SlideShare a Scribd company logo
1 of 5
Download to read offline
MOHAMED Elsayed
Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com
Mobile: +966.592336933
1
OBJECTIVE
A civil engineer with 8 years of proven track record of supervision and execution, QA/QC of reinforced
concrete heavy civil structures in a variety of environments and infrastructure varies from waste water
treatment plants to pipe lines of different purposes, including successfully delivery of schemes through
the planning process and completion of construction. Seeking a Civil, QA/QC Engineer position with a
progressive organization to amalgamate skills into a synergy of change, growth and profit.
KEY SKILLS
 Construction Plans (Conceptualizing, Designing &Detailing, Engineering, Managing, Surveying).
 Planning & Implementation, Client Development, Target Setting/Achievement.
 Project Testing & Commissioning, Turnkey Commercial Works, Engineering Resources.
 Technology Management, Financial & Resource Management, Contractual & Client Negotiations.
 Costing, Cost Control, Tender Management, Time Management & Manpower Resourcing, Reading Specs and
Codes.
 Communication & Interpersonal Networking, Conflict Resolution, Group Dynamics, Synergy.
 MS Office, MS Operating Systems, SAP 2000, AutoCAD, Codes & ACI certified.
 Materials testing including concrete destructive and non destructive tests.
 ACI & ASTM specialty in using through supervision & proposals.
PROFESSIONAL EXPERIENCE
Program QA/QC engineer, Saudi Arabian Parsons – SAPL, Riyadh, KSA February 2015 – Present
Ministry of Housing (MOH).
Key Responsibilities:
 Monitor quality status is 21 MOH projects (Medinah & Tabouk areas) through regular monthly reports enhance
quality of projects by pointing out to possible ways of improvement & submit officially to MOH.
 Regular site visits and audits for MOH projects showing current progress status and areas where corrective
actions is needed.
 Monthly Technical presentation to MOH Staff.
 Evaluation of bidder’s quality management system with respect to their prequalification of similar projects,
quality manuals and required quality team for each project through their organization chart.
 Prequalification process for building’s developers.
 Develop procedures manual for MOH supervision discipline.
 Develop Field and Source Testing manual for related infrastructure activities in MOH projects.
 Work with MOH engineers and supervision department to develop project standard quality plan and control
process.
 Evaluation of acceptance and rejection criteria for factories producing GRP, RC, VC and HDPE pipes before giving
final recommendation to Client (MOH).
 Pre-delivery inspection to quality process in factories delivering materials to be used in site varies from MEP work
to concrete batching plants.
Career Civil Engineer/Construction
MOHAMED Elsayed
Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com
Mobile: +966.592336933
2
Civil Engineer QA/QC, Saudi Diyar Consultants - SDC, Riyadh, KSA February 2013 – January2015
Key Projects to Credit:
TADAWUL TOWER
43 floors, 200 m height state-of-the-art, world-class, intelligent, recognizable
And sustainable high rise tower for Tadawul real estate headquarters, containing creative and smart
Offices, high availably data center, training facilities, supporting services and amenities.
Project located in King Abdullah Financial district KAFD with gross floor area 138,834 m2.
 PROJECT MANAGEMENT: Mace International limited
 CLIENT : Tadawul Real Estate
 LEAD Consultant and Engineer : Nikken Sekkei Ltd ,Japan.
 Compliance Consultant: Saudi Diyar Consultants.
 Contractor : SAMSUNG –CCE JV

Key Responsibilities:
 Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the
best solution as per project specifications and design.
 Inspecting and analyzing the proposed construction project and paying attention to detail and
technical accuracy for excavation, dewatering, foundation work (raft-pile caps), piles head trimming
and treatment, water proofing, super structural elements (slab-columns- beams-shear wall).
 Monitoring, managing and directing the assigned project resources to overcome “triple constraints”—
project scope, time and cost. Approved submittals and quality control inspections instruction.
 Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to
envisaged time-frames.
 Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work
completed) and reports on project progress and other project specific information, to take curative
actions in case of variance.
 Establishing, developing stable and reliable business connections with general contractor, sub-
contractors and other project team members to determine and optimize progress and plan future
activities.
 Coordinating with the contractors and client, observing a policy of open communication to reduce risk
significantly.
 Following QMS through applying ITPS in project supervision activities
MOHAMED Elsayed
Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com
Mobile: +966.592336933
3
Civil Engineer, Saudi Diyar Consultants - SDC, Riyadh, and KSA March 2012 – Feb 2013
Key Project to Credit:
Layaly Compound,
With 15,000 m2 total area, consists of 56 villas (3 types), Gym (multi purpose) & driver's quarters
Each villa is 3 levels.
CLIENT : Cayan Real estate development & investment.
Designer : Saudi Diyar Consultants (SDC).
Cost : 150 Million Saudi Riyal
Key Responsibilities:
 Coordinating with the contractors and client, observing a policy of open communication to reduce risk
significantly
 Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work
completed) and reports on project progress and other project specific information, to take curative
actions in case of variance.
 Correct implementation of ITPS & MS through construction phase.
 Collaboration of detecting any non conformance work until its closure with proper corrective action.
 Inspecting and analyzing the proposed construction project and paying attention to detail and
technical accuracy for excavation, dewatering, foundation work, water proofing, super structural
elements (slab-columns- beams-shear wall).
 Monitoring, managing and directing the assigned project resources to overcome “triple constraints”—
project scope, time and cost. Approved submittals and quality control inspections instruction.
 Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to
envisaged time-frames.
 Following up applying HSE plan in construction activities.
Civil Engineer, Saudi Diyar Consultants - SDC, Jeddah, KSA August 2010 – February 2012
Key Projects to Credit:
Zahran Business Center
14 story commercial /office building, the plot area is 1,291 m2 & total build up area 106,687 m2
Consists of 2 basements (car parking), mezzanine & 10 typical floors
 PROJECT MANAGEMENT: Masharea project management
 CLIENT : Zahran real estate development & investments
 Construction cost : 84 Million $
 Designer : Saudi Diyar Consultants (SDC)
MOHAMED Elsayed
Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com
Mobile: +966.592336933
4
Key Responsibilities:
 Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the
best solution as per project specifications and design.
 Inspecting and analyzing the proposed construction project and paying attention to detail and
technical accuracy for excavation, dewatering, foundation work (raft-pile caps), piles head trimming
and treatment, water proofing, super structural elements (slab-columns- beams-shear wall).
 Monitoring, managing and directing the assigned project resources to overcome “triple constraints”—
project scope, time and cost. Approved submittals and quality control inspections instruction.
 Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to
envisaged time-frames.
 Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work
completed) and reports on project progress and other project specific information, to take curative
actions in case of variance.
 Establishing, developing stable and reliable business connections with general contractor, sub-
contractors and other project team members to determine and optimize progress and plan future
activities.
 Coordinating with the contractors and client, observing a policy of open communication to reduce risk
significantly
Civil Engineer, Arab Contractors (Osman Ahmed Osman) Cairo, Egypt March 2008 - July 2010
Key Projects Handled:
Contract No.5 (Helwan waste water treatment plant)
Extension and rehabilitation of old plant to produce 550,000 m3/day of treated water
 CONSULTANT : Envirosivic and Dorch GMBH
 CLIENT : Holding company of water and waste water
 Cost : 150 Millions $
 Designer : Dorch GMBH
Key Responsibilities:
 Handled technical, supervisory and organizational structure of grate removal tank, primary and
secondary sedimentation tanks, thickeners tanks, screens, drying beds tanks & transformers buildings
and in-charge of day-to-day management of zone with 64 fed
 Provided office support for previous buildings in planning and execution of the designs from
transportation, site development, hydraulic, environmental, and structural and geotechnical aspects.
 Prepared all associated calculations, reports and spreadsheets, ensured the project runs to time and
budget and is safe to work on.
 Liaised with and directed the work of sub-contractors employed on the project and assured quality of
workmanship.
MOHAMED Elsayed
Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com
Mobile: +966.592336933
5
 Dealt skillfully with a diverse range of people including clients, architects, other engineering
professionals, sub-contractors and members of the educational institute.
 Coordinated between various areas, planned, organized and managed construction works in addition
to technical follow up.
 Arranged for delivery times of materials to coincide with various stages of the building process,
prepared the monthly progress reports and monthly payment certificate for the management.
EDUCATION
 Helwan University, Cairo, Egypt
B.Sc. in Civil Engineering (2007)
Graduation Project:
 Structural analysis
 Other Trainings & Certifications:
 ACI Concrete Construction Special Inspector (certification ID #01212797).
 ACI Concrete Field Testing Technician-Grade I (certification ID #01212797).
 Core course for fresh graduated site engineers (3 levels) with Arab Contractors training inst.
 Basic course for Safety and Environmental engineers with Arab Contractors training inst.
 AutoCAD 2D and Sap 2000 Egyptian Engineers Syndicate
PERSONAL DETAILS
 Date of Birth: 24 February 1984
 Nationality: Egypt
 Marital status: Married
 Visa Status: Residency Visa (Non-Transferable)
 Driving License: Egypt/Saudia Arabia
 Languages Known: English (very good), Arabic (native) & German (Fair)
 Saudi council of engineers: Registered
 Egyptian engineers syndicate: Registered

More Related Content

What's hot

Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Fergani
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)Pinak Biswas
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015Suresha Rao
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitaeSALEM MOHAMMED
 
CV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimCV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimMowafaq Al Braim
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNationalLaboratory
 
Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hani Ahmed
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesJamie Morien
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلصMohamed Hablas
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016Derek Swift
 

What's hot (18)

Tarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CVTarek Gamil El Fergani_CV
Tarek Gamil El Fergani_CV
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
 
Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016Jamie Morien CV FEB 2016
Jamie Morien CV FEB 2016
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
CV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimCV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-Braim
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
 
Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)
 
Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Mining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project OutcomesMining Project Management Systems: Driving Predictable Project Outcomes
Mining Project Management Systems: Driving Predictable Project Outcomes
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
NM_CV1
NM_CV1NM_CV1
NM_CV1
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Resume Gp
Resume GpResume Gp
Resume Gp
 

Viewers also liked

Human population and the environment
Human population and the environmentHuman population and the environment
Human population and the environmentIJAS AHAMMED
 
Gastronomia bejarana
Gastronomia bejaranaGastronomia bejarana
Gastronomia bejarana3sanagus
 
СПИД и его профилактика
СПИД и его профилактикаСПИД и его профилактика
СПИД и его профилактикаKsenya Petrunina
 
Programa mejora innovacion
Programa mejora innovacionPrograma mejora innovacion
Programa mejora innovacionAlina Contreras
 
Best currency report
Best currency  reportBest currency  report
Best currency reportNiharika Jain
 
FAD products in India (part i) by jayshah316
FAD products in India (part i) by jayshah316FAD products in India (part i) by jayshah316
FAD products in India (part i) by jayshah316Jay Shah
 
2nate has passed 50 million toman
2nate has passed 50 million toman2nate has passed 50 million toman
2nate has passed 50 million tomansheida mirjahani
 
Manifiesto de Médicos por la Vida contra el Aborto Terapeutico en Perú
Manifiesto de Médicos por la Vida contra el Aborto Terapeutico en PerúManifiesto de Médicos por la Vida contra el Aborto Terapeutico en Perú
Manifiesto de Médicos por la Vida contra el Aborto Terapeutico en PerúProvida Arequipa
 
Data mining to combine sensor information to improve oestrus detection
Data mining to combine sensor information to improve oestrus detectionData mining to combine sensor information to improve oestrus detection
Data mining to combine sensor information to improve oestrus detectionClaudia Kamphuis
 
Review of Information Security Concepts
Review of Information Security ConceptsReview of Information Security Concepts
Review of Information Security Conceptsprimeteacher32
 

Viewers also liked (13)

Human population and the environment
Human population and the environmentHuman population and the environment
Human population and the environment
 
Gastronomia bejarana
Gastronomia bejaranaGastronomia bejarana
Gastronomia bejarana
 
СПИД и его профилактика
СПИД и его профилактикаСПИД и его профилактика
СПИД и его профилактика
 
Programa mejora innovacion
Programa mejora innovacionPrograma mejora innovacion
Programa mejora innovacion
 
Best currency report
Best currency  reportBest currency  report
Best currency report
 
FAD products in India (part i) by jayshah316
FAD products in India (part i) by jayshah316FAD products in India (part i) by jayshah316
FAD products in India (part i) by jayshah316
 
2nate has passed 50 million toman
2nate has passed 50 million toman2nate has passed 50 million toman
2nate has passed 50 million toman
 
Manifiesto de Médicos por la Vida contra el Aborto Terapeutico en Perú
Manifiesto de Médicos por la Vida contra el Aborto Terapeutico en PerúManifiesto de Médicos por la Vida contra el Aborto Terapeutico en Perú
Manifiesto de Médicos por la Vida contra el Aborto Terapeutico en Perú
 
Transfondo azul-1
Transfondo azul-1Transfondo azul-1
Transfondo azul-1
 
Data mining to combine sensor information to improve oestrus detection
Data mining to combine sensor information to improve oestrus detectionData mining to combine sensor information to improve oestrus detection
Data mining to combine sensor information to improve oestrus detection
 
Lab tools grade 3
Lab tools grade 3Lab tools grade 3
Lab tools grade 3
 
G3 pics
G3 picsG3 pics
G3 pics
 
Review of Information Security Concepts
Review of Information Security ConceptsReview of Information Security Concepts
Review of Information Security Concepts
 

Similar to M.elsayed CV (20)

CV
CVCV
CV
 
CV2015
CV2015CV2015
CV2015
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
QS - CV
QS - CVQS - CV
QS - CV
 
RESUME
RESUMERESUME
RESUME
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
CV
CVCV
CV
 
Project Manager.pdf
Project Manager.pdfProject Manager.pdf
Project Manager.pdf
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
Update CV
Update CVUpdate CV
Update CV
 
Jamal Oklah CV
Jamal Oklah CVJamal Oklah CV
Jamal Oklah CV
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
Shiva Prasad Mayya - CV
Shiva Prasad Mayya - CVShiva Prasad Mayya - CV
Shiva Prasad Mayya - CV
 
Ahmed Kurdi-CV
Ahmed Kurdi-CVAhmed Kurdi-CV
Ahmed Kurdi-CV
 
CV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-BraimCV - Sr Manager- Mowafaq Al-Braim
CV - Sr Manager- Mowafaq Al-Braim
 
Manickam - CV
Manickam - CVManickam - CV
Manickam - CV
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 

M.elsayed CV

  • 1. MOHAMED Elsayed Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com Mobile: +966.592336933 1 OBJECTIVE A civil engineer with 8 years of proven track record of supervision and execution, QA/QC of reinforced concrete heavy civil structures in a variety of environments and infrastructure varies from waste water treatment plants to pipe lines of different purposes, including successfully delivery of schemes through the planning process and completion of construction. Seeking a Civil, QA/QC Engineer position with a progressive organization to amalgamate skills into a synergy of change, growth and profit. KEY SKILLS  Construction Plans (Conceptualizing, Designing &Detailing, Engineering, Managing, Surveying).  Planning & Implementation, Client Development, Target Setting/Achievement.  Project Testing & Commissioning, Turnkey Commercial Works, Engineering Resources.  Technology Management, Financial & Resource Management, Contractual & Client Negotiations.  Costing, Cost Control, Tender Management, Time Management & Manpower Resourcing, Reading Specs and Codes.  Communication & Interpersonal Networking, Conflict Resolution, Group Dynamics, Synergy.  MS Office, MS Operating Systems, SAP 2000, AutoCAD, Codes & ACI certified.  Materials testing including concrete destructive and non destructive tests.  ACI & ASTM specialty in using through supervision & proposals. PROFESSIONAL EXPERIENCE Program QA/QC engineer, Saudi Arabian Parsons – SAPL, Riyadh, KSA February 2015 – Present Ministry of Housing (MOH). Key Responsibilities:  Monitor quality status is 21 MOH projects (Medinah & Tabouk areas) through regular monthly reports enhance quality of projects by pointing out to possible ways of improvement & submit officially to MOH.  Regular site visits and audits for MOH projects showing current progress status and areas where corrective actions is needed.  Monthly Technical presentation to MOH Staff.  Evaluation of bidder’s quality management system with respect to their prequalification of similar projects, quality manuals and required quality team for each project through their organization chart.  Prequalification process for building’s developers.  Develop procedures manual for MOH supervision discipline.  Develop Field and Source Testing manual for related infrastructure activities in MOH projects.  Work with MOH engineers and supervision department to develop project standard quality plan and control process.  Evaluation of acceptance and rejection criteria for factories producing GRP, RC, VC and HDPE pipes before giving final recommendation to Client (MOH).  Pre-delivery inspection to quality process in factories delivering materials to be used in site varies from MEP work to concrete batching plants. Career Civil Engineer/Construction
  • 2. MOHAMED Elsayed Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com Mobile: +966.592336933 2 Civil Engineer QA/QC, Saudi Diyar Consultants - SDC, Riyadh, KSA February 2013 – January2015 Key Projects to Credit: TADAWUL TOWER 43 floors, 200 m height state-of-the-art, world-class, intelligent, recognizable And sustainable high rise tower for Tadawul real estate headquarters, containing creative and smart Offices, high availably data center, training facilities, supporting services and amenities. Project located in King Abdullah Financial district KAFD with gross floor area 138,834 m2.  PROJECT MANAGEMENT: Mace International limited  CLIENT : Tadawul Real Estate  LEAD Consultant and Engineer : Nikken Sekkei Ltd ,Japan.  Compliance Consultant: Saudi Diyar Consultants.  Contractor : SAMSUNG –CCE JV  Key Responsibilities:  Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the best solution as per project specifications and design.  Inspecting and analyzing the proposed construction project and paying attention to detail and technical accuracy for excavation, dewatering, foundation work (raft-pile caps), piles head trimming and treatment, water proofing, super structural elements (slab-columns- beams-shear wall).  Monitoring, managing and directing the assigned project resources to overcome “triple constraints”— project scope, time and cost. Approved submittals and quality control inspections instruction.  Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to envisaged time-frames.  Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) and reports on project progress and other project specific information, to take curative actions in case of variance.  Establishing, developing stable and reliable business connections with general contractor, sub- contractors and other project team members to determine and optimize progress and plan future activities.  Coordinating with the contractors and client, observing a policy of open communication to reduce risk significantly.  Following QMS through applying ITPS in project supervision activities
  • 3. MOHAMED Elsayed Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com Mobile: +966.592336933 3 Civil Engineer, Saudi Diyar Consultants - SDC, Riyadh, and KSA March 2012 – Feb 2013 Key Project to Credit: Layaly Compound, With 15,000 m2 total area, consists of 56 villas (3 types), Gym (multi purpose) & driver's quarters Each villa is 3 levels. CLIENT : Cayan Real estate development & investment. Designer : Saudi Diyar Consultants (SDC). Cost : 150 Million Saudi Riyal Key Responsibilities:  Coordinating with the contractors and client, observing a policy of open communication to reduce risk significantly  Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) and reports on project progress and other project specific information, to take curative actions in case of variance.  Correct implementation of ITPS & MS through construction phase.  Collaboration of detecting any non conformance work until its closure with proper corrective action.  Inspecting and analyzing the proposed construction project and paying attention to detail and technical accuracy for excavation, dewatering, foundation work, water proofing, super structural elements (slab-columns- beams-shear wall).  Monitoring, managing and directing the assigned project resources to overcome “triple constraints”— project scope, time and cost. Approved submittals and quality control inspections instruction.  Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to envisaged time-frames.  Following up applying HSE plan in construction activities. Civil Engineer, Saudi Diyar Consultants - SDC, Jeddah, KSA August 2010 – February 2012 Key Projects to Credit: Zahran Business Center 14 story commercial /office building, the plot area is 1,291 m2 & total build up area 106,687 m2 Consists of 2 basements (car parking), mezzanine & 10 typical floors  PROJECT MANAGEMENT: Masharea project management  CLIENT : Zahran real estate development & investments  Construction cost : 84 Million $  Designer : Saudi Diyar Consultants (SDC)
  • 4. MOHAMED Elsayed Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com Mobile: +966.592336933 4 Key Responsibilities:  Analyzing documentation, detailed instructions, and drawings and evaluating results to choose the best solution as per project specifications and design.  Inspecting and analyzing the proposed construction project and paying attention to detail and technical accuracy for excavation, dewatering, foundation work (raft-pile caps), piles head trimming and treatment, water proofing, super structural elements (slab-columns- beams-shear wall).  Monitoring, managing and directing the assigned project resources to overcome “triple constraints”— project scope, time and cost. Approved submittals and quality control inspections instruction.  Controlling the project life-cycle, pro-actively monitoring project schedule to enforce adherence to envisaged time-frames.  Collecting metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) and reports on project progress and other project specific information, to take curative actions in case of variance.  Establishing, developing stable and reliable business connections with general contractor, sub- contractors and other project team members to determine and optimize progress and plan future activities.  Coordinating with the contractors and client, observing a policy of open communication to reduce risk significantly Civil Engineer, Arab Contractors (Osman Ahmed Osman) Cairo, Egypt March 2008 - July 2010 Key Projects Handled: Contract No.5 (Helwan waste water treatment plant) Extension and rehabilitation of old plant to produce 550,000 m3/day of treated water  CONSULTANT : Envirosivic and Dorch GMBH  CLIENT : Holding company of water and waste water  Cost : 150 Millions $  Designer : Dorch GMBH Key Responsibilities:  Handled technical, supervisory and organizational structure of grate removal tank, primary and secondary sedimentation tanks, thickeners tanks, screens, drying beds tanks & transformers buildings and in-charge of day-to-day management of zone with 64 fed  Provided office support for previous buildings in planning and execution of the designs from transportation, site development, hydraulic, environmental, and structural and geotechnical aspects.  Prepared all associated calculations, reports and spreadsheets, ensured the project runs to time and budget and is safe to work on.  Liaised with and directed the work of sub-contractors employed on the project and assured quality of workmanship.
  • 5. MOHAMED Elsayed Riyadh, Saudia Arabia Email: Mohamed_ali_civil@hotmail.com Mobile: +966.592336933 5  Dealt skillfully with a diverse range of people including clients, architects, other engineering professionals, sub-contractors and members of the educational institute.  Coordinated between various areas, planned, organized and managed construction works in addition to technical follow up.  Arranged for delivery times of materials to coincide with various stages of the building process, prepared the monthly progress reports and monthly payment certificate for the management. EDUCATION  Helwan University, Cairo, Egypt B.Sc. in Civil Engineering (2007) Graduation Project:  Structural analysis  Other Trainings & Certifications:  ACI Concrete Construction Special Inspector (certification ID #01212797).  ACI Concrete Field Testing Technician-Grade I (certification ID #01212797).  Core course for fresh graduated site engineers (3 levels) with Arab Contractors training inst.  Basic course for Safety and Environmental engineers with Arab Contractors training inst.  AutoCAD 2D and Sap 2000 Egyptian Engineers Syndicate PERSONAL DETAILS  Date of Birth: 24 February 1984  Nationality: Egypt  Marital status: Married  Visa Status: Residency Visa (Non-Transferable)  Driving License: Egypt/Saudia Arabia  Languages Known: English (very good), Arabic (native) & German (Fair)  Saudi council of engineers: Registered  Egyptian engineers syndicate: Registered