MINPRO 88Kv SUBSTATION (Rustenburg)
Refurbishment of all 6 x 20Mva Transformer and 4 x 88kV line Feeders Bays.
The Scope of Work includes:
Refurbishment all primary and secondary plant.
Construct cable trenches
Construct an Oil holding dam with manholes and pipe works
Refurbish Transformer bay 1 – 6
Refurbish line Feeder Bay 1- 4
Restring whole 88kV Bull Busbar arrangement
WEST 3 STANDBY 44kV SUBSTATION (Carletonville)
New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping
and Stringing of Primary plant; Installation of Protection schemes and Secondary plant.
The Scope of Works includes:
Construct terrace for Substation
Construct cable trenches
Construct Transformer bay’s for 3 10Mva TRFR’s
Refurbish line Feeder Bay 1 & 2
Supply and install new steel supports
Equipping and stringing of primary plant
Supply and install new Substation fence
Install & termination of 100m 95mm²×3 core11kV XLPE HV cable
Install & termination of 600m 630mm² single core 44kV XLPE HV cable
Move 2x 10Mva Transformers to new Transformer Bay’s
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant
EAST 3 FIVE # 132kV SUBSTATION (Carletonville)
Installation in existing Substation work includes ; Installation of Earth mat; Civil work; Steelwork and Equipping and
Stringing of Primary plant for a new 20Mva TRFR.
The Scope of Works includes:
Construct cable trenches
Construct Transformer bay for 1 20Mva TRFR
Install & termination of 20m 95mm²×3 core11kV XLPE HV cable
Supply and install new steel supports
Equipping and stringing of primary plant
WEST WITS 132Kv/44kV DISTRIBUTION SUBSTATION (Carletonville)
Refurbishment of the 132kV and 44kV yard.
Scope of work includes:
Dismantle of all plant and Steel supports 25 x line Feeder Bays
Dismantle all foundations and fences
Installation of earth mat
Civil work including construction of oil holding dam with manholes and pipe works.
Supply and install new steel supports and new fences
Equipping and stringing of primary plant
Restring whole Busbar arrangement that includes all jumpers and droppers with Bus coupler
Refurbish 3 x 80Mva Transformer Bay’s
Supply and install all cable for secondary plant
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant at the Distribution Substations Wes 3 Gold, Hillside, Blyvoor Reduction, Blyvoor Mill and Blyvoor 4# Substation.
DOORNFONTEIN 44kV NETWORK (Carletonville)
Survey, bush clearing, excavation, planting stringing and commissioning of 132kV Staggered vertical single Line & double
line 30km long from WWDS to Doornfontein DS
WITPAN 44kV SUBSTATION (Welkom)
Installation of Protection schemes and Secondary plant.
The Scope of Works includes:
Installation of protection schemes, secondary plant and responsible for commissioning for 2 x 44kV line feeders.
Installation of protection, metering, Bus zone IDF, Telecontrol and AC/DC schemes
ELANDSRAND 132kV SUBSTATION (Carletonville)
Refurbishment of all 3 x Transformer Bays and 3 x132kV Line Feeder Bays.
The Scope of Works includes:
Refurbishment all primary and secondary plant.
Equipping and stringing of primary plant
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant
IMPALA 15# 88kV SUBSTATION (Rustenburg)
Extension of existing 88kV yard for complete construction of 2 x 88kV line feeders
The Scope of Works includes:
Construct terrace for extension of Yard and access road
Supply and install new steel supports
Equipping and stringing of primary plant
Construct cable trenches
Construct 2 x Line Feeder Bays
Extend Coulomb and Beam structure to extend Bull bus bars
Supply and install new Substation fence
IMPALA 16# 88kV SUBSTATION (Rustenburg)
New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping
and Stringing of Primary plant
The Scope of Works includes:
Construct a terrace for the Substation
Civil work includes construction of Oil holding dam with manholes and pipe works.
Build Control room with Battery room.
Construct cable trenches
Construct Transformer bay’s for 3 x 20Mva TRFR’s
Construct 2 x 88kV line Feeder Bay with complete Tubular Bus bar arrangement
Supply and install new Substation fence
Supply and install new steel supports
Equipping and stringing of primary plant
ROAN 132kV SUBSTATION (Hartbeesfontein)
Installation and terminations of 1500m 185mm²×3 core 22kV XLPE and 1000m 150mm²x 3 core 22kV HV cable from
Escom Transformers to customers SF6 switchgear; 20Mva Step-up Transformer
Install and commission new 22kW Switchgear
OTTOSDAL 88kV SUBSTATION (Ottosdal)
Refurbishment of the 20Mva TRFR
Refurbishment all primary and secondary plant.
Construct cable trenches
Construct Transformer bay for 20Mva TRFR
Equipping and stringing of primary plant
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant
AFLEASE MINE (Hartbeesfontein)
Survey and build a 15km bird friendly mink 22kV line. Supply and install tri- link for 800 kV transformers. Survey and build
a 6km staggered vertical mink 22kV line. Supply and install 9 sets of drop out fuse assemblies for cable terminations for
mini-subs
RITCHIE 132Kv SUBSTATION (Kimberley)
Installation of Protection schemes and Secondary plant.
The Scope of Works includes:
Supply and install all cable for secondary plant for a 20Mva Transformer; 2 x 132kV Line Feeder Bays, Tubular Bus bar
arrangement and 4 x 11kV Lines. Installation of protection, metering, Bus zone IDF, Telecontrol and AC/DC schemes
MORULENG 132kV SUBSTATION (Mogwasi)
Installation of Protection schemes and Secondary plant.
The Scope of Works includes:
Supply and install all cable for secondary plant for a 20Mva Transformer; 132kV Line Feeder Bay with PASMOW BRKR
and 2 x 22kV Lines. Installation of protection, metering, IDF, Telecontrol and AC/DC schemes plus all cable work for
secondary plant at Northam Substation.
DWAALBOOM 132Kv SUBSTATION (Dwaalboom)
Upgrade 22kV Network and extend Substation for new 20Mva Transformer
The Scope of Works includes:
Construct a terrace for the Substation extension on 22kV and 132kV side
Build a Battery room.
Construct cable trenches
Civil work including construction of oil holding dam with manholes and pipe works
Construct Transformer bay 2 x 20Mva TRFR’s
Construct complete Tubular Bus bar arrangement
Supply and install new Substation fence
Construct 22kV Busbar structure for 4 x Line feeder bays
Survey and build a 3km Hare 22kV line to reroute existing network
Refurbish 11kv meter panels of customers.
BRITS MUNIC 88kV SUBSTATION (Brits)
Replace all old equipment and 4 x 10Mva Transformers with 3 x 20Mva Transformers
Scope of Works include:
Refurbishment all primary and secondary plant.
Construct cable trenches
Construct an Oil holding dam with manholes and pipe works
Refurbish Transformer bay 1 – 3
Refurbish line Feeder Bay 1- 4
Refurbish the bus section isolators and restring jumpers
Equipping and stringing of primary plant
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant
KROONDAL 88Kv SUBSTATION (Rustenburg)
New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping
and Stringing of Primary plant
The Scope of Works includes:
Construct a terrace for the Substation
Build Control room with Battery room.
Construct cable trenches
Construct Transformer bay’s for 2 x 10Mva TRFR’s
Construct 1 x line Feeder Bay with complete Tubular Bus bar arrangement
Supply and install new Substation fence
Install & termination of 30m 95mm²×3 core11kV XLPE HV cable
LELOKO 88kV SUBSTATION (Hartbeespoortdam)
New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping
and Stringing of Primary plant. Install Protection schemes and Secondary plant.
The Scope of Works includes:
Construct a terrace and access road for the Substation
Civil work including construction of Oil holding dam with manholes and pipe works.
Building of control room
Construct cable trenches
Construct Transformer bay’s for 2 x 20Mva TRFR’s
Construct 2 x 88kV line Feeder Bay with complete Tubular Bus bar arrangement
Supply and install new Substation fence
Construct 22kV Bus bar structure for 6 x Line feeder bays
Embankment protection complete with berm and V-drain
Supply and install all cable for secondary plant
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant
Installation of protection and AC/DC schemes plus all cable work for secondary plant for 2×88kV Line Feeder Bays at
Lefco and Skeerpoort Substation.
MOEDWIL SUBSTATION (Swartruggens)
New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping
and Stringing of Primary plant. Installation of Protection schemes and Secondary plant.
The Scope of Works includes:
Construct a terrace and access road for the Substation
Civil work includes construction of Oil holding dam with manholes and pipe works.
Building of control room
Construct cable trenches
Construct Transformer bay’s for 2 x 20Mva TRFR’s
Construct 3 x 88kV line Feeder Bay with complete Tubular Bus bar arrangement
Supply and install new Substation fence
Construct 22kV Busbar structure for 6 x Line feeder bays
Embankment protection complete with berm and V-drains
Supply and install all cable for secondary plant
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant
IMPOFU 88kV SUBSTATION (Rustenburg)
New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping
and Stringing of Primary plant
The Scope of Works includes:
Construct a terrace for the Substation with access road to Substation.
Build a Control room with Battery room.
Construct cable trenches
Construct Transformer bay’s for 4 x 40Mva TRFR’s
Construct 3 x line Feeder Bay with complete Tubular Bus bar arrangement with Bus coupler
Supply and install new Substation fence
Civil work including construction of oil holding dam with manholes and pipe works
Embankment protection complete with berm and V-drains
SPRUITFONTEIN SUBSTATION (Rustenburg)
Extension of existing 88kV yard for complete construction of 2 x 88kV line feeders for Rustmo 1 1MWatt Solar farm
The Scope of Works includes:
Supply and install all cable for secondary plant
Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary
plant
Construct a 88kV line Feeder Bay with complete Tubular Bus bar arrangement
BENONI INDUSTRIAL SUBSTATION (Benoni)
Upgrade 44kV Network and extend Substation for 4 new 40Mva Transformers
The Scope of Works includes:
Construct a terrace for the Substation extension on 44kV side
Building of 44kV Control room and 3 x 11kV Switch rooms
Construct cable trenches
Civil work including construction of oil holding dam with manholes and pipe works
Construct Transformer bay 4 x 40Mva TRFR’s
Supply and install new Substation fence
Construct 44kV Bus bar structure for 4 x Line feeder bays
LEHAE 88kV SUBSTATION (Lenasia)
New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work;
The Scope of Works includes:
Construct a terrace for the Substation with access road to Substation.
Building of Control room, Battery room, Generator room, 4x Switch rooms and Ripple room
Construct cable trenches, V-drains and Subsoil drain
Construct Transformer bay’s for 4 x 40Mva TRFR’s
Construct 2 x line Feeder Bay with complete Tubular Bus bar arrangement with Bus coupler for Eskom side as well with
Eskom control room
Civil work including construction of oil holding dam with manholes and pipe works
Construct concrete ramps for access between different terraces inside Substation
Construct a retaining wall and complete embankment protection inside and outside Substation

More Related Content

Similar to hendrik cv 3

Compliance Contracting Brochure
Compliance Contracting Brochure Compliance Contracting Brochure
Compliance Contracting Brochure Paul Wagner
 
New Persentation
New PersentationNew Persentation
New PersentationTarek Fagal
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerReza Shah Abadi
 
Prefabricated Transformer Substations
Prefabricated Transformer SubstationsPrefabricated Transformer Substations
Prefabricated Transformer SubstationsOrmazabal
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREPremanandDesai
 
Hydro Experiences
Hydro ExperiencesHydro Experiences
Hydro ExperiencesAli Akal
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
underground-electric-transmission-10286-u0Te1O1.pdf
underground-electric-transmission-10286-u0Te1O1.pdfunderground-electric-transmission-10286-u0Te1O1.pdf
underground-electric-transmission-10286-u0Te1O1.pdfSatyajeetSahoo33
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACAravind Panasa
 

Similar to hendrik cv 3 (20)

E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
Compliance Contracting Brochure
Compliance Contracting Brochure Compliance Contracting Brochure
Compliance Contracting Brochure
 
Hesham Saafan C.V.1
Hesham Saafan C.V.1Hesham Saafan C.V.1
Hesham Saafan C.V.1
 
New Persentation
New PersentationNew Persentation
New Persentation
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Project List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical EnginnerProject List 1.3-May21,16- Substation Electrical Enginner
Project List 1.3-May21,16- Substation Electrical Enginner
 
Prefabricated Transformer Substations
Prefabricated Transformer SubstationsPrefabricated Transformer Substations
Prefabricated Transformer Substations
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
 
Hydro Experiences
Hydro ExperiencesHydro Experiences
Hydro Experiences
 
tanajib
tanajibtanajib
tanajib
 
Project report
Project reportProject report
Project report
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
underground-electric-transmission-10286-u0Te1O1.pdf
underground-electric-transmission-10286-u0Te1O1.pdfunderground-electric-transmission-10286-u0Te1O1.pdf
underground-electric-transmission-10286-u0Te1O1.pdf
 
presentation (1)
presentation (1)presentation (1)
presentation (1)
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
 

hendrik cv 3

  • 1. EXPERIENCE MINPRO 88Kv SUBSTATION (Rustenburg) Refurbishment of all 6 x 20Mva Transformer and 4 x 88kV line Feeders Bays. The Scope of Work includes: Refurbishment all primary and secondary plant. Construct cable trenches Construct an Oil holding dam with manholes and pipe works Refurbish Transformer bay 1 – 6 Refurbish line Feeder Bay 1- 4 Restring whole 88kV Bull Busbar arrangement WEST 3 STANDBY 44kV SUBSTATION (Carletonville) New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping and Stringing of Primary plant; Installation of Protection schemes and Secondary plant. The Scope of Works includes: Construct terrace for Substation Construct cable trenches Construct Transformer bay’s for 3 10Mva TRFR’s Refurbish line Feeder Bay 1 & 2 Supply and install new steel supports Equipping and stringing of primary plant Supply and install new Substation fence Install & termination of 100m 95mm²×3 core11kV XLPE HV cable Install & termination of 600m 630mm² single core 44kV XLPE HV cable Move 2x 10Mva Transformers to new Transformer Bay’s Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant EAST 3 FIVE # 132kV SUBSTATION (Carletonville) Installation in existing Substation work includes ; Installation of Earth mat; Civil work; Steelwork and Equipping and Stringing of Primary plant for a new 20Mva TRFR. The Scope of Works includes: Construct cable trenches Construct Transformer bay for 1 20Mva TRFR Install & termination of 20m 95mm²×3 core11kV XLPE HV cable Supply and install new steel supports Equipping and stringing of primary plant WEST WITS 132Kv/44kV DISTRIBUTION SUBSTATION (Carletonville) Refurbishment of the 132kV and 44kV yard. Scope of work includes: Dismantle of all plant and Steel supports 25 x line Feeder Bays Dismantle all foundations and fences Installation of earth mat Civil work including construction of oil holding dam with manholes and pipe works. Supply and install new steel supports and new fences Equipping and stringing of primary plant Restring whole Busbar arrangement that includes all jumpers and droppers with Bus coupler Refurbish 3 x 80Mva Transformer Bay’s Supply and install all cable for secondary plant Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant at the Distribution Substations Wes 3 Gold, Hillside, Blyvoor Reduction, Blyvoor Mill and Blyvoor 4# Substation. DOORNFONTEIN 44kV NETWORK (Carletonville) Survey, bush clearing, excavation, planting stringing and commissioning of 132kV Staggered vertical single Line & double line 30km long from WWDS to Doornfontein DS
  • 2. WITPAN 44kV SUBSTATION (Welkom) Installation of Protection schemes and Secondary plant. The Scope of Works includes: Installation of protection schemes, secondary plant and responsible for commissioning for 2 x 44kV line feeders. Installation of protection, metering, Bus zone IDF, Telecontrol and AC/DC schemes ELANDSRAND 132kV SUBSTATION (Carletonville) Refurbishment of all 3 x Transformer Bays and 3 x132kV Line Feeder Bays. The Scope of Works includes: Refurbishment all primary and secondary plant. Equipping and stringing of primary plant Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant IMPALA 15# 88kV SUBSTATION (Rustenburg) Extension of existing 88kV yard for complete construction of 2 x 88kV line feeders The Scope of Works includes: Construct terrace for extension of Yard and access road Supply and install new steel supports Equipping and stringing of primary plant Construct cable trenches Construct 2 x Line Feeder Bays Extend Coulomb and Beam structure to extend Bull bus bars Supply and install new Substation fence IMPALA 16# 88kV SUBSTATION (Rustenburg) New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping and Stringing of Primary plant The Scope of Works includes: Construct a terrace for the Substation Civil work includes construction of Oil holding dam with manholes and pipe works. Build Control room with Battery room. Construct cable trenches Construct Transformer bay’s for 3 x 20Mva TRFR’s Construct 2 x 88kV line Feeder Bay with complete Tubular Bus bar arrangement Supply and install new Substation fence Supply and install new steel supports Equipping and stringing of primary plant ROAN 132kV SUBSTATION (Hartbeesfontein) Installation and terminations of 1500m 185mm²×3 core 22kV XLPE and 1000m 150mm²x 3 core 22kV HV cable from Escom Transformers to customers SF6 switchgear; 20Mva Step-up Transformer Install and commission new 22kW Switchgear OTTOSDAL 88kV SUBSTATION (Ottosdal) Refurbishment of the 20Mva TRFR Refurbishment all primary and secondary plant. Construct cable trenches Construct Transformer bay for 20Mva TRFR Equipping and stringing of primary plant Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant AFLEASE MINE (Hartbeesfontein) Survey and build a 15km bird friendly mink 22kV line. Supply and install tri- link for 800 kV transformers. Survey and build a 6km staggered vertical mink 22kV line. Supply and install 9 sets of drop out fuse assemblies for cable terminations for mini-subs RITCHIE 132Kv SUBSTATION (Kimberley) Installation of Protection schemes and Secondary plant. The Scope of Works includes:
  • 3. Supply and install all cable for secondary plant for a 20Mva Transformer; 2 x 132kV Line Feeder Bays, Tubular Bus bar arrangement and 4 x 11kV Lines. Installation of protection, metering, Bus zone IDF, Telecontrol and AC/DC schemes MORULENG 132kV SUBSTATION (Mogwasi) Installation of Protection schemes and Secondary plant. The Scope of Works includes: Supply and install all cable for secondary plant for a 20Mva Transformer; 132kV Line Feeder Bay with PASMOW BRKR and 2 x 22kV Lines. Installation of protection, metering, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant at Northam Substation. DWAALBOOM 132Kv SUBSTATION (Dwaalboom) Upgrade 22kV Network and extend Substation for new 20Mva Transformer The Scope of Works includes: Construct a terrace for the Substation extension on 22kV and 132kV side Build a Battery room. Construct cable trenches Civil work including construction of oil holding dam with manholes and pipe works Construct Transformer bay 2 x 20Mva TRFR’s Construct complete Tubular Bus bar arrangement Supply and install new Substation fence Construct 22kV Busbar structure for 4 x Line feeder bays Survey and build a 3km Hare 22kV line to reroute existing network Refurbish 11kv meter panels of customers. BRITS MUNIC 88kV SUBSTATION (Brits) Replace all old equipment and 4 x 10Mva Transformers with 3 x 20Mva Transformers Scope of Works include: Refurbishment all primary and secondary plant. Construct cable trenches Construct an Oil holding dam with manholes and pipe works Refurbish Transformer bay 1 – 3 Refurbish line Feeder Bay 1- 4 Refurbish the bus section isolators and restring jumpers Equipping and stringing of primary plant Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant KROONDAL 88Kv SUBSTATION (Rustenburg) New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping and Stringing of Primary plant The Scope of Works includes: Construct a terrace for the Substation Build Control room with Battery room. Construct cable trenches Construct Transformer bay’s for 2 x 10Mva TRFR’s Construct 1 x line Feeder Bay with complete Tubular Bus bar arrangement Supply and install new Substation fence Install & termination of 30m 95mm²×3 core11kV XLPE HV cable LELOKO 88kV SUBSTATION (Hartbeespoortdam) New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping and Stringing of Primary plant. Install Protection schemes and Secondary plant. The Scope of Works includes: Construct a terrace and access road for the Substation Civil work including construction of Oil holding dam with manholes and pipe works. Building of control room Construct cable trenches Construct Transformer bay’s for 2 x 20Mva TRFR’s Construct 2 x 88kV line Feeder Bay with complete Tubular Bus bar arrangement Supply and install new Substation fence Construct 22kV Bus bar structure for 6 x Line feeder bays Embankment protection complete with berm and V-drain
  • 4. Supply and install all cable for secondary plant Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant Installation of protection and AC/DC schemes plus all cable work for secondary plant for 2×88kV Line Feeder Bays at Lefco and Skeerpoort Substation. MOEDWIL SUBSTATION (Swartruggens) New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping and Stringing of Primary plant. Installation of Protection schemes and Secondary plant. The Scope of Works includes: Construct a terrace and access road for the Substation Civil work includes construction of Oil holding dam with manholes and pipe works. Building of control room Construct cable trenches Construct Transformer bay’s for 2 x 20Mva TRFR’s Construct 3 x 88kV line Feeder Bay with complete Tubular Bus bar arrangement Supply and install new Substation fence Construct 22kV Busbar structure for 6 x Line feeder bays Embankment protection complete with berm and V-drains Supply and install all cable for secondary plant Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant IMPOFU 88kV SUBSTATION (Rustenburg) New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; Steelwork Equipping and Stringing of Primary plant The Scope of Works includes: Construct a terrace for the Substation with access road to Substation. Build a Control room with Battery room. Construct cable trenches Construct Transformer bay’s for 4 x 40Mva TRFR’s Construct 3 x line Feeder Bay with complete Tubular Bus bar arrangement with Bus coupler Supply and install new Substation fence Civil work including construction of oil holding dam with manholes and pipe works Embankment protection complete with berm and V-drains SPRUITFONTEIN SUBSTATION (Rustenburg) Extension of existing 88kV yard for complete construction of 2 x 88kV line feeders for Rustmo 1 1MWatt Solar farm The Scope of Works includes: Supply and install all cable for secondary plant Installation of protection, metering, Bus zone, IDF, Telecontrol and AC/DC schemes plus all cable work for secondary plant Construct a 88kV line Feeder Bay with complete Tubular Bus bar arrangement BENONI INDUSTRIAL SUBSTATION (Benoni) Upgrade 44kV Network and extend Substation for 4 new 40Mva Transformers The Scope of Works includes: Construct a terrace for the Substation extension on 44kV side Building of 44kV Control room and 3 x 11kV Switch rooms Construct cable trenches Civil work including construction of oil holding dam with manholes and pipe works Construct Transformer bay 4 x 40Mva TRFR’s Supply and install new Substation fence Construct 44kV Bus bar structure for 4 x Line feeder bays LEHAE 88kV SUBSTATION (Lenasia) New substation a turnkey operation that includes all Earthworks; Installation of Earth mat; Civil work; The Scope of Works includes: Construct a terrace for the Substation with access road to Substation. Building of Control room, Battery room, Generator room, 4x Switch rooms and Ripple room Construct cable trenches, V-drains and Subsoil drain Construct Transformer bay’s for 4 x 40Mva TRFR’s
  • 5. Construct 2 x line Feeder Bay with complete Tubular Bus bar arrangement with Bus coupler for Eskom side as well with Eskom control room Civil work including construction of oil holding dam with manholes and pipe works Construct concrete ramps for access between different terraces inside Substation Construct a retaining wall and complete embankment protection inside and outside Substation