 PLCC system uses the same High Voltage transmission line connecting
two sub-stations for telecommunication purpose too.
 PLCC is used in all power utilities as a primary communication service to
transmit speech, telemetry and protection tripping commands. This is
economic and reliable for inter grid message transfer as well as low bit
rate RTU signals.
 The voice/data are mixed with radio frequency carrier (40-500kHz),
amplified to a level of 10-80W RF power and injected in to high voltage
power line using a suitable coupling capacitor. The power line as a rigid
long conductor parallel to ground, guides the carrier waves to travel along
the transmission line. Point to point communication takes place between
two SSB transceivers at both ends.
Power Line Carrier Communication System
Power Line
(50Hz)
C.C
RF carrier
(40-500kHz)
RTU
Transmission line
L.T
PLCC TERMINAL
(ABB-ETL41)
PAX
Coupling Scheme
Local substation
To remote
substation
Coupling
Capacitor
Line
Matching
Unit
PLC terminal
Coaxial
•Transformer(s)
•BusBar
Line Trap
The PLC
signal is
routed to
H.V Line
The PLC
signal is
not
absorbed
by the
substation
Components
PLCC Terminal = Translates Voice and data into High Frequency Carrier. Output
Power =10 to 80W
LMU = Line Matching Unit = For impedance matching between line and coaxial
cable, includes high voltage protection devices like drainage coil(20mH), lightening
arrestor(500V) and an earth switch.
Coupling Capacitor (C.C) = Couples high frequency carrier with Power Line (
4000 to10000pF)
Line Trap (L.T) = Do not allow the transmitted HF carrier to enter inside the sub-
station. (L = 0.5 to 2mH) With out Line trap HF carrier get by- passed to some
other line on the same bus bar and may leak to ground ( a earth switch inside the
yard provided for each bay is kept closed during maintenance)
Line Trap function = PLC signal Blocking
Substation
Line Trap = High Impedance for PLC signal
Low Impedance for Power energy
Power energy
PLC Signal
Line Trap is a parallel LC circuit
Inductance
of
main Coil
Lightning
Arrester
Series
resistance
Tuning
Capacitor
Line Traps Mounting Options
Vertical Pedestal Horizontal Pedestal Suspension
LMU function
LMU = impedance matching Transformer + high voltage Protection
 To prevent dangerous potential on the PLCC connection
 To match PLCC set & transmission Line
Matching + Protection
LMU
PLCC Panel ( type: ABB ETL 41/42)
Cabinet Module
ABB PLCC terminal ETL- 41
System data -- complies to IEC 495
 Operating mode : Single side band Suppressed carrier
 Frequency range: 40 to 500kHz (programmable in 4 kHz
Steps)
 AF Bandwidth: 4 kHz (Speech band=300 – 3400 Hz)
 Transmitter RF output power : 40W ( +46 dBm)
 Receiver Selectivity : 70dB ( 300Hz from band limit)
 Receiver Image rejection > 80 dB
PLCC Panel Tx Block
PLCC Panel Rx Block
Types of Coupling
(A) Phase to Ground coupling :-
Types of Coupling
(B) Phase to Phase coupling :-
Types of Coupling
(C) Inter Line coupling :-
Typical PLCC Installation
MS = Master station
PAX = Private automatic exchange
PR = Protection relay
PC = Computer
M = Modem
ETLETL
LT
LT
FAX
FAX
PR PC MS PAX FAX
M
PR PC RTU FAX
M
PR= Protection relay
FAX = Facsimileequipment
M = Modem
RTU = Remote terminalunit
cc cc
Batteries
• PLCC work on rectified AC or main supply, when supply
goes off, we make use of a device for proper functioning of
PLCC called battery charger.
• This is the device that provide supply to the PLCC
equipment for uninterrupted working.
• It provide DC to the panel by battery.
Advantages
 No separate wires are needed for communication
purposes, as the power lines themselves carry power as
well as communication signals. Hence the cost is less.
 Power lines have appreciably higher mechanical strength
compared with ordinary lines. They would normally remain
unaffected under the conditions, which might seriously
damage telephone lines.
 Power lines usually provide the shortest route between
the power stations.
Advantages
 Power lines have large cross-sectional area resulting in
very low resistance per unit length. Consequently carrier
signals suffer much less attenuation than when they travel
on telephone lines of equal lengths.
 Power lines are well insulated to provide only negligible
leakage between conductors and ground even in adverse
weather conditions
 Largest spacing between conductors reduces
capacitance, which results in smaller attenuation at high
frequencies. The large spacing also reduces the cross talk
to a considerable extent.
Disadvantages
 Proper care has to be taken to guard carrier equipment
and persons using them against high voltages and
currents on the lines.
 Noise introduced by power lines is far more than in case
of telephone lines. This is due to the noise generated by
discharge across insulators, switching processes.
Power Line Carrier Communication PLCC
Power Line Carrier Communication PLCC

More Related Content

What's hot

Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
Shuvam Pathania
 
power line carrier communication
power line carrier communicationpower line carrier communication
power line carrier communication
LAVANYA d
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
Girish Gupta
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv Substation
Subhrajit Ghosh
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
Ashutosh Srivastava
 
33kv substation
33kv substation33kv substation
33kv substation
Abhishek Dawachya
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
Shubham Patel
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmissionSumit Kumar
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
Sunny Daksh
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
Sakshi Rastogi
 
Static var compensator
Static var compensatorStatic var compensator
Static var compensator
Vinay Vishwakarma
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Devices
khemraj298
 
Electric substation
Electric substation Electric substation
Electric substation
ANNU KUMAR
 
Substations
SubstationsSubstations
Substations
itfakash
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
CS V
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
Hemendra Kumar Rajput
 
Types Of Substations
Types Of SubstationsTypes Of Substations
Types Of Substations
sapna186
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION moiz89
 

What's hot (20)

Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
power line carrier communication
power line carrier communicationpower line carrier communication
power line carrier communication
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
A Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv SubstationA Training Report Of Saltlake 132/33kv Substation
A Training Report Of Saltlake 132/33kv Substation
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
33kv substation
33kv substation33kv substation
33kv substation
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmission
 
Plcc ppt1
Plcc ppt1Plcc ppt1
Plcc ppt1
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
Static var compensator
Static var compensatorStatic var compensator
Static var compensator
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Devices
 
Electric substation
Electric substation Electric substation
Electric substation
 
Substations
SubstationsSubstations
Substations
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Types Of Substations
Types Of SubstationsTypes Of Substations
Types Of Substations
 
POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION POWER SYSTEM PROTECTION
POWER SYSTEM PROTECTION
 

Similar to Power Line Carrier Communication PLCC

Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptx
Vara Prasad
 
POWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATIONPOWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATION
Atul Kumar Sharma
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
Neha Gethe
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communication
Manoj Chowdary
 
Powerlinecarrier (3)
Powerlinecarrier (3)Powerlinecarrier (3)
Powerlinecarrier (3)ajay901551
 
Power Line Carrier Communication seminar
Power Line Carrier Communication seminarPower Line Carrier Communication seminar
Power Line Carrier Communication seminarAishwary Verma
 
Ppt.aslam
Ppt.aslamPpt.aslam
Ppt.aslam
Aslam Atif
 
Plcc
PlccPlcc
Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagar
Ramanand Sagar
 
PLCC.ppt
PLCC.pptPLCC.ppt
PLCC.ppt
thomas victor
 
Chapter 10 Introduction to Air Insulation Substation .pptx
Chapter 10 Introduction to Air Insulation Substation .pptxChapter 10 Introduction to Air Insulation Substation .pptx
Chapter 10 Introduction to Air Insulation Substation .pptx
borapring
 
Track 2 session 6 - st dev con 2016 - wireless charging technologies
Track 2   session 6 - st dev con 2016 - wireless charging technologies Track 2   session 6 - st dev con 2016 - wireless charging technologies
Track 2 session 6 - st dev con 2016 - wireless charging technologies
ST_World
 
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEMTHD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
ijiert bestjournal
 
Low frequency ac transmission for power systems by Aamir Saleem
Low frequency ac transmission for power systems by Aamir SaleemLow frequency ac transmission for power systems by Aamir Saleem
Low frequency ac transmission for power systems by Aamir Saleem
Aamir Saleem
 
Power line carrier communication
Power  line  carrier  communicationPower  line  carrier  communication
Power line carrier communication
Rahul Mehta
 
Substation
SubstationSubstation
CSPTCL DANGANIYA RAIPUR (C.G.)
CSPTCL   DANGANIYA RAIPUR (C.G.)CSPTCL   DANGANIYA RAIPUR (C.G.)
CSPTCL DANGANIYA RAIPUR (C.G.)
Government Engineering College, Raipur
 
Substations
Substations Substations
Substations
Engr Muhammad Imran
 
Seminar Report on 220 KV Grid Sub Station on Bundi
Seminar Report on 220 KV  Grid Sub Station on Bundi Seminar Report on 220 KV  Grid Sub Station on Bundi
Seminar Report on 220 KV Grid Sub Station on Bundi
SahilQureshi14
 
December 2015 Online Magazine 39-42
December 2015 Online Magazine 39-42December 2015 Online Magazine 39-42
December 2015 Online Magazine 39-42Devyani Balyan
 

Similar to Power Line Carrier Communication PLCC (20)

Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptx
 
POWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATIONPOWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATION
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communication
 
Powerlinecarrier (3)
Powerlinecarrier (3)Powerlinecarrier (3)
Powerlinecarrier (3)
 
Power Line Carrier Communication seminar
Power Line Carrier Communication seminarPower Line Carrier Communication seminar
Power Line Carrier Communication seminar
 
Ppt.aslam
Ppt.aslamPpt.aslam
Ppt.aslam
 
Plcc
PlccPlcc
Plcc
 
Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagar
 
PLCC.ppt
PLCC.pptPLCC.ppt
PLCC.ppt
 
Chapter 10 Introduction to Air Insulation Substation .pptx
Chapter 10 Introduction to Air Insulation Substation .pptxChapter 10 Introduction to Air Insulation Substation .pptx
Chapter 10 Introduction to Air Insulation Substation .pptx
 
Track 2 session 6 - st dev con 2016 - wireless charging technologies
Track 2   session 6 - st dev con 2016 - wireless charging technologies Track 2   session 6 - st dev con 2016 - wireless charging technologies
Track 2 session 6 - st dev con 2016 - wireless charging technologies
 
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEMTHD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
 
Low frequency ac transmission for power systems by Aamir Saleem
Low frequency ac transmission for power systems by Aamir SaleemLow frequency ac transmission for power systems by Aamir Saleem
Low frequency ac transmission for power systems by Aamir Saleem
 
Power line carrier communication
Power  line  carrier  communicationPower  line  carrier  communication
Power line carrier communication
 
Substation
SubstationSubstation
Substation
 
CSPTCL DANGANIYA RAIPUR (C.G.)
CSPTCL   DANGANIYA RAIPUR (C.G.)CSPTCL   DANGANIYA RAIPUR (C.G.)
CSPTCL DANGANIYA RAIPUR (C.G.)
 
Substations
Substations Substations
Substations
 
Seminar Report on 220 KV Grid Sub Station on Bundi
Seminar Report on 220 KV  Grid Sub Station on Bundi Seminar Report on 220 KV  Grid Sub Station on Bundi
Seminar Report on 220 KV Grid Sub Station on Bundi
 
December 2015 Online Magazine 39-42
December 2015 Online Magazine 39-42December 2015 Online Magazine 39-42
December 2015 Online Magazine 39-42
 

More from Power System Operation

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
Power System Operation
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
Power System Operation
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
Power System Operation
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
Power System Operation
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
Power System Operation
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
Power System Operation
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
Power System Operation
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
Power System Operation
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
Power System Operation
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
Power System Operation
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Power System Operation
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
Power System Operation
 
What is load management
What is load managementWhat is load management
What is load management
Power System Operation
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
Power System Operation
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
Power System Operation
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
Power System Operation
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power System Operation
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
Power System Operation
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
Power System Operation
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
Power System Operation
 

More from Power System Operation (20)

ENERGY TRANSITION OUTLOOK 2021
ENERGY TRANSITION OUTLOOK  2021ENERGY TRANSITION OUTLOOK  2021
ENERGY TRANSITION OUTLOOK 2021
 
Thermography test of electrical panels
Thermography test of electrical panelsThermography test of electrical panels
Thermography test of electrical panels
 
What does peak shaving mean
What does peak shaving meanWhat does peak shaving mean
What does peak shaving mean
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Power System Restoration Guide
Power System Restoration Guide  Power System Restoration Guide
Power System Restoration Guide
 
Big Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid OperationsBig Data Analytics for Power Grid Operations
Big Data Analytics for Power Grid Operations
 
SPS to RAS Special Protection Scheme Remedial Action Scheme
SPS to RAS Special Protection Scheme  Remedial Action SchemeSPS to RAS Special Protection Scheme  Remedial Action Scheme
SPS to RAS Special Protection Scheme Remedial Action Scheme
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...SVC PLUS Frequency Stabilizer Frequency and voltage support for  dynamic grid...
SVC PLUS Frequency Stabilizer Frequency and voltage support for dynamic grid...
 
Principles & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground ResistancePrinciples & Testing Methods Of Earth Ground Resistance
Principles & Testing Methods Of Earth Ground Resistance
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Electrical Transmission Tower Types - Design & Parts
Electrical Transmission Tower  Types - Design & PartsElectrical Transmission Tower  Types - Design & Parts
Electrical Transmission Tower Types - Design & Parts
 
What is load management
What is load managementWhat is load management
What is load management
 
What does merit order mean
What does merit order meanWhat does merit order mean
What does merit order mean
 
What are Balancing Services ?
What are  Balancing Services ?What are  Balancing Services ?
What are Balancing Services ?
 
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools The Need for Enhanced  Power System  Modelling Techniques  &  Simulation Tools
The Need for Enhanced Power System Modelling Techniques & Simulation Tools
 
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
Power Quality  Trends in the Transition to  Carbon-Free Electrical Energy SystemPower Quality  Trends in the Transition to  Carbon-Free Electrical Energy System
Power Quality Trends in the Transition to Carbon-Free Electrical Energy System
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
What is leakage current testing
What is leakage current testingWhat is leakage current testing
What is leakage current testing
 

Recently uploaded

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 

Recently uploaded (20)

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 

Power Line Carrier Communication PLCC

  • 2. PLCC Technology  PLCC system uses the same High Voltage transmission line connecting two sub-stations for telecommunication purpose too.  PLCC is used in all power utilities as a primary communication service to transmit speech, telemetry and protection tripping commands. This is economic and reliable for inter grid message transfer as well as low bit rate RTU signals.  The voice/data are mixed with radio frequency carrier (40-500kHz), amplified to a level of 10-80W RF power and injected in to high voltage power line using a suitable coupling capacitor. The power line as a rigid long conductor parallel to ground, guides the carrier waves to travel along the transmission line. Point to point communication takes place between two SSB transceivers at both ends.
  • 3. Power Line Carrier Communication System Power Line (50Hz) C.C RF carrier (40-500kHz) RTU Transmission line L.T PLCC TERMINAL (ABB-ETL41) PAX
  • 4. Coupling Scheme Local substation To remote substation Coupling Capacitor Line Matching Unit PLC terminal Coaxial •Transformer(s) •BusBar Line Trap The PLC signal is routed to H.V Line The PLC signal is not absorbed by the substation
  • 5. Components PLCC Terminal = Translates Voice and data into High Frequency Carrier. Output Power =10 to 80W LMU = Line Matching Unit = For impedance matching between line and coaxial cable, includes high voltage protection devices like drainage coil(20mH), lightening arrestor(500V) and an earth switch. Coupling Capacitor (C.C) = Couples high frequency carrier with Power Line ( 4000 to10000pF) Line Trap (L.T) = Do not allow the transmitted HF carrier to enter inside the sub- station. (L = 0.5 to 2mH) With out Line trap HF carrier get by- passed to some other line on the same bus bar and may leak to ground ( a earth switch inside the yard provided for each bay is kept closed during maintenance)
  • 6. Line Trap function = PLC signal Blocking Substation Line Trap = High Impedance for PLC signal Low Impedance for Power energy Power energy PLC Signal
  • 7. Line Trap is a parallel LC circuit Inductance of main Coil Lightning Arrester Series resistance Tuning Capacitor
  • 8. Line Traps Mounting Options Vertical Pedestal Horizontal Pedestal Suspension
  • 9. LMU function LMU = impedance matching Transformer + high voltage Protection  To prevent dangerous potential on the PLCC connection  To match PLCC set & transmission Line Matching + Protection LMU
  • 10. PLCC Panel ( type: ABB ETL 41/42) Cabinet Module
  • 11. ABB PLCC terminal ETL- 41 System data -- complies to IEC 495  Operating mode : Single side band Suppressed carrier  Frequency range: 40 to 500kHz (programmable in 4 kHz Steps)  AF Bandwidth: 4 kHz (Speech band=300 – 3400 Hz)  Transmitter RF output power : 40W ( +46 dBm)  Receiver Selectivity : 70dB ( 300Hz from band limit)  Receiver Image rejection > 80 dB
  • 12. PLCC Panel Tx Block
  • 13. PLCC Panel Rx Block
  • 14. Types of Coupling (A) Phase to Ground coupling :-
  • 15. Types of Coupling (B) Phase to Phase coupling :-
  • 16. Types of Coupling (C) Inter Line coupling :-
  • 17. Typical PLCC Installation MS = Master station PAX = Private automatic exchange PR = Protection relay PC = Computer M = Modem ETLETL LT LT FAX FAX PR PC MS PAX FAX M PR PC RTU FAX M PR= Protection relay FAX = Facsimileequipment M = Modem RTU = Remote terminalunit cc cc
  • 18. Batteries • PLCC work on rectified AC or main supply, when supply goes off, we make use of a device for proper functioning of PLCC called battery charger. • This is the device that provide supply to the PLCC equipment for uninterrupted working. • It provide DC to the panel by battery.
  • 19.
  • 20. Advantages  No separate wires are needed for communication purposes, as the power lines themselves carry power as well as communication signals. Hence the cost is less.  Power lines have appreciably higher mechanical strength compared with ordinary lines. They would normally remain unaffected under the conditions, which might seriously damage telephone lines.  Power lines usually provide the shortest route between the power stations.
  • 21. Advantages  Power lines have large cross-sectional area resulting in very low resistance per unit length. Consequently carrier signals suffer much less attenuation than when they travel on telephone lines of equal lengths.  Power lines are well insulated to provide only negligible leakage between conductors and ground even in adverse weather conditions  Largest spacing between conductors reduces capacitance, which results in smaller attenuation at high frequencies. The large spacing also reduces the cross talk to a considerable extent.
  • 22. Disadvantages  Proper care has to be taken to guard carrier equipment and persons using them against high voltages and currents on the lines.  Noise introduced by power lines is far more than in case of telephone lines. This is due to the noise generated by discharge across insulators, switching processes.