec-16 7-Dec-16 1
Critical Path
BIM Strategy
Milestone
Mar-16
ITEM
Nov-16Oct-16
DESCRIPTION
START
DATE
COMPLETION
DATE
DURATION
(Days)
Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16Nov-15 Dec-15 Jan-16 Feb-16
End of substructure work
Prefabrication steel strcture as am alternative materials for
faster construction
Precast concrete as an alternative material
for faster construction
IBS toilet as an alternative fittings
for faster construction
End of Internal Work