PROJECT MANAGEMENT FOR
INSTRUCTIONAL DESIGNERS
A Pocket Guide for Project Management

Presented by:
Kimberly McKee and Kimberly Klotz, University of Central Arkansas
Instructional Technology Graduate Program
Kimberly Klotz
(kklotz@uca.edu)










Bachelor of Arts ‘06 (Art, Journalism)
Master of Science ‘13 (Instructional
Technology/Distance Education)
7 years of design/marketing experience in
higher education
48 hours of Project Management
professional development
Employed in the Division of Outreach and
Community Engagement, University of
Central Arkansas
Kimberly McKee
(kmckee@uca.edu)











Bachelor of Arts (English, Writing, Journalism)
Master of Science ‘13 (Instructional
Technology/Distance Education Emphasis)
17 years of technical writing experience for a
technology company
Grant writing contractor
48 hours of Project Management professional
development
Employed in the Division of Outreach and
Community Engagement, University of Central
Arkansas
What is Project Management?
Like a Map, a project
management plan helps get
you where you want to be.
Applying Project Management principles
increases the success of a project.


The application of knowledge, skills, tools and
techniques to project activities to meet the
project requirements. (PMI)
What is a project?


HAS A GOAL
Achieves the purposes and goals of an organization,
institution or business



GOALS DEFINED BY STAKEHOLDERS
Purpose and goals are defined by stakeholders



INCREASE ORGANIZATIONAL EFFECTIVENESS AND/OR
EFFICIENCY
(such as incorporating new technologies and updating/
improving processes)



NOT PART OF DAILY TASKS
Major activities outside the normal work of an
organization’s department or functional units or major
activities that cross functional boundaries
Project Characteristics


TEMPORARY
Projects have a defined beginning and end.
(Even if they don’t feel like they will ever
end!)



MAKES SOMETHING!
Creates a product, service or result that is
unique
Who can manage a project?

So, who gets to drive the car?





Outside contractors
Internal group in a Project Management Office (PMO)
Internal team
Instructional Designer
Core Competencies
of the Project Manager
Key Skills of the Project Manager
A Project Manager is
goal directed and milestone oriented!


Develops a plan to meet project goals



Monitors plan to ensure project stays on track



Energizes the team around the success of the project



Maintains organization



Establishes priorities



Communicates clear goals and expectations
Photo by Patrick Hajzler
Project Management and ADDIE Instructional Design Model
PHASE 1
PHASE 1
Project Management: Initiate
ADDIE: Analyze

 Recognizes a project or the next phase of an
existing project
 Recognizes that resources should be
committed to the project

Activities:

1. Conduct Needs Analysis
2. Develop Project Charter
3. Identify and Document Stakeholders
Needs Analysis









Feasibility study to
determine performance
gaps at the individual and
business levels
Presents alternatives and
possible solutions
Prepared by the designer,
team, outside agency
Approved by leadership
Conducting a Needs Analysis
WHY?
Answers Who, What, When, Where, Why,
How questions
Locates the root cause of the
performance gap
Compares what is expected to what is
actually achieved
Understand the
learner (job experiences, motivation,
aptitude, learning style, etc.)

HOW?


Conduct a survey



Walk thru current processes



Talk to customers, if possible and
needed



Review previous training efforts



Review sales records and customer
feedback forums



Conduct interviews



Facilitate focus groups



Facilitate workshop sessions



Conduct group brainstorming



Observations



Prototype – working model to obtain
feedback before proceeding with
project
Project Charter
Before we take a trip and plan our
route, do we really need to go?








Provides structure to the Project Plan
Justifies the project
Documents the need being addressed
Includes a description of the project
Documents proposed result of the project
Includes input from stakeholders
Leadership responsible for obtaining sign-off by the
project sponsor (person financing the project), senior
management, stakeholders
Stakeholders
Find out who is riding
in the car with you and
paying for your gas.



Includes practitioners or groups of people with
specialized knowledge or skills in a particular area



Interests should be considered throughout the
project
PHASE 2
Phase 2
Project Management: Plan
ADDIE: Design




40% of time allocated to complete the project should
be spent in planning
Size and complexity of project determines the
processes to be included

Activities:
1.
Instructional Design Document
2.
Project Management Plan
3.
Components of Project Management Plan
4.
Project Scope Statement
5.
Work Breakdown Structure (WBS)
Step 3: Instructional
Design Document



Outlines the framework of the instructional plan
Provides high-level overview of the product content
and how it will be treated



Enables stakeholders to validate the program’s
objectives, architecture, content and concepts
before development



Identifies learning strategies (learning styles and
adult learning principles)
Step 4: Project Management Plan






Components of Plan
Overall approach used to
plan and manage a project  Project Scope Statement
 Cost and Budget
 Work Breakdown Structure (WBS)
Consists of subsidiary
 Schedule Management
plans that detail how
 Issues Management
specific areas of the
 Change Management
project will be managed
 Quality Management
 Human Resource Management
 Procurement Management
Documents cost, time,
 Risk Management
quality, risk, and
resources to complete the  Communications Plan
project
Project Scope Statement

Define deliverables.
Be sure to include cost and time as well.
Lastly, get everyone on the same page.



Documents initial planning efforts for the project
Used to reach agreement among managers,
stakeholders and teams before resources are allocated
Work Breakdown Structure (WBS)

Who is the driver?
The navigator? Who pumps the gas?





Comprehensive review of the project scope
Subdivides major project deliverables and project work into
smaller, more management components called work packages
The lowest level tasks should have durations between 2 and 22
days and effort should not take more than one person more
than one week to complete
Cost and Budget

So, how much is this going to cost?
Cost of the resources needed to complete project activities
Schedule Management



Analyzing activity sequences, duration, resource
requirements and schedule constraints to create the
project schedule



Approved schedule becomes the baseline for the
remainder of the project



Project progress is monitored and tracked against the
baseline, which determines if the project is on track
Issues Management

Houston, we have a problem.
Okay let’s solve it. And then record it.


A log to document the issue, the owner,
resolution and status
Change Management

Sometimes,
we have to
take detours

Deviations from the project management plan
Quality Management

What quality is acceptable?
How do we make sure that we meet
the standards set?



Identifies the quality standards adopted for the project
Describes how the quality will be implemented and managed
Human Resource Management





Process for organizing and
managing the team
Size of team influenced by
duration of the project
Procurement Management





Process of documenting project purchasing decisions, specifying the
approach and identifying potential sellers.
Identifies project needs that must be met by purchasing products,
services or results outside the organization
Risk Management Plan
Dealing with the unexpected.



Processes necessary to
increase the probability and
impact of positive events and
decrease probability and
impact of negative events
Communication Plan





Processes required to ensure timely and appropriate
collection, retrieval and dissemination of project
information
Ensures that stakeholder needs are met
PHASE 3
PHASE 3
ADDIE: Develop and Implement
Project Management: Execute



Design document is moved to development
Communication is key to the success of the project

Activities:
1.
Preview instructional product
2.
Validate instructional product
3.
Deliver instructional product
Communication Elements










Create a positive
environment
Know your audience
Project credibility
Listen
Awareness of verbal
and nonverbal
Response to
feedback
Communication Barriers


Perceptions
(How individuals make sense of information)



Beliefs
(True/false or probable/improbable)



Attitudes
(Positive/negative responses)



Values
(Good/bad or preferred/rejected)



Noise
(Internal/external disruption to the communication
process)
Validating Product

Content
 Was learning content relevant to
the tasks to be performed?
Process
 Did the presentation method
help you learn the content?
Materials
 Were the manuals, job aids, etc.,
adequate, useful and applicable?
PHASE 4
PHASE 4
ADDIE: Evaluate
Project Management: Close








Ensure that your customer is content with the project deliverables
Obtain sign off by customer that project is complete
Hold a “lessons learned” meeting with project team and
appropriate stakeholders
Create a Final Report
Celebrate success
Project Management Institute (PMI)
www.pmi.org

PMI is one of the world’s largest not-for-profit
membership associations for the Project Management
profession, with more than 650,000 members and
credential holders in more than 185 countries.

PMI Offers Two Certification Levels:
Project Management Professional (PMP)
Certified Associate in Project
Management (CAPM) – Entry Level
Certification
Project Management
Certification Requirements
Project Management
Professional (PMP)
1.
2.

3.
4.

5.

Bachelor’s degree
3 years of Project Management
experience
4500 hours of leading projects
35 hours of Project Management
education

2.

3.
4.

5.

1.

2.

3.

High school degree
5 years of Project Management
experience
7500 hours of leading projects
35 hours of Project Management
education
Pass the test

High school diploma or
equivalent
1500 hours of Project
Management experience
Pass the test

OR

Pass the test

OR
1.

Certified Associate
in Project Management (CAPM)

1.

2.

3.

High school diploma or
equivalent
23 hours of Project Management
instruction
Pass the test
Project Management Tools
Desktop
Microsoft Project
Sales Force
Free - Open-Source
ProjectPier
Redmine

Web-Based
Wrike
Podio
Team Box
Pivital Tracker
Open workbench – free
Plan box
Basecamp
Projectmanager.com
Zoho
Fengoffice.com
Questions?

Thank you.
Download the presentation at
uca.edu/outreach or email us.
Kimberly Mckee kmckee@uca.edu
Kimberly Klotz kklotz@uca.edu
References & Resources
Cox, D. (2009). Project management for instructional.
designers: a practical guide. Bloomington, Indiana: iUniverse
Wiley, D. Project management for instructional designers.
Brigham Young University: Creative Commons license.
Retrieved from http://pm4id.org/(2013).
A guide to the project management body of knowledge. (4th
ed.). project management institute.
Swaim, T. (2013). Project management fundamentals. Ed To
Go, Retrieved from http://www.ed2go.com/
CourseDetails.aspx?tab=detail&course=pmf
Swaim, T. (2013). Pmp certification prep 1. Ed To Go,
Retrieved from http://www.ed2go.com/CourseDetails.aspx?
Needs Analysis Format
Use this format to develop a Needs Analysis Report.
1.

Training requested

2.

Job, tasks, duties to be performed

3.

Expected performance

4.

Data collection method

5.

Actual performance

6.

Cause of performance gap

7.

Cost estimate of training

8.

Benefit of training

9.

Training proposal

10.

Management support recommendations (feedback,
measurement)
Narrative

11.
Project Charter Format
Use this format to develop a Project Charter.
1.
2.

Purpose
Description of Work

3.
4.

Objectives
In-scope deliverables (what the project includes)

5.
6.
7.
8.

Out-of-scope deliverables (what the project does not include)
Roles and responsibilities
Milestones
Major known risks
Assumptions and Constraints

9.

Constraints

10.

External dependencies

11.
12.

Summary of budget
Vendors
Stakeholder Log Format
Use this format to develop a Stakeholder Log.
1.

Name

2.

Role on Project

3.

Department

4.

Interest

5.

Knowledge level

6.

Expectation

7.

Level of influence on the project
Instructional Design
Document Format
Use this format to develop an Instructional Design Document.
Learning Objectives
1.

Describe what the learner is expected to achieve when performing
the task

2.

Task statement

3. Conditions under which the task is performed
Key Points – Content and Concept
1.

Product information, concepts and criteria to be covered in each
module

Process and Activity
1.
2.

Summary of the types of learning activities that will be completed in
the respective modules
Describe how presentation and application methods are distributed
throughout the learning program
Project Management Plan
Input & Output Documents
Input:


Project charter



Instructional design document



Process outputs that will be used for the project



Environmental factors outside the organization



Specific information about what may influence success,
organizational policies, guidelines, procedures, plans, and/
or standards for conducting work



Stakeholder input, if skills and knowledge warrant

Output:


Project Management Plan
Project Scope Statement Format
Use this format to develop a Project Scope Statement.
1.
2.

Purpose and justification

3.

Objectives

4.

Project description (Includes: deliverables breakdown. Do not include: completion
criteria, external dependencies, assumptions, constraints.)

5.

Milestones and target dates

6.

Project approach (describes the plans included, scheduled meetings, scheduled
status reports, issues management, change management, communications plan,
procurement plan, resource management)

7.
8.

Approvals

Product description

Version history
Work Breakdown Structure
Input:
 Project scope statement
 Organizational policies, guidelines, procedures, plans and or
standards for conducting work
 Activity Lists (outlines all the scheduled activities to be
performed for the project within the scope of work description of
each activity and identification code or number)
 Activity Attributes (characteristics of the activities)
 Milestone Lists (major accomplishments that signal completion
of a major deliverable)
 Requirements documentation that describe the connection
between individual requirements and the business need for the
project
Work Breakdown Structure (WBS)
Output:



WBS in deliverables
WBS dictionary that includes details for
work attached to each component,
milestones, person responsible, etc.
WBS Steps
Define Project Deliverables
1.
2.
3.
4.
5.
6.
7.
8.

Define scheduled activities to complete project
Define tasks for scheduled activities
Sequence activities and tasks
Identify related dependencies
Estimate resources needed/available
Estimate duration resources will be required
Define milestones and expected target dates
Document details for the WBS dictionary
WBS Sequencing Methods
Precedence Diagramming Method


Finish-to-start (FS): predecessor activity must finish
before successor activity can start



Start-to-finish (SF): predecessor activity must start
before the successor activity can finish



Finish-to-finish (FF): predecessor activity must finish
before the successor activity finishes



Start-to-finish (SS): predecessor activity must start
before the successor activity can start
WBS Sequencing Methods
Dependency Determination
 Mandatory dependencies: inherent to the nature of the
work being done
 Discretionary dependencies: established based on best
practices within a particular industry or aspect of the
project where an unusual sequence is desired
Appling Leads and Lags
 Lags delay successor activities and require time to be
added to start or finish date. Leads speed up successor
activity and require time to be taken off either start or
finish date of scheduled activity.
Schedule Management
Input:
 Project scope statement
 Activity list
 Activity attributes (characteristics of activity,
assumptions, constraints)
 Diagram of project activities and dependencies
 Activity resource requirements
 Resource calendars
 Activity duration estimates
Output:
 Project schedule
 Schedule data
 Schedule baseline
 Project document updates
Schedule Management
Scheduling Methods








Schedule Network Analysis
Calculate early and late start dates, and early and late
finish dates for project activities.
Critical-Path Method
Identifies tasks that must be completed on time for the
project to be completed by the end date. This data
keeps project on track.
Schedule Compression
Using mathematical calculations to shorten the schedule
without changing the scope. Allows related activities to
be accomplished sooner than estimated.
What-if Scenario Analysis
Series of what if questions to present activity
assumptions to determine project duration.
Schedule Management
Scheduling Methods


Resource Leveling
Under-allocated resources can be assigned to multiple
tasks.



Critical-Chain Method
Schedule high risk tasks early in project so problems
are identified and addressed as soon as possible.



Applying Leads and Lags
Start and finish dates are adjusted.



Automated Scheduling Tools
Speeds up scheduling process based on data input.
Schedule Management
Plan Format
Use this format to develop a Schedule Management Plan.
1.

Task

2.

Responsible

3.

Estimated duration to complete

4.

Start date

5.

Finish date

6.

Delays

7.

Reason for delay

8.

Action steps
Issues Management


A log to document the issue, the owner,
resolution and status
Use this format to develop an Issues Management Log.

1.

How issues are tracked

2.

How issues are assigned

3.

How issues are prioritized

4.

How issues are resolved

5.

How issues are communicated
Change Management
Deviations from the project management
plan

Use this format to develop a Change Management Process Log.
1.

How a change request will be managed

2.

How a change request will be reviewed

3.

How a change request will be tracked

4.

How a change request will be resolved

4.

What are possible alternatives and cost

5.

Sign off
Quality Management
Identifies the quality standards adopted for the project
 Describes how the quality will be implemented and
managed
Input:
 Customer definition of quality
 Overview of schedule, cost, scope
 Quality assurance activities (testing, audits, reviews)
 Measurements (within scope, budget, schedule)
Output:
 Quality Management Plan

Quality Management
Plan Format
Use this format to develop a Quality Management Plan.
1.

Organization’s quality policy

2.

How the customer defines quality

3.

Deliverables - acceptable criteria and standards

4.

Steps to ensure that quality is part of the product

4.

Measurements

5.

Scheduled audits

6.

Sign off
Human Resource Management
Use this format to develop a Human Resources Management Plan.
1.

Roles

2.

Responsibilities

3.

Reporting relationships
Procurement Management Plan
Format
Use this format to develop a Procurement Management Plan.
1.

Procurement statement (products or services being considered)

2.

Estimated cost

3.

Vendor selection (RFI/RFP/etc.)

4.

Procurement definition
(what items will be procured and under what conditions)

5.

Selection process criteria

6.

Procurement team with contact information and defined roles

7.

Contract type and actions required to initiate

8.

Standards for each contract

9.

Vendor management (steps to ensure everything is received)

9..

Sign off
Human Resource Management
Process for organizing and managing the team
 Size of team influenced by duration of the
project
Input:
 Factors outside the project that influence
project success
 Organizational policies, guidelines, procedures,
plans and/or standards for conducting work
 Activity resource requirements
Output:
 Human Resource Plan

Procurement Management




Process of documenting project purchasing decisions, specifying the
approach and identifying potential sellers.
Identifies project needs that must be met by purchasing products, services
or results outside the organization

Input:

Factors outside of the project that impact success

Organizational policies, guidelines, plans and/or standards for conducting work

Scope baseline

Requirements documentation

Teaming agreements

Risk information

Activity-resource requirements

Project schedule

Activity cost estimates

Cost baseline
Output:

Procurement Management plan
Risk Management Plan
Processes necessary to increase the probability
and impact of positive events and decrease
probability and impact of negative events
Input:
 Factors outside of the project that influence
success
 Organizational policies, guidelines, procedures,
plans and/or standards for conducting work
 Scope statement
 Cost Management plan
 Schedule Management plan
 Communications Management plan
Output:
 Risk Management plan

Risk Management Plan Format
Use this format to develop a Risk Management Plan.
1.

Risk identification (based on discussions with key
stakeholders)

2.

Risk categorization

3.

Risk probability and impact assessment

4.

Risk prioritization

5.

Risk response planning

6.

Risk management strategy

7.

Risk monitoring (build reviews into project schedule)

8.

Risk control

9.

Assumptions with significant impact on project risk

10.

Roles and responsibilities unique to the risk function
Risk Management Plan Format
Risk Management Plan - Continued
11.

Risk management milestones

12.

Risk rating score technique

13.
14.

Risk thresholds (high, medium, low – based on impact and
probability)
Risk communication

15.

Risk tracking process

16.

Sign off
Communication Plan
Processes required to ensure timely and appropriate
collection, retrieval and dissemination of project
information
 Ensures that stakeholder needs are met
Input:
 Factors outside the project with significant influence
 Organizational policies, guidelines, procedures, plans
and standards for conducting work
 Project Charter
 Procurement documents
Output:
 Communication Plan

Communication Plan Format
Use this format to develop a Communication Plan.
1.

Purpose

2.

Need

3.

Communication Principles
(ensure consistency and tone in messages and communication efforts)

4.

Communication objectives

5.

Target audience

6.

Key messages (who, what, when, where, why, how)

7.

Change implications
(impact of the organizational changes as a result of the project)

8.

Challenges and opportunities
(Factors that help or hinder such as past situations, rumors, trust, etc.)

9.

Sign off
Communication Resources
The communication methods chosen should be driven by the
needs of the project.








Email
Text Message
Video conferencing and chat services, like Skype
Blogs and wikis (WordPress)
Calendar sharing (Google Docs)
Postal and shipping services

Desktop software tools





Microsoft Office or Open Office Suite
Visual design and mockup software
Project management software (Microsoft Project or OpenProject)
Online project management software (Wrike, TeamBox,
ManyMoons)
Cost and Budget
So, how much is this going to cost?
Cost of the resources needed to complete project activities
Input:
Scope statement
 Work breakdown structure
 Defined activities
 Sequenced activities
 Resource estimates
 Schedule
 Risks
Output:
 Cost baseline

Final Project Report Format
Use this format to develop a Final Project Report.
1.

Compare project outputs to project objectives

1.

Identify what went right or wrong

2.

Document weaknesses and strengths

3.

Include original project plan

4.

Include meeting minutes

5.

Include project journals

6.

Obtain customer feedback

7.

All project documents for archives

8.

Accounting documentation

9.

Sign off

More Related Content

What's hot

Critical curriculum design
Critical curriculum designCritical curriculum design
Critical curriculum designTansy Jessop
 
Curriculum Development Models
Curriculum  Development  ModelsCurriculum  Development  Models
Curriculum Development ModelsDr.Kumuda Gururao
 
PNU CTP Ed 3 Curriculum implementation through developments
PNU CTP Ed 3 Curriculum implementation through developmentsPNU CTP Ed 3 Curriculum implementation through developments
PNU CTP Ed 3 Curriculum implementation through developmentsJosephine Ann Necor
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Managementproject management
 
10 pmp communication management exam
10 pmp communication  management exam10 pmp communication  management exam
10 pmp communication management examJamil Faraj , PMP
 
System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development MethodologiesDevon Ravihansa
 
2 identifying and selecting projects
2 identifying and selecting projects2 identifying and selecting projects
2 identifying and selecting projectsDaw Juguilon
 
Example Dissertation Proposal Defense Power Point Slide
Example Dissertation Proposal Defense Power Point SlideExample Dissertation Proposal Defense Power Point Slide
Example Dissertation Proposal Defense Power Point SlideDr. Vince Bridges
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planningJeanette C. Patindol
 
Writing SMART learning outcomes 2015
Writing SMART learning outcomes 2015Writing SMART learning outcomes 2015
Writing SMART learning outcomes 2015Rita Ndagire Kizito
 
Compare & Contrast ADDIE and Dick and Carey Models
Compare & Contrast ADDIE and Dick and Carey ModelsCompare & Contrast ADDIE and Dick and Carey Models
Compare & Contrast ADDIE and Dick and Carey Modelsingridsears1
 
Project Management CH9 Project Scheduling
Project Management CH9 Project SchedulingProject Management CH9 Project Scheduling
Project Management CH9 Project SchedulingIzah Asmadi
 

What's hot (20)

Critical curriculum design
Critical curriculum designCritical curriculum design
Critical curriculum design
 
Curriculum Development Models
Curriculum  Development  ModelsCurriculum  Development  Models
Curriculum Development Models
 
PNU CTP Ed 3 Curriculum implementation through developments
PNU CTP Ed 3 Curriculum implementation through developmentsPNU CTP Ed 3 Curriculum implementation through developments
PNU CTP Ed 3 Curriculum implementation through developments
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Team contract
Team contractTeam contract
Team contract
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Management
 
10 pmp communication management exam
10 pmp communication  management exam10 pmp communication  management exam
10 pmp communication management exam
 
Team and project
Team and projectTeam and project
Team and project
 
11 pmp risk management exam
11 pmp risk management exam11 pmp risk management exam
11 pmp risk management exam
 
Managing project teams.
Managing project teams. Managing project teams.
Managing project teams.
 
System Development Methodologies
System Development MethodologiesSystem Development Methodologies
System Development Methodologies
 
Reflective essay
Reflective essayReflective essay
Reflective essay
 
2 identifying and selecting projects
2 identifying and selecting projects2 identifying and selecting projects
2 identifying and selecting projects
 
Example Dissertation Proposal Defense Power Point Slide
Example Dissertation Proposal Defense Power Point SlideExample Dissertation Proposal Defense Power Point Slide
Example Dissertation Proposal Defense Power Point Slide
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
5. project activity and risk planning
5. project activity and risk planning5. project activity and risk planning
5. project activity and risk planning
 
Writing SMART learning outcomes 2015
Writing SMART learning outcomes 2015Writing SMART learning outcomes 2015
Writing SMART learning outcomes 2015
 
Project management
Project managementProject management
Project management
 
Compare & Contrast ADDIE and Dick and Carey Models
Compare & Contrast ADDIE and Dick and Carey ModelsCompare & Contrast ADDIE and Dick and Carey Models
Compare & Contrast ADDIE and Dick and Carey Models
 
Project Management CH9 Project Scheduling
Project Management CH9 Project SchedulingProject Management CH9 Project Scheduling
Project Management CH9 Project Scheduling
 

Similar to Project management for instructional designers

Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional DesignersKimberly Kaye
 
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designersKimberly Kaye
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTJohn Macasio
 
PM skillz [jz]
PM skillz [jz]PM skillz [jz]
PM skillz [jz]Jo Zaarour
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
Project management professional
Project management professionalProject management professional
Project management professionalReema
 
Intro to PM.pdf
Intro to PM.pdfIntro to PM.pdf
Intro to PM.pdfDaveNjoga1
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and TechniquesInvensis Learning
 
NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1Future Managers
 
Pmi presentation structuring project v2
Pmi presentation   structuring project v2Pmi presentation   structuring project v2
Pmi presentation structuring project v2Deepak Mehtani
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1Imoh Etuk
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementUW Madison
 

Similar to Project management for instructional designers (20)

Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional Designers
 
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designers
 
ICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENTICT4GOV PROJECT MANAGEMENT
ICT4GOV PROJECT MANAGEMENT
 
PM skillz [jz]
PM skillz [jz]PM skillz [jz]
PM skillz [jz]
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
Project management
Project managementProject management
Project management
 
PMP.pdf
PMP.pdfPMP.pdf
PMP.pdf
 
Project management professional
Project management professionalProject management professional
Project management professional
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Designing education projects
Designing education projectsDesigning education projects
Designing education projects
 
Intro to PM.pdf
Intro to PM.pdfIntro to PM.pdf
Intro to PM.pdf
 
Project management
Project managementProject management
Project management
 
Project Management Best Practices - Tips and Techniques
Project Management Best Practices  - Tips and TechniquesProject Management Best Practices  - Tips and Techniques
Project Management Best Practices - Tips and Techniques
 
NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1NCV 4 Project Management Hands-On Support Slide Show - Module 1
NCV 4 Project Management Hands-On Support Slide Show - Module 1
 
Pmi presentation structuring project v2
Pmi presentation   structuring project v2Pmi presentation   structuring project v2
Pmi presentation structuring project v2
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Cs244 w10ch1
Cs244 w10ch1Cs244 w10ch1
Cs244 w10ch1
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
1548693 (1).ppt
1548693 (1).ppt1548693 (1).ppt
1548693 (1).ppt
 

Recently uploaded

How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17Celine George
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxEduSkills OECD
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaasiemaillard
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfbu07226
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringDenish Jangid
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfjoachimlavalley1
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryEugene Lysak
 
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdfTelling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdfTechSoup
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxjmorse8
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxricssacare
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePedroFerreira53928
 
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...Abhinav Gaur Kaptaan
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...Sayali Powar
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleCeline George
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXMIRIAMSALINAS13
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfQucHHunhnh
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online PresentationGDSCYCCE
 

Recently uploaded (20)

How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. HenryThe Last Leaf, a short story by O. Henry
The Last Leaf, a short story by O. Henry
 
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdfTelling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
Telling Your Story_ Simple Steps to Build Your Nonprofit's Brand Webinar.pdf
 
Morse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptxMorse OER Some Benefits and Challenges.pptx
Morse OER Some Benefits and Challenges.pptx
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
Research Methods in Psychology | Cambridge AS Level | Cambridge Assessment In...
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
NCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdfNCERT Solutions Power Sharing Class 10 Notes pdf
NCERT Solutions Power Sharing Class 10 Notes pdf
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 

Project management for instructional designers

  • 1. PROJECT MANAGEMENT FOR INSTRUCTIONAL DESIGNERS A Pocket Guide for Project Management Presented by: Kimberly McKee and Kimberly Klotz, University of Central Arkansas Instructional Technology Graduate Program
  • 2. Kimberly Klotz (kklotz@uca.edu)      Bachelor of Arts ‘06 (Art, Journalism) Master of Science ‘13 (Instructional Technology/Distance Education) 7 years of design/marketing experience in higher education 48 hours of Project Management professional development Employed in the Division of Outreach and Community Engagement, University of Central Arkansas
  • 3. Kimberly McKee (kmckee@uca.edu)       Bachelor of Arts (English, Writing, Journalism) Master of Science ‘13 (Instructional Technology/Distance Education Emphasis) 17 years of technical writing experience for a technology company Grant writing contractor 48 hours of Project Management professional development Employed in the Division of Outreach and Community Engagement, University of Central Arkansas
  • 4. What is Project Management? Like a Map, a project management plan helps get you where you want to be. Applying Project Management principles increases the success of a project.  The application of knowledge, skills, tools and techniques to project activities to meet the project requirements. (PMI)
  • 5. What is a project?  HAS A GOAL Achieves the purposes and goals of an organization, institution or business  GOALS DEFINED BY STAKEHOLDERS Purpose and goals are defined by stakeholders  INCREASE ORGANIZATIONAL EFFECTIVENESS AND/OR EFFICIENCY (such as incorporating new technologies and updating/ improving processes)  NOT PART OF DAILY TASKS Major activities outside the normal work of an organization’s department or functional units or major activities that cross functional boundaries
  • 6. Project Characteristics  TEMPORARY Projects have a defined beginning and end. (Even if they don’t feel like they will ever end!)  MAKES SOMETHING! Creates a product, service or result that is unique
  • 7. Who can manage a project? So, who gets to drive the car?     Outside contractors Internal group in a Project Management Office (PMO) Internal team Instructional Designer
  • 8. Core Competencies of the Project Manager
  • 9. Key Skills of the Project Manager A Project Manager is goal directed and milestone oriented!  Develops a plan to meet project goals  Monitors plan to ensure project stays on track  Energizes the team around the success of the project  Maintains organization  Establishes priorities  Communicates clear goals and expectations Photo by Patrick Hajzler
  • 10.
  • 11. Project Management and ADDIE Instructional Design Model
  • 13. PHASE 1 Project Management: Initiate ADDIE: Analyze  Recognizes a project or the next phase of an existing project  Recognizes that resources should be committed to the project Activities: 1. Conduct Needs Analysis 2. Develop Project Charter 3. Identify and Document Stakeholders
  • 14. Needs Analysis     Feasibility study to determine performance gaps at the individual and business levels Presents alternatives and possible solutions Prepared by the designer, team, outside agency Approved by leadership
  • 15. Conducting a Needs Analysis WHY? Answers Who, What, When, Where, Why, How questions Locates the root cause of the performance gap Compares what is expected to what is actually achieved Understand the learner (job experiences, motivation, aptitude, learning style, etc.) HOW?  Conduct a survey  Walk thru current processes  Talk to customers, if possible and needed  Review previous training efforts  Review sales records and customer feedback forums  Conduct interviews  Facilitate focus groups  Facilitate workshop sessions  Conduct group brainstorming  Observations  Prototype – working model to obtain feedback before proceeding with project
  • 16. Project Charter Before we take a trip and plan our route, do we really need to go?        Provides structure to the Project Plan Justifies the project Documents the need being addressed Includes a description of the project Documents proposed result of the project Includes input from stakeholders Leadership responsible for obtaining sign-off by the project sponsor (person financing the project), senior management, stakeholders
  • 17. Stakeholders Find out who is riding in the car with you and paying for your gas.  Includes practitioners or groups of people with specialized knowledge or skills in a particular area  Interests should be considered throughout the project
  • 19. Phase 2 Project Management: Plan ADDIE: Design   40% of time allocated to complete the project should be spent in planning Size and complexity of project determines the processes to be included Activities: 1. Instructional Design Document 2. Project Management Plan 3. Components of Project Management Plan 4. Project Scope Statement 5. Work Breakdown Structure (WBS)
  • 20. Step 3: Instructional Design Document   Outlines the framework of the instructional plan Provides high-level overview of the product content and how it will be treated  Enables stakeholders to validate the program’s objectives, architecture, content and concepts before development  Identifies learning strategies (learning styles and adult learning principles)
  • 21. Step 4: Project Management Plan    Components of Plan Overall approach used to plan and manage a project  Project Scope Statement  Cost and Budget  Work Breakdown Structure (WBS) Consists of subsidiary  Schedule Management plans that detail how  Issues Management specific areas of the  Change Management project will be managed  Quality Management  Human Resource Management  Procurement Management Documents cost, time,  Risk Management quality, risk, and resources to complete the  Communications Plan project
  • 22. Project Scope Statement Define deliverables. Be sure to include cost and time as well. Lastly, get everyone on the same page.   Documents initial planning efforts for the project Used to reach agreement among managers, stakeholders and teams before resources are allocated
  • 23. Work Breakdown Structure (WBS) Who is the driver? The navigator? Who pumps the gas?    Comprehensive review of the project scope Subdivides major project deliverables and project work into smaller, more management components called work packages The lowest level tasks should have durations between 2 and 22 days and effort should not take more than one person more than one week to complete
  • 24. Cost and Budget So, how much is this going to cost? Cost of the resources needed to complete project activities
  • 25. Schedule Management  Analyzing activity sequences, duration, resource requirements and schedule constraints to create the project schedule  Approved schedule becomes the baseline for the remainder of the project  Project progress is monitored and tracked against the baseline, which determines if the project is on track
  • 26. Issues Management Houston, we have a problem. Okay let’s solve it. And then record it.  A log to document the issue, the owner, resolution and status
  • 27. Change Management Sometimes, we have to take detours Deviations from the project management plan
  • 28. Quality Management What quality is acceptable? How do we make sure that we meet the standards set?   Identifies the quality standards adopted for the project Describes how the quality will be implemented and managed
  • 29. Human Resource Management   Process for organizing and managing the team Size of team influenced by duration of the project
  • 30. Procurement Management   Process of documenting project purchasing decisions, specifying the approach and identifying potential sellers. Identifies project needs that must be met by purchasing products, services or results outside the organization
  • 31. Risk Management Plan Dealing with the unexpected.  Processes necessary to increase the probability and impact of positive events and decrease probability and impact of negative events
  • 32. Communication Plan   Processes required to ensure timely and appropriate collection, retrieval and dissemination of project information Ensures that stakeholder needs are met
  • 34. PHASE 3 ADDIE: Develop and Implement Project Management: Execute   Design document is moved to development Communication is key to the success of the project Activities: 1. Preview instructional product 2. Validate instructional product 3. Deliver instructional product
  • 35. Communication Elements       Create a positive environment Know your audience Project credibility Listen Awareness of verbal and nonverbal Response to feedback
  • 36. Communication Barriers  Perceptions (How individuals make sense of information)  Beliefs (True/false or probable/improbable)  Attitudes (Positive/negative responses)  Values (Good/bad or preferred/rejected)  Noise (Internal/external disruption to the communication process)
  • 37. Validating Product Content  Was learning content relevant to the tasks to be performed? Process  Did the presentation method help you learn the content? Materials  Were the manuals, job aids, etc., adequate, useful and applicable?
  • 39. PHASE 4 ADDIE: Evaluate Project Management: Close      Ensure that your customer is content with the project deliverables Obtain sign off by customer that project is complete Hold a “lessons learned” meeting with project team and appropriate stakeholders Create a Final Report Celebrate success
  • 40. Project Management Institute (PMI) www.pmi.org PMI is one of the world’s largest not-for-profit membership associations for the Project Management profession, with more than 650,000 members and credential holders in more than 185 countries. PMI Offers Two Certification Levels: Project Management Professional (PMP) Certified Associate in Project Management (CAPM) – Entry Level Certification
  • 41. Project Management Certification Requirements Project Management Professional (PMP) 1. 2. 3. 4. 5. Bachelor’s degree 3 years of Project Management experience 4500 hours of leading projects 35 hours of Project Management education 2. 3. 4. 5. 1. 2. 3. High school degree 5 years of Project Management experience 7500 hours of leading projects 35 hours of Project Management education Pass the test High school diploma or equivalent 1500 hours of Project Management experience Pass the test OR Pass the test OR 1. Certified Associate in Project Management (CAPM) 1. 2. 3. High school diploma or equivalent 23 hours of Project Management instruction Pass the test
  • 42. Project Management Tools Desktop Microsoft Project Sales Force Free - Open-Source ProjectPier Redmine Web-Based Wrike Podio Team Box Pivital Tracker Open workbench – free Plan box Basecamp Projectmanager.com Zoho Fengoffice.com
  • 43. Questions? Thank you. Download the presentation at uca.edu/outreach or email us. Kimberly Mckee kmckee@uca.edu Kimberly Klotz kklotz@uca.edu
  • 44. References & Resources Cox, D. (2009). Project management for instructional. designers: a practical guide. Bloomington, Indiana: iUniverse Wiley, D. Project management for instructional designers. Brigham Young University: Creative Commons license. Retrieved from http://pm4id.org/(2013). A guide to the project management body of knowledge. (4th ed.). project management institute. Swaim, T. (2013). Project management fundamentals. Ed To Go, Retrieved from http://www.ed2go.com/ CourseDetails.aspx?tab=detail&course=pmf Swaim, T. (2013). Pmp certification prep 1. Ed To Go, Retrieved from http://www.ed2go.com/CourseDetails.aspx?
  • 45. Needs Analysis Format Use this format to develop a Needs Analysis Report. 1. Training requested 2. Job, tasks, duties to be performed 3. Expected performance 4. Data collection method 5. Actual performance 6. Cause of performance gap 7. Cost estimate of training 8. Benefit of training 9. Training proposal 10. Management support recommendations (feedback, measurement) Narrative 11.
  • 46. Project Charter Format Use this format to develop a Project Charter. 1. 2. Purpose Description of Work 3. 4. Objectives In-scope deliverables (what the project includes) 5. 6. 7. 8. Out-of-scope deliverables (what the project does not include) Roles and responsibilities Milestones Major known risks Assumptions and Constraints 9. Constraints 10. External dependencies 11. 12. Summary of budget Vendors
  • 47. Stakeholder Log Format Use this format to develop a Stakeholder Log. 1. Name 2. Role on Project 3. Department 4. Interest 5. Knowledge level 6. Expectation 7. Level of influence on the project
  • 48. Instructional Design Document Format Use this format to develop an Instructional Design Document. Learning Objectives 1. Describe what the learner is expected to achieve when performing the task 2. Task statement 3. Conditions under which the task is performed Key Points – Content and Concept 1. Product information, concepts and criteria to be covered in each module Process and Activity 1. 2. Summary of the types of learning activities that will be completed in the respective modules Describe how presentation and application methods are distributed throughout the learning program
  • 49. Project Management Plan Input & Output Documents Input:  Project charter  Instructional design document  Process outputs that will be used for the project  Environmental factors outside the organization  Specific information about what may influence success, organizational policies, guidelines, procedures, plans, and/ or standards for conducting work  Stakeholder input, if skills and knowledge warrant Output:  Project Management Plan
  • 50. Project Scope Statement Format Use this format to develop a Project Scope Statement. 1. 2. Purpose and justification 3. Objectives 4. Project description (Includes: deliverables breakdown. Do not include: completion criteria, external dependencies, assumptions, constraints.) 5. Milestones and target dates 6. Project approach (describes the plans included, scheduled meetings, scheduled status reports, issues management, change management, communications plan, procurement plan, resource management) 7. 8. Approvals Product description Version history
  • 51. Work Breakdown Structure Input:  Project scope statement  Organizational policies, guidelines, procedures, plans and or standards for conducting work  Activity Lists (outlines all the scheduled activities to be performed for the project within the scope of work description of each activity and identification code or number)  Activity Attributes (characteristics of the activities)  Milestone Lists (major accomplishments that signal completion of a major deliverable)  Requirements documentation that describe the connection between individual requirements and the business need for the project
  • 52. Work Breakdown Structure (WBS) Output:   WBS in deliverables WBS dictionary that includes details for work attached to each component, milestones, person responsible, etc.
  • 53. WBS Steps Define Project Deliverables 1. 2. 3. 4. 5. 6. 7. 8. Define scheduled activities to complete project Define tasks for scheduled activities Sequence activities and tasks Identify related dependencies Estimate resources needed/available Estimate duration resources will be required Define milestones and expected target dates Document details for the WBS dictionary
  • 54. WBS Sequencing Methods Precedence Diagramming Method  Finish-to-start (FS): predecessor activity must finish before successor activity can start  Start-to-finish (SF): predecessor activity must start before the successor activity can finish  Finish-to-finish (FF): predecessor activity must finish before the successor activity finishes  Start-to-finish (SS): predecessor activity must start before the successor activity can start
  • 55. WBS Sequencing Methods Dependency Determination  Mandatory dependencies: inherent to the nature of the work being done  Discretionary dependencies: established based on best practices within a particular industry or aspect of the project where an unusual sequence is desired Appling Leads and Lags  Lags delay successor activities and require time to be added to start or finish date. Leads speed up successor activity and require time to be taken off either start or finish date of scheduled activity.
  • 56. Schedule Management Input:  Project scope statement  Activity list  Activity attributes (characteristics of activity, assumptions, constraints)  Diagram of project activities and dependencies  Activity resource requirements  Resource calendars  Activity duration estimates Output:  Project schedule  Schedule data  Schedule baseline  Project document updates
  • 57. Schedule Management Scheduling Methods     Schedule Network Analysis Calculate early and late start dates, and early and late finish dates for project activities. Critical-Path Method Identifies tasks that must be completed on time for the project to be completed by the end date. This data keeps project on track. Schedule Compression Using mathematical calculations to shorten the schedule without changing the scope. Allows related activities to be accomplished sooner than estimated. What-if Scenario Analysis Series of what if questions to present activity assumptions to determine project duration.
  • 58. Schedule Management Scheduling Methods  Resource Leveling Under-allocated resources can be assigned to multiple tasks.  Critical-Chain Method Schedule high risk tasks early in project so problems are identified and addressed as soon as possible.  Applying Leads and Lags Start and finish dates are adjusted.  Automated Scheduling Tools Speeds up scheduling process based on data input.
  • 59. Schedule Management Plan Format Use this format to develop a Schedule Management Plan. 1. Task 2. Responsible 3. Estimated duration to complete 4. Start date 5. Finish date 6. Delays 7. Reason for delay 8. Action steps
  • 60. Issues Management  A log to document the issue, the owner, resolution and status Use this format to develop an Issues Management Log. 1. How issues are tracked 2. How issues are assigned 3. How issues are prioritized 4. How issues are resolved 5. How issues are communicated
  • 61. Change Management Deviations from the project management plan Use this format to develop a Change Management Process Log. 1. How a change request will be managed 2. How a change request will be reviewed 3. How a change request will be tracked 4. How a change request will be resolved 4. What are possible alternatives and cost 5. Sign off
  • 62. Quality Management Identifies the quality standards adopted for the project  Describes how the quality will be implemented and managed Input:  Customer definition of quality  Overview of schedule, cost, scope  Quality assurance activities (testing, audits, reviews)  Measurements (within scope, budget, schedule) Output:  Quality Management Plan 
  • 63. Quality Management Plan Format Use this format to develop a Quality Management Plan. 1. Organization’s quality policy 2. How the customer defines quality 3. Deliverables - acceptable criteria and standards 4. Steps to ensure that quality is part of the product 4. Measurements 5. Scheduled audits 6. Sign off
  • 64. Human Resource Management Use this format to develop a Human Resources Management Plan. 1. Roles 2. Responsibilities 3. Reporting relationships
  • 65. Procurement Management Plan Format Use this format to develop a Procurement Management Plan. 1. Procurement statement (products or services being considered) 2. Estimated cost 3. Vendor selection (RFI/RFP/etc.) 4. Procurement definition (what items will be procured and under what conditions) 5. Selection process criteria 6. Procurement team with contact information and defined roles 7. Contract type and actions required to initiate 8. Standards for each contract 9. Vendor management (steps to ensure everything is received) 9.. Sign off
  • 66. Human Resource Management Process for organizing and managing the team  Size of team influenced by duration of the project Input:  Factors outside the project that influence project success  Organizational policies, guidelines, procedures, plans and/or standards for conducting work  Activity resource requirements Output:  Human Resource Plan 
  • 67. Procurement Management   Process of documenting project purchasing decisions, specifying the approach and identifying potential sellers. Identifies project needs that must be met by purchasing products, services or results outside the organization Input:  Factors outside of the project that impact success  Organizational policies, guidelines, plans and/or standards for conducting work  Scope baseline  Requirements documentation  Teaming agreements  Risk information  Activity-resource requirements  Project schedule  Activity cost estimates  Cost baseline Output:  Procurement Management plan
  • 68. Risk Management Plan Processes necessary to increase the probability and impact of positive events and decrease probability and impact of negative events Input:  Factors outside of the project that influence success  Organizational policies, guidelines, procedures, plans and/or standards for conducting work  Scope statement  Cost Management plan  Schedule Management plan  Communications Management plan Output:  Risk Management plan 
  • 69. Risk Management Plan Format Use this format to develop a Risk Management Plan. 1. Risk identification (based on discussions with key stakeholders) 2. Risk categorization 3. Risk probability and impact assessment 4. Risk prioritization 5. Risk response planning 6. Risk management strategy 7. Risk monitoring (build reviews into project schedule) 8. Risk control 9. Assumptions with significant impact on project risk 10. Roles and responsibilities unique to the risk function
  • 70. Risk Management Plan Format Risk Management Plan - Continued 11. Risk management milestones 12. Risk rating score technique 13. 14. Risk thresholds (high, medium, low – based on impact and probability) Risk communication 15. Risk tracking process 16. Sign off
  • 71. Communication Plan Processes required to ensure timely and appropriate collection, retrieval and dissemination of project information  Ensures that stakeholder needs are met Input:  Factors outside the project with significant influence  Organizational policies, guidelines, procedures, plans and standards for conducting work  Project Charter  Procurement documents Output:  Communication Plan 
  • 72. Communication Plan Format Use this format to develop a Communication Plan. 1. Purpose 2. Need 3. Communication Principles (ensure consistency and tone in messages and communication efforts) 4. Communication objectives 5. Target audience 6. Key messages (who, what, when, where, why, how) 7. Change implications (impact of the organizational changes as a result of the project) 8. Challenges and opportunities (Factors that help or hinder such as past situations, rumors, trust, etc.) 9. Sign off
  • 73. Communication Resources The communication methods chosen should be driven by the needs of the project.        Email Text Message Video conferencing and chat services, like Skype Blogs and wikis (WordPress) Calendar sharing (Google Docs) Postal and shipping services Desktop software tools     Microsoft Office or Open Office Suite Visual design and mockup software Project management software (Microsoft Project or OpenProject) Online project management software (Wrike, TeamBox, ManyMoons)
  • 74. Cost and Budget So, how much is this going to cost? Cost of the resources needed to complete project activities Input: Scope statement  Work breakdown structure  Defined activities  Sequenced activities  Resource estimates  Schedule  Risks Output:  Cost baseline 
  • 75. Final Project Report Format Use this format to develop a Final Project Report. 1. Compare project outputs to project objectives 1. Identify what went right or wrong 2. Document weaknesses and strengths 3. Include original project plan 4. Include meeting minutes 5. Include project journals 6. Obtain customer feedback 7. All project documents for archives 8. Accounting documentation 9. Sign off