 Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)
 Project Scope – due to frequent pipe bursting and significant water loss a replacement of existing asbestos cement and zinc
Pipelines has been defined through 7nr priority sectors / zones:
 Lot A1 - a part of the existing asbestos cement pressure transmission main, which conveys the water from the well field
“Korace” to the reservoir “Bijelo Brdo”, was to be replaced.
 Lot A2 - two sections of the asbestos cement gravity transmission main, which conveys water from the reservoir “Bijelo Brdo”
to the reservoir “Babino Brdo” was to be replaced.
 Lot A3 - The gravity asbestos cement transmission main, which conveys water from the reservoir Babino Brdo“ to the reservoir
„Gakovac”, shall be partly replaced. The other gravity asbestos cement transmission main, which delivers water from the
reservoir “Babino Brdo“ to the Water Supply Zone 1 in the city of “Derventa”, was also to be partly replaced.
 Lot A4 - the Reservoir “Gakovac”- City Network Feeder Line located in Stevana Nemanje Street was to be replaced.
 Lot A5 - a distribution asbestos cement pipes which are located in “Srpske Vojske”street was to be replaced, new house
connections installed
 Lot A6 – a distribution asbestos cement pipeline in “Stefana Nemanje Street” with belonging house connections were to be
replaced.
 Lot A7 – The distribution Zinc-pipes which are located in “Radnička street” together with belonging house connections were to
be replaced.
 Lot A8 – Provision and installation of SCADA System with associated software, equipments, ultrasonic flow meters, pressure
reducing valves on critical locations, integration into the SCADA System.
 Lot A9 – provision of Water Meters, PE Shafts and associated fittings for Water Utility “Komunalac”
 In total - 12,630.52m of DI & PE Pipelines have been installed under the Project, 309nr of house connections, 14nr of supporting
concrete manholes. From remaining budget – several pipelines were extended (Lot A3, A5, A6, A7).
 Project Budget – 2,000,000.00EUR
PROJECT’S SIGN BOARD WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES
WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES
, TYTON-SIT JOINTS
WS PIPE MATERIAL – HDPE100, SDR11-17, PN10, PN16
“PIPELIFE” PIPES
LOT A-1
(Transmission Main DI
DN300; L = 2.207,80m)
A part of the existing asbestos cement
pressure transmission main, which
conveys the water from the well field
“Korace” to the reservoir “Bijelo
Brdo”, was to be replaced.
Pipe material:
DI DN300, PN16 in 2,207.80m Length
with 1nr new Mud Outlet Valve Shaft.
Considering this previously war-
affected area has present mine fields,
it was required that demining of pipe
route corridor is conducted prior of
any construction works.
BHMAC DEMINING AREA SAFE DEMINED 20M WIDE PIPE-ROUTE CORRIDOR
DI DN300 PIPE MATERIAL DELIVERY WITHIN SAFETY
CORRIDOR
DI DN300 INSTALLATION
TITANIUM SITS JOINTS
PRESSURE TEST AS PER EN805, PIPE ANCHORING
MUD OUTLET VALVE MANHOLE
MUD OUTLET VALVE MANHOLE
LotA2
Transmission main
HDPE DN300
Two sections of the asbestos cement
gravity transmission main, which
conveys water from the reservoir
“Bijelo Brdo” to the reservoir “Babino
Brdo” was to be replaced.
Pipe material:
HDPE100, PN10, SDR17, OD315mm,
L=843.10m with 2nr House
Connections
PE PIPE WELDING PRESSURE TESTING – EN805
REPLACEMENT OF VALVES, FITTINGS AT EXISTING MUD
OUTLET VALVE MANHOLE
REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE
MANHOLE
REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE
MANHOLE
REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE
MANHOLE
LotA3
Transmission Main
The gravity asbestos cement
transmission main, which conveys
water from the reservoir Babino Brdo“
to the reservoir „Gakovac”, shall be
partly replaced.
The other gravity asbestos cement
transmission main, which delivers
water from the reservoir “Babino
Brdo“ to the Water Supply Zone 1 in
the city of “Derventa”, was also to be
partly replaced
Extension of City Network:
Pipe Material:
DI DN400, PN16 – L=253m;
DI DN300, PN16 – L=485m;
HDPE ID315, PN16 – 1,760m;
3nr new Shafts – 2 Mud Outlets, 1nr
Air Valves
PIPE ROUTE CORRIDOR DEMINED BY BHMAC
REGARDLESS, UNEXPLODED MINE ENCOUNTERED DURING
TRENCH EXCAVATION WORKS, WORKS ABORTED UNTIL
DEMINING COMPLETION
DI DN300 PIPE CONNECTION TO RESERVOIR “BABNO BRDO” DOWNSTREAM PIPE ROUTE
MUD OUTLET VALVE SHAFTS (DI DN300, DN400) MUD OUTLET VALVE SHAFTS (DI DN300, DN400)
DISCHARGE PIPES WITH “FROG FLAP VALVES”
AIR VALVE MANHOLE AT DI DN300 AIR VALVE MANHOLE AT DI DN300
TRANSITION TO HDPE OD315, PN16 EXTENSION OF TRANSMISSION MAIN HDPE OD315, PN16
LotA4
Feeder Line
The Reservoir “Gakovac”- City
Network Feeder Line located in
Stevana Nemanje Street was to be
replaced
Pipe material:
HDPE PN10, PN16:
OD315 – L=577m
1nr Air Valve Shaft
1nr Flow Meter Shaft (Lot A8)
HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC”
WATER RESERVOIR
HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC”
WATER RESERVOIR
GRAVITY FEEDER LINE AIR VALVE MANHOLE
GRAVITY FEEDER LINE AIR VALVE MANHOLE GRAVITY FEEDER LINE AIR VALVE
JOINT FLOW METER MANHOLE FLOW METERS / PART OF SCADA SYSTEM
LotA5
Distribution Pipeline
The distribution asbestos cement
pipes which are located in “Srpske
Vojske”street shall be replaced, new
house connections installed
Distribution Pipeline:
HDPE OD180, PN10 – 1,502m;
House Connections – 46nr
HDPE OD180, PN10 PIPE
LotA6
Distribution Pipeline
Distribution asbestos cement pipeline
in “Stefana Nemanje Street” with
belonging house connections to be
replaced:
Pipe material – HDPE PN16:
OD125 – 3,224m;
OD63-282m;
House Connections – 188nr;
2nr new shafts
HDPE OD125, PN16 PIPE
WATER METER PE SHAFTS R=1.0M, H=1.0M (PROVIDED
UNDER LOT A9)
INSTALLATION OF HOUSE CONNECTION’S WATER METERS
PE WATER METER SHAFT
TRANSITION FROM OD125 TO OD63MM PIPE
GATEVALVE MANHOLE
PRESSURE REDUCING VALVE SHAFT PRESSURE REDUCING VALVE
GREEN AREA HYDRANT COVER COMMISSIONING ON TAKE OVER INSPECTION
GREEN AREA GATE VALVES COVER, SURFACE CAPS
LotA7
Distribution Pipeline
The distribution Zinc-pipes which are
located in “Radnička street” together
with belonging house connections
were to be replaced.
Pipe Material -HDPE PN16:
OD125 – L=1,022m;
OD63 – L=474m;
House Connections – 73nr;
1nr Pressure Reducing Valve Shaft
PIPE TRENCH EXCAVATION HDPE OD125MM PN16 PIPE LAYING
PRESSURE REDUCING VALVE SHAFT-TO-BE PRESSURE REDUCING VALVE SHAFT-TO-BE
PRESSURE REDUCINGVALVE SHAFT PRESSURE REDUCING VALVE
LotA8
SCADA System
SCADA System:
Fm-01 PS “Korace”; (Flow Meter)
Fm-02 “Lupljanica”; (Flow Meter)
Fm-03 “Bilica Vrelo”; (Flow Meter)
Fm-04 “Bilica Vrelo”; (Flow Meter)
Fm-05 Reservoir “Babino Brdo”; (Flow
Meter)
Fm-06 Reservoir ”Babino Brdo”,
existing shaft; (Flow Meter)
Fm-07, 08 Reservoir ”Gakovac”; (Flow
Meter)
Pr-02 Reservoir “Vrhovi” (Pressure
Reducing Valve)
SCADA Control Center – PS “Korace”
1nr Buster Pump – PS “Bilica Vrelo”
8nr new shafts constructed
LotA8
SCADA System
Fm-01 PS “Korace”; (Flow Meter)
LotA8
SCADA System
Fm-02 PS “Lupljanica”; (Flow Meter)
LotA8
SCADA System
Fm-03 “Bilica Vrelo”; (Flow Meter)
LotA8
SCADA System
Fm-04 “Bilica Vrelo”; (Flow Meter)
LotA8
SCADA System
Fm-05 Reservoir “Babino Brdo” Inlet;
(Flow Meter)
LotA8
SCADA System
Fm-06 Reservoir ”Babino Brdo”
Outlet, existing shaft; (Flow Meter)
LotA8
SCADA System
Fm-07 Reservoir ”Gakovac”; (Flow
Meter)
LotA8
SCADA System
Fm-08, 09 Reservoir ”Gakovac” Inlet /
Outlet; (Flow Meter)
LotA8
SCADA System
Pr-02 Reservoir “Vrhovi” (Pressure
Reducing Valve)
LotA8
SCADA System
1nr Buster Pump – PS “Bilica Vrelo”
LotA9
“Delivery ofWS
material”
Lot A9 “Delivery of WS material”:
Water Meters (Qn = 1.5m³/h, dry type)
INSA (1/2“, 3/4", 1“, 5/4“, 6/4“, 2“)–
3,000nr
HDPE WM shafts 1.0x1.0m – 500nr
Shut-off valves (DN3/4“, 1“, 5/4“, 6/4“,
2“) – 6,000nr
Various fittings and valves.

More Related Content

What's hot

Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelinesGasforlife Polysource
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boRobinking Boley
 
Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...
Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...
Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...San Diego County Water Authority
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-ajulio-civil
 
ES&E Magazine - Dawson Creek
ES&E Magazine - Dawson CreekES&E Magazine - Dawson Creek
ES&E Magazine - Dawson CreekKevin Vieira
 
Analysis of the drinking water supply system of dire dawa town & proposal...
Analysis of the drinking water supply system of dire dawa town & proposal...Analysis of the drinking water supply system of dire dawa town & proposal...
Analysis of the drinking water supply system of dire dawa town & proposal...Endale Belete
 

What's hot (8)

Atten tanks jd
Atten tanks jdAtten tanks jd
Atten tanks jd
 
Part 5 structural design of pipelines
Part 5 structural design of pipelinesPart 5 structural design of pipelines
Part 5 structural design of pipelines
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
Thiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_boThiet ke duong_ong_tren_bo
Thiet ke duong_ong_tren_bo
 
Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...
Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...
Other Actions Related to Board Consideration of the Carlsbad Desalination Pro...
 
Sc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-aSc 0009-rwpc-pip-civ-cal-0511 0-a
Sc 0009-rwpc-pip-civ-cal-0511 0-a
 
ES&E Magazine - Dawson Creek
ES&E Magazine - Dawson CreekES&E Magazine - Dawson Creek
ES&E Magazine - Dawson Creek
 
Analysis of the drinking water supply system of dire dawa town & proposal...
Analysis of the drinking water supply system of dire dawa town & proposal...Analysis of the drinking water supply system of dire dawa town & proposal...
Analysis of the drinking water supply system of dire dawa town & proposal...
 

Similar to Derventa, Water Supply Project

Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww projectVladimir Popovic
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosniaVladimir Popovic
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010AlfredBirnhuber
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgiaVladimir Popovic
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectVladimir Popovic
 
EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013AlfredBirnhuber
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipelineVladimir Popovic
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaVladimir Popovic
 
EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012AlfredBirnhuber
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewVladimir Popovic
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasUbaldoJGarca
 
EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015AlfredBirnhuber
 
EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014AlfredBirnhuber
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b ProjectsAnandhan Annasamy
 
EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017AlfredBirnhuber
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 

Similar to Derventa, Water Supply Project (20)

Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww project
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Waste water project derventa, bosnia
Waste water project derventa, bosniaWaste water project derventa, bosnia
Waste water project derventa, bosnia
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
 
EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013EADIPS FGR annual journal 2013
EADIPS FGR annual journal 2013
 
Ghadames project, conveyance pipeline
Ghadames project, conveyance pipelineGhadames project, conveyance pipeline
Ghadames project, conveyance pipeline
 
Rehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgiaRehabilitation of ws system, lanchkhuti, georgia
Rehabilitation of ws system, lanchkhuti, georgia
 
EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012EADIPS FGR annual journal 2012
EADIPS FGR annual journal 2012
 
Lanchkhuti WS Project Overview
Lanchkhuti WS Project OverviewLanchkhuti WS Project Overview
Lanchkhuti WS Project Overview
 
Fundamentos Teóricos Cloacas
Fundamentos Teóricos CloacasFundamentos Teóricos Cloacas
Fundamentos Teóricos Cloacas
 
EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015EADIPS FGR annual journal 2015
EADIPS FGR annual journal 2015
 
EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014EADIPS FGR annual journal 2014
EADIPS FGR annual journal 2014
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
 
EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017EADIPS FGR annual journal 2017
EADIPS FGR annual journal 2017
 
Vani Water Supply Project
Vani Water Supply ProjectVani Water Supply Project
Vani Water Supply Project
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 

More from Vladimir Popovic

Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaVladimir Popovic
 
Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Vladimir Popovic
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionVladimir Popovic
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationVladimir Popovic
 
Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Vladimir Popovic
 
Ghadames project, minor structures
Ghadames project, minor structuresGhadames project, minor structures
Ghadames project, minor structuresVladimir Popovic
 
Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Vladimir Popovic
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Vladimir Popovic
 
Al Jewaibyah Regulating Tank 70,000m3
Al Jewaibyah Regulating Tank  70,000m3Al Jewaibyah Regulating Tank  70,000m3
Al Jewaibyah Regulating Tank 70,000m3Vladimir Popovic
 

More from Vladimir Popovic (9)

Rehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgiaRehabilitation of ws system vani, georgia
Rehabilitation of ws system vani, georgia
 
Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3Lanchkhuti Oragvis gele ws rc tank 1,900m3
Lanchkhuti Oragvis gele ws rc tank 1,900m3
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
 
Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3Lashis gele rc ws tank 500m3
Lashis gele rc ws tank 500m3
 
Ghadames project, minor structures
Ghadames project, minor structuresGhadames project, minor structures
Ghadames project, minor structures
 
Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3Garayan Water Supplying Tank, 300,000m3
Garayan Water Supplying Tank, 300,000m3
 
Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3Debeljaca WS Reservoir 700m3
Debeljaca WS Reservoir 700m3
 
Al Jewaibyah Regulating Tank 70,000m3
Al Jewaibyah Regulating Tank  70,000m3Al Jewaibyah Regulating Tank  70,000m3
Al Jewaibyah Regulating Tank 70,000m3
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsmeharikiros2
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...ssuserdfc773
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 

Recently uploaded (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 

Derventa, Water Supply Project

  • 1.
  • 2.  Rehabilitation of the UrbanWater Supply & Sanitation in Sava River Basin (BMZ ID 2002 65 876)  Project Scope – due to frequent pipe bursting and significant water loss a replacement of existing asbestos cement and zinc Pipelines has been defined through 7nr priority sectors / zones:  Lot A1 - a part of the existing asbestos cement pressure transmission main, which conveys the water from the well field “Korace” to the reservoir “Bijelo Brdo”, was to be replaced.  Lot A2 - two sections of the asbestos cement gravity transmission main, which conveys water from the reservoir “Bijelo Brdo” to the reservoir “Babino Brdo” was to be replaced.  Lot A3 - The gravity asbestos cement transmission main, which conveys water from the reservoir Babino Brdo“ to the reservoir „Gakovac”, shall be partly replaced. The other gravity asbestos cement transmission main, which delivers water from the reservoir “Babino Brdo“ to the Water Supply Zone 1 in the city of “Derventa”, was also to be partly replaced.  Lot A4 - the Reservoir “Gakovac”- City Network Feeder Line located in Stevana Nemanje Street was to be replaced.  Lot A5 - a distribution asbestos cement pipes which are located in “Srpske Vojske”street was to be replaced, new house connections installed  Lot A6 – a distribution asbestos cement pipeline in “Stefana Nemanje Street” with belonging house connections were to be replaced.  Lot A7 – The distribution Zinc-pipes which are located in “Radnička street” together with belonging house connections were to be replaced.  Lot A8 – Provision and installation of SCADA System with associated software, equipments, ultrasonic flow meters, pressure reducing valves on critical locations, integration into the SCADA System.  Lot A9 – provision of Water Meters, PE Shafts and associated fittings for Water Utility “Komunalac”  In total - 12,630.52m of DI & PE Pipelines have been installed under the Project, 309nr of house connections, 14nr of supporting concrete manholes. From remaining budget – several pipelines were extended (Lot A3, A5, A6, A7).  Project Budget – 2,000,000.00EUR
  • 3. PROJECT’S SIGN BOARD WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES
  • 4. WS PIPE MATERIAL – DUCTILE IRON “PAM” NATURAL PIPES , TYTON-SIT JOINTS WS PIPE MATERIAL – HDPE100, SDR11-17, PN10, PN16 “PIPELIFE” PIPES
  • 5. LOT A-1 (Transmission Main DI DN300; L = 2.207,80m) A part of the existing asbestos cement pressure transmission main, which conveys the water from the well field “Korace” to the reservoir “Bijelo Brdo”, was to be replaced. Pipe material: DI DN300, PN16 in 2,207.80m Length with 1nr new Mud Outlet Valve Shaft. Considering this previously war- affected area has present mine fields, it was required that demining of pipe route corridor is conducted prior of any construction works.
  • 6. BHMAC DEMINING AREA SAFE DEMINED 20M WIDE PIPE-ROUTE CORRIDOR
  • 7. DI DN300 PIPE MATERIAL DELIVERY WITHIN SAFETY CORRIDOR DI DN300 INSTALLATION
  • 9. PRESSURE TEST AS PER EN805, PIPE ANCHORING
  • 10. MUD OUTLET VALVE MANHOLE
  • 11. MUD OUTLET VALVE MANHOLE
  • 12. LotA2 Transmission main HDPE DN300 Two sections of the asbestos cement gravity transmission main, which conveys water from the reservoir “Bijelo Brdo” to the reservoir “Babino Brdo” was to be replaced. Pipe material: HDPE100, PN10, SDR17, OD315mm, L=843.10m with 2nr House Connections
  • 13.
  • 14. PE PIPE WELDING PRESSURE TESTING – EN805
  • 15. REPLACEMENT OF VALVES, FITTINGS AT EXISTING MUD OUTLET VALVE MANHOLE REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE MANHOLE
  • 16. REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE MANHOLE REPLACEMENT OF AIR VALVE AT EXISTING AIR VALVE MANHOLE
  • 17. LotA3 Transmission Main The gravity asbestos cement transmission main, which conveys water from the reservoir Babino Brdo“ to the reservoir „Gakovac”, shall be partly replaced. The other gravity asbestos cement transmission main, which delivers water from the reservoir “Babino Brdo“ to the Water Supply Zone 1 in the city of “Derventa”, was also to be partly replaced Extension of City Network: Pipe Material: DI DN400, PN16 – L=253m; DI DN300, PN16 – L=485m; HDPE ID315, PN16 – 1,760m; 3nr new Shafts – 2 Mud Outlets, 1nr Air Valves
  • 18. PIPE ROUTE CORRIDOR DEMINED BY BHMAC REGARDLESS, UNEXPLODED MINE ENCOUNTERED DURING TRENCH EXCAVATION WORKS, WORKS ABORTED UNTIL DEMINING COMPLETION
  • 19. DI DN300 PIPE CONNECTION TO RESERVOIR “BABNO BRDO” DOWNSTREAM PIPE ROUTE
  • 20.
  • 21. MUD OUTLET VALVE SHAFTS (DI DN300, DN400) MUD OUTLET VALVE SHAFTS (DI DN300, DN400)
  • 22.
  • 23. DISCHARGE PIPES WITH “FROG FLAP VALVES”
  • 24. AIR VALVE MANHOLE AT DI DN300 AIR VALVE MANHOLE AT DI DN300
  • 25.
  • 26. TRANSITION TO HDPE OD315, PN16 EXTENSION OF TRANSMISSION MAIN HDPE OD315, PN16
  • 27. LotA4 Feeder Line The Reservoir “Gakovac”- City Network Feeder Line located in Stevana Nemanje Street was to be replaced Pipe material: HDPE PN10, PN16: OD315 – L=577m 1nr Air Valve Shaft 1nr Flow Meter Shaft (Lot A8)
  • 28. HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC” WATER RESERVOIR HDPE OD315, PN16 PIPE CONNECTION TO “GAKOVAC” WATER RESERVOIR
  • 29. GRAVITY FEEDER LINE AIR VALVE MANHOLE
  • 30. GRAVITY FEEDER LINE AIR VALVE MANHOLE GRAVITY FEEDER LINE AIR VALVE
  • 31. JOINT FLOW METER MANHOLE FLOW METERS / PART OF SCADA SYSTEM
  • 32. LotA5 Distribution Pipeline The distribution asbestos cement pipes which are located in “Srpske Vojske”street shall be replaced, new house connections installed Distribution Pipeline: HDPE OD180, PN10 – 1,502m; House Connections – 46nr
  • 34.
  • 35. LotA6 Distribution Pipeline Distribution asbestos cement pipeline in “Stefana Nemanje Street” with belonging house connections to be replaced: Pipe material – HDPE PN16: OD125 – 3,224m; OD63-282m; House Connections – 188nr; 2nr new shafts
  • 37. WATER METER PE SHAFTS R=1.0M, H=1.0M (PROVIDED UNDER LOT A9) INSTALLATION OF HOUSE CONNECTION’S WATER METERS
  • 38. PE WATER METER SHAFT
  • 39. TRANSITION FROM OD125 TO OD63MM PIPE
  • 41. PRESSURE REDUCING VALVE SHAFT PRESSURE REDUCING VALVE
  • 42.
  • 43. GREEN AREA HYDRANT COVER COMMISSIONING ON TAKE OVER INSPECTION
  • 44. GREEN AREA GATE VALVES COVER, SURFACE CAPS
  • 45. LotA7 Distribution Pipeline The distribution Zinc-pipes which are located in “Radnička street” together with belonging house connections were to be replaced. Pipe Material -HDPE PN16: OD125 – L=1,022m; OD63 – L=474m; House Connections – 73nr; 1nr Pressure Reducing Valve Shaft
  • 46. PIPE TRENCH EXCAVATION HDPE OD125MM PN16 PIPE LAYING
  • 47. PRESSURE REDUCING VALVE SHAFT-TO-BE PRESSURE REDUCING VALVE SHAFT-TO-BE
  • 48. PRESSURE REDUCINGVALVE SHAFT PRESSURE REDUCING VALVE
  • 49. LotA8 SCADA System SCADA System: Fm-01 PS “Korace”; (Flow Meter) Fm-02 “Lupljanica”; (Flow Meter) Fm-03 “Bilica Vrelo”; (Flow Meter) Fm-04 “Bilica Vrelo”; (Flow Meter) Fm-05 Reservoir “Babino Brdo”; (Flow Meter) Fm-06 Reservoir ”Babino Brdo”, existing shaft; (Flow Meter) Fm-07, 08 Reservoir ”Gakovac”; (Flow Meter) Pr-02 Reservoir “Vrhovi” (Pressure Reducing Valve) SCADA Control Center – PS “Korace” 1nr Buster Pump – PS “Bilica Vrelo” 8nr new shafts constructed
  • 50. LotA8 SCADA System Fm-01 PS “Korace”; (Flow Meter)
  • 51. LotA8 SCADA System Fm-02 PS “Lupljanica”; (Flow Meter)
  • 52. LotA8 SCADA System Fm-03 “Bilica Vrelo”; (Flow Meter)
  • 53. LotA8 SCADA System Fm-04 “Bilica Vrelo”; (Flow Meter)
  • 54. LotA8 SCADA System Fm-05 Reservoir “Babino Brdo” Inlet; (Flow Meter)
  • 55. LotA8 SCADA System Fm-06 Reservoir ”Babino Brdo” Outlet, existing shaft; (Flow Meter)
  • 56. LotA8 SCADA System Fm-07 Reservoir ”Gakovac”; (Flow Meter)
  • 57. LotA8 SCADA System Fm-08, 09 Reservoir ”Gakovac” Inlet / Outlet; (Flow Meter)
  • 58. LotA8 SCADA System Pr-02 Reservoir “Vrhovi” (Pressure Reducing Valve)
  • 59. LotA8 SCADA System 1nr Buster Pump – PS “Bilica Vrelo”
  • 60. LotA9 “Delivery ofWS material” Lot A9 “Delivery of WS material”: Water Meters (Qn = 1.5m³/h, dry type) INSA (1/2“, 3/4", 1“, 5/4“, 6/4“, 2“)– 3,000nr HDPE WM shafts 1.0x1.0m – 500nr Shut-off valves (DN3/4“, 1“, 5/4“, 6/4“, 2“) – 6,000nr Various fittings and valves.