SlideShare a Scribd company logo
1E Professional Services Project Delivery
Methodology
The 1E project delivery methodology is designed to overcome common
failures by following a structured and tested delivery process.
50% of business have had an IT project fail
http://www.cio.com/article/2380469/careers-staffing/why-are-so-many-it-projects-failing-.html
37% of all IT projects fail
http://www.zdnet.com/article/cio-analysis-why-37-percent-of-projects-fail/
Annual cost of failed US government IT projects is $20 billion
PM Network, May 2015 Volume 25, Number 5
1E Professional Services Project Delivery Methodology
Copyright © 1E 2015 All Rights Reserved 2 | Page
The 1E project delivery methodology is considered best in class through tool and process
implementation at key project stages. By implementing a standard delivery process, both the project
team and the customer stakeholders understand where the project is and where it is going.
THE 1E PROJECT TEAM
CONSULTING The 1E Consultant team is a global team of certified experts in 1E products & systems
management with an average of 10+ years industry experience. For every project, 1E Consultants
perform an intensive transfer of knowledge and best practices to the customer, focused on the unique
characteristics of the implementation and environment. Our consultants have a proven track record of
IT cost optimization while increasing efficiency.
PROJECT MANAGEMENT All 1E Project Managers are PMI (PMP) and/or PRINCE certified with over a
decade of combined 1E experience, and several decades of enterprise software experience. 1E
Professional Services as a whole works on over 100 projects each year, which allows for constant
refinement of the delivery process based on lessons learned.
TRAINING 1E instructors have several years of real-world experience, while learners are actively
encouraged to question and contribute from their own personal experience.
METHODOLOGY
Every 1E project is delivered via the following stages:
Customer Training
Discovery and Requirements Formalization
Existing Environment Health Check
Solution Design
Lab Implementation and Test Plan Execution
Production Solution Implementation
Pre-Pilot Execution to a Small Group
Formal Pilot Roll Out
Project Close and Hand Over Activities
Training
Discovery
Health
Check
Design
Lab
Prod
Pre-
Pilot
Pilot
Close
1E Professional Services Project Delivery Methodology
Copyright © 1E 2015 All Rights Reserved 3 | Page
KNOWLEDGE BASELINING With training from 1E, the customer technical team will glean a thorough
understanding of the implementation and discover how the value of 1E solutions can be maximized year
after year. Training the technical team at the start of the project on new technology leads to better
knowledge transfer, discovery sessions, and design. If the customer project team has expertise in the 1E
products even before the project begins, it ensures a successful project hand over.
CLEAR PROJECT GOALS In support of the SOW document, it's critical to specifically define project
requirements during the discovery and project kickoff phase. Properly defining requirements is the
catch all to ensure expectations are specified, communicated, and agreed. This also ensures the
customer technical team working on the project and directly affected have a chance provide input, add
requirements, and identify concerns.
PREEMPT ISSUES For every project, a thorough environment health check is performed. Without a health
check, existing customer issues could lay dormant only to appear later in the project, causing delays and
surprises. The 1E Health Check covers a wide range of technology, from CM and networking checks, to
security and package practices. By performing a Health Check early on, issues are mitigated and the
customer avoids laying a new technology on top of existing problems.
DESIGN A good design takes into account supporting technologies and has an eye towards the future.
1E project team designs the product implementation building on customer unique goals and
requirements taken from the detailed Discovery and Health Check phases. The design is also updated
and right sized as the project progresses through testing and piloting, so the final leave behind design
accurately reflects what the project delivered.
Training Discovery
Health
Check
Design Lab Prod Pre-Pilot Pilot Close
Training Discovery
Health
Check
Design Lab Prod
Pre-
Pilot
Pilot Close
Training Discovery
Health
Check
Design Lab Prod Pre-Pilot Pilot Close
Training Discovery
Health
Check Design Lab Prod Pre-Pilot Pilot Close
1E Professional Services Project Delivery Methodology
Copyright © 1E 2015 All Rights Reserved 4 | Page
LAB TESTING For each 1E product there is an extensive test plan and test case suite to ensure
configurations are correct for the customer environment. It is important that a representative lab or
test environment is used for this testing in order to mimic a production implementation. This is another
way to discover unknown customer environmental risks.
PRODUCTION IMPLEMENTATION All activities to this point (health check, design, lab) enable the project
team to promote the solution to the customer production environment. The project team also
supports any change request procedures required by the customer during or ahead of the production
implementation.
PRE-PILOT 1E developed the concept of a pre-pilot, which is a pilot in the production environment but
on a much smaller and selective scale. Pre-pilot targets a handful of users, preferably friendly IT users,
who will provide helpful use cases and feedback, but will understand if issues arise. These users are
problem solvers themselves, and will work with the project team to fix issues rather than complaining to
project sponsors that they were inconvenienced. There will always be issues during a pilot. It's better
to uncover issues during the pre-pilot/pilot rather than after full deployment.
FORMAL PILOT Because the 1E process puts a heavy emphasis on discovering environmental issues early
and often, by the time the formal pilot is executed, the number of unknowns is reduced. Formal
piloting won't uncover any core solution issues, rather will highlight edge cases. As a result, the large
majority of end users will see a fully functional, mature and issue free solution which is easy to endorse.
INCREMENTAL SIGN OFF AND CLOSE Incremental sign off on deliverables as the project progresses helps
prevent surprises during a formal project close and allows the entire project team to claim formal and
tangible progress throughout the project. At the end of the project, all deliverables are confirmed and
regular check ins are scheduled with the 1E Customer Success teams to ensure continued product use,
discuss any issues, and continue to measure savings against the baseline.
Training Discovery
Health
Check
Design Lab Prod Pre-Pilot Pilot Close
Training Discovery
Health
Check
Design Lab Prod Pre-Pilot Pilot Close
Training Discovery
Health
Check
Design Lab Prod Pre-Pilot Pilot Close
Training Discovery
Health
Check
Design Lab Prod Pre-Pilot Pilot Close
Training Discovery
Health
Check
Design Lab Prod Pre-Pilot Pilot Close
ABOUT 1E
1E provides Software Lifecycle Automation for the
Digital Business. Our clients include the biggest
organizations in the world – Bank of America, Walmart,
AT&T, Dell, SAP, Nestle, State Farm and the State
Department. With more than 26 million licenses
deployed worldwide, 1,700 organizations in 42
countries trust 1E to help them to work efficiently,
productively and sustainably.
WWW.1E.COM
Copyright © 1E 2015 All Rights Reserved

More Related Content

What's hot

Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4
DevOps.com
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
Business Beam
 
Scaled Agile Framework (SAFe) 4.5 Metrics
Scaled Agile Framework (SAFe) 4.5 MetricsScaled Agile Framework (SAFe) 4.5 Metrics
Scaled Agile Framework (SAFe) 4.5 Metrics
David Rico
 
The Agile PMO
The Agile PMOThe Agile PMO
The Agile PMO
Adrian Quinney
 
How to Assess the Maturity of your PMO
How to Assess the Maturity of your PMOHow to Assess the Maturity of your PMO
How to Assess the Maturity of your PMO
Americo Pinto
 
Accenture Public Service - The Future of Government Back Office Operations
Accenture Public Service - The Future of Government Back Office OperationsAccenture Public Service - The Future of Government Back Office Operations
Accenture Public Service - The Future of Government Back Office Operations
accenture
 
Why agile is failing in large enterprises
Why agile is failing in large enterprisesWhy agile is failing in large enterprises
Why agile is failing in large enterprises
LeadingAgile
 
Establishing an effective epmo
Establishing an effective epmoEstablishing an effective epmo
Establishing an effective epmo
Wael Genina, MBA, PMP
 
Lean-Agile PMO
Lean-Agile PMOLean-Agile PMO
Lean-Agile PMO
LeanKit
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
Project Management CoE
 
Basement remodel rev eh
Basement remodel rev ehBasement remodel rev eh
Basement remodel rev eh
esands2437
 
The Innovative PMO
The Innovative PMO The Innovative PMO
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
Tery Everett
 
DSDM Frameworks for Agile Project Management Offices
DSDM Frameworks for Agile Project Management OfficesDSDM Frameworks for Agile Project Management Offices
DSDM Frameworks for Agile Project Management Offices
netmind
 
Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008
ITVAMP, LLC
 
Rick Austin - Portfolio mangement in an agile world [Agile DC]
Rick Austin - Portfolio mangement in an agile world [Agile DC]Rick Austin - Portfolio mangement in an agile world [Agile DC]
Rick Austin - Portfolio mangement in an agile world [Agile DC]
LeadingAgile
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
Lou Bahrmasel, PMP, MBA
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
TURKI , PMP
 
AWARENESS MANAGEMENT PROJECT ISO 21500 Series.ppt
AWARENESS MANAGEMENT PROJECT  ISO 21500 Series.pptAWARENESS MANAGEMENT PROJECT  ISO 21500 Series.ppt
AWARENESS MANAGEMENT PROJECT ISO 21500 Series.ppt
AliFRizaldi1
 
The agile pmo v2
The agile pmo v2The agile pmo v2

What's hot (20)

Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4Value stream management is essential for dev ops v4
Value stream management is essential for dev ops v4
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
Scaled Agile Framework (SAFe) 4.5 Metrics
Scaled Agile Framework (SAFe) 4.5 MetricsScaled Agile Framework (SAFe) 4.5 Metrics
Scaled Agile Framework (SAFe) 4.5 Metrics
 
The Agile PMO
The Agile PMOThe Agile PMO
The Agile PMO
 
How to Assess the Maturity of your PMO
How to Assess the Maturity of your PMOHow to Assess the Maturity of your PMO
How to Assess the Maturity of your PMO
 
Accenture Public Service - The Future of Government Back Office Operations
Accenture Public Service - The Future of Government Back Office OperationsAccenture Public Service - The Future of Government Back Office Operations
Accenture Public Service - The Future of Government Back Office Operations
 
Why agile is failing in large enterprises
Why agile is failing in large enterprisesWhy agile is failing in large enterprises
Why agile is failing in large enterprises
 
Establishing an effective epmo
Establishing an effective epmoEstablishing an effective epmo
Establishing an effective epmo
 
Lean-Agile PMO
Lean-Agile PMOLean-Agile PMO
Lean-Agile PMO
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
 
Basement remodel rev eh
Basement remodel rev ehBasement remodel rev eh
Basement remodel rev eh
 
The Innovative PMO
The Innovative PMO The Innovative PMO
The Innovative PMO
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
DSDM Frameworks for Agile Project Management Offices
DSDM Frameworks for Agile Project Management OfficesDSDM Frameworks for Agile Project Management Offices
DSDM Frameworks for Agile Project Management Offices
 
Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008Pmo Gap Analysis Sample Itvamp 2008
Pmo Gap Analysis Sample Itvamp 2008
 
Rick Austin - Portfolio mangement in an agile world [Agile DC]
Rick Austin - Portfolio mangement in an agile world [Agile DC]Rick Austin - Portfolio mangement in an agile world [Agile DC]
Rick Austin - Portfolio mangement in an agile world [Agile DC]
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
 
AWARENESS MANAGEMENT PROJECT ISO 21500 Series.ppt
AWARENESS MANAGEMENT PROJECT  ISO 21500 Series.pptAWARENESS MANAGEMENT PROJECT  ISO 21500 Series.ppt
AWARENESS MANAGEMENT PROJECT ISO 21500 Series.ppt
 
The agile pmo v2
The agile pmo v2The agile pmo v2
The agile pmo v2
 

Viewers also liked

Professional Services Sales Techniques & Methodology
Professional Services Sales Techniques & MethodologyProfessional Services Sales Techniques & Methodology
Professional Services Sales Techniques & Methodology
Ambareesh Kulkarni
 
Reduce your cost of delay with continuous delivery
Reduce your cost of delay with continuous deliveryReduce your cost of delay with continuous delivery
Reduce your cost of delay with continuous delivery
Joshua Partogi
 
Ambareesh Kulkarni, Professional background
Ambareesh Kulkarni, Professional backgroundAmbareesh Kulkarni, Professional background
Ambareesh Kulkarni, Professional background
Ambareesh Kulkarni
 
Evolution of Client Services functions
Evolution of Client Services functionsEvolution of Client Services functions
Evolution of Client Services functions
Ambareesh Kulkarni
 
35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction project
Marvin M Gamboa
 
Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01
Jerico Awat
 
1E and Servicenow integration
1E and Servicenow integration1E and Servicenow integration
1E and Servicenow integration
Ambareesh Kulkarni
 
ASAP 8.0 Methodology
ASAP 8.0 MethodologyASAP 8.0 Methodology
ASAP 8.0 Methodology
Palisade Corporation
 
Integrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery ProcessIntegrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery Process
Alan McSweeney
 
Workshop: Creating the Future of Professional Services
Workshop: Creating the Future of Professional ServicesWorkshop: Creating the Future of Professional Services
Workshop: Creating the Future of Professional Services
Ross Dawson
 
General technical specification for construction
General technical specification for constructionGeneral technical specification for construction
General technical specification for construction
mool1005
 
Specifications 101
Specifications 101Specifications 101
Specifications 101
Andrej_M
 
SPECIFICATIONS
SPECIFICATIONSSPECIFICATIONS
SPECIFICATIONS
Joedy Mae Mangampo
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
guestc8140fe
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
JAI MCA-STUDENT
 
Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
Wayne Holley
 
Personal Branding To Stand Out & Differentiate Yourself
Personal Branding To Stand Out & Differentiate YourselfPersonal Branding To Stand Out & Differentiate Yourself
Personal Branding To Stand Out & Differentiate Yourself
Mohamed Yasser
 

Viewers also liked (17)

Professional Services Sales Techniques & Methodology
Professional Services Sales Techniques & MethodologyProfessional Services Sales Techniques & Methodology
Professional Services Sales Techniques & Methodology
 
Reduce your cost of delay with continuous delivery
Reduce your cost of delay with continuous deliveryReduce your cost of delay with continuous delivery
Reduce your cost of delay with continuous delivery
 
Ambareesh Kulkarni, Professional background
Ambareesh Kulkarni, Professional backgroundAmbareesh Kulkarni, Professional background
Ambareesh Kulkarni, Professional background
 
Evolution of Client Services functions
Evolution of Client Services functionsEvolution of Client Services functions
Evolution of Client Services functions
 
35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction project
 
Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01
 
1E and Servicenow integration
1E and Servicenow integration1E and Servicenow integration
1E and Servicenow integration
 
ASAP 8.0 Methodology
ASAP 8.0 MethodologyASAP 8.0 Methodology
ASAP 8.0 Methodology
 
Integrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery ProcessIntegrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery Process
 
Workshop: Creating the Future of Professional Services
Workshop: Creating the Future of Professional ServicesWorkshop: Creating the Future of Professional Services
Workshop: Creating the Future of Professional Services
 
General technical specification for construction
General technical specification for constructionGeneral technical specification for construction
General technical specification for construction
 
Specifications 101
Specifications 101Specifications 101
Specifications 101
 
SPECIFICATIONS
SPECIFICATIONSSPECIFICATIONS
SPECIFICATIONS
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
 
Personal Branding To Stand Out & Differentiate Yourself
Personal Branding To Stand Out & Differentiate YourselfPersonal Branding To Stand Out & Differentiate Yourself
Personal Branding To Stand Out & Differentiate Yourself
 

Similar to Professional Services Project Delivery Methodology

Odoo Implementation Methodology
Odoo Implementation MethodologyOdoo Implementation Methodology
Odoo Implementation Methodology
Quang Ngoc
 
Odoo implementation
Odoo implementationOdoo implementation
Odoo implementation
Odoo Thaidev
 
Product management
Product managementProduct management
Product management
Thiru Shastry, CBAP
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
ray biztech
 
Optimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and PrioritizationOptimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and Prioritization
Info-Tech Research Group
 
What is agile?
What is agile?What is agile?
What is agile?
Rohana K Amarakoon
 
Product management In a nutshell
Product management In a nutshellProduct management In a nutshell
Product management In a nutshell
Wessam Sonbol
 
Fitman webinar 2015 06 Verification and Validation methodology
Fitman webinar 2015 06 Verification and Validation methodologyFitman webinar 2015 06 Verification and Validation methodology
Fitman webinar 2015 06 Verification and Validation methodology
FITMAN FI
 
Top 50 Agile Interview Questions and Answers.pdf
Top 50 Agile Interview Questions and Answers.pdfTop 50 Agile Interview Questions and Answers.pdf
Top 50 Agile Interview Questions and Answers.pdf
Jazmine Brown
 
Professional Services Roadmap 2011 and beyond
Professional Services Roadmap 2011 and beyondProfessional Services Roadmap 2011 and beyond
Professional Services Roadmap 2011 and beyond
Ambareesh Kulkarni
 
Why is it important to hire an independent testing team for your development ...
Why is it important to hire an independent testing team for your development ...Why is it important to hire an independent testing team for your development ...
Why is it important to hire an independent testing team for your development ...
App Sierra
 
TDWI STL 20140613 Agile - Paul Holway
TDWI STL 20140613 Agile - Paul HolwayTDWI STL 20140613 Agile - Paul Holway
TDWI STL 20140613 Agile - Paul Holway
TDWI St. Louis
 
360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence
guestf2e1db
 
NITC-2016 - Effectiveness of Agile Test Planning
NITC-2016 - Effectiveness of Agile Test Planning NITC-2016 - Effectiveness of Agile Test Planning
NITC-2016 - Effectiveness of Agile Test Planning
Udayantha de Silva
 
Agile Testing
Agile Testing Agile Testing
Agile Project Management Essential
Agile Project Management EssentialAgile Project Management Essential
Agile Project Management Essential
Reema
 
Introduction to Agile and Lean Software Development
Introduction to Agile and Lean Software DevelopmentIntroduction to Agile and Lean Software Development
Introduction to Agile and Lean Software Development
Thanh Nguyen
 
Lean Communication - Product Camp Silicon Valley 2014
Lean Communication - Product Camp Silicon Valley 2014Lean Communication - Product Camp Silicon Valley 2014
Lean Communication - Product Camp Silicon Valley 2014
Saeed Khan
 
Software Product Life Cycle
Software Product Life CycleSoftware Product Life Cycle
Software Product Life Cycle
Mahesh Panchal
 
What is Agile Development?
What is Agile Development?What is Agile Development?
What is Agile Development?
MagmaLabs
 

Similar to Professional Services Project Delivery Methodology (20)

Odoo Implementation Methodology
Odoo Implementation MethodologyOdoo Implementation Methodology
Odoo Implementation Methodology
 
Odoo implementation
Odoo implementationOdoo implementation
Odoo implementation
 
Product management
Product managementProduct management
Product management
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
 
Optimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and PrioritizationOptimize Project Intake Approval and Prioritization
Optimize Project Intake Approval and Prioritization
 
What is agile?
What is agile?What is agile?
What is agile?
 
Product management In a nutshell
Product management In a nutshellProduct management In a nutshell
Product management In a nutshell
 
Fitman webinar 2015 06 Verification and Validation methodology
Fitman webinar 2015 06 Verification and Validation methodologyFitman webinar 2015 06 Verification and Validation methodology
Fitman webinar 2015 06 Verification and Validation methodology
 
Top 50 Agile Interview Questions and Answers.pdf
Top 50 Agile Interview Questions and Answers.pdfTop 50 Agile Interview Questions and Answers.pdf
Top 50 Agile Interview Questions and Answers.pdf
 
Professional Services Roadmap 2011 and beyond
Professional Services Roadmap 2011 and beyondProfessional Services Roadmap 2011 and beyond
Professional Services Roadmap 2011 and beyond
 
Why is it important to hire an independent testing team for your development ...
Why is it important to hire an independent testing team for your development ...Why is it important to hire an independent testing team for your development ...
Why is it important to hire an independent testing team for your development ...
 
TDWI STL 20140613 Agile - Paul Holway
TDWI STL 20140613 Agile - Paul HolwayTDWI STL 20140613 Agile - Paul Holway
TDWI STL 20140613 Agile - Paul Holway
 
360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence
 
NITC-2016 - Effectiveness of Agile Test Planning
NITC-2016 - Effectiveness of Agile Test Planning NITC-2016 - Effectiveness of Agile Test Planning
NITC-2016 - Effectiveness of Agile Test Planning
 
Agile Testing
Agile Testing Agile Testing
Agile Testing
 
Agile Project Management Essential
Agile Project Management EssentialAgile Project Management Essential
Agile Project Management Essential
 
Introduction to Agile and Lean Software Development
Introduction to Agile and Lean Software DevelopmentIntroduction to Agile and Lean Software Development
Introduction to Agile and Lean Software Development
 
Lean Communication - Product Camp Silicon Valley 2014
Lean Communication - Product Camp Silicon Valley 2014Lean Communication - Product Camp Silicon Valley 2014
Lean Communication - Product Camp Silicon Valley 2014
 
Software Product Life Cycle
Software Product Life CycleSoftware Product Life Cycle
Software Product Life Cycle
 
What is Agile Development?
What is Agile Development?What is Agile Development?
What is Agile Development?
 

More from Ambareesh Kulkarni

Travel Management Dashboard application
Travel Management Dashboard applicationTravel Management Dashboard application
Travel Management Dashboard application
Ambareesh Kulkarni
 
Carlson Wagonlit: Award winning application
Carlson Wagonlit: Award winning applicationCarlson Wagonlit: Award winning application
Carlson Wagonlit: Award winning application
Ambareesh Kulkarni
 
Analyze Optimize Realize - Business Value Analysis
Analyze Optimize Realize - Business Value AnalysisAnalyze Optimize Realize - Business Value Analysis
Analyze Optimize Realize - Business Value Analysis
Ambareesh Kulkarni
 
Building the Digital Bank
Building the Digital BankBuilding the Digital Bank
Building the Digital Bank
Ambareesh Kulkarni
 
Packaged Dashboard Reporting Solution
Packaged Dashboard Reporting Solution Packaged Dashboard Reporting Solution
Packaged Dashboard Reporting Solution
Ambareesh Kulkarni
 
Actuate Certified Business Solutions for SAP
Actuate Certified Business Solutions for SAPActuate Certified Business Solutions for SAP
Actuate Certified Business Solutions for SAP
Ambareesh Kulkarni
 
Windows 10 Migration
Windows 10 MigrationWindows 10 Migration
Windows 10 Migration
Ambareesh Kulkarni
 
Actuate BI implementation for MassMutual's SAP BW
Actuate BI implementation for MassMutual's SAP BW Actuate BI implementation for MassMutual's SAP BW
Actuate BI implementation for MassMutual's SAP BW
Ambareesh Kulkarni
 
Professional Services packaged solutions for SAP
Professional Services packaged solutions for SAPProfessional Services packaged solutions for SAP
Professional Services packaged solutions for SAP
Ambareesh Kulkarni
 
SAP R3 SQL Query Builder
SAP R3 SQL Query BuilderSAP R3 SQL Query Builder
SAP R3 SQL Query Builder
Ambareesh Kulkarni
 
Zero Touch Operating Systems Deployment
Zero Touch Operating Systems DeploymentZero Touch Operating Systems Deployment
Zero Touch Operating Systems Deployment
Ambareesh Kulkarni
 
Enterprise BI & SOA
Enterprise BI & SOAEnterprise BI & SOA
Enterprise BI & SOA
Ambareesh Kulkarni
 
Professional Services Automation
Professional Services AutomationProfessional Services Automation
Professional Services Automation
Ambareesh Kulkarni
 
Storage Provisioning for Enterprise Information Applications
Storage Provisioning for Enterprise Information ApplicationsStorage Provisioning for Enterprise Information Applications
Storage Provisioning for Enterprise Information Applications
Ambareesh Kulkarni
 
Build or Buy ?
Build or Buy ?Build or Buy ?
Build or Buy ?
Ambareesh Kulkarni
 
Spotfire Integration & Dynamic Output creation
Spotfire Integration & Dynamic Output creationSpotfire Integration & Dynamic Output creation
Spotfire Integration & Dynamic Output creation
Ambareesh Kulkarni
 
Enterprise Deployments & SOA
Enterprise Deployments & SOAEnterprise Deployments & SOA
Enterprise Deployments & SOA
Ambareesh Kulkarni
 
Deploying PP in a virtualized environment
Deploying PP in a virtualized environmentDeploying PP in a virtualized environment
Deploying PP in a virtualized environment
Ambareesh Kulkarni
 
End User Informatics
End User InformaticsEnd User Informatics
End User Informatics
Ambareesh Kulkarni
 
Enterprise Reporting for ERP Systems
Enterprise Reporting for ERP SystemsEnterprise Reporting for ERP Systems
Enterprise Reporting for ERP Systems
Ambareesh Kulkarni
 

More from Ambareesh Kulkarni (20)

Travel Management Dashboard application
Travel Management Dashboard applicationTravel Management Dashboard application
Travel Management Dashboard application
 
Carlson Wagonlit: Award winning application
Carlson Wagonlit: Award winning applicationCarlson Wagonlit: Award winning application
Carlson Wagonlit: Award winning application
 
Analyze Optimize Realize - Business Value Analysis
Analyze Optimize Realize - Business Value AnalysisAnalyze Optimize Realize - Business Value Analysis
Analyze Optimize Realize - Business Value Analysis
 
Building the Digital Bank
Building the Digital BankBuilding the Digital Bank
Building the Digital Bank
 
Packaged Dashboard Reporting Solution
Packaged Dashboard Reporting Solution Packaged Dashboard Reporting Solution
Packaged Dashboard Reporting Solution
 
Actuate Certified Business Solutions for SAP
Actuate Certified Business Solutions for SAPActuate Certified Business Solutions for SAP
Actuate Certified Business Solutions for SAP
 
Windows 10 Migration
Windows 10 MigrationWindows 10 Migration
Windows 10 Migration
 
Actuate BI implementation for MassMutual's SAP BW
Actuate BI implementation for MassMutual's SAP BW Actuate BI implementation for MassMutual's SAP BW
Actuate BI implementation for MassMutual's SAP BW
 
Professional Services packaged solutions for SAP
Professional Services packaged solutions for SAPProfessional Services packaged solutions for SAP
Professional Services packaged solutions for SAP
 
SAP R3 SQL Query Builder
SAP R3 SQL Query BuilderSAP R3 SQL Query Builder
SAP R3 SQL Query Builder
 
Zero Touch Operating Systems Deployment
Zero Touch Operating Systems DeploymentZero Touch Operating Systems Deployment
Zero Touch Operating Systems Deployment
 
Enterprise BI & SOA
Enterprise BI & SOAEnterprise BI & SOA
Enterprise BI & SOA
 
Professional Services Automation
Professional Services AutomationProfessional Services Automation
Professional Services Automation
 
Storage Provisioning for Enterprise Information Applications
Storage Provisioning for Enterprise Information ApplicationsStorage Provisioning for Enterprise Information Applications
Storage Provisioning for Enterprise Information Applications
 
Build or Buy ?
Build or Buy ?Build or Buy ?
Build or Buy ?
 
Spotfire Integration & Dynamic Output creation
Spotfire Integration & Dynamic Output creationSpotfire Integration & Dynamic Output creation
Spotfire Integration & Dynamic Output creation
 
Enterprise Deployments & SOA
Enterprise Deployments & SOAEnterprise Deployments & SOA
Enterprise Deployments & SOA
 
Deploying PP in a virtualized environment
Deploying PP in a virtualized environmentDeploying PP in a virtualized environment
Deploying PP in a virtualized environment
 
End User Informatics
End User InformaticsEnd User Informatics
End User Informatics
 
Enterprise Reporting for ERP Systems
Enterprise Reporting for ERP SystemsEnterprise Reporting for ERP Systems
Enterprise Reporting for ERP Systems
 

Recently uploaded

A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
ScyllaDB
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
c5vrf27qcz
 
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
Edge AI and Vision Alliance
 
Day 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio FundamentalsDay 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio Fundamentals
UiPathCommunity
 
Session 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdfSession 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdf
UiPathCommunity
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
christinelarrosa
 
ScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking ReplicationScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking Replication
ScyllaDB
 
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
Fwdays
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
Hiroshi SHIBATA
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
BibashShahi
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
FilipTomaszewski5
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
Javier Junquera
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
Enterprise Knowledge
 
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid ResearchHarnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Neo4j
 
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
zjhamm304
 
AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
Ajin Abraham
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
Antonios Katsarakis
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
MichaelKnudsen27
 
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge GraphGraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
Neo4j
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving
 

Recently uploaded (20)

A Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's ArchitectureA Deep Dive into ScyllaDB's Architecture
A Deep Dive into ScyllaDB's Architecture
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
 
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
 
Day 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio FundamentalsDay 2 - Intro to UiPath Studio Fundamentals
Day 2 - Intro to UiPath Studio Fundamentals
 
Session 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdfSession 1 - Intro to Robotic Process Automation.pdf
Session 1 - Intro to Robotic Process Automation.pdf
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
 
ScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking ReplicationScyllaDB Tablets: Rethinking Replication
ScyllaDB Tablets: Rethinking Replication
 
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
 
Introduction of Cybersecurity with OSS at Code Europe 2024
Introduction of Cybersecurity with OSS  at Code Europe 2024Introduction of Cybersecurity with OSS  at Code Europe 2024
Introduction of Cybersecurity with OSS at Code Europe 2024
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
 
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid ResearchHarnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
 
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...QA or the Highway - Component Testing: Bridging the gap between frontend appl...
QA or the Highway - Component Testing: Bridging the gap between frontend appl...
 
AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
 
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge GraphGraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
 

Professional Services Project Delivery Methodology

  • 1. 1E Professional Services Project Delivery Methodology The 1E project delivery methodology is designed to overcome common failures by following a structured and tested delivery process. 50% of business have had an IT project fail http://www.cio.com/article/2380469/careers-staffing/why-are-so-many-it-projects-failing-.html 37% of all IT projects fail http://www.zdnet.com/article/cio-analysis-why-37-percent-of-projects-fail/ Annual cost of failed US government IT projects is $20 billion PM Network, May 2015 Volume 25, Number 5
  • 2. 1E Professional Services Project Delivery Methodology Copyright © 1E 2015 All Rights Reserved 2 | Page The 1E project delivery methodology is considered best in class through tool and process implementation at key project stages. By implementing a standard delivery process, both the project team and the customer stakeholders understand where the project is and where it is going. THE 1E PROJECT TEAM CONSULTING The 1E Consultant team is a global team of certified experts in 1E products & systems management with an average of 10+ years industry experience. For every project, 1E Consultants perform an intensive transfer of knowledge and best practices to the customer, focused on the unique characteristics of the implementation and environment. Our consultants have a proven track record of IT cost optimization while increasing efficiency. PROJECT MANAGEMENT All 1E Project Managers are PMI (PMP) and/or PRINCE certified with over a decade of combined 1E experience, and several decades of enterprise software experience. 1E Professional Services as a whole works on over 100 projects each year, which allows for constant refinement of the delivery process based on lessons learned. TRAINING 1E instructors have several years of real-world experience, while learners are actively encouraged to question and contribute from their own personal experience. METHODOLOGY Every 1E project is delivered via the following stages: Customer Training Discovery and Requirements Formalization Existing Environment Health Check Solution Design Lab Implementation and Test Plan Execution Production Solution Implementation Pre-Pilot Execution to a Small Group Formal Pilot Roll Out Project Close and Hand Over Activities Training Discovery Health Check Design Lab Prod Pre- Pilot Pilot Close
  • 3. 1E Professional Services Project Delivery Methodology Copyright © 1E 2015 All Rights Reserved 3 | Page KNOWLEDGE BASELINING With training from 1E, the customer technical team will glean a thorough understanding of the implementation and discover how the value of 1E solutions can be maximized year after year. Training the technical team at the start of the project on new technology leads to better knowledge transfer, discovery sessions, and design. If the customer project team has expertise in the 1E products even before the project begins, it ensures a successful project hand over. CLEAR PROJECT GOALS In support of the SOW document, it's critical to specifically define project requirements during the discovery and project kickoff phase. Properly defining requirements is the catch all to ensure expectations are specified, communicated, and agreed. This also ensures the customer technical team working on the project and directly affected have a chance provide input, add requirements, and identify concerns. PREEMPT ISSUES For every project, a thorough environment health check is performed. Without a health check, existing customer issues could lay dormant only to appear later in the project, causing delays and surprises. The 1E Health Check covers a wide range of technology, from CM and networking checks, to security and package practices. By performing a Health Check early on, issues are mitigated and the customer avoids laying a new technology on top of existing problems. DESIGN A good design takes into account supporting technologies and has an eye towards the future. 1E project team designs the product implementation building on customer unique goals and requirements taken from the detailed Discovery and Health Check phases. The design is also updated and right sized as the project progresses through testing and piloting, so the final leave behind design accurately reflects what the project delivered. Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close Training Discovery Health Check Design Lab Prod Pre- Pilot Pilot Close Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close
  • 4. 1E Professional Services Project Delivery Methodology Copyright © 1E 2015 All Rights Reserved 4 | Page LAB TESTING For each 1E product there is an extensive test plan and test case suite to ensure configurations are correct for the customer environment. It is important that a representative lab or test environment is used for this testing in order to mimic a production implementation. This is another way to discover unknown customer environmental risks. PRODUCTION IMPLEMENTATION All activities to this point (health check, design, lab) enable the project team to promote the solution to the customer production environment. The project team also supports any change request procedures required by the customer during or ahead of the production implementation. PRE-PILOT 1E developed the concept of a pre-pilot, which is a pilot in the production environment but on a much smaller and selective scale. Pre-pilot targets a handful of users, preferably friendly IT users, who will provide helpful use cases and feedback, but will understand if issues arise. These users are problem solvers themselves, and will work with the project team to fix issues rather than complaining to project sponsors that they were inconvenienced. There will always be issues during a pilot. It's better to uncover issues during the pre-pilot/pilot rather than after full deployment. FORMAL PILOT Because the 1E process puts a heavy emphasis on discovering environmental issues early and often, by the time the formal pilot is executed, the number of unknowns is reduced. Formal piloting won't uncover any core solution issues, rather will highlight edge cases. As a result, the large majority of end users will see a fully functional, mature and issue free solution which is easy to endorse. INCREMENTAL SIGN OFF AND CLOSE Incremental sign off on deliverables as the project progresses helps prevent surprises during a formal project close and allows the entire project team to claim formal and tangible progress throughout the project. At the end of the project, all deliverables are confirmed and regular check ins are scheduled with the 1E Customer Success teams to ensure continued product use, discuss any issues, and continue to measure savings against the baseline. Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close Training Discovery Health Check Design Lab Prod Pre-Pilot Pilot Close
  • 5. ABOUT 1E 1E provides Software Lifecycle Automation for the Digital Business. Our clients include the biggest organizations in the world – Bank of America, Walmart, AT&T, Dell, SAP, Nestle, State Farm and the State Department. With more than 26 million licenses deployed worldwide, 1,700 organizations in 42 countries trust 1E to help them to work efficiently, productively and sustainably. WWW.1E.COM Copyright © 1E 2015 All Rights Reserved