SlideShare a Scribd company logo
1 of 4
Download to read offline
Mohamed Abdelaziz
Project Manager,
Kuwait cell: +965 97 60 44 00
Egypt Roaming: +2 010 00 38 27 27
moh.you99@yahoo.com
Egyptian, D.O.B 31-10-1981, Married, Have two children
I EDUCATION
Bachelor degree in Civil Engineering –
Faculty of Engineering, HTI, EGY – 2004
Career Development Courses:
ď‚· IPMA. 2011
ď‚· Internal Auditor. 2011
ď‚· Quality management system regarding ISO 9001:2008 requirement 2011.
ď‚· Project Manager Professional (PMP). 2005
I MEMBERSHIPS
ď‚· Member , Engineers Syndicate , Egypt (2004)
I AREA OF EXPERTISE
ď‚· Strategic Planning & Strategy Execution.
ď‚· Projects, Operations, Contracts and Claims Management.
ď‚· Design and Build Contracts, Handing over & Contract Closeout.
 Trouble Shooter for building’s technical and commercial problems.
ď‚· Quality Management & Familiar with Data Management systems using Deltek,
Newforma, HR.net and Aconex.
I KEY EXPERIENCE AND BACKGROUND
Civil Engineer with 12 years’ experience in Construction, Supervision and Management of fast track,
multi-disciplined, multiple packages Projects in Kuwait, Oman, Kingdom of Saudi Arabia, and Egypt
built according to American & Egyptian codes and standards comprising Commercial and residential
buildings, shopping centers, five star hotels, Schools and industrial Projects, With Proven Skills in
achieving specified objectives/goals, as per Company Mission for greater of business margin, with
High level of interpersonal and communication skills, , Highly energetic, not afraid to take up new
tasks, always eager to accept new challenges. Keen to meet deadlines, Self-motivated, hard worker
and strong work ethics.
I PROFESSIONAL HISTORY
Dar SSH International Engineering Consultants, Kuwait
Dec 2013 - Till date Project Manager.
Al Tawbad General Trading & Contracting Co., Kuwait
Apr 2013 - Dec 2013 Planning and Projects Management
Dar DAMEC Engineering Consultant, Kuwait
May 2012 - Apr 2013 Planning and Projects Management
Redcon Construction Company, Egypt
Apr 2011 - Feb 2012 Projects Management, Closeout Team Leader & Quality Manager
Jun 2010 - Apr 2011 Planning & Project Management
Jul 2009 - Jun 2010 Construction Manager
Jul 2008 - Feb 2009 Planner
Apr 2008 - Jul 2008 Assistant Project Manager.
Jul 2007 – Apr 2008 Site Manager
Oct 2004 – Jun 2006 Site Engineer
WARA Construction Company, Salalah - Oman
Feb 2009 - Jun 2009 Assistant planning Manager
KTC; K.S.A, Yanbu
Jul 2006 – Jun 2007 Site Engineer
I PROJECT SUMMARY
Dar SSH International Engineering Consultants, Kuwait
Dec 2013 – Till Date Project Manager.
Project Manager “in house” managing three Design and Build Mega projects with
construction value exceeds US$ 4.5 billion, responsible for all commercial
issues and project's management aspects, Identify and implement best practices
to drive team performance and managing a multi-disciplinary team of designers
across all disciplines of managers / seniors / engineers and operators by
facilitating the coordination amongst all concerned in the technical and design
teams, as well as providing advice and support through the design review process
from inception through completion in order to ensure efficient delivery in line with
client’s and statutory requirements to meet deadlines, Support in preparing and
reviewing all technical correspondence to relevant parties to ensure clarity and
efficiency; Assisting in carrying out analysis and forecasts on manpower
utilization, chargeability and recommending necessary strategies to ensure high
efficiency, Collecting contract related documents for proper tracking, and ensuring
efficient circulation to all concerned, Supports in ensuring ongoing compliance
with contractual requirements during project life cycle, Ensures to build strong
relationships as well as client satisfaction through project, Ensures all project key
parameters and data are available and updated for proper reference or decision
making, Further, involved in our Management services at Bahrain and confers
across regions, divisions and Territories to coordinate work and resolve matters.
Projects:
- Sheikh Jaber Al-Ahmad Al-Sabah Causeway project - Main Link & Doha Link:
Owner: MPW
Consultant: Consortium of Dar AL Handasah, SSH and T.Y.LIN
Main Link Consortium: Hyundai, Combined Group and the designer SYSTRA
Doha Link Consortium: GS E & C, and the designer’s Tony Gee and Korea
Engineering Consultants Corp.
The project is one of the largest projects to be constructed in the GCC region, The 36
km causeway Main Link extends over the Kuwait bay provides new strategic highway
routes to facilitate planned development to the north of Kuwait City (Subiyah City)
which will help create a new residential area for up to 500,000 inhabitants in the north
side of the country, The project includes the construction of 2 artificial islands and 26
separate building, and the Doha link with 13 KM to entertainment city includes three
buildings.
- Shadadiya Industrial Zone project: SSH is providing full design, engineering and
value engineering services to Mushrif Trading and Contracting Company. The design
and construction of all infrastructure for the Industrial Zone has been awarded on a
design and build basis. The employer for the project is the Public Authority for Industry
(PAI). The site has an area of 5,000,000 m²
Al Tawbad General Trading & Contracting Co., Kuwait
Apr 2013 - Dec 2013 Planning and Projects Management
Responsible for Reviewing and understanding all relevant documents and conditions pertaining
to each project for most of company projects to Develop in conjunction with the Project
Manager and Client a suitable Work Breakdown Structure for the project in order to Prepare
and monitor Construction Schedule to meet the project objectives, Monitoring overall progress
measurement systems covering engineering, procurement, fabrication and construction
progress, Further all aspects of the planning and scheduling among all locations including
staffing, consistent methods/procedures, compliance with the contract, schedule assurance and
team work, Set project goals and objectives for team members, Monthly Updates, 15 days
look-ahead Program, Corrective measures schedules to catch up delays (if any).
Dar DAMEC Engineering Consultant, Kuwait
May 2012 - Apr 2013 Planning and Projects Management
Responsible for Reviewing and understand all relevant documents and conditions pertaining to
all Dar projects, Attend the formal handover from Proposals and Estimating at the start of the
project in accordance with Corporate Procedures, Develop in conjunction with the Client a
suitable Work Breakdown Structure for the project, Establish and agree the level and frequency
of reporting required by the project, Prepare and monitor Construction Schedule, Monthly
Updates, 15 days look-ahead Program, Corrective measures schedules to catch up delays (if
any) Further, contract administration and tendering evaluation. Supervise and develop other
planning and specialist support staff, In charging the Resident Engineer at under construction
Factory for Kuwait Saudi Pharmaceutical Industries Co. at Sabhan for two months.
Redcon Construction Company, Egypt
Apr 2011 - Feb 2012 Projects Management, Closeout Team Leader & Quality Manager
Reporting to: Board & Top Management
Responsible for Company Configuration as a 1st Class construction company with over 500
employees to be ISO 9001:2008 Certified, acting as Quality & Project Manager for upgrading &
Configuration Company Quality Management system to meet ISO 9001:2008 Requirement and
lead Internal Auditor team; Also chair in behalf Management representative along project
consultation life to reach Declaration for certification from certification body, Preparation of the
companies’ Quality Manual and control and supervise all amendments and revisions. Control
distribution of all the company quality documentation, Monitor all quality related activities on the
project and perform all internal and external audits, Verify contractor quality requirements are
specified to vendors and contractor documentation submittals, Preparation and control of
project quality management documentation prior to project commencement, Review quality
inspection personnel qualifications and training requirements, the disposition of all issued
nonconformance reports, Monitor the progress and effectiveness of the project quality
management system. Recommend and implement improvements when required, Coordinate
all QA/QC activities with the site quality personnel, Coordinate all quality related
correspondence with the customer’s representatives, Following up Handing Over Phases for
Multi-Projects, working as closeout team leader for some projects in Hurgadah, Cairo, Sharm
El Sheikh.
Redcon Construction Company, Egypt
Jun 2010 – Apr 2011 Planning & Project Management
National Documents House. Project with total budget of (12.500.000 $./ 84,000,000 L.E.),
responsible for Planning, QC and contract Administration to ensure that Sub Contractors
maintain the highest technical standards in accordance with the conditions of contract and
technical specifications and drawings, Control and monitor overall construction supervision,
inspection, quality control, time and cost control of the project to Ensure Sub Contractor’s
Compliance with Contract documents, Check and approve Contractor's quality Control
Program, Safety Plan and the implementation of QA/QC, and safety Programs, Prepare and
monitor Construction Schedule, Monthly Updates, 45 days look-ahead Program , Corrective
measures schedules to catch up delays (if any), Prepare monthly report for PM & top
management on Construction status, financial status, Engineering Status performance with all
related charts, Critical areas of concern & proposed remedies, QC & Testing, List of Approved
Suppliers/Sub-Contractors, Ensure that the review and approvals of materials and shop
drawings are in accordance with the requirements of the contract documents and in a proper
timing with the schedule, Approval of Mock-ups, Chair regular Bi-Weekly technical coordination
meetings and Bi-Weekly Progress Meetings, Prepare Corrective measures Schedule to catch
up delays if any in coordination with all Trades and reporting Project Management and top
manager in this.
Redcon Construction Company, Egypt
Jul 2009 – Jun 2010 Construction Manager
Securities Administration Building in Smart Village, with total budget of (3.024.000 $ /
21,000,000 L.E.), responsible for Finalizing Project Turn Key Acceptance & ensure contract
close-out requirements are carried out in full; Review and Approve the Final Invoice with
Consultant; Finalize Facades Work (Artificial stone, Structure Glazing, Marble,..); Tiles Work
(Ceramic, Borsalin, Mouzaiko, Sornaga ...); Slab on grade (1800 M²); Cladding Work; Epoxy
Coating for upper & lower Basement.(3200M²).
WARA Construction Company, Salalah - Oman
Feb 2009 - Jun 2009 Assistant Planning Manager
Touristic & Commercial Complex With total budget of (36,358,000 $ / 14.000.000 R.O.),
responsible for Preparing & monitoring Contractor's Construction Schedule. Prepare Monthly
Updates & 45 days look-ahead Program, Reply to all the related correspondence as consultant
NCN, JSI and all queries, Project schedule, follow up &update reports; Allocating Resource &
Cash Flow, the Project is Touristic & Commercial Complex, Salalah, Oman, the Project was US
dollars 160 Million 66,000 m2, comprising of a Hypermarket to be operated By the prominent
Carrefour (over 9000 m2), First Class shopping mall, food courts, cafés (approx. area 27,000
m2), Four star hotel/service apartments (16,000 m2), bowling alley, billiard hall, cinema
complex, theme park, external prayer hall, hotel services apartments, Basement houses public
car park, an electrical substation, services rooms, the hotel kitchen and laundry, storage
spaces, serviced apartments are on first, second and third floors, hotel’s administrative offices
and seating area for food courts, The project comprises 7 bid packages based on fast track.
Redcon Construction Company, Egypt
Jul 2008 – Feb 2009 Planner
Securities Administration Building in Smart Village, with total budget of (3.024.000 $ /
21,000,000 L.E.), responsible for making Project Base line schedule, follow up &update
reports; Allocating Resources and Cash Flow; Claim Estimator; Variation Studying;
Coordination with all trades and Subcontractors.
Redcon Construction Company; Egypt
April 2008 – July 2008 Assistant Project Manager
Misr Glass Manufacturing, Project with total Budged of (10,512,000 $ / 73.000.000L.E.)
with total area of 16600 m. Responsible for Scheduling the project in logical Breakdown
required to meet deadlines, Direct and supervise workers, Requisition supplies and materials to
complete construction projects,.
Jul 2007- April 2008 Site Manager. PYRAMIDS FACTORY & ADMINASTRATION BUILDING
with total budget of (11,520,000 $ / 8.000.000 L.E.)
Responsible for Construction of Sub super Structure, Finalizing for project turnkey acceptance,
Manage the day-to-day working, Take actions to deal with the results of delays, bad weather, or
emergencies at construction site, Confer with supervisory personnel, owners, contractors, and
design professionals to discuss and resolve matters such as work procedures, complaints, and
construction problems, Plan the delivery of the project at hand, Execution for all activities as Slab
on grade (3600 m2); Epoxy coating for manufacturing area (walls & floors 980m2); GUPSUM
BOARD;CLADING WORK; Water & damp proofing; Porcelain tiles (3600 m2);Walls ceramic tiles
(13200 m2); Landscape& Coordination for electromechanical work.
KTC; KSA, Yanbu
Jul 2006 – June 2007 Site Engineer
One Boys Primary, Two Girls Primary, Two Girls Intermediate Schools with Total
budget (17,000,000 $ / 65.000.000 S.R.) with ROYAL COMMISSION for JUBAIL &
YANBU KSA, Responsible for construction Phase
Redcon Construction Company; Egypt
Oct 2004 – July 2006 Site Engineer
Jan 2006 – May 2006 Non-Wove n’s Factory & Factory F1. With total budget of
(1,512,000 $ / 10.500.000 L.E.) Responsible for Construction Phase.
Oct 2004 – Jan 2006 Royal Ceramic &Porcelain Factory Responsible for Construction
of administration building; raw material warehouses; firefighting and chemical treatment
tanks; glaze miles ; power plant and transformers building ; Supervising the installation of
factory steel structure work ; Slab on grade for 22000 m.

More Related Content

What's hot

TPA COMPANY PROFILE - 2016
TPA COMPANY PROFILE - 2016TPA COMPANY PROFILE - 2016
TPA COMPANY PROFILE - 2016RAJEEV ROY
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)S Ajith
 
Resume_P Prakosa 201605
Resume_P Prakosa 201605Resume_P Prakosa 201605
Resume_P Prakosa 201605Pantjoro Prakosa
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CVAlaa Mohan
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.Viad zalaf
 
Amar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmarRahatePatil
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hbeisheh
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Fergani
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineersailesh konduru
 
Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)tarek mohamed ghonaim
 

What's hot (20)

CV
CVCV
CV
 
TPA COMPANY PROFILE - 2016
TPA COMPANY PROFILE - 2016TPA COMPANY PROFILE - 2016
TPA COMPANY PROFILE - 2016
 
Zain Ul Abideen_281116
Zain Ul Abideen_281116Zain Ul Abideen_281116
Zain Ul Abideen_281116
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
peercv- 1
peercv- 1peercv- 1
peercv- 1
 
Resume_P Prakosa 201605
Resume_P Prakosa 201605Resume_P Prakosa 201605
Resume_P Prakosa 201605
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CV
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
 
CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
Amar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmar Rajendra Rahate Resume
Amar Rajendra Rahate Resume
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
 
Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineer
 
Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 

Viewers also liked

CV LAST 02-08-2015 GENERAL
CV LAST 02-08-2015 GENERALCV LAST 02-08-2015 GENERAL
CV LAST 02-08-2015 GENERALMohamed Dawoud
 
Sample Resume Slideshare
Sample Resume SlideshareSample Resume Slideshare
Sample Resume Slidesharesubhash2204
 
GE Reference Letter
GE Reference LetterGE Reference Letter
GE Reference LetterMurat KAYA
 
Hisham Amira final
Hisham Amira finalHisham Amira final
Hisham Amira finalHisham Amira
 
Nadine film & TV CV
Nadine film & TV CVNadine film & TV CV
Nadine film & TV CVNadine Schoen
 
OGBONNA HSE SPECIALIST CV 2015
OGBONNA HSE SPECIALIST CV 2015OGBONNA HSE SPECIALIST CV 2015
OGBONNA HSE SPECIALIST CV 2015chibueze ogbonna
 
Andre Claasen Cv Redone
Andre Claasen Cv RedoneAndre Claasen Cv Redone
Andre Claasen Cv RedoneAndre Claasen
 
Resume mark anthony paloma
Resume   mark anthony palomaResume   mark anthony paloma
Resume mark anthony palomamarkamolap09
 
A Claasen CV Dec 2014
A Claasen CV Dec 2014A Claasen CV Dec 2014
A Claasen CV Dec 2014Andre Claasen
 
kcurtisenergybckgrd.
kcurtisenergybckgrd.kcurtisenergybckgrd.
kcurtisenergybckgrd.Keith Curtis
 
Curriculum Vitae Sample Format
Curriculum Vitae Sample FormatCurriculum Vitae Sample Format
Curriculum Vitae Sample FormatAugustine Ferdinand
 

Viewers also liked (13)

BAKR CV FOR GULF
BAKR CV FOR GULFBAKR CV FOR GULF
BAKR CV FOR GULF
 
CV LAST 02-08-2015 GENERAL
CV LAST 02-08-2015 GENERALCV LAST 02-08-2015 GENERAL
CV LAST 02-08-2015 GENERAL
 
Sample Resume Slideshare
Sample Resume SlideshareSample Resume Slideshare
Sample Resume Slideshare
 
GE Reference Letter
GE Reference LetterGE Reference Letter
GE Reference Letter
 
Hisham Amira final
Hisham Amira finalHisham Amira final
Hisham Amira final
 
Nadine film & TV CV
Nadine film & TV CVNadine film & TV CV
Nadine film & TV CV
 
OGBONNA HSE SPECIALIST CV 2015
OGBONNA HSE SPECIALIST CV 2015OGBONNA HSE SPECIALIST CV 2015
OGBONNA HSE SPECIALIST CV 2015
 
Andre Claasen Cv Redone
Andre Claasen Cv RedoneAndre Claasen Cv Redone
Andre Claasen Cv Redone
 
Resume mark anthony paloma
Resume   mark anthony palomaResume   mark anthony paloma
Resume mark anthony paloma
 
A Claasen CV Dec 2014
A Claasen CV Dec 2014A Claasen CV Dec 2014
A Claasen CV Dec 2014
 
CV - Merrill Richardson
CV - Merrill RichardsonCV - Merrill Richardson
CV - Merrill Richardson
 
kcurtisenergybckgrd.
kcurtisenergybckgrd.kcurtisenergybckgrd.
kcurtisenergybckgrd.
 
Curriculum Vitae Sample Format
Curriculum Vitae Sample FormatCurriculum Vitae Sample Format
Curriculum Vitae Sample Format
 

Similar to Mohamed abdelaziz c.v.

Similar to Mohamed abdelaziz c.v. (20)

Lina Mohamed CV
Lina Mohamed CVLina Mohamed CV
Lina Mohamed CV
 
BIJU DIVAKARAN
BIJU DIVAKARANBIJU DIVAKARAN
BIJU DIVAKARAN
 
CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
CV
CVCV
CV
 
Ahmed Kurdi-CV
Ahmed Kurdi-CVAhmed Kurdi-CV
Ahmed Kurdi-CV
 
NM_CV1
NM_CV1NM_CV1
NM_CV1
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
CV - Jahangeer Raza
CV - Jahangeer RazaCV - Jahangeer Raza
CV - Jahangeer Raza
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
 
CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016CV-Rajkumar 23.11.2016
CV-Rajkumar 23.11.2016
 
Baba TODAI - Resume
Baba TODAI - ResumeBaba TODAI - Resume
Baba TODAI - Resume
 
Haifa Resume
Haifa Resume Haifa Resume
Haifa Resume
 
. Gamal Aboul Hassan
. Gamal Aboul Hassan. Gamal Aboul Hassan
. Gamal Aboul Hassan
 
M.elsayed CV
M.elsayed CVM.elsayed CV
M.elsayed CV
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

Mohamed abdelaziz c.v.

  • 1. Mohamed Abdelaziz Project Manager, Kuwait cell: +965 97 60 44 00 Egypt Roaming: +2 010 00 38 27 27 moh.you99@yahoo.com Egyptian, D.O.B 31-10-1981, Married, Have two children I EDUCATION Bachelor degree in Civil Engineering – Faculty of Engineering, HTI, EGY – 2004 Career Development Courses: ď‚· IPMA. 2011 ď‚· Internal Auditor. 2011 ď‚· Quality management system regarding ISO 9001:2008 requirement 2011. ď‚· Project Manager Professional (PMP). 2005 I MEMBERSHIPS ď‚· Member , Engineers Syndicate , Egypt (2004) I AREA OF EXPERTISE ď‚· Strategic Planning & Strategy Execution. ď‚· Projects, Operations, Contracts and Claims Management. ď‚· Design and Build Contracts, Handing over & Contract Closeout. ď‚· Trouble Shooter for building’s technical and commercial problems. ď‚· Quality Management & Familiar with Data Management systems using Deltek, Newforma, HR.net and Aconex. I KEY EXPERIENCE AND BACKGROUND Civil Engineer with 12 years’ experience in Construction, Supervision and Management of fast track, multi-disciplined, multiple packages Projects in Kuwait, Oman, Kingdom of Saudi Arabia, and Egypt built according to American & Egyptian codes and standards comprising Commercial and residential buildings, shopping centers, five star hotels, Schools and industrial Projects, With Proven Skills in achieving specified objectives/goals, as per Company Mission for greater of business margin, with High level of interpersonal and communication skills, , Highly energetic, not afraid to take up new tasks, always eager to accept new challenges. Keen to meet deadlines, Self-motivated, hard worker and strong work ethics. I PROFESSIONAL HISTORY Dar SSH International Engineering Consultants, Kuwait Dec 2013 - Till date Project Manager. Al Tawbad General Trading & Contracting Co., Kuwait Apr 2013 - Dec 2013 Planning and Projects Management Dar DAMEC Engineering Consultant, Kuwait May 2012 - Apr 2013 Planning and Projects Management Redcon Construction Company, Egypt Apr 2011 - Feb 2012 Projects Management, Closeout Team Leader & Quality Manager Jun 2010 - Apr 2011 Planning & Project Management Jul 2009 - Jun 2010 Construction Manager Jul 2008 - Feb 2009 Planner Apr 2008 - Jul 2008 Assistant Project Manager. Jul 2007 – Apr 2008 Site Manager Oct 2004 – Jun 2006 Site Engineer WARA Construction Company, Salalah - Oman Feb 2009 - Jun 2009 Assistant planning Manager KTC; K.S.A, Yanbu Jul 2006 – Jun 2007 Site Engineer
  • 2. I PROJECT SUMMARY Dar SSH International Engineering Consultants, Kuwait Dec 2013 – Till Date Project Manager. Project Manager “in house” managing three Design and Build Mega projects with construction value exceeds US$ 4.5 billion, responsible for all commercial issues and project's management aspects, Identify and implement best practices to drive team performance and managing a multi-disciplinary team of designers across all disciplines of managers / seniors / engineers and operators by facilitating the coordination amongst all concerned in the technical and design teams, as well as providing advice and support through the design review process from inception through completion in order to ensure efficient delivery in line with client’s and statutory requirements to meet deadlines, Support in preparing and reviewing all technical correspondence to relevant parties to ensure clarity and efficiency; Assisting in carrying out analysis and forecasts on manpower utilization, chargeability and recommending necessary strategies to ensure high efficiency, Collecting contract related documents for proper tracking, and ensuring efficient circulation to all concerned, Supports in ensuring ongoing compliance with contractual requirements during project life cycle, Ensures to build strong relationships as well as client satisfaction through project, Ensures all project key parameters and data are available and updated for proper reference or decision making, Further, involved in our Management services at Bahrain and confers across regions, divisions and Territories to coordinate work and resolve matters. Projects: - Sheikh Jaber Al-Ahmad Al-Sabah Causeway project - Main Link & Doha Link: Owner: MPW Consultant: Consortium of Dar AL Handasah, SSH and T.Y.LIN Main Link Consortium: Hyundai, Combined Group and the designer SYSTRA Doha Link Consortium: GS E & C, and the designer’s Tony Gee and Korea Engineering Consultants Corp. The project is one of the largest projects to be constructed in the GCC region, The 36 km causeway Main Link extends over the Kuwait bay provides new strategic highway routes to facilitate planned development to the north of Kuwait City (Subiyah City) which will help create a new residential area for up to 500,000 inhabitants in the north side of the country, The project includes the construction of 2 artificial islands and 26 separate building, and the Doha link with 13 KM to entertainment city includes three buildings. - Shadadiya Industrial Zone project: SSH is providing full design, engineering and value engineering services to Mushrif Trading and Contracting Company. The design and construction of all infrastructure for the Industrial Zone has been awarded on a design and build basis. The employer for the project is the Public Authority for Industry (PAI). The site has an area of 5,000,000 m² Al Tawbad General Trading & Contracting Co., Kuwait Apr 2013 - Dec 2013 Planning and Projects Management Responsible for Reviewing and understanding all relevant documents and conditions pertaining to each project for most of company projects to Develop in conjunction with the Project Manager and Client a suitable Work Breakdown Structure for the project in order to Prepare and monitor Construction Schedule to meet the project objectives, Monitoring overall progress measurement systems covering engineering, procurement, fabrication and construction progress, Further all aspects of the planning and scheduling among all locations including staffing, consistent methods/procedures, compliance with the contract, schedule assurance and team work, Set project goals and objectives for team members, Monthly Updates, 15 days look-ahead Program, Corrective measures schedules to catch up delays (if any).
  • 3. Dar DAMEC Engineering Consultant, Kuwait May 2012 - Apr 2013 Planning and Projects Management Responsible for Reviewing and understand all relevant documents and conditions pertaining to all Dar projects, Attend the formal handover from Proposals and Estimating at the start of the project in accordance with Corporate Procedures, Develop in conjunction with the Client a suitable Work Breakdown Structure for the project, Establish and agree the level and frequency of reporting required by the project, Prepare and monitor Construction Schedule, Monthly Updates, 15 days look-ahead Program, Corrective measures schedules to catch up delays (if any) Further, contract administration and tendering evaluation. Supervise and develop other planning and specialist support staff, In charging the Resident Engineer at under construction Factory for Kuwait Saudi Pharmaceutical Industries Co. at Sabhan for two months. Redcon Construction Company, Egypt Apr 2011 - Feb 2012 Projects Management, Closeout Team Leader & Quality Manager Reporting to: Board & Top Management Responsible for Company Configuration as a 1st Class construction company with over 500 employees to be ISO 9001:2008 Certified, acting as Quality & Project Manager for upgrading & Configuration Company Quality Management system to meet ISO 9001:2008 Requirement and lead Internal Auditor team; Also chair in behalf Management representative along project consultation life to reach Declaration for certification from certification body, Preparation of the companies’ Quality Manual and control and supervise all amendments and revisions. Control distribution of all the company quality documentation, Monitor all quality related activities on the project and perform all internal and external audits, Verify contractor quality requirements are specified to vendors and contractor documentation submittals, Preparation and control of project quality management documentation prior to project commencement, Review quality inspection personnel qualifications and training requirements, the disposition of all issued nonconformance reports, Monitor the progress and effectiveness of the project quality management system. Recommend and implement improvements when required, Coordinate all QA/QC activities with the site quality personnel, Coordinate all quality related correspondence with the customer’s representatives, Following up Handing Over Phases for Multi-Projects, working as closeout team leader for some projects in Hurgadah, Cairo, Sharm El Sheikh. Redcon Construction Company, Egypt Jun 2010 – Apr 2011 Planning & Project Management National Documents House. Project with total budget of (12.500.000 $./ 84,000,000 L.E.), responsible for Planning, QC and contract Administration to ensure that Sub Contractors maintain the highest technical standards in accordance with the conditions of contract and technical specifications and drawings, Control and monitor overall construction supervision, inspection, quality control, time and cost control of the project to Ensure Sub Contractor’s Compliance with Contract documents, Check and approve Contractor's quality Control Program, Safety Plan and the implementation of QA/QC, and safety Programs, Prepare and monitor Construction Schedule, Monthly Updates, 45 days look-ahead Program , Corrective measures schedules to catch up delays (if any), Prepare monthly report for PM & top management on Construction status, financial status, Engineering Status performance with all related charts, Critical areas of concern & proposed remedies, QC & Testing, List of Approved Suppliers/Sub-Contractors, Ensure that the review and approvals of materials and shop drawings are in accordance with the requirements of the contract documents and in a proper timing with the schedule, Approval of Mock-ups, Chair regular Bi-Weekly technical coordination meetings and Bi-Weekly Progress Meetings, Prepare Corrective measures Schedule to catch up delays if any in coordination with all Trades and reporting Project Management and top manager in this. Redcon Construction Company, Egypt Jul 2009 – Jun 2010 Construction Manager Securities Administration Building in Smart Village, with total budget of (3.024.000 $ / 21,000,000 L.E.), responsible for Finalizing Project Turn Key Acceptance & ensure contract close-out requirements are carried out in full; Review and Approve the Final Invoice with Consultant; Finalize Facades Work (Artificial stone, Structure Glazing, Marble,..); Tiles Work (Ceramic, Borsalin, Mouzaiko, Sornaga ...); Slab on grade (1800 M²); Cladding Work; Epoxy Coating for upper & lower Basement.(3200M²).
  • 4. WARA Construction Company, Salalah - Oman Feb 2009 - Jun 2009 Assistant Planning Manager Touristic & Commercial Complex With total budget of (36,358,000 $ / 14.000.000 R.O.), responsible for Preparing & monitoring Contractor's Construction Schedule. Prepare Monthly Updates & 45 days look-ahead Program, Reply to all the related correspondence as consultant NCN, JSI and all queries, Project schedule, follow up &update reports; Allocating Resource & Cash Flow, the Project is Touristic & Commercial Complex, Salalah, Oman, the Project was US dollars 160 Million 66,000 m2, comprising of a Hypermarket to be operated By the prominent Carrefour (over 9000 m2), First Class shopping mall, food courts, cafĂ©s (approx. area 27,000 m2), Four star hotel/service apartments (16,000 m2), bowling alley, billiard hall, cinema complex, theme park, external prayer hall, hotel services apartments, Basement houses public car park, an electrical substation, services rooms, the hotel kitchen and laundry, storage spaces, serviced apartments are on first, second and third floors, hotel’s administrative offices and seating area for food courts, The project comprises 7 bid packages based on fast track. Redcon Construction Company, Egypt Jul 2008 – Feb 2009 Planner Securities Administration Building in Smart Village, with total budget of (3.024.000 $ / 21,000,000 L.E.), responsible for making Project Base line schedule, follow up &update reports; Allocating Resources and Cash Flow; Claim Estimator; Variation Studying; Coordination with all trades and Subcontractors. Redcon Construction Company; Egypt April 2008 – July 2008 Assistant Project Manager Misr Glass Manufacturing, Project with total Budged of (10,512,000 $ / 73.000.000L.E.) with total area of 16600 m. Responsible for Scheduling the project in logical Breakdown required to meet deadlines, Direct and supervise workers, Requisition supplies and materials to complete construction projects,. Jul 2007- April 2008 Site Manager. PYRAMIDS FACTORY & ADMINASTRATION BUILDING with total budget of (11,520,000 $ / 8.000.000 L.E.) Responsible for Construction of Sub super Structure, Finalizing for project turnkey acceptance, Manage the day-to-day working, Take actions to deal with the results of delays, bad weather, or emergencies at construction site, Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems, Plan the delivery of the project at hand, Execution for all activities as Slab on grade (3600 m2); Epoxy coating for manufacturing area (walls & floors 980m2); GUPSUM BOARD;CLADING WORK; Water & damp proofing; Porcelain tiles (3600 m2);Walls ceramic tiles (13200 m2); Landscape& Coordination for electromechanical work. KTC; KSA, Yanbu Jul 2006 – June 2007 Site Engineer One Boys Primary, Two Girls Primary, Two Girls Intermediate Schools with Total budget (17,000,000 $ / 65.000.000 S.R.) with ROYAL COMMISSION for JUBAIL & YANBU KSA, Responsible for construction Phase Redcon Construction Company; Egypt Oct 2004 – July 2006 Site Engineer Jan 2006 – May 2006 Non-Wove n’s Factory & Factory F1. With total budget of (1,512,000 $ / 10.500.000 L.E.) Responsible for Construction Phase. Oct 2004 – Jan 2006 Royal Ceramic &Porcelain Factory Responsible for Construction of administration building; raw material warehouses; firefighting and chemical treatment tanks; glaze miles ; power plant and transformers building ; Supervising the installation of factory steel structure work ; Slab on grade for 22000 m.