Traditional Management System
Definition of Traditional Project
Management
• The traditional project management as 'a set of
techniques and tools that can be applied to an activity
that seeks an end product, outcomes or a service'.
• Traditional project management has everything
required for managing and successfully executing a
project
• Traditional project management is a project
management approach that will work for most domains
and environments.
• This approach uses orthodox tools and techniques for
management and solving problems
• These tools and techniques have been proven for
decades, so the outcome of such tools and techniques
can be accurately predicted.
• When it comes to special environments and conditions,
one should move away from traditional project
management approach and should look into modern
methods that have been specifically developed for
such environments and conditions.
• Traditional project management is a universal practice
that includes a set of developed techniques used for
planning, estimating, and controlling activities.
• The aim of those techniques is to reach the desired
result on time, within budget, and in accordance with
specifications
• Traditional project management is mainly used on
projects where activities are completed in a sequence
and there are rarely any changes.
• The concept of traditional project management is
based on predictable experience and predictable tools.
• Each project follows the same lifecycle, which includes
five stages: initiating, planning, executing, controlling,
and closing.
Gantt’s approach load chart
Henry Gantt
Project Control Schedule is a time-scaled bar chart.
It uses the logic developed in the Network Diagram,
considers the length of time it takes to execute individual
activities, factors in resource availability, and places
everything into calendar time.
It’s the document of choice for helping the team focus on
what needs to be done and when.
A Project Control Schedule is used primarily as an
internal control document for the project team and
some stakeholders.
Progress evaluation, variance calculation, and
continuous forecasting are all done using the Project
Control Schedule.
Gantt was influenced in his view through involvement in
Navy ship construction during World War I.
“He broke down all the tasks in the ship construction
process and diagrammed them using the now familiar
grid, bars and milestones.”
This familiar time grid is now called the Gantt chart. It
remains today the most used planning and control
document in industry after more than 100 years
Sample Gantt chart.
Progress chart
Milestones :
Clear, concrete, binary events
implying progress.
For example: Review (with approval),
Sign off of a deliverable, Funds
approved Shown as 0 length task in
Gantt chart.
Project Control – Progress chart
Step 1 - Take a baseline.
• Baseline plan: a copy of the plan (WBS with all
dates, assignments, costs).
• Used to report progress against the baseline.
• Taken at a mutually agreed upon planning point:
• Proposal or Analysis completion
• +25% to -10% stage
• Baseline is (theoretically) not alterable
• Unless major scope change occurs.
Project Control
Double Gantt: Shows Project Schedule Progress vs baseline
Project Monitoring
• Typical Monitoring Activities
– regular reviews of progress against schedule using
WBS as basis (Plan against Baseline)
– regular review of actual costs (O/P from SAP) against
budgeted costs and Earned Value at WBS level
– regular review of resource loading
– regular progress meetings with project team
– regular meetings with contractors
– production of periodic progress reports
– risk reviews
– inspections/ audits
Implementation Model
Step 1
Perform Tasks
Step 3
Manage Change
Step 4
Update the Plan
Step 2
Track Progress
Resolve
Issues
Bar chart merits and limitations:
Merits:
They are simple to construct and read and remain the
best tool to use for communicating to team members
what they need to do within given time frames.
It is much easier to read a bar chart than a network
diagram.
The best working tool is the bar chart.
Merits:
The people doing the work will find it much easier to see
when they are supposed to start and finish their jobs
if you give them a bar chart.
Scheduling software always allows you to print a bar
chart, even though a CPM network is used to find the
critical path and to calculate floats.
Bar charts serious drawback
It is very difficult to determine the impact of a slip
on one task on the rest of the project.
It is hard to tell how this will affect the rest of the
work.
The reason is that the bar chart did not show the
interdependencies of the work.
(Contemporary software does show links between bars,
making them easier to read. The actual name for these bar
charts is “time-line critical path schedules.”)
Limitations:
Schedule e
Creating the project schedule consists of several steps.
First, a network or logic diagram is prepared to display
the optimum sequencing of the tasks.
Next, the length of time required to complete each task
(its duration) is estimated.
By combining information on the preferred sequence of
tasks, the estimated task durations, and an assumed
project start date, the team can place tasks in “real
time,” much like scheduling appointments on a
calendar.
Schedule :e
This reveals the total project duration and the
expected project completion date.
The final part of this step consists of creating a
logic-based, time-scaled bar chart that will be used
during the project execution to track progress.
Time estimates units
Determining the Project Schedule
Table 3.2 Time Estimates for Milwaukee Paper Manufacturing
ACTIVITY DESCRIPTION TIME (WEEKS)
A Build internal components 2
B Modify roof and floor 3
C Construct collection stack 2
D Pour concrete and install frame 4
E Build high-temperature burner 4
F Install pollution control system 3
G Install air pollution device 5
H Inspect and test 2
Total time (weeks) 25
Determining the Project Time Estimates
Earliest start (ES) = earliest time at which an activity can
start, assuming all predecessors have
been completed
Earliest finish (EF) = earliest time at which an activity can
be finished
Latest start (LS) = latest time at which an activity can
start so as to not delay the completion
time of the entire project
Latest finish (LF) = latest time by which an activity has to
be finished so as to not delay the
completion time of the entire project
Forward Pass
Begin at starting event and work forward
Earliest Start Time Rule:
► If an activity has only a single immediate
predecessor, its ES equals the EF of the
predecessor
► If an activity has multiple immediate
predecessors, its ES is the maximum of all the EF
values of its predecessors
ES = Max {EF of all immediate predecessors}
Forward Pass
Earliest Finish Time Rule:
► The earliest finish time (EF) of an activity is
the sum of its earliest start time (ES) and
its activity time
EF = ES + Activity time
Begin at starting event and work forward
4-25
Task Splitting and Task Delaying
Time estimates units
Slack time:
• The amount of delay that can be tolerated between the
starting time and completion time of a task without
causing a delay in the completion date of the entire
project.
• Tasks that have slack time can be delayed to achieve
resource leveling

More Related Content

What's hot

Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Construction contract
Construction contract Construction contract
Construction contract Rakshith Reddy
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management pptRajeshPV12
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and schedulingAditi Garg
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and ArbitrationJIT KUMAR GUPTA
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorSyafiq Deen
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
Construction project delivery methods
Construction project delivery methodsConstruction project delivery methods
Construction project delivery methodsNitin Kumar
 

What's hot (20)

Construction Project management
Construction Project management Construction Project management
Construction Project management
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Construction contract
Construction contract Construction contract
Construction contract
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
Tender
TenderTender
Tender
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Schedule of materials 2
Schedule of materials 2Schedule of materials 2
Schedule of materials 2
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction project delivery methods
Construction project delivery methodsConstruction project delivery methods
Construction project delivery methods
 

Similar to Traditional Management System.ppt

7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
Time management pressent
Time management pressentTime management pressent
Time management pressentiklil fairuz
 
Chapter 5-Project Management.pptx
Chapter 5-Project Management.pptxChapter 5-Project Management.pptx
Chapter 5-Project Management.pptxBahredinAbdella1
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.pptTinotendaChivese
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managersNaganna Chetty
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling DiagramsSaqib Raza
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.pptMdHelalHossain6
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTS.Vijaya Bhaskar
 
Network analysis cpm module3 ppt
Network analysis cpm module3 pptNetwork analysis cpm module3 ppt
Network analysis cpm module3 pptahsanrabbani
 
PMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For BeginnersPMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For BeginnersIIMSE Edu
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Controlakashpadole
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 

Similar to Traditional Management System.ppt (20)

pm--basic.pptx
pm--basic.pptxpm--basic.pptx
pm--basic.pptx
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Time management pressent
Time management pressentTime management pressent
Time management pressent
 
Chapter 5-Project Management.pptx
Chapter 5-Project Management.pptxChapter 5-Project Management.pptx
Chapter 5-Project Management.pptx
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
Chapter 4.pptx
Chapter 4.pptxChapter 4.pptx
Chapter 4.pptx
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling Diagrams
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Unit IV-Project Management
Unit IV-Project ManagementUnit IV-Project Management
Unit IV-Project Management
 
project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
MandC.pdf
MandC.pdfMandC.pdf
MandC.pdf
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Network analysis cpm module3 ppt
Network analysis cpm module3 pptNetwork analysis cpm module3 ppt
Network analysis cpm module3 ppt
 
4) PTM & PCM .pptx
4) PTM & PCM .pptx4) PTM & PCM .pptx
4) PTM & PCM .pptx
 
PMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For BeginnersPMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For Beginners
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 

Recently uploaded

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 

Recently uploaded (20)

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 

Traditional Management System.ppt

  • 2. Definition of Traditional Project Management • The traditional project management as 'a set of techniques and tools that can be applied to an activity that seeks an end product, outcomes or a service'. • Traditional project management has everything required for managing and successfully executing a project
  • 3. • Traditional project management is a project management approach that will work for most domains and environments. • This approach uses orthodox tools and techniques for management and solving problems • These tools and techniques have been proven for decades, so the outcome of such tools and techniques can be accurately predicted. • When it comes to special environments and conditions, one should move away from traditional project management approach and should look into modern methods that have been specifically developed for such environments and conditions.
  • 4. • Traditional project management is a universal practice that includes a set of developed techniques used for planning, estimating, and controlling activities. • The aim of those techniques is to reach the desired result on time, within budget, and in accordance with specifications
  • 5. • Traditional project management is mainly used on projects where activities are completed in a sequence and there are rarely any changes. • The concept of traditional project management is based on predictable experience and predictable tools. • Each project follows the same lifecycle, which includes five stages: initiating, planning, executing, controlling, and closing.
  • 6.
  • 7. Gantt’s approach load chart Henry Gantt Project Control Schedule is a time-scaled bar chart. It uses the logic developed in the Network Diagram, considers the length of time it takes to execute individual activities, factors in resource availability, and places everything into calendar time. It’s the document of choice for helping the team focus on what needs to be done and when.
  • 8. A Project Control Schedule is used primarily as an internal control document for the project team and some stakeholders. Progress evaluation, variance calculation, and continuous forecasting are all done using the Project Control Schedule. Gantt was influenced in his view through involvement in Navy ship construction during World War I. “He broke down all the tasks in the ship construction process and diagrammed them using the now familiar grid, bars and milestones.”
  • 9. This familiar time grid is now called the Gantt chart. It remains today the most used planning and control document in industry after more than 100 years Sample Gantt chart.
  • 10. Progress chart Milestones : Clear, concrete, binary events implying progress. For example: Review (with approval), Sign off of a deliverable, Funds approved Shown as 0 length task in Gantt chart.
  • 11. Project Control – Progress chart Step 1 - Take a baseline. • Baseline plan: a copy of the plan (WBS with all dates, assignments, costs). • Used to report progress against the baseline. • Taken at a mutually agreed upon planning point: • Proposal or Analysis completion • +25% to -10% stage • Baseline is (theoretically) not alterable • Unless major scope change occurs.
  • 12. Project Control Double Gantt: Shows Project Schedule Progress vs baseline
  • 13. Project Monitoring • Typical Monitoring Activities – regular reviews of progress against schedule using WBS as basis (Plan against Baseline) – regular review of actual costs (O/P from SAP) against budgeted costs and Earned Value at WBS level – regular review of resource loading – regular progress meetings with project team – regular meetings with contractors – production of periodic progress reports – risk reviews – inspections/ audits
  • 14. Implementation Model Step 1 Perform Tasks Step 3 Manage Change Step 4 Update the Plan Step 2 Track Progress Resolve Issues
  • 15. Bar chart merits and limitations: Merits: They are simple to construct and read and remain the best tool to use for communicating to team members what they need to do within given time frames. It is much easier to read a bar chart than a network diagram. The best working tool is the bar chart.
  • 16. Merits: The people doing the work will find it much easier to see when they are supposed to start and finish their jobs if you give them a bar chart. Scheduling software always allows you to print a bar chart, even though a CPM network is used to find the critical path and to calculate floats.
  • 17. Bar charts serious drawback It is very difficult to determine the impact of a slip on one task on the rest of the project. It is hard to tell how this will affect the rest of the work. The reason is that the bar chart did not show the interdependencies of the work. (Contemporary software does show links between bars, making them easier to read. The actual name for these bar charts is “time-line critical path schedules.”) Limitations:
  • 18. Schedule e Creating the project schedule consists of several steps. First, a network or logic diagram is prepared to display the optimum sequencing of the tasks. Next, the length of time required to complete each task (its duration) is estimated. By combining information on the preferred sequence of tasks, the estimated task durations, and an assumed project start date, the team can place tasks in “real time,” much like scheduling appointments on a calendar.
  • 19. Schedule :e This reveals the total project duration and the expected project completion date. The final part of this step consists of creating a logic-based, time-scaled bar chart that will be used during the project execution to track progress.
  • 21. Determining the Project Schedule Table 3.2 Time Estimates for Milwaukee Paper Manufacturing ACTIVITY DESCRIPTION TIME (WEEKS) A Build internal components 2 B Modify roof and floor 3 C Construct collection stack 2 D Pour concrete and install frame 4 E Build high-temperature burner 4 F Install pollution control system 3 G Install air pollution device 5 H Inspect and test 2 Total time (weeks) 25
  • 22. Determining the Project Time Estimates Earliest start (ES) = earliest time at which an activity can start, assuming all predecessors have been completed Earliest finish (EF) = earliest time at which an activity can be finished Latest start (LS) = latest time at which an activity can start so as to not delay the completion time of the entire project Latest finish (LF) = latest time by which an activity has to be finished so as to not delay the completion time of the entire project
  • 23. Forward Pass Begin at starting event and work forward Earliest Start Time Rule: ► If an activity has only a single immediate predecessor, its ES equals the EF of the predecessor ► If an activity has multiple immediate predecessors, its ES is the maximum of all the EF values of its predecessors ES = Max {EF of all immediate predecessors}
  • 24. Forward Pass Earliest Finish Time Rule: ► The earliest finish time (EF) of an activity is the sum of its earliest start time (ES) and its activity time EF = ES + Activity time Begin at starting event and work forward
  • 25. 4-25 Task Splitting and Task Delaying Time estimates units Slack time: • The amount of delay that can be tolerated between the starting time and completion time of a task without causing a delay in the completion date of the entire project. • Tasks that have slack time can be delayed to achieve resource leveling