WHAT IS MICROSOFT EXCEL ?
 Microsoft Excel is a spreadsheet program used to record and analyze numerical and
statistical data.
 Microsoft Excel provides multiple features to perform various operations like calculations,
pivot tables, graph tools, macro programming, etc.
 A Excel spreadsheet can be understood as a collection of columns and rows that form a
table.
 The point where a column and a row meet is called a cell.
 The address of a cell is given by the letter representing the column and the number
representing a row.
USES OF MICROSOFT EXCEL
Education
 Use of table styles, shapes, charts, data tools, and formulas in the classrooms. And it provides a visual
representation of data.
Business
 The business can use MS Excel to perform goal setting, budgeting process, and planning, etc. also
Financial services and financial accounting are the areas of finance that rely on and benefit from
Excel spreadsheets the most.
Goal Setting and Planning
 MS Excel provides a wide range of templates which can be used for organizational as well as
personal goal setting and planning.
Business Owners
 Excel allows Entrepreneur to store any data from accounts, to merchandise, to phone numbers and
view and track it in an organized manner.
Housewives
 The Housewives can manage their daily house expenses which can track the spending habit of each
member of the house.
Data Analysis And Data Science
 Excel Offers The data Analysis function which is quite handy for the data analyst to Understand
the data.
Daily Progress Report
 Excel is also helpful in creating a daily progress report, Especially in project- based companies
whether the clients need a weekly, monthly, report from the company.
Career Development
 The task such as learning management ,time management, work & life management and goal
focused habits are important which can be efficiently practiced on MS-Excel.
Data Security
 All the files of MS- Excel can be kept password protected through visual basic programming or directly
within the excel file.
WHAT IS FUNCTION IN EXCEL ?
A function is a predefined formula that performs calculations using specific values in a particular order.
Function is used for quick tasks like finding the summation of a range of numbers, counting the number of items in a
given range, etc.
Let's look at some of the 5 most commonly statistical functions :
Steps to Open the Function in Excel
 You can simply enter the desired formula in the required cell to attain a return value on the
argument.
 You can manually open the formula dialogue box in the spreadsheet and enter the values to attain
a return value.
 To open the from Function library - go to the Formula →More Functions →Statistical
→ then choose the desired formula we want.
 Also you can find some formulas in bar under sheet tab bar
SUM FUNCTION
 SUM: This function adds all of the values of the cells in the argument.
 FORMULA : =SUM(number1,[number2],…..)
Sum will be
Average will be
AVERAGE FUNCTION
 AVERAGE: This function determines the average of the value included in the
argument
 FORMULA : =AVERAGE(number1,[number2],…..)
MAX FUNCTION
 FORMULA : =MAX(number1,[number2],…..)
 MAX: This function determines the highest cell value included in the argument
Maximum will be
MIN FUNCTION
 FORMULA : =MIN(number1,[number2],…..)
 MIN: This function determines the lowest cell value included in the argument
Minimum will be
COUNT FUNCTION
 FORMULA : =COUNT(value1,[value2],…..)
 COUNT : This function counts the number of cell with numerical data in the
argument. This function is useful for quickly counting items in cell range
Count will be
Ms Excel- Its uses & Functions.pptx

More Related Content

What's hot (20)

Introduction to MS excel
Introduction to MS excelIntroduction to MS excel
Introduction to MS excel
 
Basic Ms excel
Basic Ms excelBasic Ms excel
Basic Ms excel
 
Ms excel
Ms excelMs excel
Ms excel
 
Ppt on ms excel
Ppt on ms excelPpt on ms excel
Ppt on ms excel
 
MS Excel Basics
 MS Excel Basics MS Excel Basics
MS Excel Basics
 
MS EXCEL
MS EXCELMS EXCEL
MS EXCEL
 
Formula in MS Excel
Formula in MS ExcelFormula in MS Excel
Formula in MS Excel
 
Ms Excel Basic to Advance Tutorial
Ms Excel Basic to Advance TutorialMs Excel Basic to Advance Tutorial
Ms Excel Basic to Advance Tutorial
 
M.S EXCEL
M.S EXCELM.S EXCEL
M.S EXCEL
 
Basic Excel PPT Presentation.pptx
Basic Excel PPT Presentation.pptxBasic Excel PPT Presentation.pptx
Basic Excel PPT Presentation.pptx
 
Teaching Excel
Teaching ExcelTeaching Excel
Teaching Excel
 
Ms word 2010
Ms word 2010Ms word 2010
Ms word 2010
 
Microsoft Office Introduction
Microsoft Office IntroductionMicrosoft Office Introduction
Microsoft Office Introduction
 
Ms excel ppt presentation
Ms excel ppt presentationMs excel ppt presentation
Ms excel ppt presentation
 
03 Excel formulas and functions
03 Excel formulas and functions03 Excel formulas and functions
03 Excel formulas and functions
 
Introduction to Excel
Introduction to ExcelIntroduction to Excel
Introduction to Excel
 
Excel ppt
Excel pptExcel ppt
Excel ppt
 
Ms excel
Ms excelMs excel
Ms excel
 
Excel Tutorial
Excel TutorialExcel Tutorial
Excel Tutorial
 
MS Excel 2nd
MS Excel 2ndMS Excel 2nd
MS Excel 2nd
 

Similar to Ms Excel- Its uses & Functions.pptx

EXCELimportance.pptx
EXCELimportance.pptxEXCELimportance.pptx
EXCELimportance.pptx
AnuvaHaq
 
Ms excel and it’s function
Ms excel and it’s functionMs excel and it’s function
Ms excel and it’s function
sneha94
 
Starting with Microsoft Excel
Starting with Microsoft ExcelStarting with Microsoft Excel
Starting with Microsoft Excel
devilnotefma13
 

Similar to Ms Excel- Its uses & Functions.pptx (20)

Lesson 6.pptx
Lesson 6.pptxLesson 6.pptx
Lesson 6.pptx
 
EXCELimportance.pptx
EXCELimportance.pptxEXCELimportance.pptx
EXCELimportance.pptx
 
ADVANCED EXCEL COURSE IN LAXMI NAGAR
ADVANCED EXCEL COURSE IN LAXMI NAGARADVANCED EXCEL COURSE IN LAXMI NAGAR
ADVANCED EXCEL COURSE IN LAXMI NAGAR
 
Top uses of microsoft excel
Top uses of microsoft excelTop uses of microsoft excel
Top uses of microsoft excel
 
Mastering Microsoft Excel: Attitude Academy’s MS Excel Classes in Yamuna V...
   Mastering Microsoft Excel: Attitude Academy’s MS Excel Classes in Yamuna V...   Mastering Microsoft Excel: Attitude Academy’s MS Excel Classes in Yamuna V...
Mastering Microsoft Excel: Attitude Academy’s MS Excel Classes in Yamuna V...
 
Excel and Advanced Excel Training in Noida.pptx
Excel and Advanced Excel Training in Noida.pptxExcel and Advanced Excel Training in Noida.pptx
Excel and Advanced Excel Training in Noida.pptx
 
gaurav.docx
gaurav.docxgaurav.docx
gaurav.docx
 
Excel-Essentials-A-Practical-Approach-to-Mastering-Spreadsheet-Management
Excel-Essentials-A-Practical-Approach-to-Mastering-Spreadsheet-ManagementExcel-Essentials-A-Practical-Approach-to-Mastering-Spreadsheet-Management
Excel-Essentials-A-Practical-Approach-to-Mastering-Spreadsheet-Management
 
A Presentation on Spreadsheet
A Presentation on SpreadsheetA Presentation on Spreadsheet
A Presentation on Spreadsheet
 
MS Office Automation
MS Office AutomationMS Office Automation
MS Office Automation
 
Microsoft Excel 101: What you must know
Microsoft Excel 101: What you must knowMicrosoft Excel 101: What you must know
Microsoft Excel 101: What you must know
 
Advanced Excel Demo
Advanced Excel DemoAdvanced Excel Demo
Advanced Excel Demo
 
Windows, MS office.pptx
Windows, MS office.pptxWindows, MS office.pptx
Windows, MS office.pptx
 
08 ms excel
08 ms excel08 ms excel
08 ms excel
 
Windows, MS office.pptx
Windows, MS office.pptxWindows, MS office.pptx
Windows, MS office.pptx
 
Ms excel and it’s function
Ms excel and it’s functionMs excel and it’s function
Ms excel and it’s function
 
microsoftoffice-introduction-200729052822.pdf
microsoftoffice-introduction-200729052822.pdfmicrosoftoffice-introduction-200729052822.pdf
microsoftoffice-introduction-200729052822.pdf
 
What Is Excel.docx
What Is Excel.docxWhat Is Excel.docx
What Is Excel.docx
 
Starting with Microsoft Excel
Starting with Microsoft ExcelStarting with Microsoft Excel
Starting with Microsoft Excel
 
Data Analytics Using MS Excel
Data Analytics Using MS ExcelData Analytics Using MS Excel
Data Analytics Using MS Excel
 

More from Vishal Doke

More from Vishal Doke (12)

Credit Risk Management on Bank of Baroda.docx
Credit Risk Management on Bank of Baroda.docxCredit Risk Management on Bank of Baroda.docx
Credit Risk Management on Bank of Baroda.docx
 
PESTLE & Country Risk Argentina.pptx
PESTLE & Country Risk Argentina.pptxPESTLE & Country Risk Argentina.pptx
PESTLE & Country Risk Argentina.pptx
 
Credit Rating Agencies.pptx
Credit Rating Agencies.pptxCredit Rating Agencies.pptx
Credit Rating Agencies.pptx
 
Option Strategy.pptx
Option Strategy.pptxOption Strategy.pptx
Option Strategy.pptx
 
Vodafone tax case.pptx
Vodafone tax case.pptxVodafone tax case.pptx
Vodafone tax case.pptx
 
STRATEGIES USED BY BRAND to change the attitude of consumers towards it.pptx
STRATEGIES USED BY BRAND to change the attitude of consumers towards it.pptxSTRATEGIES USED BY BRAND to change the attitude of consumers towards it.pptx
STRATEGIES USED BY BRAND to change the attitude of consumers towards it.pptx
 
Ratio Analysis of IPCA Laboratories.pptx
Ratio Analysis of IPCA Laboratories.pptxRatio Analysis of IPCA Laboratories.pptx
Ratio Analysis of IPCA Laboratories.pptx
 
NPA in Banking Sector.pptx
NPA in Banking Sector.pptxNPA in Banking Sector.pptx
NPA in Banking Sector.pptx
 
T Test Presentation.pptx
T Test Presentation.pptxT Test Presentation.pptx
T Test Presentation.pptx
 
Leadership Lessons from Mr. Ratan Tata Main - Copy.pptx
Leadership Lessons from Mr. Ratan Tata Main - Copy.pptxLeadership Lessons from Mr. Ratan Tata Main - Copy.pptx
Leadership Lessons from Mr. Ratan Tata Main - Copy.pptx
 
Trade war USA VS china.pptx
Trade war USA VS china.pptxTrade war USA VS china.pptx
Trade war USA VS china.pptx
 
Accounting Standards 21-30.pptx
Accounting Standards 21-30.pptxAccounting Standards 21-30.pptx
Accounting Standards 21-30.pptx
 

Recently uploaded

Recently uploaded (20)

How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
B.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdfB.ed spl. HI pdusu exam paper-2023-24.pdf
B.ed spl. HI pdusu exam paper-2023-24.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 

Ms Excel- Its uses & Functions.pptx

  • 1.
  • 2. VPM’s Dr V N Bedekar Institute of Management Studies Sandeep Moghe smoghe@vpmthane.org Switch Account
  • 3. Microsoft Excel Presentation By – P11 Doke Vishal Vijay P13 Gaikwad Tejas Ashok P15 Gawade Anjali Arun P17 Gawas Sanket Harishchandra P19 Ghosalkar Swarali Chandrashekhar
  • 4. WHAT IS MICROSOFT EXCEL ?  Microsoft Excel is a spreadsheet program used to record and analyze numerical and statistical data.  Microsoft Excel provides multiple features to perform various operations like calculations, pivot tables, graph tools, macro programming, etc.  A Excel spreadsheet can be understood as a collection of columns and rows that form a table.  The point where a column and a row meet is called a cell.  The address of a cell is given by the letter representing the column and the number representing a row.
  • 5. USES OF MICROSOFT EXCEL Education  Use of table styles, shapes, charts, data tools, and formulas in the classrooms. And it provides a visual representation of data. Business  The business can use MS Excel to perform goal setting, budgeting process, and planning, etc. also Financial services and financial accounting are the areas of finance that rely on and benefit from Excel spreadsheets the most. Goal Setting and Planning  MS Excel provides a wide range of templates which can be used for organizational as well as personal goal setting and planning.
  • 6. Business Owners  Excel allows Entrepreneur to store any data from accounts, to merchandise, to phone numbers and view and track it in an organized manner. Housewives  The Housewives can manage their daily house expenses which can track the spending habit of each member of the house. Data Analysis And Data Science  Excel Offers The data Analysis function which is quite handy for the data analyst to Understand the data.
  • 7. Daily Progress Report  Excel is also helpful in creating a daily progress report, Especially in project- based companies whether the clients need a weekly, monthly, report from the company. Career Development  The task such as learning management ,time management, work & life management and goal focused habits are important which can be efficiently practiced on MS-Excel. Data Security  All the files of MS- Excel can be kept password protected through visual basic programming or directly within the excel file.
  • 8. WHAT IS FUNCTION IN EXCEL ? A function is a predefined formula that performs calculations using specific values in a particular order. Function is used for quick tasks like finding the summation of a range of numbers, counting the number of items in a given range, etc. Let's look at some of the 5 most commonly statistical functions :
  • 9. Steps to Open the Function in Excel  You can simply enter the desired formula in the required cell to attain a return value on the argument.  You can manually open the formula dialogue box in the spreadsheet and enter the values to attain a return value.  To open the from Function library - go to the Formula →More Functions →Statistical → then choose the desired formula we want.  Also you can find some formulas in bar under sheet tab bar
  • 10. SUM FUNCTION  SUM: This function adds all of the values of the cells in the argument.  FORMULA : =SUM(number1,[number2],…..) Sum will be
  • 11. Average will be AVERAGE FUNCTION  AVERAGE: This function determines the average of the value included in the argument  FORMULA : =AVERAGE(number1,[number2],…..)
  • 12. MAX FUNCTION  FORMULA : =MAX(number1,[number2],…..)  MAX: This function determines the highest cell value included in the argument Maximum will be
  • 13. MIN FUNCTION  FORMULA : =MIN(number1,[number2],…..)  MIN: This function determines the lowest cell value included in the argument Minimum will be
  • 14. COUNT FUNCTION  FORMULA : =COUNT(value1,[value2],…..)  COUNT : This function counts the number of cell with numerical data in the argument. This function is useful for quickly counting items in cell range Count will be